c7ea610e28e0f5b4e040007f0100549d

18
part of Aker © 2009 Aker Solutions Aker Oilfield Services Short Introduction

Upload: ninguem2222222

Post on 18-Jan-2016

1 views

Category:

Documents


0 download

DESCRIPTION

example for vessel types

TRANSCRIPT

Page 1: c7ea610e28e0f5b4e040007f0100549d

part of Aker

© 2009 Aker Solutions

Aker Oilfield Services Short Introduction

Page 2: c7ea610e28e0f5b4e040007f0100549d

There is a need for solutions and capacity for cost efficient subsea well services

40%

25%

Gap in recovery from subsea fields

Releasing lost / trapped production subsea is by far the most cost effective production increase (IOR) initiative;

• No infrastructure investment required • Fully integrated solutions provides limited resource requirements

Page 3: c7ea610e28e0f5b4e040007f0100549d

AKOFS vessel portfolio

Skandi Santos • Delivered from the yard in December 2009

• On five year contract with Petrobras (+5 years option)

• Scope of service: Installation and retrieval of subsea

trees and modules using SOES and fibre rope

deployment system

• Operational in Brazil since March 2010 with more than

250 operations performed

Skandi Aker • Delivered from the yard in May 2010

• Topside & subsea commissioning and testing ongoing

• Ready for subsea well intervention services 2012

Aker Wayfarer • Delivered from the yard in October 2010

• Sister ship to Skandi Aker

• Vessel is prepared for IMO MODU code

• Currently operation in the construction market

• It will take ~18 months once the decision is made until

the vessel can operate in the LWI market

Skandi Santos

Aker Wayfarer Skandi Aker

Aker

Wayfarer

Skandi

Aker

Skandi Aker

Skandi Santos

Aker Wayfarer

Slide 3 March 3rd, 2011

Page 4: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 4

AKOFS Subsea Well Service Vessels – Main Features

■ Largest monohull well intervention vessels in the

market

● Sized to house deep water riser intervention

system, wireline and coiled tubing spread plus

a well test package

■ Safe intervention on DP

● Tension systems catering for large drive and

drift off’s without risk of compensator lock up

or pressure control rig up hitting drill floor

■ Innovative Upper riser system

● Use of submerged flow and safety head with

low pressure telescopic joint facilitating

building of wireline / coiled tubing toolstrings

in non heaving environment

■ Integral fluid & pumping systems

● 400 m3 mixing system

● 45 m3 bulk storage

● 400 m3 fluid storage + 1000 m3 drillwater

● 3 HP pumps + 1 chemical injection pump

■ State of art 450 tonnes module handling system

● Automated handling systems minimizing

manual handling

Page 5: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 5

Vessel Outfitting

■ Two off AHC Marine Cranes

● 400 t AHC main crane

● 50 t AHC secondary crane

■ Dual Work ROV Systems (3rd Optional System)

● One centre moonpool and one side door

LARS

■ 450 t derrick and module handling system

■ 7 3/8” LRP, riser and workover control system

■ Integral fluid & pumping systems

■ Choke / kill manifold, flare boom, deluge system,

utilities and permanent pipework facilitating hook-

up of well test plant

Page 6: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 6

Marine Cranes

■ 400 t AHC Main Crane

● 285 t @ 2000 m

● 4 anti heeling tanks

● Under deck winch

■ 50 t AHC Crane

● 25 t @ 2000 m

Page 7: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 7

ROV and LARS Systems

■ Perry Slingsby Triton XLS 150

● 2 heavy duty work class ROVs

● One centre moonpool and one side

door LARS

● Depth Rating 3000 m

● Tether: 350 m

● Optional obs ROV system in through

second side door

Page 8: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 8

Module Handling System

■ 450 t Derrick and Module

Handling System

● AHC drawwork

● Riser tension system

● Top tension system (for

tension frame)

