Aker Oilfield Services Short Introduction
There is a need for solutions and capacity for cost efficient subsea well services
40%
25%
Gap in recovery from subsea fields
Releasing lost / trapped production subsea is by far the most cost effective production increase (IOR) initiative;
• No infrastructure investment required • Fully integrated solutions provides limited resource requirements
AKOFS vessel portfolio
Skandi Santos • Delivered from the yard in December 2009
• On five year contract with Petrobras (+5 years option)
• Scope of service: Installation and retrieval of subsea
trees and modules using SOES and fibre rope
deployment system
• Operational in Brazil since March 2010 with more than
250 operations performed
Skandi Aker • Delivered from the yard in May 2010
• Topside & subsea commissioning and testing ongoing
• Ready for subsea well intervention services 2012
Aker Wayfarer • Delivered from the yard in October 2010
• Sister ship to Skandi Aker
• Vessel is prepared for IMO MODU code
• Currently operation in the construction market
• It will take ~18 months once the decision is made until
the vessel can operate in the LWI market
Skandi Santos
Aker Wayfarer Skandi Aker
Aker
Wayfarer
Skandi
Aker
Skandi Aker
Skandi Santos
Aker Wayfarer
Slide 3 March 3rd, 2011
© 2009 Aker Solutions part of Aker Slide 4
AKOFS Subsea Well Service Vessels – Main Features
■ Largest monohull well intervention vessels in the
market
● Sized to house deep water riser intervention
system, wireline and coiled tubing spread plus
a well test package
■ Safe intervention on DP
● Tension systems catering for large drive and
drift off’s without risk of compensator lock up
or pressure control rig up hitting drill floor
■ Innovative Upper riser system
● Use of submerged flow and safety head with
low pressure telescopic joint facilitating
building of wireline / coiled tubing toolstrings
in non heaving environment
■ Integral fluid & pumping systems
● 400 m3 mixing system
● 45 m3 bulk storage
● 400 m3 fluid storage + 1000 m3 drillwater
● 3 HP pumps + 1 chemical injection pump
■ State of art 450 tonnes module handling system
● Automated handling systems minimizing
manual handling
© 2009 Aker Solutions part of Aker Slide 5
Vessel Outfitting
■ Two off AHC Marine Cranes
● 400 t AHC main crane
● 50 t AHC secondary crane
■ Dual Work ROV Systems (3rd Optional System)
● One centre moonpool and one side door
LARS
■ 450 t derrick and module handling system
■ 7 3/8” LRP, riser and workover control system
■ Integral fluid & pumping systems
■ Choke / kill manifold, flare boom, deluge system,
utilities and permanent pipework facilitating hook-
up of well test plant
© 2009 Aker Solutions part of Aker Slide 6
Marine Cranes
■ 400 t AHC Main Crane
● 285 t @ 2000 m
● 4 anti heeling tanks
● Under deck winch
■ 50 t AHC Crane
● 25 t @ 2000 m
© 2009 Aker Solutions part of Aker Slide 7
ROV and LARS Systems
■ Perry Slingsby Triton XLS 150
● 2 heavy duty work class ROVs
● One centre moonpool and one side
door LARS
● Depth Rating 3000 m
● Tether: 350 m
● Optional obs ROV system in through
second side door
© 2009 Aker Solutions part of Aker Slide 8
Module Handling System
■ 450 t Derrick and Module
Handling System
● AHC drawwork
● Riser tension system
● Top tension system (for
tension frame)
● Moonpool hatch and cursor
system
● Operating control cabin
housing all key operators
© 2009 Aker Solutions part of Aker Slide 9
Moonpool
■ 7,2 x 7,2 m Moonpool
■ Skiddable center door with light
wing hatches, false rotary and riser
hangoff capability
■ Lower cursor frame guiding
equipment in moonpool for safe
launch and recovery
■ Drill floor can be elevated providing
20 m free stack up height
LOWER CURSOR FRAME
