    THE VISTA

    Structural Calcularions

    * ADDITION STEEL BEAM AT CLUBHOUSE (Rev.01)

    Submitted by : Tacheng Metal Co.

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    2/44

    BackgroundThe Vista is a high-rise condominium development located in Ho Chi Minh City, Vietnam. The faadeconsists of numerous cladding systems, in accordance with the architectural intent.

    This report consists of the revision of structural check of additional beam at second storey made to supportcurtainwall.

    The structural checks are for faade elements only. The adequacy of building structures supporting thesefaade systems is to be verified by structural engineers separately.

    Design Criteria

    Design Referencesa. Project Specificationsb. BS 6399 - Design Loading for Buildingc. BS 5950 - Structural Use of Steelwork in Buildingsd. AS 1288 Glass in Buildings-Selection and Installatione. WONJIN Stud Anchor WSA Design Data (attached)

    Material SpecificationsStructural steel, Grade 43 fy = 275 N/mm2

    E = 2.0 x 105 N/mm2

    Design Loadings

    Dead Load

    Glass gl = 27 kN/m3

    Wind Load

    -1.72kPa, +1.29kPa

    Serviceability Limit

    Permissible Deflection Under Service Load

    Steel span/240Glass Panel span/90, not exceeding 20mm

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    3/44

    Additional beam

    Dead load, DL = 12mm thick glass + fixings + framing (20% glass load)= 1.2x0.012x27x6= 2.33kN/m

    Wind suction, WL = 1.72x6= 9.98kN/m

    Wind pressure, W L = 1.29x6= 7.74kN/m

    SAP2000 Model

    Nodes diagram

    Model extrude view

    The upper column end is released vertically withvertical slot hole for vertical tolerance.

    All beams are designed wind pinned ends by released in bending moment,(refer frame released assignment table)

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    4/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    5/44

    Loading condition

    Dead load vertical force= 1.2x0.012x27x6.0= 2.33kN/m

    Dead load moment due toeccentricity= 1.2x0.012x27x6.0x0.43

    = 1.003kNm/m

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    6/44

    Wind load in Y direction

    Pressure in windward;

    Suction in side wall

    Wind load in X direction

    Pressure in windward;

    Suction in side wall

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    7/44

    Load combinations

    Thermal expansion force= 60 oC

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    8/44

    Member fail ratio

    Member fail ratio = 0.921 at notched part < 1.0 OK

    Member code checking

    NOTE: Member UB300x175x14x9 is referred to the notched member UB300x300x14x9 notched 125mm

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    9/44

    Deflection

    Maximum dead load deflection = 1.48mm < lesser of 5500/240 or 20mm< 20mm - OK

    Maximum thermal expansion = 4.2mm < lesser of 6000/300 or 20mm< 20mm - OK

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    10/44

    Maximum wind load deflection = 14.8mm < lesser of 5500/240 or 20mm

    < 20mm - OK

    Maximum wind load deflection = 12.9mm < lesser of 5500/240 or 20mm

    < 20mm - OK

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    11/44

    Connection Design

    Connection between beam UB300x300 and column UB250x250 & UC300x300 to UB300x300

    All beams is designed pinned-pinned,Max. beam end force:Shear in major, Vx = 38.4kNShear in minor, Vy = 12.2kN

    Axial, N = 26.7kNTorsion, T = 3.85kNm

    Steel angle 100x100x6@150mm length

    SS bolt M12

    Beam to column flange

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    12/44

    Bolt connected to beam webBolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPaTensile strength of bolt, pt = 374MPaBolt area, A = 245mm2No. of bolt = 2

    Shear force per bolt, V = [(38.42+26.72)0.5/2]/2 - double shear= 11.69kN

    Shear capacity of bolt, Vc = 245x311/1000= 76.2kN > V - OK

    Bolt connected to main web or column flangeBolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPaTensile strength of bolt, p t = 374MPaBolt area, A = 157mm2No. of bolt = 4Shear force per bolt, V = [(38.42+12.22)0.5/4

