bus testing program

65
Bus Testing Program Operated by: Thomas D. Larson, Pennsylvania Transportation Institute Altoona Bus Testing and Research Center Pennsylvania Transportation Institute College of Engineering The Pennsylvania State University Federal Transit Administration’s Steering Committee Meeting March 28 th , 2013 University Park, PA

Upload: amir-clark

Post on 03-Jan-2016

38 views

Category:

Documents


0 download

DESCRIPTION

Federal Transit Administration’s. Bus Testing Program. Steering Committee Meeting March 28 th , 2013 University Park, PA. Operated by: Thomas D. Larson, Pennsylvania Transportation Institute Altoona Bus Testing and Research Center Pennsylvania Transportation Institute - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Bus Testing Program

Bus Testing Program

Operated by:Thomas D. Larson, Pennsylvania Transportation Institute

Altoona Bus Testing and Research CenterPennsylvania Transportation Institute

College of EngineeringThe Pennsylvania State University

Federal Transit Administration’s

Steering Committee Meeting

March 28th, 2013

University Park, PA

Page 2: Bus Testing Program

Purpose of Meeting

• Steering committee members include:– Transit bus manufactures– Transit industry manufacturers– Transit agency professionals– Experts from national labs– FTA Personnel

• Meeting objectives:– Review current program– Suggest improvements to tests, policies and procedures– Present and discuss MAP-21 changes

Page 3: Bus Testing Program

Altoona Bus Research and Testing Center

2237 Old Route 220 N

Duncansville, PA

Page 4: Bus Testing Program

LTI’s Full-Scale Research Facility (Test Track)

Vehicle Testing Laboratory

Research Laboratory and Office

Vehicle Handling Area

Entrance (Test Track Road)

Rock Road

Brake Slope

Vehicle Durability Track

Dynamometer

Rail-Guided Crash Test Facility

Large Impact Pendulum

Bus Lane

Pavement Durability Track

Page 5: Bus Testing Program

The Bus Testing Law

• STURRA– Established center (1989)– Required testing of new model buses to be purchased with Federal funding– Established test categories

(based on early 1980’s First Article Bus Testing Plan, i.e., White Book)

• ISTEA – Provided 80% test fee funded by FTA– Provided 20% test fee funded by entity having vehicle tested– Expanded test categories

• TEA21– Provided funding until 2004

• SAFETEA-LU– Provides continued funding

• MAP-21– Establishes pass/fail requirement

Page 6: Bus Testing Program

Definition of a Bus?

• 49 Code of Federal Regulations, part 665.5– “a rubber-tired automotive vehicle used for the

provision of mass transportation service by or for a recipient.”

Page 7: Bus Testing Program

Testing Determinations

• Independent of testing center

• Made by FTA– FTA Program Manager: Mr. Greg Rymarz– Reasonable approach based on “family of

vehicles”– Consistent, qualified engineering support

• Booz Allen & Hamilton

Page 8: Bus Testing Program

Full Testing

• Explicitly required when a new bus model has not been tested previously at the Altoona Bus Research and Testing Center

Page 9: Bus Testing Program

Partial Testing

• Applies to previously-tested models only

• Required for– “Major change in chassis or components”

• Might be required when a change– Potentially impacts structural integrity– Potentially impacts safety characteristics

Page 10: Bus Testing Program

Altoona’s Testing Plan

• Standardized

• Based on minimum expected vehicle service life or mileage

• Minimum performance criteria proposed

• Mandated pass/fail provision

• In addition to FMVSS requirements

Page 11: Bus Testing Program

The Tests

• Eight evaluation categories– Maintainability– Reliability– Safety-Braking– Performance– Structural Integrity

and Durability– Fuel Economy– Noise– Emissions

Page 12: Bus Testing Program

Data Reported

• Comprehensive Final Test Report– Comprehensive report for each model tested– Format standardized for ease of comparison

between competing models– Objective results– Pass/fail provision mandated by MAP-21– Descriptions of all problems/failures

encountered– Data intended for use during procurement

process

Page 13: Bus Testing Program

Test Report Format

Page 14: Bus Testing Program

Web Dissemination of Test Results

• Web-based Information Management System– Currently

maintaining web presence

– Contains test data from all reports

– Queries for specific, cross-referenced data

– Allows statistical analysis www.altoonabustest.orgwww.altoonabustest.org

Page 15: Bus Testing Program

Web Update

• Administrative site allows timely updates by authorized personnel.

