  • 7/27/2019 CEA Clean Coal Technology

    1/26

    India-EU Working Group on

    Delhi- 21 Jan 2008

    CLEAN COAL TECHNOLOIN INDIA

    Central Electricity Authority

    New Delhi

  • 7/27/2019 CEA Clean Coal Technology

    2/26

    OverviewOverview

    Indian Power Sector ProfileIndian Power Sector Profileoo Installed Capacity MixInstalled Capacity Mix

    oo Capacity Addition PlansCapacity Addition Plans

    oo Coal consumptionCoal consumption

    Improving EfficiencyImproving Efficiencyoo Higher size unitsHigher size units

    oo Supercritical technologySupercritical technology

    oo Efficiency improvement in existing staEfficiency improvement in existing sta

    New Technology OptionsNew Technology Options

  • 7/27/2019 CEA Clean Coal Technology

    3/26

    Indian Power SectoIndian Power Sector

    Installed Generation Capacity ~140 GInstalled Generation Capacity ~140 G

    Electricity GenerationElectricity Generation-- 660660 TwhTwh (2006(2006--00

    Per Capita ConsumptionPer Capita Consumption--665 Kwh/ Y665 Kwh/ Y

    Shortages (Energy ~ 8.5%, Peak ~ 15Shortages (Energy ~ 8.5%, Peak ~ 15 Rapidly ExpandingRapidly Expanding

    Emphasis on EfficiencyEmphasis on Efficiency

    Increasing private sector participationIncreasing private sector participation Structural reformsStructural reforms

  • 7/27/2019 CEA Clean Coal Technology

    4/26

    Installed Capacity (As on 31s

    Thermal

    90646 MW (6

    Hydro34681 MW (25%)

    Nuclear

    4120 MW (3%)

    Renewables

    10855 MW (8%)

    OOi

    GG

    CoCo

    Total : 140302 MW

  • 7/27/2019 CEA Clean Coal Technology

    5/26

    14043

    8206 81397259

    4997

    14

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    U.S.A

    Japan

    Fran

    ce

    Germ

    any

    S.Africa Ch

    ina

    Per Capita Electricity Consumption (Per Capita Electricity Consumption (

    India: 665 (2006India: 665 (2006--07)07)

  • 7/27/2019 CEA Clean Coal Technology

    6/26

    CAPACITY ADDITION 11CAPACITY ADDITION 11thth PLAPLAN

    78,577 MW78,577 MW

    THERMAL,

    58,644, 75%

    NUCLEAR,

    3,380, 4%

    Coal 5 4 3 5 5 MW ( 6 9 % )

  • 7/27/2019 CEA Clean Coal Technology

    7/26

    CAPACITY ADDITION 12CAPACITY ADDITION 12thth PLAPLA

    TentativeTentative 82,200 MW82,200 MW

    Hydro

    30,000, 3

    Nuclear,

    12,000, 15%

    Thermal,

    40,200, 49%

  • 7/27/2019 CEA Clean Coal Technology

    8/26

    Coal consumptionCoal consumption

    Proven coal reserve of about 96 billion tons

    Present coal consumption: 303Present coal consumption: 303 MnMn Tons p.Tons p.

    Run of mine: 260 MTRun of mine: 260 MT

    Washed coal: 033 MTWashed coal: 033 MT

    Imported : 010 MTImported : 010 MT

    Projected coal consumption in year 2012Projected coal consumption in year 2012

    MTMT

    Coal mining capacity being augmented by aCoal mining capacity being augmented by a

    captive coal blocks to private / public sectocaptive coal blocks to private / public secto Gap to be covered by imported coalGap to be covered by imported coal

  • 7/27/2019 CEA Clean Coal Technology

    9/26

    Indian Coal QualityIndian Coal Quality

    Indian coal has high ash content, is sloIndian coal has high ash content, is slohighly abrasive with high ash fusion tehighly abrasive with high ash fusion tewhich affects the design of boilerwhich affects the design of boiler

    PC technologyPC technology the current workhorthe current workhor

    gradually through learning curvegradually through learning curve

    Any new technology must cope up wiAny new technology must cope up wiIndian coalIndian coal

    Being the cheapest and indigenously aBeing the cheapest and indigenously a

    it will remain the mainstay fuel for powit will remain the mainstay fuel for powgeneration for many more yearsgeneration for many more years

  • 7/27/2019 CEA Clean Coal Technology

    10/26

    Coal BeneficiationCoal Beneficiation

    Indian coalIndian coal high ash 40high ash 40--45%45% Open cast miningOpen cast mining