    = 10.07kNShear capacity of bolt, Vc = 157x311/1000

    = 48.8kN > V - OKTension force per bolt, V = 26.7/4+38.4x0.05/(2x0.1)

    = 16.28kNTension capacity of bolt, Vc= 157x374/1000

    = 58.7kN > T - OK

    Combined strength = 0.48 < 1.4 - OK

    SS bolt M12

    SS bolt M12

    Steel angle 100x100x6@150mm length

    Steel angle 100x100x6@150mm length

    Beam to column web

    Beam to beam

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    13/44

    Reaction force

    Connection A

    Connection B

    Connection C

    Connection C

    Connection A

    Connection D

    Connection D

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    14/44

    Column bottom end connection (Connection A)Fx = 11.43kNFy = 1.71kNFz = 33.62kN (Compression)Mx = 4.95kNMy = 36.65kNm

    Welding to base 12mm thick base plateConservatively consider only the welding at bolt flange end,Welding strength = 220MPaWelding throat size = 0.7X9

    = 6.3mmWelding length = 2x250

    = 500mmLongitudinal stress = {[11.43x103/(500x6.3)]2+[1.71x103/(500x6.3)]2}0.5

    = 6.32MPaTransverse strength, ptc = 220MPa

    Transverse stress, pt = 36.65x106/[2(250x6.33/12+1252x250x6.3)/125]+4.95x106/[2(6.3x2503/12)/125]= 130.8MPa

    Transverse strength, ptc = 1.25x220= 275MPa

    Combined stress = 6.32/220+130.8/275= 0.504 < 1.0 - OK

    9mm fillet weldis structurally adequate.

    WSA M20 stud boltShear force per anchor, V = [(11.432+1.712)0.5/6

    = 1.93kNShear capacity of anchor = min(26.4x1.46x1.65, 34.27)

    = 34.27kN > V - OKPull-out force per anchor, P = 4.95/(3x0.4)+37.65x0.4/[2x(0.42+0.22)]-33.62/6

    = 36.17kNTensile capacity of anchor = min(52.6x1.46x0.83x1.0, 54.4)

    = 54.4kN > P - OKCombined capacity = 1.93/34.27+36.17/54.4

    = 0.721 < 1.2 - OKHence 6 x WSA M20 stud boltis adequate.

    Full fillet weld 9mm

    Steel plate 500x500x12mm400mm

    200mm

    200mm

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    15/44

    Bracket for beam end (Connection B)Slot hole is provided for the connection between the cantilever beam to the main beam to allow for thermalexpansion,Vertical shear, Vv = 37.41kNPull-out force, P = 85.08kNMoment, M = 1.02kNm

    Welding to base 12mm thick base plateWelding strength = 220MPaWelding throat size = 0.7X9

    = 6.3mmWelding length = 2x250

    = 500mmLongitudinal stress = 37.41x103/(500x6.3)

    = 11.88MPaTransverse strength, ptc = 220MPa

    Transverse stress, pt = 1.02x106/[2(250x6.33/12+1252x250x6.3)/125]+85.05x103/(500x6.3)= 29.6MPa

    Transverse strength, ptc = 1.25x220= 275MPa

    Combined stress = 11.99/220+29.6/275= 0.162 < 1.0 - OK

    9mm fillet weldis structurally adequate.

    WSA M20 stud boltShear force per anchor, V = 37.41/6

    = 6.24kNShear capacity of anchor = min(26.4x1.46x1.65, 34.27)

    = 34.27kN > V - OKPull-out force per anchor, P = 1.02x0.4/[2x(0.42+0.22)]+85.08/6

    = 15.2kNTensile capacity of anchor = min(52.6x1.46x0.83x1.0, 54.4)

    = 54.4kN > P - OKCombined capacity = 6.24/34.27+15.2/54.4

    = 0.461 < 1.2 - OKHence 6 x WSA M20 stud boltis adequate.

    400mm

    200mm

    12mm think plate

    500mm

    Full fillet weld 9mm @ both flange.Since the moment force is less than thatfor connection A, 9mm weld is adequate.