Page 16: Bus Testing Program

Web Presence

Page 17: Bus Testing Program

Web Database

• Capabilities include the ability – To select and

compare bus models

– To apply multiple filters to a search

Page 18: Bus Testing Program

Bus Models Tested

Since its inception, the test center has completed testing of 410 buses.Since its inception, the test center has completed testing of 410 buses.

Number of Buses

Service-Life Category

162

12-Year, 500,000 mile

65 10-Year, 350,000 mile

114 7-Year, 200,000 mile

19 5-Year, 150,000 mile

50 4-Year, 100,000 mile

As of March 31, 2008

Page 19: Bus Testing Program

Electric/HEV Buses Tested

• Hybrid-Electric– Advanced Vehicle Systems (AVS)(Capstone Turbine)– Ebus (Capstone Turbine)– Northrup Grumman Advanced Technology Transit Bus (ATTB)– Orion VI (BAE Systems)– Transteq (Ecomark Shuttle)

• Vehicle performance severely limited testing– New Flyer/Allison– Gillig/Allison– Trolley Enterprises/SK International– New Flyer/ISE Research– Azure– Orion– Gillig– DesignLine

• Battery-Electric– Advanced Vehicle Systems (AVS-22)– Ebus– Proterra

• Dual-Mode – Neoplan Dual-Mode DMA/Skoda

Page 20: Bus Testing Program

Failures Encountered

• Majority of failures encountered– Chassis/structure– Suspension– Engine/drive train– Exhaust/emissions– Electrical– Air conditioning/heating– Brakes– Steering– Fuel Systems– Seats/Lifts/Doors/Windows

Page 21: Bus Testing Program

Examples of Failures

Page 22: Bus Testing Program

Examples of Failures

Page 23: Bus Testing Program

Quantity and Class of Failures

Class 1: Potential for Serious Injury or Crash 41

Class 2: Bus inoperable causing interruption in revenue service

172

Class 3: Bus operational but must be removed from service until repaired

4,497

Class 4: Degrades operation, may be repaired during next scheduled service interval

4,164

Total Number of Failures: 8,874

Based on data from 410 buses completing structural durability test. Based on data from 410 buses completing structural durability test.

As of March 31, 2008

Page 24: Bus Testing Program

An Ambitious Beginning

• Technical and regulatory changes since 1990(ADA, Clean Air, etc.)

– Deployment of new technologies• Alternative fuels/Fuel cells• Battery and hybrid-electric buses• Advanced materials-SS and light weight composites• Electronic controls/multiplexed systems• Advanced engines (diesel, gas, turbine, etc.)• Advanced after-treatment including urea injection, SCR catalysts, etc.

– Evaluating new technologies• Bus testing played prominent role

– Identifying “teething” problems– Helping to correct problems early in production cycle– Emissions testing– Brake testing– Pass/fail criteria

Page 25: Bus Testing Program

Safety Benefits

• Detect defects directly related to safety of transit-riding publicExamples:– Bus Fires– Cracked CNG cylinder support brackets

• High-pressure fuel cylinder detachment

– CNG fuel system cracks/leaks– Fuel tank leaks– Fire detection/suppression system failures– High current electrical short circuits– Broken steering/suspension components

• Loss of vehicle control

Page 26: Bus Testing Program

Making a Positive Impact

• Testing raises the bar– Requires better reliability and performance

• Manufacturers– Opportunity to correct deficiencies (without

public disclosure)

• Transit agencies – Use test results to

• Manage risk during procurement• Modify maintenance schedules

Page 27: Bus Testing Program

Expansion of Testing Program

• Facility Modifications Since 2000– Accommodate new tests– Accommodate advanced technology buses

