    Collaborative Engineering

    Change Order Process

    By

    Himanshu Jain Neopoint Consulting

    Tony Miller Metro

  • 8/14/2019 Change Order Process

    2/27

    Metro Overview

    Metro Integrated Environment

    Standard ECO Process

    Metro ECO Requirements

    Collaborative ECO Process

    How we did it

    Lessons Learned

    Agenda

  • 8/14/2019 Change Order Process

    3/27

    St. Louis Metropolitan areas public transit operator

    42.5 miles Light rail system

    467 Buses

    65 LRV

    120 Para-transit vans

    6 Garage/Maintenance facilities

    Metro spends $96 million annually to operate and maintain

    Metro Material Organization Structure

    Metro Overview

    CENTRAL Metro Link

    Brentwood Debalivere Illinois Saint Clair

  • 8/14/2019 Change Order Process

    4/27

    Oracle 11.5.9 Public Sector

    Financials, INV, WIP, BOM, OM, MSCA, CST, ENG, PO etc.

    Operational Environment

    Maintenance Operations Group

    Materials Management

    Integrated with Maximus Fleet-focus M5

    Collaboration between Operations and Materials Close to real time integration

    Validated material issues

    Job costing in M5 based on material issued

    Complete visibility of inventory on hand and transactions

    Controlled change process for any BOM changes

    Complete tracking and visibility of outside processing

    Integrated planning and scheduling

    Metro Integrated Environment

  • 8/14/2019 Change Order Process

    5/27

  • 8/14/2019 Change Order Process

    6/27

    Oracle Integration with M5

    Vehicle in forMaintenance

    Work OrderCreated in M 5

    Work Order

    Interfaced as

    Discrete Job

    Material Issued tothe Job

    MaterialAvailable ?

    Procure materialon Urgent basis or

    Hold the Job

    Y e s

    N o

    Cost

    Transactions

    Interface Issuetransaction to M 5

    Apply Material

    Issues to WorkOrder

    Accumulate JobCost

    E n d

    M5VehicleMaintenance

    System

    (Operations)

    OracleApplictions

    (MaterialsG

    roup)

  • 8/14/2019 Change Order Process

    7/27

    Problems with ECO Process

    Initiated on verbal communication from Operations

    No record in system of suggested changes

    Miscommunication Lead to wrong BOM & downstream effects

    Obsolete Inventory after changes

    POs not corrected appropriately

    At times lead to reactive process

    Waited for the material request from Operations

    Ordered material

    On receipt of material changed the BOM

  • 8/14/2019 Change Order Process

    8/27

    Standard ECO Life Cycle

    ECO process uses two Statuses

    ECO Status

    ECO Approval Status

    Standard ECO Life Cycle

    Sequence ECO Status Approved Status

    Start creating new ECO Hold Not Submitted for Approval

    Complete data entry Open Not Submitted for Approval

    Submit approval process N/A Approval Required

    Oracle W orkflow controlsapproval process

    N/A Approval Required

    Approve and release Released Approved

    Production updates date Scheduled N/A

    Effective date arrives Implemented N/A

  • 8/14/2019 Change Order Process

    9/27

    Standard ECO Approvals

    ECO Approval using workflow: In this approval process, the ECO type incombination with ECO priority is linked to an Oracle workflow process. Once the

    ECO is submitted for approval the workflow takes over and controls the process till

    approval is granted. Once that happens workflow automatically updates the status.

    ECO Approval using approval list: In this approval process, a simple approval list

    is used and submission for approval an Oracle alert is send out to all the members of

    the list. Once appropriate members approve the ECO, the status of the ECO is

    changed manually.

