cascade gateway border atis hugh conroy whatcom council of governments [email protected] tbwg boston, ma...
TRANSCRIPT
Cascade GatewayBorder ATIS
Hugh ConroyWhatcom Council of [email protected]
TBWGBoston, MA
April 13, 2010
Peace Arch, Blaine, Washington
The Cascade Gateway
British Columbia
Washington
Peace Arch -Douglas
Pacific Highway
Lynden - Aldergove
Sumas - Huntingdon
Peace Arch or Pacific Highway?
, WA
SURREY, BC
??
??
PeacePeace Arch Arch
Pacific Pacific HighwayHighway
99
NB: Save 45 minutes at Pac Hwy.SB: Save 8 minutes at Peace Arch.
, WA
SURREY, BC
PeacePeace Arch Arch
Pacific Pacific HighwayHighway
PA….25 minPH….37 min
PA….55 minPH….10 min
Approach to US Primary at Peace Arch POE Approach to US Primary at Peace Arch POE SchematicSchematic
N
Wait-time Estimation
NEXUS Lane
Closed
Closed
Closed
Closed
Closed
48 sec.
72 sec.
(15 sec.)
Average service time:60 sec.
Open primary booth
Closed primary booth
CarATIS loop detector
KEY
Estimation: Queue length is 26 cars.Service rate is 60 seconds per car.Estimated wait time = (26 cars) (60 seconds) = 26 minutes
Variable Message Signs
Southbound Northbound
Northbound ATIS System
Southbound ATIS System
CascadeGatewayData.com
Click for month view
Year Summary
Choose the measurements you wish to display
Click for day view
Month SummaryEasily compare months
Click for delay report
Data can be downloaded into .csv file
Day Summary
Delay Report
Set the threshold for delay
Custom Reports
Any date range
Multiple locations or detectors
Choose data and
measurements
Customized Email Reports
Individuals can have customized reports sent at a certain delay, for specific crossings, to their email.
Custom report admin screen
N
NTruckroute
FASTtruckroute
NEXUS
Std Cars
Bus