CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Upload: joanna-freeman

Post on 28-Dec-2015

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

CDM BASELINE METHODOLOGIES:The devil is in the details

Climate Change Information CenterManila ObservatoryAteneo de Manila University

Page 2: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Contents

I. Importance of baselines in CDM

II. Relevant studies needed in a CDM PDD

III. Baseline methodologiesA. Procedures to determine project additionality

B. Procedures for calculating baseline emissions

C. Simplified methodologies for small-scale projects

IV. Concluding remarks

Page 3: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

I. The Importance of Baselines in CDM

Page 4: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

CDM Project

• Achieves Sustainable Development objectives for the host developing country

• Reduces GHG Emissions

Page 5: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Clean Development Mechanism• Enables developed countries (known as

Annex I countries) to meet their emission reduction commitments in a flexible and cost-effective manner

• Assists developing countries (non-Annex I countries) in meeting their sustainable development objectives

• Investors benefit by obtaining Certificates of Emissions Reductions (CERs)

• Host countries benefit in the form of investment, access to better technology, and local sustainable development

Page 6: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

What is the idea of the CDM?

• Reduce GHG emissions in one countryto permit an equivalent quantity of GHG emissions in another country, without changing the global emission balance.

• Emission Reductions (ERs) must: – Create real, measurable, and long-term benefits related to the

mitigation of climate change. (KP Art. 12.5b)

– Be additional to any that would occur in the absence of the certified project activity. (KP Art. 12.5c)

• => Integrity and credibility is critical

Page 7: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Basic notion of baselines

CO2 Emissions

CDM project CO2 emissions (observable)

Real, measurable and long-termAdditional CO2

emissions reduction

Years

Baseline scenario CO2 emissions (that would occur)

baseline

study

Page 8: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

CER: A special product

• CER is a payment for the Project Developer not to produce

• To reduce GHG emissions

• Thus, the importance of special requirements– Definition of baselines– Calculation of GHG emission reductions– Monitoring of GHG emission reductions

Page 9: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

What is a baseline scenario?

• The baseline is the scenario that unfolds in the absence of the project activity

• In other words, it is an interpretation of “what would have happened otherwise”

• Presumed counterfactual alternative to the proposed CDM project

Page 10: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Additionality

• Additionality is the key eligibility criterion in CDM projectsYou must do something that you would not

have done without the CDM

• Two types of additionality Project Additionality Environmental Additionality

Page 11: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Baseline methodologies

Evaluate

• Project Additionality– Methodology (Meth) Panel Recommendation to

Executive Board (EB), July 2003

• Environmental Additionality– Marrakech Accords CDM Modalities and Procedures

(M&P), COP-7, 2001

Page 12: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Project Additionality

• Baseline methodology evaluates whether or not the proposed CDM project activity would have gone ahead anyway.

• Baseline methodology assesses why the proposed CDM project activity is less likely to occur than one or more of the other possible scenarios.

Page 13: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Project Additionality

• A baseline methodology evaluates a priori whether the CDM project activity is the baseline scenario.

• CDM project should be considered as a possible baseline scenario since the possibility it would have been implemented in the absence of carbon credits (CERs) must be examined to determine whether it is additional

• Baseline methodology must demonstrate that the CDM project activity is additional and therefore not the baseline scenario.

Page 14: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Environmental Additionality• A CDM project activity is additional if

anthropogenic emissions of GHGs by sources are reduced below those that would have occurred in the absence of the registered CDM project activity.

-CDM M&P para. 43

Emission Reductions=

hypothetical baseline emissions – effective (project) emissions

Page 15: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Environmental Additionality

• Forecast:Baseline Emissions– Project Emissions___________________= Emission Reductions (must

be >0)

• Environmental additionality: if project is expected to generate a positive quantity of ERs.

Page 16: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

How to measure ERs?

CO2 Emissions

project emissions (actual)

Additional ERs

Years

baseline emissions

(hypothetical,

partly monitorable)

monitoring plan &

calculation concept

monitor using

time

indicators and

proxy variables

measure directly or using emission indicators

Page 17: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Baseline methodologies

Evaluate

• Project Additionality– Methodology (Meth) Panel Recommendation to

Executive Board (EB), July 2003

• Environmental Additionality– Marrakech Accords CDM Modalities and Procedures

(M&P), COP-7, 2001

Page 18: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

II. Relevant Studies Needed in a CDM PDD

Page 19: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

What are the relevant questions?

• Project Design Document (PDD) with Annexes:– What is the baseline scenario?

Baseline Study

– How to measure the ER? Monitoring Plan

– How many ER to expect?

Emissions Reduction Study

Page 20: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University
Page 21: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Baseline StudyBaseline Study(BLS)

Page 22: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Two Baseline Filters• Boundary for possible baseline scenarios

– where do you look?