    No Formal Approval: In this case no formal approval is required and status is set toapproved

  • 8/14/2019 Change Order Process

    10/27

    Standard ECO Approval Workflow

  • 8/14/2019 Change Order Process

    11/27

    Metro ECO Requirements

    Multi level approval process

    Approval across departments

    Allow collaboration and communication between operations and

    material group Track and record all BOM changes

    FYI notifications to managers and planners

    Notification to creator on approval

    Controlled Implementation of changes

  • 8/14/2019 Change Order Process

    12/27

    ECO Approval Workflow

  • 8/14/2019 Change Order Process

    13/27

    How we Did It?

    Customized ECO Approval Workflow Passed Approval Hierarchy to custom workflow

    Defined ECO priorities

    Linked Priorities with ECO Type

    Associated Custom workflow to ECO Type and Priority

    Created Approval Hierarchy Defined First Approval List

    Superintendents of maintenance

    Defined Second Approval List VP of Maintenance

    Director of product development

    Defined For Information Only List Superintendent of maintenance

    VP of maintenance

    Forecast and production scheduler

    Manager production and inventory control

    Defined Approval Hierarchy in Manufacturing Lookups

  • 8/14/2019 Change Order Process

    14/27

    Metro ECO Approval Workflow

  • 8/14/2019 Change Order Process

    15/27

    Define ECO Priorities

  • 8/14/2019 Change Order Process

    16/27

    Define ECO Change Type

  • 8/14/2019 Change Order Process

    17/27

    Linking Workflow to ECO Type and Priority

  • 8/14/2019 Change Order Process

    18/27

    Define First Approval List

  • 8/14/2019 Change Order Process

    19/27

    Define Second Approval List

  • 8/14/2019 Change Order Process

    20/27

    Define ECO For Information OnlyList

  • 8/14/2019 Change Order Process

    21/27

    Approval Hierarchy in Manufacturing Lookup

  • 8/14/2019 Change Order Process

    22/27

    Profile Options

    Profile Settings for Changing Bills Only With ECOs

    To limit users access to bills of material only through ECOs, set the

    following Bills of Material profile options to No:

    BOM: Standard Item Access

    BOM: Planning Item Access

    BOM: Model Item Access

    And the following Engineering profile options to Yes:

    ENG: Standard Item Change Order Access

    ENG: Planning Item Change Order Access

    ENG: Model Item Change Order Access

    ENG: Engineering Item Change Order Access.

    Profile Settings for Changing Bills With or Without ECOs

    With the same seven profile options listed above all set to Yes, bills can

    be changed with or without ECOs.

  • 8/14/2019 Change Order Process

    23/27

    Benefits of Collaborative ECO process

    Intangible Benefits

    Better planning and Forecast is possible

    MRP is used to drive requirements

    Reduced material handling and warehouse management cost Operations can plan better with communication changes

    Operations validates and confirms changes

    No stock-outs because of better communication

    No loss of time waiting for material

    Shared responsibility of the change as everything is tracked andmaintained in the system

    Allows to collaborate with Operations to ensure all in stock material isused before change is implemented

  • 8/14/2019 Change Order Process

    24/27

    Benefits of Collaborative ECO process

    Tangible Benefits

    Reduced Obsolete material from $300,000 to $40,000 on an annual basis.

    Reduced inventorying of material by 25% because of better coordination.

    Before ECO only 11% of material was on Kits, After ECO almost 80%of it is on Kits

    Improved material availability to 99%

  • 8/14/2019 Change Order Process

    25/27

    Approvers did not log in to Oracle to approve on a regular basis.

    Changed to use of email notification

    Effective use ofWhere used parts list as part of the verificationprocess.

    Coordination between purchasing and product forecasters

    Setting up alerts to facilitate this process

    Changes to approval hierarchy as organization structure changes.

    Simple configuration changes to Approval list and Approval hierarchyenabled this easily

    Lessons Learned

  • 8/14/2019 Change Order Process

    26/27

    AQ&Q U E S T I O N SQ U E S T I O N SA N S W E R SA N S W E R S

  • 8/14/2019 Change Order Process

    27/27

    Thank You

    Himanshu Jain [email protected]

    Tony Miller [email protected]