    Coal BeneficiationCoal Beneficiation

    Savings in Transport costSavings in Transport cost

    Better use of Transport infrastructureBetter use of Transport infrastructure

    Advantages in O&MAdvantages in O&M

    IssuesIssues

    Low Washing YieldsLow Washing Yields

    Problem of Rejects Disposal/ useProblem of Rejects Disposal/ use

    Presently washing has been found ecoPresently washing has been found ecofor load centre stationsfor load centre stations

  • 7/27/2019 CEA Clean Coal Technology

    11/26

    Improving EfficiencImproving Efficienc

    Higher size unitsHigher size unitsoo More efficient, economy of scaleMore efficient, economy of scale

    oo Quicker capacity additionQuicker capacity addition

    oo Reduced land/ manpower requirementReduced land/ manpower requirement

    Supercritical TechnologySupercritical Technology

    oo Higher efficiencyHigher efficiency

    oo lower GHG emissionlower GHG emission

    Efficiency Improvement in existingEfficiency Improvement in existingoo Upgrading old fleetUpgrading old fleet

    oo ReplacementReplacement

  • 7/27/2019 CEA Clean Coal Technology

    12/26

    538/ 538538/ 538170170500500

    535/ 535535/ 535150150250 (New)250 (New)535/ 535535/ 535150150210/ 250 KWU210/ 250 KWU

    535/ 535535/ 535130130110/ 120/ 140/110/ 120/ 140/

    150150

    53553590906060--10010048248260603030--5050

    ooCCkg/ cmkg/ cm22

    GG

    DD

    EffEff

    MS/MS/

    RHRH

    TempTemp

    MS. PrMS. PrUnit SizeUnit Size

    Prevailing Unit Sizes

  • 7/27/2019 CEA Clean Coal Technology

    13/26

    Proposed Unit SizesProposed Unit Sizes

    4040247kg/ cm247kg/ cm22 565/ 593565/ 593 OO CC800800

    4040247kg/ cm247kg/ cm22 565/ 593565/ 593 OO CC

    3939

    247kg/ cm247kg/ cm22

    538/ 565538/ 565 OO

    CC660660

    GG

    DD

    EE

    ParametersParametersUnit SizeUnit Size

    (MW)(MW)

    Expected Efficiency Gain of ~ 4% over Prese

    Units (170 kg/cm2 535/535 oC)

  • 7/27/2019 CEA Clean Coal Technology

    14/26

    EfficiencyImpact of Tropical Climate

    Indian CoalIndian Coal2%2%

    CW TemperatureCW Temperature

    (33 Vs 15)(33 Vs 15) ooCC

    ImIm

    AA

    (%(%

    Impact onImpact on

    GrossGross

    Efficiency (%)Efficiency (%)

    ParameterParameter

  • 7/27/2019 CEA Clean Coal Technology

    15/26

    Share of Different Unit Sizes- 2

    0%

    25%

    6%

    48%

    6%

    38%

    16%

    27%

    21%

    39%

    12%

    19%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    800/660 500/600 300/250 210/200

  • 7/27/2019 CEA Clean Coal Technology

    16/26

    Capacity Breakup 2007

    2007

  • 7/27/2019 CEA Clean Coal Technology

    17/26

    Supercritical technology being adopted to Supercritical technology being adopted to efficiency, reduce coal consumption and Gefficiency, reduce coal consumption and G

    660/ 800 MW units planned in big way660/ 800 MW units planned in big way

    Parameters adopted 247 kg/ cmParameters adopted 247 kg/ cm22 535/ 565 535/ 565 kg/ cmkg/ cm22 565/ 593 deg C565/ 593 deg C

    Six units of NTPC under execution at SipaSix units of NTPC under execution at Sipa Ultra Mega Projects, 4000 MW each, envisUltra Mega Projects, 4000 MW each, envis

    supercritical units.supercritical units.3 projects already awarded to3 projects already awarded to IPPsIPPs through tathrough ta

    competitive bidding.competitive bidding.