● Moonpool hatch and cursor

system

● Operating control cabin

housing all key operators

Page 9: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 9

Moonpool

■ 7,2 x 7,2 m Moonpool

■ Skiddable center door with light

wing hatches, false rotary and riser

hangoff capability

■ Lower cursor frame guiding

equipment in moonpool for safe

launch and recovery

■ Drill floor can be elevated providing

20 m free stack up height

LOWER CURSOR FRAME

Page 10: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 10

Cargo Rail Crane – Riserhandling

■ Cargo rail crane with lifting yoke for

riser handling

■ 7t winch for handling of other cargo

■ 16 m handling radius

■ Pre programmed for pick up and

delivery of riser to catwalk

Page 11: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 11

Fluid & Pumping Systems

■ 3 HP pumps

■ 1 HP CI pump

■ 1500 m3 fluid storage

■ 450 m3 fluid mixing

system

■ 45 m3 bulk storage

■ Fluid return system incl

choke / kill manifold,

shaker, degasser

Page 12: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker to edit this text Slide 12

■ State of art module handling system with automation of

critical operations minimizing manual handling

■ Redundant SIL 2 ESD / Shutdown system

■ Riser and upper tension system with 65 ft stroke and no

risk of compensator lock up

■ Deck skidding system covering entire deck of vessel for

safe handling of cargo with minimal lifts

■ Integral fluid and pumping systems minimizing non

permanent pressurized pipework

■ Operating control cabin housing key operators

with optimal communication

■ Submerged flow & safety head enabling

building of wireline and coiled tubing

toolstrings in non heaving environment. No

planned manrider operations

■ Large deck space facilitating placement of well

test plant in safe distance from other critical

systems

Key Safety Features Skandi Aker

Page 13: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker

Light Well Intervention Riser System

Sub-systems:

● Upper riser section

■ Upper riser valves and rams

■ Interfaces with vessel

● High Pressure Riser

■ HP monobore riser joints

■ Riser circulation umbilical

● Lower Riser Package (LRP)

■ EDP - Emergency Disconnect Package

■ WCP - Well Control Package

● Workover Control System (WOCS)

■ Electro-hydraulic control umbilicals & reels

■ Subsea Power and Communication unit

■ WOCM - subsea Workover Control Module

Page 14: c7ea610e28e0f5b4e040007f0100549d

Aker Solutions can offer a complete solution for cost efficient regular maintenance of subsea wells

■ Wireline

■ Coiled Tubing

■ Well Test & Clean Up

■ SURF Installation

■ Tophole Drilling

Tower Cabin

Onshore Support Centre Customer Operations Centre

WL/CT Specialists

Page 15: c7ea610e28e0f5b4e040007f0100549d

Wireline Services

■ Full slick and electric line range on cables

● Slickline 0.125”

● Braided 7/32”

● E-line 7/32” – 5/16” – 7-46”

■ Access to Wireline Tractor and applications

● Scale Removal

● Honing

● Hydraulic shifting of sleeves

● Change out of gas lift valves (GLV)

■ Full range of cased hole tools

● PLT

● Casing Evaluation

● Perforation

● Zonal isolation

■ Rig up length: unlimited

■ Will run all third party and company provided tools

■ Run from control chair in tower cabin

● Wireline and Tractor from same chair by same operator

■ Real time data transfer available

Page 16: c7ea610e28e0f5b4e040007f0100549d

Coiled Tubing Services

■ All sizes up to 2 3/8” OD

● Sizes defined by operation

■ Full pumping capacity

● 4” flowline from choke and kill manifold to CT reel

● 4” flowline from mixing and pump installation bellow deck.

■ N2 service

● Cryonic tanks on deck

● Pressure, pump rate and N2 volume can be adjusted to fit all wells

■ Will run all third party and company provided tools

■ Rig up length: Unlimited

■ Run from control chair in tower cabin

● Pumping controlled from same cabin

● Work station for third party available in tower cabin

■ Real time data transfer available

Page 17: c7ea610e28e0f5b4e040007f0100549d

Well Test and Clean Up Services

■ Vessel is ready prepared for

mobilizing of well test unit

on aft deck

■ Well test unit will be

mobilized on basis of client /

project needs

■ Vessel is certified for "oil on

deck" and manifolds and

piping is pre-laid and EX-

zones are defined

accordingly

■ Zone classification

performed

■ Overall ESD / F&G /

Shutdown System

Page 18: c7ea610e28e0f5b4e040007f0100549d

© 2009 Aker Solutions part of Aker Slide 18

The Worlds First Fully Fledged Intervention

Vessel from Aker Solutions is already a reality…