• Possible alternative scenarios to provide service– first filter:– identify constraints: legal, political, economic, costs…

• Plausible alternative scenarios (short list)– second filter:– chose baseline method: justify why most appropriate– apply method and determine:

• => the most likely baseline scenario

Page 23: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University
Page 24: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Purpose of the BLS

• The systematic determination and description of the baseline scenario,

• Using an agreed baseline methodology. A variety of approaches and methods are possible.

• The baseline scenario is: the basis for the Monitoring Plan and thus for the determination of baseline emissions.

Page 25: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Sections of the BLS• Project description and characteristics• Sector background etc.• Boundaries• Selection of baseline method• Possible alternative scenarios (to include BAU &

project)• Legal and other constraints• Selection of plausible alternative scenarios• Application of selected baseline method and

determination of the most likely baseline scenario• Discussion of time dimension of baseline• Leakage (and Permanence for sink projects)• Greenhouse gases covered• => Complete description of determined baseline

scenario and its development over time

Page 26: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Monitoring PlanMonitoring Plan(MP)

Page 27: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Purpose of the Monitoring Plan• Provides a complete calculation system for ERs• Builds on and complements the BLS• Is a legally binding document, a part of the ER

Purchase Agreement• Develops the monitoring and ER calculation concept• Allows to monitor:

– baseline emissions and – project emissions – using emission indicators and time indicators

• Thus, meets the KP / MA requirements for ex post monitoring of project and baseline data– monitoring is preferred option; projections are a fallback option

• Is a set of clear and definite instructions

Page 28: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University
Page 29: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Emission Reduction StudyEmission Reduction Study(ERS)

Page 30: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Purpose of the ERS

• To project – emissions in baseline scenario – emissions in project scenario – expected emission reductions

• To establish environmental additionality• To provide structured risk information by

simulating ER calculation (sensitivity analysis)• To provide basis for informed negotiations

Page 31: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Emission Reduction Study

• Builds on Monitoring Plan• Uses MP concepts, assumptions, parameters etc• Ensures that same methodology is used ex ante and ex post• Makes assumptions about monitorable indicators (forecast

likely indicator values)• Uses MP calculation tool (spreadsheet) to calculate baseline

emissions, project emissions and ERs.• Runs simulations with different data sets for monitorable

indicators and possible development scenarios • Projects and records expected baseline and project

emissions and ERs for each crediting year

Page 32: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University
Page 33: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

III. Baseline methodologies

Page 34: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

How to develop CDM baselines?(CDM M&P)

(45) A baseline shall be established …a) using approved and new methodologies,

b) in a transparent and conservative manner,

c) on a project-specific basis,

d) using simplified procedures for small-scale projects,

e) taking account of national and/or sectoral policies. (e.g., sectoral reform initiatives, local fuel availability, power sector expansion plans, and the economic situation in the project sector)

Page 35: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

How to develop CDM baselines?(CDM M&P)

(48)Select baseline method …– that is deemed most appropriate,– that is consistent with guidance from Executive

Board,– … and justify the choice.

Page 36: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

III.A Procedures to determine Project AdditionalityProject Additionality

Page 37: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Meth Panel Recommendations to EB, July 2003

• Baseline methodology must include a procedure to assess “why the proposed project CDM project activity” is less likely to occur than one or more of the other possible scenarios.

Page 38: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Meth Panel Recommendations to EB, July 2003

Examples of such procedures• Qualitative or quantitative assessment of

different potential options and an indication of why the non-project option is more likely to occur

• Qualitative or quantitative assessment of one or more barriers facing the proposed project activity.

• Indication that the project type is not common practice (e.g. occurs in less than [<x%] of similar cases) in the proposed area of implementation, and not required by recent/pending legislation/regulations.

Page 39: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Some methods to determine project additionality

• Economic / investment analysis– Internal rate of return comparison– Least cost comparison (power projects)

• Scenario / barrier analysis– Comparison based on investment risks

• Control groups

Page 40: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Investment Analysis

• An established and rigorous methodology

• An objective method that screens alternatives on the basis of the maximization of the return of investment

• The baseline would have the highest IRR or NPV or lowest cost, not taking into account any CER-revenues

Page 41: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Economic Analysis of Alternatives

0.00%

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

1 2 3 4 5 6

Options

Inte

rna

l Ra

te o

f R

etu

rn

IRR without C revenues IRR with C revenues

baseline

CDM project

Page 42: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Economic Analysis of AlternativesN

et P

rese

nt

Val

ue

Options

0

CERs

CDM Projects Baseline

Page 43: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Economic Analysis of Alternatives

Options

CDM Project

Baseline: Lowest CostC

OST

Page 44: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Scenario Analysis

• Investigates the barriers and risks concerning an investment decision

• Types of risks: regulatory, market, development, environmental, project & country risks

• Non-economic constraints are the predominant factors for an investment decision

• Baseline would be the option with the lowest barriers and risks

Page 45: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Scenario Analysis

• A thorough analysis of the local circumstances need to be made to justify the baseline selection

• Challenge of this method is to provide data and other information that can be validated

Page 46: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Control group method

• Method searches a comparison group that is not offered the opportunity to sell CERs and use their behavior as reference

• Finding an appropriate control group is not an easy task, since each group will often face different circumstances.