© 2009 Aker Solutions part of Aker Slide 10
Cargo Rail Crane – Riserhandling
■ Cargo rail crane with lifting yoke for
riser handling
■ 7t winch for handling of other cargo
■ 16 m handling radius
■ Pre programmed for pick up and
delivery of riser to catwalk
© 2009 Aker Solutions part of Aker Slide 11
Fluid & Pumping Systems
■ 3 HP pumps
■ 1 HP CI pump
■ 1500 m3 fluid storage
■ 450 m3 fluid mixing
system
■ 45 m3 bulk storage
■ Fluid return system incl
choke / kill manifold,
shaker, degasser
© 2009 Aker Solutions part of Aker to edit this text Slide 12
■ State of art module handling system with automation of
critical operations minimizing manual handling
■ Redundant SIL 2 ESD / Shutdown system
■ Riser and upper tension system with 65 ft stroke and no
risk of compensator lock up
■ Deck skidding system covering entire deck of vessel for
safe handling of cargo with minimal lifts
■ Integral fluid and pumping systems minimizing non
permanent pressurized pipework
■ Operating control cabin housing key operators
with optimal communication
■ Submerged flow & safety head enabling
building of wireline and coiled tubing
toolstrings in non heaving environment. No
planned manrider operations
■ Large deck space facilitating placement of well
test plant in safe distance from other critical
systems
Key Safety Features Skandi Aker
© 2009 Aker Solutions part of Aker
Light Well Intervention Riser System
Sub-systems:
● Upper riser section
■ Upper riser valves and rams
■ Interfaces with vessel
● High Pressure Riser
■ HP monobore riser joints
■ Riser circulation umbilical
● Lower Riser Package (LRP)
■ EDP - Emergency Disconnect Package
■ WCP - Well Control Package
● Workover Control System (WOCS)
■ Electro-hydraulic control umbilicals & reels
■ Subsea Power and Communication unit
■ WOCM - subsea Workover Control Module
Aker Solutions can offer a complete solution for cost efficient regular maintenance of subsea wells
■ Wireline
■ Coiled Tubing
■ Well Test & Clean Up
■ SURF Installation
■ Tophole Drilling
Tower Cabin
Onshore Support Centre Customer Operations Centre
WL/CT Specialists
Wireline Services
■ Full slick and electric line range on cables
● Slickline 0.125”
● Braided 7/32”
● E-line 7/32” – 5/16” – 7-46”
■ Access to Wireline Tractor and applications
● Scale Removal
● Honing
● Hydraulic shifting of sleeves
● Change out of gas lift valves (GLV)
■ Full range of cased hole tools
● PLT
● Casing Evaluation
● Perforation
● Zonal isolation
■ Rig up length: unlimited
■ Will run all third party and company provided tools
■ Run from control chair in tower cabin
● Wireline and Tractor from same chair by same operator
■ Real time data transfer available
Coiled Tubing Services
■ All sizes up to 2 3/8” OD
● Sizes defined by operation
■ Full pumping capacity
● 4” flowline from choke and kill manifold to CT reel
● 4” flowline from mixing and pump installation bellow deck.
■ N2 service
● Cryonic tanks on deck
● Pressure, pump rate and N2 volume can be adjusted to fit all wells
■ Will run all third party and company provided tools
■ Rig up length: Unlimited
■ Run from control chair in tower cabin
● Pumping controlled from same cabin
● Work station for third party available in tower cabin
■ Real time data transfer available
Well Test and Clean Up Services
■ Vessel is ready prepared for
mobilizing of well test unit
on aft deck
■ Well test unit will be
mobilized on basis of client /
project needs
■ Vessel is certified for "oil on
deck" and manifolds and
piping is pre-laid and EX-
zones are defined
accordingly
■ Zone classification
performed
■ Overall ESD / F&G /
Shutdown System
© 2009 Aker Solutions part of Aker Slide 18
The Worlds First Fully Fledged Intervention
Vessel from Aker Solutions is already a reality…