change order guidelines - electri international order-electri-july... · 1 ©m. syal _2014...
TRANSCRIPT
![Page 1: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/1.jpg)
©M. Syal _2014 1
Construction Management, School of Planning, Design and Construction
Change Order Guidelines
ELECTRI International
Prof. Matt Syal, Ph.D. Joseph Diffendal
Daniel Duah, Ph.D.
Construction Management School of Planning, Design and Construction
Michigan State University
![Page 2: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/2.jpg)
©M. Syal _2014 2
Construction Management, School of Planning, Design and Construction
Preview • Thanks to the task force members who provided
inputs and/or case studies • Great start and support by the Toronto chapter • There are three types of industry studies and
each has increasing level of task force passion and controversy: Descriptive e.g. Research Directions Exploratory for new business e.g., LEED, Smart Grid Impact on current business e.g., Change Orders
• Quick summary in the next few slides but I will stay after this meeting to collect more input
![Page 3: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/3.jpg)
©M. Syal _2014 3
Construction Management, School of Planning, Design and Construction
Project Focus • Direct Cost Categories
and Items • Overhead-Profit Practices
and Percentages • Impact Factors and
Consequential Costs
![Page 4: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/4.jpg)
©M. Syal _2014 4
Construction Management, School of Planning, Design and Construction
Methodology • Literature Review: Academic, Industry, Constn. Finance • Standard Contract Documents:
- AIA A201-2007 & A401-2007 - ConsensusDocs 200-2012 & 750-2012 - EJCDC C700-2007 & C523-2013 - Canadian CDCC 2-2008 and CCA 1-2008
• Industry Surveys: NECA, ELECTRI, and COAA • Court Cases • Case Studies • Other Subcontractors’ Groups: SMACNA, PHCCA • Owners’ Groups: COAA, CURT, NACA
(COAA invited the researchers to present their work at their Fall 2013 conference in San Diego and also allowed the researchers to survey their members)
![Page 5: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/5.jpg)
©M. Syal _2014 5
Construction Management, School of Planning, Design and Construction
Parts of the Final Report • Final Report is in two-parts:
o Part I - Guidelines: Templates for use by contractors and for sharing with clients
o Part II – Appendices: Research and analysis support for Part - I
![Page 6: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/6.jpg)
©M. Syal _2014 6
Construction Management, School of Planning, Design and Construction
Change Order (C.O.) Costs
Direct Costs Indirect Costs/ OH & P
Impact Factors / Consequential
Costs
Direct Labor, Material and Equipment
Costs
Job Costs/Expenses Related to C.O.
Overhead Expenses Profit
Project Delay Claims and
Costs
Lost Labor Productivity
Costs
Other Added Costs
Cost Categories
![Page 7: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/7.jpg)
©M. Syal _2014 7
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
Summary Change Order TemplateI. DIRECT COSTS*
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
*Major sources of information/rates: 1. NECA Manual of Labor Units (NECA Labor 2011) 2. NECA Tool & Equipment Schedule (NECA Equipment 2013) 3. Electrical Price Guide - Trade Service (EPG 2014) 4. R.S. Means Electrical Cost Data (RS Means 2014)
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
![Page 8: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/8.jpg)
©M. Syal _2014 8
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 9: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/9.jpg)
©M. Syal _2014 9
Construction Management, School of Planning, Design and Construction
Direct Costs - Labor
Units Unit $ Comments Total $
Labor Wages and Burden*
Supervision and Related Field Office Personnel
Room, Board and Travel Allowance
Supervision (other than foreman)
Change Order Preparation and Processing
Estimating and ExpeditingMain Office Personnel in Project Offices
"Direct Cost - Labor" Template
1A. LABOR COST ITEMS - Allowed
1B. LABOR COST ITEMS - May Be / Depends
*Note: use labor rate and burden on a journeyman basis unless specified otherwise
![Page 10: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/10.jpg)
©M. Syal _2014 10
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 11: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/11.jpg)
©M. Syal _2014 11
Construction Management, School of Planning, Design and Construction
Sample Labor Burden Breakdown (Sources: UMich 2014, NECA-MI, Case Studies)
(A)
2.00 % or $
Sick Pay 1.00 % or $
1.00 % or $
% or $
(B)
(C)
15.00 % or $
5.00 % or $
2.00 % or $
0.50 % or $
2.00 % or $
% or $
(D)
(E)
Taxes and Burden: Applied to Total Taxable Wage
7.65 % or $
0.13 % or $
3.60 % or $
9.01 % or $
0.11 % or $
1.00 % or $
3.00 % or $
% or $
(F)
(G)
Note: The percentages shown are examples. Use numbers applicable in your area.