    Many more supercritical units in pipeline.Many more supercritical units in pipeline. Introduction of supercritical units would iIntroduction of supercritical units would im

    efficiency in power generationefficiency in power generation

    Supercritical TechnoloSupercritical Technolo

  • 7/27/2019 CEA Clean Coal Technology

    18/26

    Efficiency improvemenEfficiency improvemen

    in existing stationsin existing stations

    Upgrading old fleet of inefficient powUpgrading old fleet of inefficient pow

    with poor availability through renovatwith poor availability through renovat

    modernisationmodernisation

    Improving efficiency / availability thrImproving efficiency / availability throimprovement in O&M practicesimprovement in O&M practices

    Replacement of very old poor performReplacement of very old poor perform

  • 7/27/2019 CEA Clean Coal Technology

    19/26

    Shift in focus fromShift in focus from Generation MaxGeneration MaxOverall Plant OptimizationOverall Plant Optimization

    Replacement of very old small size low effReplacement of very old small size low eff

    High end technology solutions foHigh end technology solutions foenhancementenhancement

    -- Steam turbine and boiler upgradesSteam turbine and boiler upgrades-- Steam flow path modificationSteam flow path modification

    -- Improved plant controlImproved plant control

    -- Higher steam parametersHigher steam parameters

    AdditionalityAdditionality in efficiency (Beyond Orin efficiency (Beyond Orefficiency )efficiency )

    Future Approach Towards R&M

  • 7/27/2019 CEA Clean Coal Technology

    20/26

    New Technology optioNew Technology optio

    Ultra supercritical (USC) and advanceUltra supercritical (USC) and advance

    technologytechnology

    CirculatingCirculating FluidisedFluidised Bed CombustionBed Combustion

    Integrated Gasification Combined CyIntegrated Gasification Combined Cyc

  • 7/27/2019 CEA Clean Coal Technology

    21/26

    Ultra supercritical technUltra supercritical techn

    Parameters of about 280 bars and 600Parameters of about 280 bars and 600

    more efficient but higher capital costmore efficient but higher capital cost

    Experience limited mainly in Japan, GExperience limited mainly in Japan, G

    and Denmarkand Denmark

    TechnoTechno--economics, suitability with Ineconomics, suitability with In

    institutional capacity building to be ginstitutional capacity building to be gu

    factors for adoptionfactors for adoption

  • 7/27/2019 CEA Clean Coal Technology

    22/26

    Circulating Fluidized BCirculating Fluidized B

    CombustionCombustion

    CFBC being used for high Sulphur ligCFBC being used for high Sulphur lig

    125 MW CFBC units125 MW CFBC units

    4 units operational at4 units operational at SuratSurat lignite andlignite and AA

    6 units under implementation at6 units under implementation at SuratSurat liliBarsingsarBarsingsar and Giral TPSand Giral TPS

    250 MW CFBC units250 MW CFBC units

    Under installation atUnder installation at NeyveliNeyveli LigniteLignite

  • 7/27/2019 CEA Clean Coal Technology

    23/26

    IGCCIGCC

    Limited experience available with low aLimited experience available with low a No large IGCC units in operation withNo large IGCC units in operation with

    bedbed gasifiergasifier considered suitable for Indconsidered suitable for Ind

    High CostHigh Cost

    India pursuing a demo project of abouIndia pursuing a demo project of abouby NTPCby NTPC

    Through international coThrough international co--operation (operation (FeasFeasstudy done bystudy done by NexantNexant, USA), USA)

    Through indigenous R&D (DPR unThrough indigenous R&D (DPR unfinalisationfinalisation))

  • 7/27/2019 CEA Clean Coal Technology

    24/26

    Coal Bed Methane and UCoal Bed Methane and U

    Coal Bed MethaneCoal Bed Methane

    26 CBM blocks awarded with potential 26 CBM blocks awarded with potential

    MMSCMDMMSCMD

    Work in progressWork in progress

    Underground coal gasificationUnderground coal gasification

    Agencies such as ONGC, GAIL keen oAgencies such as ONGC, GAIL keen o

    pilot plantspilot plants

  • 7/27/2019 CEA Clean Coal Technology

    25/26

    Low carbon technologLow carbon technolog

    Keeping close watch on internationalKeeping close watch on internationaldevelopmentsdevelopments

    Participation in internationalParticipation in international forafora

    FutureGenFutureGen Carbon Sequestration Leadership ForumCarbon Sequestration Leadership Forum

    Asia Pacific Partnership on Clean DevelAsia Pacific Partnership on Clean DevelClimateClimate

    Kyoto ProtocolKyoto Protocol

    LargeLarge NosNos of CDM Projectsof CDM Projects

    Official COOfficial CO22 Emission Baseline NotifiedEmission Baseline Notified

  • 7/27/2019 CEA Clean Coal Technology

    26/26