• New Facilities– Brake slope– Emissions Lab– Battery testing/simulation

• Power processing systems

– Hydrogen fueling station• Completed spring 2006

Page 28: Bus Testing Program

Bus Maintenance and Testing Facility

• Vehicle Testing Laboratory (2004)

– 10,000 ft2 heated maintenance/testing area– Large-roll (72-in diameter) dynamometer

• Schenck-Pegasus (Horiba Automotive Test Systems)

• Electronic inertial simulation– Battery/electric drive test area

• Aerovironment AV-900 power processing system

• Environmental Chamber for full-scaleBattery pack testing

– Emissions testing laboratory

Page 29: Bus Testing Program

Regulatory Changes

• FTA Final Rule Published October 5th 2009 Testing of Overloaded Buses Emissions and Brake Testing

• FTA Withdrew the 175lb per person requirement in December 2012

• MAP-21 Requires Pass/Fail

• Federal Register: 49 CFR Part 665

• Go to : www.regulations.gov to view or post comments to the docket

Page 30: Bus Testing Program

Proposed Changes to tests

• Perform fuel economy tests on chassis dynamometer.

• Replace current fuel economy cycles (CBD, Arterial, Commuter) with cycles used for emissions tests: (Manhattan, Orange County, and UDDS)

Page 31: Bus Testing Program

Bus Testing—Into the Future

• Predicting continued significant advancement in new bus technologies (i.e., Bus Rapid Transit)– Driving Factors

• Safety and security• Better performance, efficiency, reliability• Enhanced service• Advancements in materials systems• Increased integration of advanced systems

• Anticipating future changes in industry

• Looking forward to meeting challenges

• Bus Testing Steering Committee

Page 32: Bus Testing Program

Information

Greg Rymarz, FTA Program ManagerPhone: 202-366-6410Email: [email protected]

•David J. Klinikowski, Program DirectorPhone: 814-863-1898Email: [email protected]

•Robert R. Reifsteck, Altoona ManagerPhone: 814-695-4067Email: [email protected]

Page 33: Bus Testing Program

Brake Testing Update

Larson Transportation Institute Bus Research and Testing Center

Steering Committee Meeting

Allen Homan27 March 2013

Page 34: Bus Testing Program

Mid-Sized Buses

Page 35: Bus Testing Program

Full-Size Buses

Page 36: Bus Testing Program

Current Equipment

Page 37: Bus Testing Program

Proposed System

Page 38: Bus Testing Program

Questions?

Allen Homan(814) 863-8011

[email protected]

Page 39: Bus Testing Program

Emissions Testing Update

Larson Transportation Institute Bus Research and Testing Center

Steering Committee Meeting

Dr. Suresh Iyer27 March 2013

Page 40: Bus Testing Program

Overview

• 2005 – Decided on concept of full scale dilution tunnel

• 2006 – Finalized specifications

• 2007 - Identified potential suppliers

• 2008 – Placed orders

• 2009 – Modified facilities, equipment delivered and

commissioned

• 2010 – Started emissions tests on buses

• 2011 – Received ISO 17025 laboratory accreditation from A2LA

• 2010 to 2012 – Performed emissions tests on 44 buses

Page 41: Bus Testing Program

Buses Tested

Year Tested

Fuel Type Bus Type

Diesel CNG Gasoline Propane Artic 40’ 30’ Cutaway

2010 7 4 2 0 0 4 2 7

2011 8 6 2 1 1 3 1 12

2012 4 7 2 1 0 6 0 8

Total 19 17 6 2 1 13 3 27

44 44

2010-2012

Page 42: Bus Testing Program

Specifications

Chassis Dyno

• 300 HP (absorb/deliver)

• Large roll (72 inches)

• 25 tons inertia

• 80 mph

• Simulated road load

Emissions Equipment

• Full scale dilution

• CO2, CO, Nox, NO, THC, CH4, particulates

• Diesel, gasoline, CNG, propane, LNG, ethanol, hybrid energy

• Driver aid

Page 43: Bus Testing Program

Capabilities

• Gaseous Emissions (dilute continuous, dilute bag, and raw)– CO2

– CO– THC and CH4

– NOx and NO

• Particulates (PM)– Secondary air conditioned for dilution

• Up to 3 phases in one test

• Fuel consumption by carbon balance

Page 44: Bus Testing Program

Advantages

• Less sensitive to ambient conditions– Conditioned air to dilution tunnel– Conditioned air to engine intake

