channel repair and automation of the main canal of … · a modernization of the exploitation and...

2
WATER & ENVIRONMENT CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO AMBIENTE, S.L. CHANNEL REPAIR AND AUTOMATION OF THE MAIN CANAL OF THE TURIA CONTRACT INFORMATION ADMINISTRATIVE INFORMATION TECHNICAL INFORMATION CONTRACT TYPE: Technical Assistance to the Work Management. CONTRACT NAME: Technical Assistance to the Work Management included in the Urgent Action 3.2.j “Channel Repair and Automation of the Main Canal of the Turia (Valencia), Collection in Law 11/2005” LOCATION: Valencia (Spain) BUDGET: 1,248,374.03 € WORK BUDGET: 18,159,732.27 € CLIENT: ACUAMED S.A. DATE (BEGINNING – END): August 2007 – October 2012 Length of Canal 70,044.00 ml Covered irrigation Surface 24,500.00 ha Clean residuals from area 33.656,00 m 3 Covering cannel with slab 7,365.00 m 2 Waterproofing 4,700,00 ml Floodgate types Narcy, Narbio y Narmil… 14.00 units Flat guard gates 12.00 units Beacons with mask modules 23.00 units Flat folding gates 2.00 units Ultrasonic flowmeter 3.00 units Bubbling measurement equipment 4.00 units Parshall type gauging sections 4.00 units Remote control system 1.00 units Mariana Fountain Tunnel 1,616.75 ml Weir Outlet Benageber - Flow Rate 72.00 m 3 /s - Height 3.00 m Draining of “El Romano” - Flow Rate 19.50 m 3 /s - Wall of gabions in slope 5,038.00 m 3 WORK OBJECTIVE The works have the objective to guarantee the correct functioning of the canal, giving a solution to the different structural problems of stability, filtration, draining, etc. that are present. DEVELOPED TASKS Geometric Control Economic Control Quality Control of Materials Initial and Final Project Repot Monthly Reports Liquidation Project of the Work Price Revisions PROJECT LOCATION

Upload: others

Post on 27-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHANNEL REPAIR AND AUTOMATION OF THE MAIN CANAL OF … · a modernization of the exploitation and control of the canal is undertaken through the replacement of the current intake

WATER & ENVIRONMENT

CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO AMBIENTE, S.L.

CHANNEL REPAIR AND AUTOMATION OF THE MAIN CANAL OF THE TURIA

CONTRACT INFORMATION

ADMINISTRATIVE INFORMATION TECHNICAL INFORMATION

CONTRACT TYPE: Technical Assistance to the Work Management.

CONTRACT NAME: Technical Assistance to the Work Management included in the Urgent Action 3.2.j “Channel Repair and Automation of the Main Canal of the Turia (Valencia), Collection in Law 11/2005”

LOCATION: Valencia (Spain)

BUDGET: 1,248,374.03 €

WORK BUDGET: 18,159,732.27 €

CLIENT: ACUAMED S.A.

DATE (BEGINNING – END): August 2007 – October 2012

Length of Canal 70,044.00 ml Covered irrigation Surface 24,500.00 ha Clean residuals from area 33.656,00 m3 Covering cannel with slab 7,365.00 m2 Waterproofing 4,700,00 ml Floodgate types Narcy, Narbio y Narmil… 14.00 units Flat guard gates 12.00 units Beacons with mask modules 23.00 units Flat folding gates 2.00 units Ultrasonic flowmeter 3.00 units Bubbling measurement equipment 4.00 units Parshall type gauging sections 4.00 units Remote control system 1.00 units Mariana Fountain Tunnel 1,616.75 ml Weir Outlet Benageber - Flow Rate 72.00 m3/s - Height 3.00 m

Draining of “El Romano” - Flow Rate 19.50 m3/s - Wall of gabions in slope 5,038.00 m3

WORK OBJECTIVE

The works have the objective to guarantee the correct functioning of the canal, giving a solution to the different structural problems of stability, filtration, draining, etc. that are present.

DEVELOPED TASKS

Geometric Control

Economic Control

Quality Control of Materials

Initial and Final Project Repot

Monthly Reports

Liquidation Project of the Work

Price Revisions

PROJECT LOCATION

Page 2: CHANNEL REPAIR AND AUTOMATION OF THE MAIN CANAL OF … · a modernization of the exploitation and control of the canal is undertaken through the replacement of the current intake

WATER & ENVIRONMENT

CPS INFRAESTRUCTURAS MOVILIDAD Y MEDIO AMBIENTE, S.L.

WORK DESCRIPTION

Drainage works are undertaken (guard gutters, underpasses, fords, overpasses, inlets, sewer upgrades); the repair of siphons; the repair of tunnels (cleaning, reinforcement of slab, vault lining, drains, nozzles); the residual cleaning in the canal; the repair of slabs and boxes; waterproofing and joint treatments; Covering of channel sections with slab; and finally, heightening of the section. A new tunnel of 1,600.16 m is also constructed to suppress a section of the canal located on an unstable slope; a drain that allows a 100 m gap between the canal and outlet, protecting the slope by means of a gabion wall: a new weir at the foot of the dam allows the release, if necessary, of a flow of 72 m3/s. Likewise, a modernization of the exploitation and control of the canal is undertaken through the replacement of the current intake systems, automation and remote control thereof, including the construction of a control center. Carrying out the renovation of the intakes, implementing level and constant gates and mask modules. The other key point of the work aims to facilitate the access and maintenance of the channel through conditioning of the different service roads. This is achieved by cleaning and improving access and the new roads and the execution of safety and signaling works.

New Tunnel “Mariana Source” New Tunnel “Mariana Source”

New dam at base of Benageber dam Draining of Romano

Siphon of Pilatos Irrigation Outlet “Losa del Obispo”