TOTAL LABOR RATE -- (E+F) $
Others (specify): x (C) $TOTAL TAXES and BURDEN $
Bonds Allowance x (C) -$ Small Tools Allowance x (C) -$
Workers' Comp. x (C) (From WC Rates) -$ Contractors' Liability Ins. x (C) -$
F.U.T.A. x (C) -$ S.U.T.A. / M.E.S.C. x (C) (From SUTA Rates) -$
F.I.C.A. x (C) -$
Apprentice / Training -$ Others (specify): $
TOTAL NON-TAXABLE FRINGES $TOTAL TRADE RATE -- (C+D) $
Accidental Insurance -$ Pension / Retiree benefit -$
Health, Vision Insurance -$ Life Insurance -$
TOTAL TAXABLE FRINGES -$ TOTAL TAXABLE WAGE -- (A+B) -$
Non-taxable Fringes: Applied to Base Wage x (A)
Holiday Pay -$ Others (specify): $
Vacation/Holiday -$ -$
BASE WAGE -$ Taxable Fringes: Base Wage x (A)
![Page 12: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/12.jpg)
©M. Syal _2014 12
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 13: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/13.jpg)
©M. Syal _2014 13
Construction Management, School of Planning, Design and Construction
Units Unit $ Comments Total $
Materials
Equipment and Rental
Transportation of Material & Equipment
Storage / Handling of Material & EquipmentTemporary FacilitiesInspection / Testing of Material & EquipmentSmall / Hand Tools (not owned by workers)Non-hazardous Waste Clean-up
Restocking and Cancellation
"Direct Cost - Material and Equipment" Template
3A & 4A. MATERIAL AND EQUIPMENT COST ITEMS - Allowed
3B & 4B. MATERIAL AND EQUIPMENT COST ITEMS - May Be / Depends
Direct Costs - Material and Equipment
![Page 14: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/14.jpg)
©M. Syal _2014 14
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 15: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/15.jpg)
©M. Syal _2014 15
Construction Management, School of Planning, Design and Construction
Direct Costs - Job Costs / Expenses
Units Unit $ Comments Total $
Bonds, Security and Project InsuranceSales Taxes
Permit Fees
Subcontractor CostsJob Office-related Operation CostsLicenses and CertificationSpecial Consultants’ FeesSafety Measures and EquipmentWater, Power, and Fuel CostsMobilize and Demobilize
Special Project Requirements (e.g., LEED)
Drawings, Documents and PrintingParkingShop Expenses*Guaranties and Warranties
"Direct Cost - Job Costs / Expenses Related to C.O" Template
5A. JOB COST / EXPENSE ITEMS - Allowed
5B. JOB COST / EXPENSE ITEMS - May Be / Depends
* May include shop labor, material procurement, handling, delivery, inventory control, equipment costs and maintenance, depreciation, utilities, rent, insurance, consumables, etc.
![Page 16: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/16.jpg)
©M. Syal _2014 16
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 17: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/17.jpg)
©M. Syal _2014 17
Construction Management, School of Planning, Design and Construction
OH-P % Breakdown as per NECA
Item Average of All FirmsTotal Sales 100.00%
Direct Cost:Material 29.93%Direct Labor Wages 24.94%Labor Adder 13.40%Other Direct Job Expense 4.56%Subcontract Expense 6.63%
Total Direct Costs 79.46%
Overhead Breakdown:
Compensation of Salaried Personnel (including all compensation as well as bonuses, taxes, profit sharing and other employee benefits/burdens)
10.28%
Utilities (including gas, electric, water, and telephone) 0.34%Rent or Mortgage Costs 0.83%Education and Training Expenses 0.09%All other Overhead Expenses 5.46%
Total Overhead Expenses 17.00%
Operating Profit 3.54%
Gross Income (OH&P) 20.54%
Ovehead and Profit % Breakdown (% of Sales)Electrical Contractors' Income Statement (NECA 2010)
![Page 18: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/18.jpg)
©M. Syal _2014 18
Construction Management, School of Planning, Design and Construction
OH % Based on Analysis
Source Average % Electrical Industry Survey Responses (average)
Transportation Research Board report on Contractors' Home Office Overhead - Electrical Contractors (NCHRP 2013)National Construction Financial Management Association - Moss Adams LLP (CFMA 2013)NECA Financial Performance Annual Report (2010)
Change Order OH as % of Total Price
*These OH % are to be calculated on total Change Order amount. Convert these %s for applying to total of Direct Costs by using the formula and example below: % for Direct Cost = % for total C.O. amount/1 - % for total C.O. amount e.g., If the OH % is 20% on the total C.O amount of $100 then the OH % for the Direct Cost of $80 = 0.20/(1-0.20) = 0.20/0.80 = 0.25 or 25%
(Therefore, based on this formula the above-noted OH of 19.16% of total C.O. amount should equal to 23.70% of Direct Cost)
*19.16%(23.70%)
![Page 19: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/19.jpg)
©M. Syal _2014 19
Construction Management, School of Planning, Design and Construction
Sample OH Cost Breakdown
Item % of Sales/RevenueMain Office Operations: Personnel: salaries, benefits, bonuses, etc.
