  • 7/27/2019 Centralized System for Traffic Control

    1/59

    By: Ashish Sinha Nithin H S Pratik Tilak Ramakrishna Anantha

  • 7/27/2019 Centralized System for Traffic Control

    2/59

    Objectives of Our ProjectReducing Traffic density in GangwaysCreating a centralized system in order to improve

    traffic condition.

  • 7/27/2019 Centralized System for Traffic Control

    3/59

    Root causes for Traffic Jam

  • 7/27/2019 Centralized System for Traffic Control

    4/59

    Problem 1Under utilized gangway between engine Jundate and

    engine sub assembly lineRoot Cause:Tow motor is being parked in that gangway, whiledriver is fixing hose pipes for engine.

    Solutions:Shifting the parking place and inventory shelf

    towards engine sub assembly line.Benefits:Diversion of Chassis frame tow motor and engine sub

    assembly line supplies to weld shop gangway throughthis route.

  • 7/27/2019 Centralized System for Traffic Control

    5/59

    36503900

    Present Situation

    Gangway is blocked by the parking of Tow motor

    Engine Jundate

    Tow motor with engine

    chorokyu

    Pneumatic cylinder

  • 7/27/2019 Centralized System for Traffic Control

    6/59

  • 7/27/2019 Centralized System for Traffic Control

    7/59

  • 7/27/2019 Centralized System for Traffic Control

    8/59

  • 7/27/2019 Centralized System for Traffic Control

    9/59

  • 7/27/2019 Centralized System for Traffic Control

    10/59

  • 7/27/2019 Centralized System for Traffic Control

    11/59

    Tow motor with engine

    chorokyu

    Proposed Idea

    Pneumatic cylinderEngine Jundate

  • 7/27/2019 Centralized System for Traffic Control

    12/59

    Problem -2Parking of Dollies near IP Sub assembly line obstructing the

    gangway 1Root CauseThere is no space available for dollies while

    replenishing the stock.SolutionIntroducing Set Pallet System for IP sub assembly line.BenefitsIt will remove traffic congestion near IP sub assembly line.

  • 7/27/2019 Centralized System for Traffic Control

    13/59

  • 7/27/2019 Centralized System for Traffic Control

    14/59

  • 7/27/2019 Centralized System for Traffic Control

    15/59

  • 7/27/2019 Centralized System for Traffic Control

    16/59

  • 7/27/2019 Centralized System for Traffic Control

    17/59

    Problem - 3Parking of Dollies near Engine Sub assembly line

    obstructing the weld shop Gangway Root CauseThere is no space available for dollies while

    replenishing the stock.SolutionIntroducing Set Pallet System for Engine sub assembly line.

    BenefitsIt will remove traffic congestion near Engine subassembly line.

  • 7/27/2019 Centralized System for Traffic Control

    18/59

  • 7/27/2019 Centralized System for Traffic Control

    19/59

  • 7/27/2019 Centralized System for Traffic Control

    20/59

    Kaizen -1

    Increasing the Rear Axle lot size from 4 to 5

    Number of movements can be reduced are - 19

    Increased movement of Assembly line employee is- 30 cms

  • 7/27/2019 Centralized System for Traffic Control

    21/59

  • 7/27/2019 Centralized System for Traffic Control

    22/59

  • 7/27/2019 Centralized System for Traffic Control

    23/59

  • 7/27/2019 Centralized System for Traffic Control

    24/59

    Kaizen -2Shifting the tow motor parking place which is

    obstructing the traffic in the junction

  • 7/27/2019 Centralized System for Traffic Control

    25/59

  • 7/27/2019 Centralized System for Traffic Control

    26/59

  • 7/27/2019 Centralized System for Traffic Control

    27/59

    Problem - 4Traffic Jam at JunctionsTo many tow motors are coming from differentdirection at the same time causing an average traffic

    jam of 1.2 mins.

  • 7/27/2019 Centralized System for Traffic Control

    28/59

  • 7/27/2019 Centralized System for Traffic Control

    29/59

  • 7/27/2019 Centralized System for Traffic Control

    30/59

  • 7/27/2019 Centralized System for Traffic Control

    31/59

  • 7/27/2019 Centralized System for Traffic Control

    32/59

  • 7/27/2019 Centralized System for Traffic Control

    33/59

  • 7/27/2019 Centralized System for Traffic Control

    34/59

  • 7/27/2019 Centralized System for Traffic Control

    35/59

    Centralized Inventory and Traffic monitoring system

    Based on the real time inventory at assembly line each tow motor agent is assigned dynamically with a priority.The priority is completely automatic and it can be setmanually in the master centralized control unit by usingthe key pad and an LCD display.IR transmitter is installed on each Tow motor and IR receiver is installed on each road near the common

    interface.The agent continuously transmits its ID code and when thetow motor approaches the common interface IR signalfrom the agent is detected by the road unit.

