cable entries and flexible cable sealing system power
TRANSCRIPT
www.hauff-technik.de
Always. Reliable. Tight.
POWER STATION GROSSENKNETEN
CABLE ENTRIES AND FLEXIBLE CABLE SEALING SYSTEM
22
Cable entries and flexible cable sealing system
NATURAL GAS PROCESSING PLANT
Power plant Grossenkneten
Cable entry system KES-M 150 with pressure tight connection to theconcreted wall insert HSI 150-K2.
Precise alignment of the KES-M 150 system and the pipe sockets at the top of the finished floor level. Precise alignment with the top level of the flooring can be achieved by cutting to length the pipe sockets.
Cable entry system KES-M 150 as water pressure tight and flexible lead through the bottom slab.
Cable entry system KES-M 150 with spacer for fixation andpositioning of the hose bundels.
Cable entry system KES-M 150 with renovation wall sleeve SFR. Leadthrough the planned bottom slab for a pressure tight empty ductconnection to the cable pits and for continuative laying in the groundof power and control cables.
Hauff-Technik GmbH & Co. KG
Robert-Bosch-Straße 989568 Hermaringen, GERMANY
Tel. +49 7322 1333-0Fax +49 7322 1333-999
www.hauff-technik.de
The
info
rmat
ion
in t
his
pam
ph
let
is b
ased
on
ou
r cu
rren
t te
chn
ical
kn
ow
led
ge
and
exp
erie
nce
. Th
is d
oes
no
t re
leas
e p
roce
sso
rs a
nd
use
rs f
rom
th
e re
spo
nsi
bili
ty o
f co
nd
uct
ing
th
eir
ow
n c
hec
ks a
nd
tra
ils d
ue
to t
he
nu
mb
er o
f p
oss
ible
infl
uen
ces
in t
he
pro
cess
ing
an
d u
se o
f o
ur
pro
du
cts.
We
will
rep
lace
all
par
ts t
hat
are
un
usa
ble
bec
ause
of
def
ecti
ve m
ater
ials
. No
rep
lace
men
t fo
r d
efec
ts a
risi
ng
du
rin
g t
ran
spo
rt o
r st
ora
ge
or
du
e to
imp
rop
er in
stal
lati
on
an
d t
hei
r co
nse
qu
ence
s.kr
aftw
erk
_gro
ssen
knet
en_e
n_1
8031
2
Project information and solutions provided by Hauff-Technik
FACTS
The construction of a combined power-heat generation facility was started in October 2012 with a planed performance of 30 MW electrical and 80 tons steam. Gas is driving a giant turbine which is moving the generator. The so occuring hot exhaust is used to generate the steam required for the production process via the heat exchange device. The power plant is supplying the electricity for the natural gas processing plant and the compressor station. The total volume of investment was at approx. 65 Mio Euro and the plant was launched in 2014.For wall penetrations HSI 150-K2 wall entries with different sizes were installed. Connection at the wall and floor areas were done with the flexible cable entry system KES-M 150 and the Hateflex spiral hose. Cable entry systems are ideal for achieving optimized and pressure tight empty duct connections at buildings/manholes, to penetrate bottom slabes and to act as additional ducts for later use. The KES-M 150 and the renovation wall sleeve SFR allowed to built special floor penetrations to achieve the required floor level height and pressure tight penetrations.
PROJECT INFORMATION
Location 26197 GroßenknetenVor dem Esch
Construction company Fa. Köster GmbH49080 Osnabrück
Engineering ILF beratende Ingenieure Münchenberatend: Ing. Büro IMN, Müller und Nümann, 29313 Hambühren
SOLUTIONS PROVIDED BY HAUFF-TECHNIK
Specification cable entries, cable sealing systems
Requirement pressure tight duct system through the bottom slab/flooring
Products used double wall insert HSI 150-K2flexible cable sealing system KES-M150 withflexible pressure tight rubber sleeve connections and Hateflex spiral hose 14150renovation wall sleeve SFR