Office Utilities: telephone, internet, gas, electric, water, etc.Office Equipment: computers, data, photocopy, fax, etc.Office FurnitureEducation and TrainingCompany-wide Safety InitiativesBusiness LicencesCorporate Business InsuranceLegal Fees, Accounting and RoyaltiesAdvertising and MarketingAutos and Auto InsuranceStorage and Equipment YardShop OperationsDues and SubscriptionsRent or MortgageProperty TaxesOther Corporate Overhead
Project-Related: Estimating (not related to C.O.) Scheduling (not related to C.O.) Timkeeping (not related to C.O.) Other Project-Related OH
Total Overhead Percentage* %
Sample Ovehead Costs Breakdown
*If applying as % of direct costs, convert it by using (this %)/(1-this %)
![Page 20: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/20.jpg)
©M. Syal _2014 20
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 21: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/21.jpg)
©M. Syal _2014 21
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 22: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/22.jpg)
©M. Syal _2014 22
Construction Management, School of Planning, Design and Construction
Labor Productivity-related Factors (may decrease productivity or increase labor hours – can be used to add to labor hrs. in the
change order or submit as separate claim)
Added Cost Factors (may increase change order costs -
can be used to add cost to the change order or submit as separate
claim)
Project and Field Conditions –related Factors
(may cause project delays – can be used to indicate potential delay on the change order and then, later submit a
delay claim) Stacking of Trades Increased Contract Administration Capacity Issues
Morale and Attitude Cash Flow Interruption Altered Conditions Reassignment of Manpower Delayed Retainage Release Ripple Effect
Crew Size Inefficiency Lost Profits Cumulative Impact of Change orders Concurrent Operations Increased Job cost Accounting Coordination Time
Dilution of Supervision Lost Opportunity Costs Season and Weather Changes Learning Curve Reordering of Parts Phasing and Sequence Errors and Omissions Premiums for Purchasing Materials Beneficial Occupancy Material Escalation Costs Joint Occupancy Supervision Time for Another Project Site Access Interest/Finance Charges Logistics Depreciation Fatigue Canceled Contracts Ripple Effect Overtime Season and Weather Changes
Aggravation & Stress Interference & Disruptions
Down or Idle Time Acceleration Working in Finished Areas Congested Drawings Suspension of Work Phasing and Sequence
![Page 23: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/23.jpg)
©M. Syal _2014 23
Construction Management, School of Planning, Design and Construction
Labor Productivity-related Factors (may decrease productivity or
increase labor hours – can be used to add to labor hrs. in the change
order or submit as separate claim)
Added Cost Factors (may increase change order costs -
can be used to add cost to the change order or submit as
separate claim)
Project and Field Conditions –related Factors
(may cause project delays – can be used to indicate potential delay on the change order and then, later submit a
delay claim) Stacking of Trades Increased Contract Administration Capacity Issues
Morale and Attitude Cash Flow Interruption Altered Conditions Reassignment of Manpower Delayed Retainage Release Ripple Effect
Crew Size Inefficiency Lost Profits Cumulative Impact of Change orders
Concurrent Operations Increased Job cost Accounting Coordination Time
Dilution of Supervision Lost Opportunity Costs Season and Weather Changes Learning Curve Reordering of Parts Phasing and Sequence Errors and Omissions Premiums for Purchasing Materials Beneficial Occupancy Material Escalation Costs Joint Occupancy Supervision Time for Another
Project
Site Access Interest/Finance Charges Logistics Depreciation Fatigue Canceled Contracts Ripple Effect Overtime Season and Weather Changes
Aggravation & Stress Interference & Disruptions
Down or Idle Time Acceleration Working in Finished Areas Congested Drawings Suspension of Work
![Page 24: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/24.jpg)
©M. Syal _2014 24
Construction Management, School of Planning, Design and Construction
Labor Productivity-related Factors (may decrease productivity or
increase labor hours – can be used to add to labor hrs. in the change
order or submit as separate claim)
Added Cost Factors (may increase change order costs -
can be used to add cost to the change order or submit as separate
claim)
Project and Field Conditions –related Factors
(may cause project delays – can be used to indicate potential delay on
the change order and then, later submit a delay claim)
Stacking of Trades Increased Contract Administration Capacity Issues
Morale and Attitude Cash Flow Interruption Altered Conditions Reassignment of Manpower Delayed Retainage Release Ripple Effect Crew Size Inefficiency Lost Profits Cumulative Impact of Change orders
Concurrent Operations Increased Job cost Accounting Coordination Time