  • 7/27/2019 Centralized System for Traffic Control

    36/59

    R l i I i l

  • 7/27/2019 Centralized System for Traffic Control

    37/59

    Real time Inventory manipulator

  • 7/27/2019 Centralized System for Traffic Control

    38/59

    Sensors used for finding out inventory at Assembly line

    Ultrasonic SensorError 0.5 cms

    Bending Beam Load SensorError 1% of its capacity

    Motion sensor

    Long range IR Proximity sensor

  • 7/27/2019 Centralized System for Traffic Control

    39/59

    Ultrasonic sensor: List of workstationsFortuner SPS dolly

    CarpetRoof mouldWeighing sensor: List of workstations:Stabilizer barRear axle

    Propeller shaftExhaust center pipeRadiatorProximity sensor: List of workstation:Tyre LHTyre RHMotion sensor: List of workstation:Modular dolly IP dolly Engine

  • 7/27/2019 Centralized System for Traffic Control

    40/59

    Ultrasonic Sensor working Principle

    Centralized system

  • 7/27/2019 Centralized System for Traffic Control

    41/59

    -- Tow motor

    -- Base station

    -- Zig bee Transreceiver

    -- Micro processor

    -- EEPROM

    2 0 m

    t s Real timeinventory data

  • 7/27/2019 Centralized System for Traffic Control

    42/59

    Centralized system

    Real timeinventory data

    Inventory atassembly line

  • 7/27/2019 Centralized System for Traffic Control

    43/59

    1 234

    Real timeinventory data

  • 7/27/2019 Centralized System for Traffic Control

    44/59

    12345

    Real timeinventory data

  • 7/27/2019 Centralized System for Traffic Control

    45/59

  • 7/27/2019 Centralized System for Traffic Control

    46/59

    SPS

    1. Tow motor moves from SPS to A/S line for part delivery,

    2. Tow motor waiting in A/S line for part delivery ,

    3. First tow motor inform the Second Tow motor to stop nearSPS until it inventory get consumed to fixed quantity ,

    The parking of Tow motors can be eliminated with propercommunication between two tow motors.

    Proper Communication Between tow motors

  • 7/27/2019 Centralized System for Traffic Control

    47/59

  • 7/27/2019 Centralized System for Traffic Control

    48/59

  • 7/27/2019 Centralized System for Traffic Control

    49/59

  • 7/27/2019 Centralized System for Traffic Control

    50/59

    BenefitsLow cost and efficient systemLong range sensors

    Reprogrammable cmosIt can minimize traffic Jam with real time dataReduction of traffic congestion at each junction.Proper information sharing between tow motors.

  • 7/27/2019 Centralized System for Traffic Control

    51/59

  • 7/27/2019 Centralized System for Traffic Control

    52/59

    Estimated project cost for one junction

    Centralized Unit:Cost: Rs.15,000/unit

    Vehicle Unit:

    No. of tow motors: 14Total cost per unit :Rs.7,000Total cost : Rs.98,000

    Road Unit:

    No. of road units required=3Total cost per unit= Rs.4,500Total cost: 4500*3= Rs.13,500

    Total cost for this junction= Rs.1,26,500

  • 7/27/2019 Centralized System for Traffic Control

    53/59

  • 7/27/2019 Centralized System for Traffic Control

    54/59

    a) Ultrasonic sensor: List of workstations:Fortuner SPS dolly CarpetRoof mould

    Estimated cost for using Ultrasonic sensor:No. of sensors= 3Cost per sensor= Rs.1,100Total cost= 1100*3= Rs.3,300

    Estimated cost of Real Time Inventory system

  • 7/27/2019 Centralized System for Traffic Control

    55/59

    b) Weighing sensor: List of workstations:Stabilizer barRear axlePropeller shaft

    Exhaust center pipeRadiator

    Estimated cost for using Weighing sensor:No. of sensors per workstation= 4Cost per sensor= Rs.5,000

    Junction box= Rs.6,000Total cost per workstation= Rs.26,000

    Total no. of workstations= 5

    Total cost required= 5 * 26000= Rs.1,30,000

    Estimated cost of Real Time Inventory system

  • 7/27/2019 Centralized System for Traffic Control

    56/59

    c) Motion sensor: List of workstation:Modular dolly IP dolly

    Engine

    Estimated cost for using Motion sensor:No. of sensors per workstation= 2Cost per sensor= Rs.2,500

    Total cost per workstation= 2*2500= Rs.5,000

    Total no. of workstations= 3

    Total cost required= 3*5000= Rs.15,000

    Estimated cost of Real Time Inventory system

  • 7/27/2019 Centralized System for Traffic Control

    57/59

    d) Proximity sensor: List of workstation:Tyre LHTyre RH

    Estimated cost for using Proximity sensor: No. of sensors required in each workstation : Tyre LH= 15Tyre RH= 10

    Cost per sensor= Rs.500No. of sensors required= 25

    Total cost required= 25*500= Rs.12,500

    Estimated cost of Real Time Inventory system