• Baseline is the control group, CDM project is the treatment group

Page 47: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Control group method

• Difficulty of finding valid control groups can be overcome if the sample of the control groups is bigger

• Difficulty of finding groups which are reasonably homogenous

Page 48: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

III.B Procedures forcalculating baseline emissionscalculating baseline emissions

Page 49: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Challenge of calculating baseline emissions

• Baseline is a counterfactual– What would have happened otherwise if there

was no CDM project?

• How to forecast the emissions which would have occurred?

• How to forecast the emissions which would have happened otherwise if there was no CDM project?

Page 50: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

CDM M&P Para. 44

• The baseline of a CDM project activity is the scenario that reasonably represents the anthropogenic emissions by sources of greenhouse gases that would occur in the absence of the proposed project activity

Page 51: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

CDM M&P Approaches(Para. 48)

a) Existing actual or historical emissions

b) Emissions from a technology that represents an economically attractive course of action, taking into account barriers to investment

c) The average emissions of similar activities, in previous 5 years, in similar social, economic, environmental circumstances, and whose performance is the top 20% of their category

Page 52: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Meth Panel Recommendation,no. 15, July 2003

• Since only one approach should be chosen in accordance with paragraph 48 of the CDM M&P, developers are advised to select the one that most closely reflects the process used for calculating baseline emissions or baseline emission rates.

Page 53: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Meth Panel Recommendationno. 15 & 16, July 2003

• Process used for project additionality determination can be different from the approach used for calculating baseline emissions

• Paragraph 48 of CDM M&P apply to the approach used for calculating baseline emissions

Page 54: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Clean Development Mechanism

Types of small-scale projects that could qualify for fast-track approval procedures

• Renewable energy projects up to 15 megawatts (MW) of output capacity

• Energy efficiency improvements that reduce energy consumption on the supply and/or demand side by up to 15 gigawatt-hours (GWh)/year

• Other project activities that both reduce emissions at source and directly emit less than 15 kilotons (kt) of CO2 equivalent annually

Page 55: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

III.C Small-Scale Small-Scale CDM Projects

SimplifiedSimplified Baseline and Monitoring Methodologies

Page 56: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Type I – Renewable Energy Projects

• I.A Electricity Generation by the User– E.g., solar home systems, solar water pumps, wind

battery chargers

• I.B Mechanical Energy for the User– E.g., wind-powered pumps, solar water pumps, water

mills, wind mills

• I.C Thermal Energy for the User– E.g., solar water heaters and dryers, solar cookers,

energy derived from biomass for water heating

• I.D Renewable Electricity Generation for a Grid

Page 57: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Type I – Energy Efficiency Improvement Projects

• II.A Supply-side Energy Efficiency Improvements – Transmission and Distribution

• II.B Supply-side Energy Efficiency Improvements – Generation

• II.C Demand-Side Energy Efficiency Program for Specific Technologies

• II.D Energy Efficiency and Fuel Switching Measures for Industrial Facilities

• II.E Energy Efficiency and Fuel Switching Measures for Buildings

Page 58: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Type III – Other Project Activities

• III.A Agriculture

• III.B Switching Fossil Fuels

• III.C Emission reductions by low-greenhouse emission vehicles

• III.D Methane recovery and avoidance

Page 59: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Simplified methodologies forSmall-Scale CDM Projects

• Technology / Measure

• Boundary

• Baseline

• Leakage

• Monitoring

Page 60: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

IV. Concluding remarks

Page 61: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Interpretation of COP-7 Guidance• … is not concrete enough:

– Mixture of baseline and monitoring concepts– Concrete baseline and monitoring methods yet to be agreed /

approved– When to apply which approach and method?

• … needs to be interpreted by project developer, Designated Operational Entities, Meth Panel and the Executive Board in light and context of other relevant provisions

• Depends on concrete project input from project developers and Parties

• The development of a project baseline and monitoring concept is a highly creative process which must yield conceptually rigorous results. It is currently more an art than a science.

Page 62: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

What is emerging from PCF, CERUPT …… is a variety of methods:

– No single, but a hybrid mixture of methods.– Complexity depends on circumstances, project

type and design.– Methodologies to be approved, “political issues” to

be decided by the Parities.• Baseline study and MP must “work” together:

– Method-driven scenario forecast in the baseline study – as a basis for:

– … monitoring concept and tools for calculating baseline and project emissions in the MP.

• More experience and discussion is needed– Contribution to evolutionary concept for baselines

and monitoring.• The devil is in the details

Page 63: CDM BASELINE METHODOLOGIES: The devil is in the details Climate Change Information Center Manila Observatory Ateneo de Manila University

Roberto C. Yap, S.J., Ph.D.

Environmental Economist

Climate Change Information Center

Manila Observatory

Ateneo de Manila University

Tel +63 2 426-6144

Fax +63 2 426-6070