chapter 26 - scaffolding guideline
TRANSCRIPT
-
8/10/2019 Chapter 26 - Scaffolding Guideline
1/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 1of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
ADWEA HSE PROCEDURE MANUAL
SCAFFOLDING GUIDELINES
Prepared
by:
Date:
HSE Specialist
Reviewedby: Date:
Technical Advisor
Approved
by:
Date:
Planning & Development
Director
-
8/10/2019 Chapter 26 - Scaffolding Guideline
2/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 2of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
ABE F CE
1. :..................................................................................................... 4
2. A A, A AA: ............................................... 4
3. : ......................................................................................................... 4
4. AA AA, A : ......................................... 6
5. AA A: ......................................................................................... 7
6. AB A A A:................................................................ 10
7. , AA A A: ......................................................... 13
8. , AA A ......................................................... 14
9. A .................................................................................................. 14
10. A A.............................................................................................. 15
11. A A ...................................................................................... 17
AA
A A () ....................................................................... 19
B A ................................................................................................ 20
A ...................................................................................... 22
A.................................................. 24
A B ................................................. 25
AA A A & A .................. 26
A A A B A..................................... 27
AA ................................................................................................ 31
AA ................................................................................................ 32
-
8/10/2019 Chapter 26 - Scaffolding Guideline
3/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 3of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
A
A B A A B
A
1 1 HE A HE
1 4 3 : HA18001:2007
-
8/10/2019 Chapter 26 - Scaffolding Guideline
4/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 4of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
1. :
,
.
2. A A, A AA:
,
CAC :
A . (32) 1982.
BH ADAD, B 1139: 1990 .
BH ADAD, B 2482: 1981 .
BH ADAD, B 5973: 1993 C A
.
BH ADAD, B 5974: 1990 C
.
3. :
F G, , .
B : A .
B:
.
B: A
.
B :A ,
5.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
5/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 5of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
B : A
, .
: A
() .
: A , ,
,
.
:A .
: F , ,
.
:A
.
:A
.
: A ()
.
.
: .
:A .
: A ,
.
: A ,
.
: A .
A : A .
-
8/10/2019 Chapter 26 - Scaffolding Guideline
6/32
-
8/10/2019 Chapter 26 - Scaffolding Guideline
7/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 7of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
A .
. B
.
A :
1. A
.
2. A .
3. A ;
, .
4. A , .
B:
A B . B 2482
.
B
.
.
B 300
12.
B 2482
.
5. AA A (A )
50
,
, B 5973
.
,
.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
8/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 8of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
,
.
:
A .
B
.
,
.
35 219 .
1,0002,
, 1,7002.
:
A .
.
,
.
.
, :
.
A
.
.
B:
B
.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
9/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 9of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
.
.
A
35 55
.
, .
B
30.
:
4 () 6 .
.
.
B, : 6.25
: 3.50
D : 6.25
E 12.5 .
:
A
, .
A .
E
.
; 50.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
10/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 10of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
,
.
150 .
,
300.
G
2.
G 910
1.15 .
765.
38 1.50 50 150
50 2.60 50 200
63 3.25 50 250
225
; ,
,
600 650
3
850
( 430
,
)
4
F
1.05 5
1.30 6
1.50 7
-
8/10/2019 Chapter 26 - Scaffolding Guideline
11/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 11of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
6. AB A A A
,
.
A . . A ,
, .
E . A
.
4:1 ( 4
, 1 ) (A G). ,
(.. ) , ,
.
A 900 (3 ) , ,
, (AG).
.
B, , , ., .
600 (2 ) .
.
, ,
.
.
.
B .
.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
12/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 12of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
,
, , .
,
,
.
, ,
.
,
, .
760 (30 )
.
,
610 (24 ) .
250
(10 ).
, (.. , , .)
, .
330 (13 )
.
100 (4 )
.
410 (16 ).
, ,
. .
-
8/10/2019 Chapter 26 - Scaffolding Guideline
13/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 13of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
.
D , , .
B ,
, , .
.
.
.
.
1.8
(6
) ,
.
, , .
,
.
, :
. B
.
.
D , , , ,
.
.
D .
.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
14/32
-
8/10/2019 Chapter 26 - Scaffolding Guideline
15/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 15of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
,
.
8. , AA A
, C F , ,
,
, , . C' F ()
.
,
C F ,
. /
. C F /
' (A A).
9. A
C F
, " "
" " (A H). :
D E,
/2
D , F
D ,
D , F .
E D
D D
A .
C ,
, .
-
8/10/2019 Chapter 26 - Scaffolding Guideline
16/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 16of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
10. A A
A 50 25 , H,
B, B, , , C , H , B
F, C' C E
B . B 5973 .
E
, C.
A , C' E
C
" ". C "" .
(A ):
.
,
, .
, , 150 . C
.
A 6.
,
.
, ,
150 .
E ,
.
2.7 .
B :
, .. , ;
-
8/10/2019 Chapter 26 - Scaffolding Guideline
17/32
-
8/10/2019 Chapter 26 - Scaffolding Guideline
18/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 18of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
.
1/3,
, .
.
11. A A
C .
