    Chapter 14

    Network Design and Implementation

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    2/29

    Agenda

    A nalysis and Design

    ImplementationL A N Voice Network Design

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    3/29

    A nalysis and Design Phases

    Request Feasibility Study

    A nalysis (requirement)A lternatives (cost and benefit)

    Design Selection Cost Documentation Management approval

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    4/29

    Implementation Phases Purchasing and vendor agreement Installation Training, and testing Conversion Follow up audit

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    5/29

    Request

    Source User Senior managers

    Communication department External environment (customer, government, etc.)

    Form: formal or informal Prioritization (costs & benefits analysis) Outcome: approval, deny, or on hold by

    management

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    6/29

    Feasibility Study

    Team User, specialist, and management

    Problems Technical or non-technicalA nalysis (technical, operational,economical, legal, schedule)

    Report and presentation Go or stop

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    7/29

    A nalysis

    A nalysis items Geographic requirement (scope) Traffic load analysis

    Peak load (no. of message and length) National & international busy hour

    Traffic flow pattern by individual location (map) Response time, reliability, & availability (cost) Terminal operators (end users & their education

    background and needs) Capacity growth projection (6 months to 5 years) Constraint: time, cost, and compatibility

    Documentation and reports

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    8/29

    Alternatives

    Sources (vendors)A vailability (enchancements or new

    products) Incompatibility issues Costs/services trade off

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    9/29

    Design Items

    Configuration diagram Routing time (peak and average) Response time (peak and average) Delay consideration (queue)

    Simulation What if for routing, response, and delay

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    10/29

    Selection Procedures Request for proposal (RFP) or request for

    quotation (RFQ) Selection criteria and its weight

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    11/29

    Request for Proposal

    Title Table of contents Description of organization Problem definition Operation requirements Format of response Evaluation criteria Decision schedule References

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    12/29

    Description of Organization Organization chart Organization locations Overview of system

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    13/29

    Problem Definition Error rate Misrouting Time consuming Security

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    14/29

    Operation Requirements

    Reliability Down time

    Misrouting Lost message Transmission error

    Performance Throughput Response time Error rate

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    15/29

    Format of Response - I

    Title Table of contents Overview Software (function & feature) Hardware (function, feature, & capacity) Performance (future growth) Site requirement Conversion (installation, testing, &

    schedule)

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    16/29

    Format of Response - II Maintenance (support) Costs Warranty Coverage User Training References Other related information

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    17/29

    Selection criteria Proposed solution Compatibility Security and backup Price Technical support Product maintenance Repair service Financial viability

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    18/29

    Vendor Response to RFP - I Introduction Executive summary Table of contents System design System feature Growth capacity Installation and testing methods Maintenance arrangements Ongoing support Installation schedule Pricing and timing of payments Warranty coverage Training and education Other Recommendation

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    19/29

    Documentation Diagrams and maps Configuration and wiring

    Components list Hardware: model and specification Software: version, release, no. of copies

    Implementation plan (Gantt chart) Milestones A ctivities Schedule

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    20/29

    ManagementA

    pproval Review and verification

    Users Operators

    Management: budget

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    21/29

    Purchasing

    Vendor agreement Equipment configuration specification A cceptance test

    Schedule: delivery, installation, testing,operation

    Location: delivery, installation, testing,operation

    Other terms and conditions: payment, warranty,maintenance

    Get a experienced lawyer

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    22/29

    Training

    Types of instruction Classroom Hand on

    In house Outside

    Educating Users Operators Maintenance crew

    Security and backup

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    23/29

    Testing

    Testing time Testing Tools

    Software & hardware IBMs Telecommunication Network Simulator

    Testing areas Performance Stress testing (load) Error handling Error recovery procedures

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    24/29

    Conversion Types

    Parallel

    Cut over Pilot Piece by piece

    Help desk Vendor technicians or consultants Implementation problems cleanup

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    25/29

    Audit

    A fter six months Check performance or success criteria Formal report to management for proper

    actions

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    26/29

    LA

    N Design Number of nodes Usage Traffic: day and time Disk storage Speed Security and backup Compatibility Management

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    27/29

    Voice Network Design Peak load and average load Grade of service Capacity & usage of circuits Overdesigning or planned delay

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    28/29

    Points to Remember

    A nalysis and Design Implementation

    L A N Voice Network Design

  • 8/6/2019 Chapter+14+Network+Design+and+Implementation

    29/29

    Discussion Develop a simple request for proposal to

    add e-business to a traditional departmentstore.