case la metro pmis dashboard study - drmcnatty

1
877-367-7990 [email protected] 26300 La Alameda, Ste. 250 Mission Viejo, CA 92691 www.drmcnay.com Overview DRMcNay and Associates, Inc., (DRMcNay) assisted LA Metro to implement a program management system that included Primavera Contract Management, Primavera P6, MLM OPWebtools, Contract Management Interface (CMI) and Ecosys. These tools were further enhanced via data integraon to the LA Metro accounng system. LA Metro has been ulizing these tools to manage their Measure R and other program-wide efforts. Challenges LA Metro idenfied a need to publish select informaon from these data sources in a publicly accessible dashboard The Dashboard content is acvely pulled on a regular basis from the internal PMIS tools (Ecosys, P6 and CM). This informaon must then be reviewed and correcons made prior to public consumpon, and the Dashboard design must provide the tools to publish versions and also track the publicaon informaon for auding purposes. Soluon DRMcNay designed the dashboard interface to pull in key program and detail-level data that can be published as a publicly accessible web-view. Dashboard would consist of simple elements/ portlets, and the data would be published in a clearly defined workflow process. Projects are organized into porolios—currently only CASE STUDY PROJECT AT A GLANCE COMPANY LA Metro LOCATION Los Angeles, California SERVICES PROVIDED Implementaon Training Custom Development HOSTING Hosted: Primavera P6 Contract Management Interface Contract Management EcoSys TECHNOLOGIES USED Contract Management Interface EcoSys Primavera P6 & Primavera Contract Management LA Metro PMIS Dashboard Having hired DRMcNay to implement P6 into their program management system, LA Metro later requested a public interface system (dashboard) where select informaon is presented in a simple to understand format. DRMcNay created a dashboard based on the live informaon in the project management informaon system (PMIS). D R McNatty Platinum Partner represenng Measure R projects, but can be also used to include other projects/porolios. Results LA Metro is now publishing Measure R data to the public. This provides monthly progress reporng to the general public based on live informaon in the PMIS systems, and can also benefit LA Metro internally as a means to audit informaon found in the PMIS systems. To see this soluon live click HERE. To read about how DRMcNay implemented the Program Management Informaon System, read the case study HERE.

Upload: others

Post on 20-Feb-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

[email protected]

26300 La Alameda, Ste. 250Mission Viejo, CA 92691

www.drmcnatty.com

OverviewDRMcNatty and Associates, Inc., (DRMcNatty) assisted LA Metro to implement a program management system that included Primavera Contract Management, Primavera P6, MLM OPWebtools, Contract Management Interface (CMI) and Ecosys. These tools were further enhanced via data integration to the LA Metro accounting system. LA Metro has been utilizing these tools to manage their Measure R and other program-wide efforts.

ChallengesLA Metro identified a need to publish select information from these data sources in a publicly accessible dashboard

The Dashboard content is actively pulled on a regular basis from the internal PMIS tools (Ecosys, P6 and CM). This information must then be reviewed and corrections made prior to public consumption, and the Dashboard design must provide the tools to publish versions and also track the publication information for auditing purposes.

SolutionDRMcNatty designed the dashboard interface to pull in key program and detail-level data that can be published as a publicly accessible web-view. Dashboard would consist of simple elements/portlets, and the data would be published in a clearly defined workflow process. Projects are organized into portfolios—currently only

CASE STUDYPROJECT AT A GLANCE

COMPANY

LA Metro

LOCATION

Los Angeles, California

SERVICES PROVIDED

ImplementationTrainingCustom Development

HOSTING

Hosted:Primavera P6 Contract ManagementInterfaceContract ManagementEcoSys

TECHNOLOGIES USED

Contract Management InterfaceEcoSys Primavera P6 & Primavera Contract Management

LA Metro PMIS DashboardHaving hired DRMcNatty to implement P6 into their program management system, LA Metro later requested a public interface system (dashboard) where select information is presented in a simple to understand format. DRMcNatty created a dashboard based on

the live information in the project management information system (PMIS).

D R McNattyPlatinumPartner

representing Measure R projects, but can be also used to include other projects/portfolios.

ResultsLA Metro is now publishing Measure R data to the public. This provides monthly progress reporting to the general public based on live information in the PMIS systems, and can also benefit LA Metro internally as a means to audit information found in the PMIS systems.

To see this solution live click HERE. To read about how DRMcNatty implemented the Program Management Information System, read the case study HERE.