    4x bolt M16 with horizontal slot

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    16/44

    Bracket for beam end (Connection C)Vertical shear, Vv = 12.83kNHorizontal shear, VH = 31.42kNPull-out force, P = 34.65kN

    Bolt M12 connect the bracket and webBolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPaTensile strength of bolt, pt = 374MPaBolt area, A = 84mm2No. of bolt = 2Shear force per bolt, V = (12.832+34.652)0.5/2

    = 18.47kNShear capacity of bolt, Vc = 245x311/1000

    = 76.2kN > V - OK

    Steel plate 12 mm thickBending moment, M = 31.42x0.05

    = 1.571kNmBending capacity, Mc = 270x122/6x275/106

    = 1.78kNm > M - OK

    10mm welding connecting the steel plate to base plateEffective throat = 7mmZH = 2x2702x7/6 = 170100mm3ZV = (2x73x270/12+2x62x270x7)/6 = 25252.5mm3MH = 0.04x12.83 = 0.513kNm

    MV = 0.04x31.42 = 1.257kNmTransverse stress =1.257x106/25252.5+0.513x106/170100+34.65x103/(7x2x270)

    = 62MPa

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    17/44

    WSA M20 stud bolt,

    Pull out force per anchor, P = 34.65x0.25/(2x0.2)+12.95x0.04/(2x0.22)+31.42x0.04/(2x0.2)= 25.98kN

    Shear force per anchor, Vc = [(12.83/4)2+(31.42/2)2]0.5= 16.03kN

    Tensile capacity of anchor = min(52.6x1.46x0.805x1.0, 54.4)

    = 54.4kN < P - OKShear capacity of anchor = min(26.4x1.46x1.60, 34.27)

    = 34.27kN < V - OKCombined capacity = 25.98/54.4+16.03/34.27

    = 0.95 < 1.2 - OK

    Pull-out force per anchor, P = [(12.83/4)2+(31.42/2)2]0.5= 16.03kN

    Shear force per anchor, V = 34.65x0.25/(2x0.2)+12.95x0.04/(2x0.22)+31.42x0.04/(2x0.2)= 25.98kN

    Tensile capacity of anchor = min(52.6x1.46x0.805x0.97, 54.4)= 54.4kN < P - OK

    Shear capacity of anchor = min(26.4x1.46x1.14, 34.27)= 34.27kN < V - OK

    Combined capacity = 25.98/54.4+16.03/34.27= 1.06 < 1.2 - OK

    Hence 4 x WSA M20 stud bolt is adequate.

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    18/44

    Column top end connection (Connection D)Vertical shear force, Fz = 5.18kN

    Bolt M12 connect the bracket and web

    Bolt used = SS316 Class 70 M20Shear strength of bolt, pv = 311MPa

    Tensile strength of bolt, p t = 374MPaBolt area, A = 84mm2No. of bolt = 2Shear force per bolt, V = 5.18/2

    = 2.59kNShear capacity of bolt, Vc = 245x311/1000

    = 76.2kN > V - OK

    WSA M12 stud bolt,Shear force per anchor, V = 5.18/2

    = 2.59kNShear capacity of anchor = min(12.9x1.46x6.0, 8.12)

    = 8.12kN < Vc - OKHence 2 x WSA M12 stud boltis adequate.

    WSA stud bolt M12

    Steel Angle 125x75x12 @100 mm length

    SS bolt M12 with vertical slot hole

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    19/44

    APPENDIX:

    WONJIN TECHNICAL DATA

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    20/44

    KENSUM ORIENT, INC. 05.Aug.2009

    WONJIN STUD ANCHOR WSA / FOR INFORMATION

    - 1 -

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    21/44

    - 3 -

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    22/44

    - 4 -

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    23/44

    - 5 -

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    24/44

    APPENDIX:

    DETAIL REFERENCE

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    25/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    26/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    27/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    28/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    29/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    30/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    31/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    32/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    33/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    34/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    35/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    36/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    37/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    38/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    39/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    40/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    41/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    42/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    43/44

  • 7/30/2019 Calculation Additional Steel Beam at Clubhse Rev1 300311

    44/44