• Two banks of emissions analyzers– Simultaneous dilute and raw exhaust measurements

(check)– Reliability

• Large roll (dyno) reduces tire flexure (and tire heating) during tests

• Absorbed power (dyno) is fed back into the grid

Page 45: Bus Testing Program

Heavy-Duty Dynamometer

EGSC
I think it is well accepted that most modern engines are producing smaller particulates.
Page 46: Bus Testing Program

Emissions Testing Facility-Overview

Page 47: Bus Testing Program

Midsize Bus under Test

Page 48: Bus Testing Program

Midsize Bus under Test

Page 49: Bus Testing Program

40’ Bus under Test

Page 50: Bus Testing Program

40’ Bus under Test

Page 51: Bus Testing Program

Test Cycles

Manhattan Cycle, Average speed 7 mph

Orange County CycleAverage speed 12 mph

Page 52: Bus Testing Program

Test Cycles

UDDS CycleAverage speed 19 mph

Page 53: Bus Testing Program

Failed Exhaust After-Treatment System: Diesel

Concretion of urea in dosing section before catalyst

Urea powder of the type found exiting tail pipe

Page 54: Bus Testing Program

Failed Exhaust After-Treatment System: CNG

Ceramic substrate intact Failed ceramic substrate missing

Page 55: Bus Testing Program

Failed Exhaust After-Treatment System: CNG

Muffler opened upPieces of failed ceramic substrate

found in muffler

Page 56: Bus Testing Program

Comparative Test with WVU Equipment

• Compared with WVU Transportable Chassis Dyno and Emissions Lab

• Simultaneous data collection and independent analysis– Analyzer results were within experimental error

– Mobility and reliability of WVU system resulted in delays during set up and testing

– Stationary PSU system is automated and easy to operate

Page 57: Bus Testing Program

Uncertainty in Emissions Measurement

• Summer project 2012

• Experimental uncertainty only

• Relate sub-system uncertainty

• Three methods– Raw exhaust - continuous– Dilute exhaust - continuous– Dilute bag – collected during test

• Manuscript of a journal paper in progress

Page 58: Bus Testing Program

Future

• Investigate sensitivity of species to method of measurement

• Ammonia and NO2 analyzers

• Upgrade to 500 HP dyno

Page 59: Bus Testing Program

Questions?

Dr. Suresh Iyer(814) 865-2327

[email protected]

Page 60: Bus Testing Program

Battery Application Technology Testing

Energy Research Laboratory (BATTERY)

Timothy Cleary28 March 2013

Page 61: Bus Testing Program

BATTERY

Battery Application Technology Testing Energy Research Laboratory

Focuses on the development and testing of advanced battery systems

Page 62: Bus Testing Program

BATTERY Projects

• Thermal Management, SOC and SOH Estimation of a Large format Lithium-Titanate Battery System Designed for Heavy Vehicle Applications with Fast Charging Sponsor: U.S. Dept. of Transportation/Mineta National Transit Research Consortium

• Thermal Design Validation, Control Optimization and Energy Storage Evaluation of an Experimental Electric LocomotiveSponsor: U.S. Dept. of Transportation/Norfolk Southern

• Bus Testing Support – Future Battery Safety / Crash Testing

Page 63: Bus Testing Program

BATTERY Facilities

• AeroVironment - AV900 & ABC150

Bi-Directional Load Capability

AV900 ABC 150

Power +/- 250kW +/- 125kW

Current+/- 1000

ADC+/- 530 ADC

Voltage8 to 900

VDC8 to 495 VDC

Page 64: Bus Testing Program

BATTERY Facilities

• ESPEC – Walk-in Temperature & Humidity Control• Temperature Range: -65 to 85°C

• Humidity Range: 95 to 10 % RH (temp dependent)

• 9’ x 7’ x 7.8’ Interior Dimensions

Page 65: Bus Testing Program

Questions?

Mr. Timothy Cleary(814) 865-0500

[email protected]