 Energy Saving

 Performance

Contracting

Smart Growth/Smart EnergySmart Growth/Smart Energy

December 7, 2007December 7, 2007

Page 2: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 2/38

Introduction to session

Promote and deliver

cost-effective energy

efficiency outcomes

Page 3: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 3/38

Page 4: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 4/38

What is the  Energy Services Coalition?

• Goal is to Assist with Performance

Contracting

• Cooperative Between Customers andEnergy Services Companies (ESCo’s)

• Helpful Website with Tools to get youStarted 

 –

www.energyservicescoalition.org

Page 5: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 5/38

Information

www.mass.gov/doer

“Energy Management Services”

Page 6: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 6/38

Introduction to Speakers

•  Jerry Drummond 

•  Kathy Stanley• Steve Lisauskas

Page 7: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 7/38

 Jerry Drummond 

Page 8: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 8/38

What is Performance Contracting?

Performance contracts install energy

efficient facility improvements, with no up front cost, paid for out of

 guaranteed energy savings from yourexisting operating budget.

Performance contracts install energy

efficient facility improvements, with

 no up front cost, paid for out of

 guaranteed energy savings from yourexisting operating budget.

Page 9: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 9/38

Energy Services Company

Develop Design Finance Construct Maintain

ESCo

Page 10: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 10/38

Page 11: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 11/38

Performance Contracting  Core Components

• Technical

• Financial

• Contractual

Page 12: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 12/38

Technical

• Lighting

• Lighting controls

• Motors replacement• Energy management

system installation and

optimization• Variable frequency

drives

• Hot water reset

• Control valves for boilers

• Water conservation• Plug load controls

(including PCs)

• Boiler replacement

• Green/renewabletechnologies

Page 13: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 13/38

Financial

• Where does the money come from?

• Existing budget neutral

• Energy

• Maintenance

• Capital improvement

• Rebates and incentives

• Municipal Lease or Other 

Page 14: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 14/38

Project Funding

Operational Budget

Utility

 Maintenance Technology

Communications

Capital Budget

Technology

 Infrastructure

Upgrades

 Facilities

 Infrastructure

Upgrades

The Savings Buckets…

Page 15: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 15/38

Operating Budget=$1m

Page 16: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 16/38

Operating Budget=$1m

Page 17: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 17/38

How is it paid for?

$0

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

$700,000

$800,000

$900,000

$1,000,000

CurrentSituation

InstallationPeriod

Program Years1-10

Post ProgramYears 11+

Excess Savings

Program Cost

Utility Payment

Page 18: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 18/38

Contractual• How can you buy this?

• How do we measure success?

• Guarantees• When do you start to pay?

• What happens if….?

Hotter/Colder  Energy prices change

Add buildings

Eliminate buildings

Schedule changes

Page 19: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 19/38

Getting Started

• Organize a team

ProcurementBudget and finance

Technical

Legal

Page 20: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 20/38

Springfield Project

Customer Name: City of Springfield 36 Court StreetSpringfield, MA 0113

Owner’s Representative: Patrick SullivanDirector of Parks andRecreation

Contact Information: (413) 787-6444

Page 21: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 21/38

Springfield Project

Project Size: $15,000,000Municipal Bond 

Guaranteed Savings: $1,174,843 Annually

Utility Rebate: $600,000+

Page 22: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 22/38

Springfield Project

Scope of Work: Boilers – High EfficiencyCondensing Steam

Lighting Retrofits & ControlsCentralized Energy Management SystemCogenerationPool Cover 

Air Handler Replacement & Repair Centralized Computer Network Controller Heating System ImprovementsPlug Load Controls

Page 23: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 23/38

 Kathy Stanley

Page 24: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 24/38

Getting Started

• Self Assessment – Critical Path

Drives Site Selection

Drives Technical Issues

Drives Calculating SavingsPrevents “Cream Skimming”

Page 25: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 25/38

Prepare An Energy Baseline

• Do this  first 

Include all energy types

Detail and summary by Btu

Include Square Footage in Calcs

Get your benchmarks

• Allocate Resources or Outsource for

speed 

Page 26: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 26/38

Use Your Baseline

• Identify Problem Areas

• Save Money Now!