.
, C
, ,
.
C , ,
. ,
.
.
C
.
E .
.
D .
.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
19/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 19of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment A Scaffold Inspection(s) Register
Name of Contractor
Address of Site
Work Commenced Date
Location and description of scaffold etc. Date of Resul t of inspection Name and s ignature of person
and other plant or equipment inspected Inspection State whether in good order who made the inception
Short check list - at each inspection check that your scaffolding does not have these faults:
WEEK WEEK WEEK1 2 3 4 1 2 3 4 1 2 3 4
FOOTINGS Soft and uneven BRACING Some missing TIES Some missing
No base plates Facade and Loose LooseNo side boards Ledger Wrong FittingsUndermined BOARDING Bad boards
PUTLOGS Wrongly spaced Trap boardsAND Loose Incomplete
STANDARDSNot plumb TRANSOMSWrongly supported InsufficientJoined at same height Wrong fittings SupportsWrong spacing LooseDamaged GUARD Wrong heigh
COUPLINGSDamaged RAIL & LooseNo check Couplers TOE BOARDSome missing
LEDGERS Not levelJoint in same bays BRIDLES Wrong Space LADDERS DamagedLoose Wrong Coupling Insufficient lengthDamaged Weak Support Not tied
SCAFFOLD INSPECTIONSSCAFFOLD INSPECTIONSSCAFFOLD INSPECTIONSSCAFFOLD INSPECTIONS
-
8/10/2019 Chapter 26 - Scaffolding Guideline
20/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 20of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment B Scaffold Fittings
BASE PLATE
ADJUSTA!3LE BASE PLATE
RJGHT -ANGLE COULPER
PUTLOG COUPLER
UNIVERSAL COUPLER
BRACE COUPLER
-
8/10/2019 Chapter 26 - Scaffolding Guideline
21/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 21of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Swivel Coupler
Joint Pin
Reveal Pin
Sleeve Coupler
-
8/10/2019 Chapter 26 - Scaffolding Guideline
22/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 22of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment C Scaffold Terminology
-
8/10/2019 Chapter 26 - Scaffolding Guideline
23/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 23of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
-
8/10/2019 Chapter 26 - Scaffolding Guideline
24/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 24of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment D Through Tie for Independent Tied Scaffold
Tie fixed with right angle couplersand placed close to the windowreveal.
-
8/10/2019 Chapter 26 - Scaffolding Guideline
25/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 25of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment E Independent Tied Scaffold Column Box Tie
-
8/10/2019 Chapter 26 - Scaffolding Guideline
26/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 26of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment F Standard Scaffolds Typical Independent & Putlog
Scaffold
-
8/10/2019 Chapter 26 - Scaffolding Guideline
27/32
-
8/10/2019 Chapter 26 - Scaffolding Guideline
28/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 28of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Fabricated Tabular Frame Mobile Scaffold
-
8/10/2019 Chapter 26 - Scaffolding Guideline
29/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 29of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Tower Scaffold
Portable Ladder
-
8/10/2019 Chapter 26 - Scaffolding Guideline
30/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 30of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
H
H
3.5 1 3 1
(.. )
, .
G B
A ,
B
B C
G
B
C (A
A &
)
D &
B
D D
-
8/10/2019 Chapter 26 - Scaffolding Guideline
31/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 31of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
This document is the property of ADWEA, and can not be used nor given to outside party without prior authorisation
Attachment H Scafftag Inserts
Note:-The front of the Scafftag is to have a green background with white lettering.The back of the Scafftag is to have a yellow background with black lettering
SCAFFTAG
ERRECTION ANDINSPECTION RECORD
Location ________________________
Date Erected ___________________
Built By ______________________
Date Inspected __________________
Forman Scaffolder Signature ___________
Date Modified ___________________
Modified By _____________________
Date Re-inspected ______________
Forman Scaffolder Signature___________
Expiry Date of Label __________
Dismantling Date _______________
STRUCTURE TO BE
USED FOR
Very Light Duty
0.75 kN/m2
Light Duty1.50 kN/m2
General Purpose2.00 kN/m2
Heavy Duty2.5 kN/m2
Special Purposes.kN/m2
WARNING
UNLAWFUL REMOVAL ORINTERFERENCE WITH THIS SIGNCOULD MAKE YOU LIABLE FOR
DISCIPLINARY ACTION
Contractors Forman Scaffolder(every 7 days)
DATE SIGNED
LADDER No RUNGS: _______________
No OF STANDARDS: _______________
No OF LIFT: _______________________
M2 BOARDING _____________________
STRUCTURE DECOMMISIONED
DATE: ____________________________
SIGNATURE: _____________________
-
8/10/2019 Chapter 26 - Scaffolding Guideline
32/32
Effective Date : 18.06.2009
Volume Chapter Version
19 26 1ABU DHABI WATER AND ELECTRICITY
AUTHORITY (ADWEA)
Page 32of 32
Approved by:
SCAFFOLDINGGUIDELINES Director of Planning & Development
The Scafftag is to be placed in the Scafftag Holder (See attachment -I)
Attachment I Scafftag Holder