chapter 1: introduction

45
Vermelding onderdeel organisatie February 1, 2012 1 Breakwaters and Closure dams Kust- en oeverwerken II ct5308 Breakwaters and Closure Dams H.J. Verhagen Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering

Upload: tu-delft-opencourseware

Post on 19-Jun-2015

515 views

Category:

Technology


0 download

DESCRIPTION

CT5308 chapter 1 introduction

TRANSCRIPT

Page 1: Chapter 1: Introduction

Vermelding onderdeel organisatie

February 1, 2012

1

Breakwaters and Closure dams

Kust- en oeverwerken II

ct5308 Breakwaters and Closure Dams

H.J. Verhagen

Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering

Page 2: Chapter 1: Introduction

February 1, 2012 2

elements

• Lectures • Book:

Breakwaters and Closure Dam Verhagen, d’Angremond & Van Roode published by Spon, UK £ 40 (paperback) available via VSSD (normal €39.50, members € 19) available as “netbook” via Library (only TU-ip)

• Website: via Blackboard go to course ct5308 • practical information • PowerPoint presentations • additional texts

• Assessment: • via exercise • via oral examinations

Page 3: Chapter 1: Introduction

February 1, 2012 3

Netbook version

• goto http://discover.tudelft.nl

• type “breakwaters and closure dams”

• click on book (Spon version)

• click on “Go to full text”

• Good links, but only useful in online version

Page 4: Chapter 1: Introduction

February 1, 2012 4

Example Netbook

Page 5: Chapter 1: Introduction

February 1, 2012 5

Other references

• Rock Manual (2007)

• Closure of Tidal Basins (1987)

• Coastal Engineering Manual

• Various PIANC publications

• EN13383

• Manual on the use of… (2x)

• CD-ROM will be made available

Page 6: Chapter 1: Introduction

February 1, 2012 6

1. Introduction

2. Coastal Hydrodynamics

3. Coastal Sediment Processes

4. Coastal Geology

5. Coastal Project planning and design

6. Design of coastal project elements

7 Appendices (Glossary)

http://chl.erdc.usace.army.mil/cemtoc

Coastal engineering manual (shore protection manual)

Page 7: Chapter 1: Introduction

February 1, 2012 7

Design of Coastal Project Elements (Hughes, updated 6/1/2006)

1 Introduction to Coastal Project Element Design

2 Types and Functions of Coastal Structures

3 Site Specific Design Conditions

4 Materials and Construction Aspects

5.1 Fundamentals of Design - Part 1

5.2 Fundamentals of Design - Part 2

5.3 Fundamentals of Design - Part 3

6 Reliability in Design

7 Design of Specific Project Elements - Case Studies

8 Monitoring, Maintenance and Repair of Coastal Projects

Page 8: Chapter 1: Introduction

February 1, 2012 8

Page 9: Chapter 1: Introduction

February 1, 2012 9

Page 10: Chapter 1: Introduction

February 1, 2012 10

Page 11: Chapter 1: Introduction

February 1, 2012 11

Page 12: Chapter 1: Introduction

February 1, 2012 12

organization Master Hydraulic Engineering

Page 13: Chapter 1: Introduction

February 1, 2012 13

Making a mattress

Page 14: Chapter 1: Introduction

February 1, 2012 14

Bed protection

Page 15: Chapter 1: Introduction

February 1, 2012 15

??

Page 16: Chapter 1: Introduction

February 1, 2012 16

Completed block mat

Page 17: Chapter 1: Introduction

February 1, 2012 17

Block mat factory

Page 18: Chapter 1: Introduction

February 1, 2012 18

Transport of the block mat

Page 19: Chapter 1: Introduction

February 1, 2012 19

Placing the block mat

Page 20: Chapter 1: Introduction

February 1, 2012 20

Caspian quarry, Dubai

Page 21: Chapter 1: Introduction

February 1, 2012 21

Quarry in Bulgaria

Page 22: Chapter 1: Introduction

February 1, 2012 22

Larvik, Norway

Page 23: Chapter 1: Introduction

February 1, 2012 23

Loading a quarry train

Page 24: Chapter 1: Introduction

February 1, 2012 24

Quarry train for the Maasvlakte 1

Page 25: Chapter 1: Introduction

February 1, 2012 25

Loading a stone barge (Palm I, Dubai)

Page 26: Chapter 1: Introduction

February 1, 2012 26

The split barge

Page 27: Chapter 1: Introduction

February 1, 2012 27

Split barge

Page 28: Chapter 1: Introduction

February 1, 2012 28

Heavy stonework (Palm I, Dubai)

Page 29: Chapter 1: Introduction

February 1, 2012 29

Large construction cranes

Page 30: Chapter 1: Introduction

February 1, 2012 30

Placing riprap by crane

Page 31: Chapter 1: Introduction

February 1, 2012 31

Placing riprap by crane

Page 32: Chapter 1: Introduction

February 1, 2012 32

Using the orange peel grab

Page 33: Chapter 1: Introduction

February 1, 2012 33

Side stone dumping vessel

Page 34: Chapter 1: Introduction

February 1, 2012 34

side stone dumping vessel

Page 35: Chapter 1: Introduction

February 1, 2012 35

ship for placing concrete cubes

Page 36: Chapter 1: Introduction

February 1, 2012 36

Placing cubes by helicopter

Page 37: Chapter 1: Introduction

February 1, 2012 37

Helicopter in action

Page 38: Chapter 1: Introduction

February 1, 2012 38

Emergency closure in New Orleans

Page 39: Chapter 1: Introduction

February 1, 2012 39

Closure with a cable car

Page 40: Chapter 1: Introduction

February 1, 2012 40

Horizontal closure by tipping (Korea)

Page 41: Chapter 1: Introduction

February 1, 2012 41

Closing with sand bags and sack-gabions

Page 42: Chapter 1: Introduction

February 1, 2012 42

Sirevåg Berm breakwater

Page 43: Chapter 1: Introduction

February 1, 2012 43

Antifer blocks at Sines (Portugal)

Page 44: Chapter 1: Introduction

February 1, 2012 44

Breakwater under construction

Page 45: Chapter 1: Introduction

February 1, 2012 45

Xbloc armour units in Bar Beach