Case study 22: The Shard London Bridge, Ormandy Group Ltd Client: Mace MEP The Project At just under 310 metres this is the tallest building in Europe. Ormandy’s contract required the supply of packaged pump assemblies, packaged heat exchangers, packaged DHW calorifiers along with heat interface packages. The client’s approach to M&E installations was modelled on the use of offsite manufactured installations from initial concept. The client requirement was to simplify the engineering sequence, improve quality, de-risk the project programme and minimise onsite M&E interfaces. Installations were scheduled for completion 1 month before delivery date. Sign off was carried out at the Ormandy facility. The three main benefits of off-site manufacture identified by the client were: offsite construction de-risks aspects of health and safety onsite, many of the construction interfaces with other building trades such as brick layers, plaster boarders are eliminated manufacturing quality is vastly improved in a controlled factory environment. All trades such as controls, electrical and insulation are completed and verified offsite, this ensures that when the package gets to site it is a complete finished article ready for installation and incorporation into the project built in programme certainty, the offsite elements can be taken off the critical path. The client just needs to control logistics and sequencing. For further information or enquiries, please contact the Ormandy Group on: 01422 350111, email: sales@ ormandyltd.com Benefits Time: the use of offsite manufactured and tested building service installations ensured programme certainty meaning that these components could be taken off the critical path allowing the client to focus on logistics and sequencing Cost: reduced site supervision and management plus reduced labour on site Quality: defect free installations Sustainability: reduced material waste Health and safety: no reported accidents on site, no hot work on site Chilled water pump set package

Upload: others

Post on 23-Jul-2020

21 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case study 22: The Shard London Bridge, Ormandy Group Ltdciria.org/buildoffsite/pdf/Case studies/casestudy_theshard.pdf · Case study 22: The Shard London Bridge, Ormandy Group Ltd

Case study 22: The Shard London Bridge, Ormandy Group Ltd

Client: Mace MEPThe ProjectAt just under 310 metres this is the tallest building in Europe. Ormandy’s contract required the supply of packaged pump assemblies, packaged heat exchangers, packaged DHW calorifiers along with heat interface packages.

The client’s approach to M&E installations was modelled on the use of offsite manufactured installations from initial concept. The client requirement was to simplify the engineering sequence, improve quality, de-risk the project programme and minimise onsite M&E interfaces.

Installations were scheduled for completion 1 month before delivery date. Sign off was carried out at the Ormandy facility.

The three main benefits of off-site manufacture identified by the client were:

�� offsite construction de-risks aspects of health and safety onsite, many of the construction interfaces with other building trades such as brick layers, plaster boarders are eliminated

�� manufacturing quality is vastly improved in a controlled factory environment. All trades such as controls, electrical and insulation are completed and verified offsite, this ensures that when the package gets to site it is a complete finished article ready for installation and incorporation into the project

�� built in programme certainty, the offsite elements can be taken off the critical path. The client just needs to control logistics and sequencing.

For further information or enquiries, please contact the Ormandy Group on: 01422 350111, email: [email protected]

BenefitsTime: the use of offsite manufactured and tested building service installations ensured programme certainty meaning that these components could be taken off the critical path allowing the client to focus on logistics and sequencingCost: reduced site supervision and management plus reduced labour on siteQuality: defect free installationsSustainability: reduced material wasteHealth and safety: no reported accidents on site, no hot work on site

Chilled water pump set package

Page 2: Case study 22: The Shard London Bridge, Ormandy Group Ltdciria.org/buildoffsite/pdf/Case studies/casestudy_theshard.pdf · Case study 22: The Shard London Bridge, Ormandy Group Ltd

Chilled water plate heat exchanger package