canal forth clydein scotland

24
At the beginning there were two canals: Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

Upload: winson-ng

Post on 16-Apr-2017

525 views

Category:

Art & Photos


0 download

TRANSCRIPT

Page 1: Canal Forth Clydein Scotland

At the beginning there were two canals:Canal Forth and Clyde was built in 1777 between harbors Grangemouth and Falkirk connecting Glasgow with west cost of Scotland. Canal Union between Falkirk and Edinburgh was finished in 1822. Because of geographical difficulties, which created a difference of 79ft.in elevation, the two canals were connected by 11 locks.

Page 2: Canal Forth Clydein Scotland
Page 3: Canal Forth Clydein Scotland

In 1963, after 150 yrs of existence of this water way with 11 locks the construction of a huge water carousel started. This extraordinary idea was finished in 2002 and became a symbol of Scotland. This invention saves not only time but also energy.

Page 4: Canal Forth Clydein Scotland
Page 5: Canal Forth Clydein Scotland
Page 6: Canal Forth Clydein Scotland

This is the only rotational boat transporter in the world. It has two arms and each arm forms a kind of huge tub filled with water. Boats enter the tub, then the tub locks up and the huge arm starts rotating .

Page 7: Canal Forth Clydein Scotland

lower canallower canal

Page 8: Canal Forth Clydein Scotland

Entrance to lower canalEntrance to lower canal

Page 9: Canal Forth Clydein Scotland

A Boat is approaching the “tub”A Boat is approaching the “tub”

Page 10: Canal Forth Clydein Scotland
Page 11: Canal Forth Clydein Scotland

There are boats in both “tubs” There are boats in both “tubs” upper and lowerupper and lower

35 m35 m

Page 12: Canal Forth Clydein Scotland

Rotation is startingRotation is starting

Page 13: Canal Forth Clydein Scotland

Boats in both rotating armsBoats in both rotating arms

Page 14: Canal Forth Clydein Scotland

rotationrotation

Page 15: Canal Forth Clydein Scotland

Otáčení...Otáčení...

Page 16: Canal Forth Clydein Scotland

Just before “landing”Just before “landing”

Page 17: Canal Forth Clydein Scotland
Page 18: Canal Forth Clydein Scotland
Page 19: Canal Forth Clydein Scotland

Closing the gate , regulation of level of water and “tubs” rotationTakes 15 min. only.

Page 20: Canal Forth Clydein Scotland
Page 21: Canal Forth Clydein Scotland

One “tub” 78ft. Long with water and boat weights about 300 tons. One “tub” 78ft. Long with water and boat weights about 300 tons.

Page 22: Canal Forth Clydein Scotland

The “tubs” are filled according the Archimedes’ Law.So the weight of “tubs” are balanced.

To open the upper and lower lock and turn the whole system by 180◦ they need an engine of 22.5 kW which only use 1.5 kWh

Page 23: Canal Forth Clydein Scotland
Page 24: Canal Forth Clydein Scotland