Clean up billing issues

Clean up meter issues

Fix “no capital required” problems

Skim your own cream

Page 27: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 27/38

Avoid Bumps in the Road

• Before you start:

Internal agreement on financing strategy and financial

 parameters of the project Realistic expectations

Involve a representative from all departments, i.e.

 purchasing, legal, facilities, accounting, finance

Designate a project manager who is committed to seeing the

 project through

Page 28: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 28/38

Avoid Bumps in the Road

• Selecting a Partner (ESCO)

Follow your procurement law and process

Keep careful notes and document as much as possible Place a high priority on firms with a strong, successful

team

Check references diligently and document Ask questions several different ways, look for

consistency

Be sure you meet and interview the actual personnelworking on your project

Page 29: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 29/38

Avoid Bumps in the Road

• Negotiating the contract

Be clear about construction project structure, i.e. fixed

 price vs. cost plus Close the scope definition before beginning negotiations

Be clear about savings sources

Be specific about deadlines for deliverables and enforce

them

Check all measurement and verification specifics, check

all engineering calculations for sound engineering practice

Page 30: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 30/38

Steve Lisauskas

Page 31: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 31/38

Where We Started

$0

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

   B  a   l   l   i  e   t   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   B  o

   l  a  n   d ,

   E   d  w  a  r   d   P   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   B  r   i   d  g  e   A

  c  a   d  e  m  y ,

   E  a  s   t  e  r  n   A  v  e  n  u  e   C

  a  m  p  u  s

   B  r  o  o   k   i  n  g  s   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   C  e  n   t  r  a   l   H   i  g   h

   S  c   h  o  o   l

   C   h  e  s   t  n  u   t

   S  c   h  o  o   l

   D  e   b  e  r  r  y   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   D

  r  y   d  e  n   M  e  m  o  r   i  a   l   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   E   L   L   S ,

   M  a  r  g  a  r  e   t   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   G  e  r  e  n  a   C  o  m  m  u  n   i   t  y

   S  c   h  o  o   l

   G   l   i  c   k  m  a  n   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   H   i  g   h

   S  c   h  o  o   l  o   f   S  c   i  e  n  c  e  a  n   d   T  e  c   h

  n  o   l  o  g  y

   I  n   d   i  a  n   O  r  c   h  a  r   d   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   K  e  n  s   i  n  g   t  o  n   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   L   i   b  e  r   t  y   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   M  a  r  y   L  y  n  c   h   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   P  o   t   t  e  n  g  e  r   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   R  e

   b  e  c  c  a   J  o   h  n  s  o  n   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   S  u  m  n  e  r   A  v  e   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   V  a  n   S   i  c   k   l  e   M   i   d   d   l  e   S  c   h  o  o   l   S  p  r   i  n  g   f   i  e   l   d   H   i  g   h

   S  c   h  o  o   l

   W  a  s   h   i  n  g   t  o  n   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

   Z  a  n  e   t   t   i   E   l  e  m  e  n   t  a  r  y

   S  c   h  o  o   l

Current Cost Proposed Cost

Page 32: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 32/38

What did we get?• 60+ Boilers

• Centralized Energy Management System

• Infrastructure Revitalization

• Improved Learning and Work Environment

• Strategic Energy Plan

• Long Term Partnership with Guaranteed

Financial and Technical Accountability

Page 33: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 33/38

What Savings Are Expected

• Over $ 2,000,000 in Annual Energy Savings

• Hundreds of Thousands of Dollars in

Maintenance and Other Operating CostReductions

• Preventive Maintenance vs. Repair Based • $15,000,000+ in Reduced Capital Spending

• All Annual Positive Cash Flow is Springfield’sto Keep

Page 34: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 34/38

Page 35: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 35/38

• Emission Reductions (Metric Tons)

137,748 of carbon dioxide 215 of sulfur dioxide

140 nitrogen oxide

Impacts for the Program Term

Page 36: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 36/38

Equivalent Impact for  Program Term

29,762 Passenger Cars off road

Page 37: C6_mchughe

8/14/2019 C6_mchughe

http://slidepdf.com/reader/full/c6mchughe 37/38

Equivalent Impact for  Program Term

41,413 planted acres of trees

Page 38: C6_mchughe