Dilution of Supervision Lost Opportunity Costs Season and Weather Changes Learning Curve Reordering of Parts Phasing and Sequence Errors and Omissions Premiums for Purchasing Materials Beneficial Occupancy Material Escalation Costs Joint Occupancy Supervision Time for Another Project Site Access Interest/Finance Charges Logistics Depreciation Fatigue Canceled Contracts Ripple Effect Overtime Season and Weather Changes
Aggravation & Stress Interference & Disruptions
Down or Idle Time Acceleration Working in Finished Areas Congested Drawings Suspension of Work
![Page 25: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/25.jpg)
©M. Syal _2014 25
Construction Management, School of Planning, Design and Construction
METHODS / TECHNIQUES FOR IMPACT FACTORS
No. Method / Technique (References)
1. Toronto Change Order Protocol/MCAA Percentage Method (Toronto 2010, MCAA 2012)
2. Stacking of Trades –Hanna Method (Hanna et al. 2002)
3. Measured Mile Approach (Hanna 2011, Long and Carter 2013, DeVries 2012)
4. Cumulative Impact of Change Orders Method (Hanna 2001)
5. RS Means Method for Electrical Change Order Work (RS Means 2013)
6. US Army Corp of Engineers Impact Studies (Vorster & De La Garza 1990, Fuerst et al. 1991)
7. NAVSEA’s Relative Importance Method (Jozwick 2005)
![Page 26: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/26.jpg)
©M. Syal _2014 26
Construction Management, School of Planning, Design and Construction
Productivity Loss %s (MCAA 2012 & Toronto 2010)
Factors % of loss if condition is:
Minor Average Severe
1. Stacking of Trades Operations take place within physically limited space with other contractors. Results in congestion of personnel, inability to locate tools conveniently, increased loss of tools, additional safety hazards and increased visitors. Optimum crew size cannot be utilized.
10% 20% 30%
2. Morale and Attitude Excessive hazard, competition for overtime, over-inspection, multiple contract changes and rework, disruption of labor rhythm and scheduling, poor site conditions, etc.
5% 10% 15%
3. Reassignment of Manpower Loss occurs with move-on, move-off men because of unexpected changes, excessive changes, or demand made to expedite or reschedule completion of certain work phases. Preparation not possible for orderly change.
5% 10% 15%
4. Crew Size Inefficiency Additional men to existing crews "breaks up" original team effort, affect labor rhythm. Applies to basic contract hours also.
10% 20% 30%
5. Concurrent Operations Stacking of this contractor's own force. Effect of adding operation to already planned sequence of operations. Unless gradual and controlled implementation of additional operations made, factor will apply to all remaining and proposed contract hours.
10% 20% 30%
Continued……
![Page 27: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/27.jpg)
©M. Syal _2014 27
Construction Management, School of Planning, Design and Construction
Guidelines – Summary Template
Subtotal: A
BC
2. Profit % (C X %): D
Subtotal: E
C+D+E
III. CONSEQUENTIAL COSTS (per attached breakdown and justification OR reserve the right to submit later)
3. Delay Days and Costs (provide here OR indicate to provide later)2. Other Added Costs (add to direct job costs/expenses OR procide separately here
Total Change Order Cost:
Summary Change Order TemplateI. DIRECT COSTS
II. INDIRECT COSTS
1. Lost Labor Productivity Cost (add to direct labor cost OR provide separately here)
1. Labor (per attached breakdown)2. Labor Burden (per attached breakdown)3. Material (per attached breakdown and quotes)4. Equipment (per attached breakdown, quotes and/or rental schedule)5. Related Job Costs / Expenses (per attached breakdown)
1. Overhead % (modified to use as % of total direct costs, per attached calculations) (A X %): Subtotal (A+B):
![Page 28: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/28.jpg)
©M. Syal _2014 28
Construction Management, School of Planning, Design and Construction
Closing Observations • There is fair amount of contradictory information related to
change orders in various standard contract documents and other sources
• Owners are as unsure about many change order related issues as contractors are
• For overhead %, contractors should think of in terms of % of total change order amount and not just % of direct costs
• In the case of impact factors/consequential costs, the burden is on the contractor to make a professional case with detailed substantiation/calculations
• Quote from a task force member - “We have to keep putting these guidelines in the face of our clients. For too long we have been allowing clients to dictate how we price change orders. If we en masse start using these, it will help pushback and educate our clients, although it will not happen overnight.”
![Page 29: Change Order Guidelines - ELECTRI International Order-ELECTRI-July... · 1 ©M. Syal _2014 Construction ... Subcontractor Costs ... Total Change Order Cost: Summary Change Order Template](https://reader031.vdocuments.net/reader031/viewer/2022030417/5aa3050e7f8b9aa0108e00e1/html5/thumbnails/29.jpg)
©M. Syal _2014 29
Construction Management, School of Planning, Design and Construction
Thank You
Questions?