Chuuk  State    

Typhoon  Maysak  Storm  Damage  Assessments  Schools  and  Dispensaries  

June  2015    

 Assessments  and  Report  by:    Karen  Wonders,  PE  and  Phillip  Gianan  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  1    

June  2015  

 

Table  of  Contents    Introduction   2  

Map  of  Chuuk  Lagoon   2  

Recommendations   3  

Table  1  –  Weno  Island   3  

Photographs  –  Weno  Island   3  –  5  

Table  2  –  Chuuk  Lagoon   6  

Photographs  –  Chuuk  Lagoon   6  –  10  

Conclusions  –  A  Way  Forward   11  

Appendix  A  –  Map  of  Chuuk  Lagoon  (large)    

Appendix  B  –  Repair  Cost  Estimates    

Appendix  C  –  Summary  of  Materials      

 

Chuuk  State  –  TM  Storm  Damage  Assessments  2    

June  2015  

 

Introduction  During  the  first  week  of  June  2015,  a  team  consisting  of  the  Director  of  OEEM  and  two  staff  engineers  from  the  Department  of  Transportation,  Communication  &  Infrastructure,  traveled  to  meet  with  Chuuk  State  officials.    The  team  discussed  the  FSM  National  Government’s  continued  support  for  their  ongoing  typhoon  relief  efforts.    The  goal  and  mission  of  this  endeavor  was  to  primarily  identify  schools  with  relatively  minor  damages  that  may  be  repaired  in  a  timely  manner  for  the  beginning  of  the  next  school  year  with  the  funding,  technical  and  possible  logistical  assistance  of  the  FSM  National  Government.    For  the  purpose  of  this  report  and  so  as  not  to  exclude  any  schools  in  need,  the  facilities  requiring  more  extensive  repairs  are  also  included  for  future  consideration  and  are  noted  with  an  asterisk  (  *  ).        In  addition  to  the  meetings  with  State  officials,  the  engineers  conducted  school  and  dispensary  inspections  in  conjunction  with  the  continuing  relief  runs  in  the  Chuuk  Lagoon.    The  Indie  Trader  ship  was  chartered  by  IOM  and  was  offered  as  the  vehicle  of  transportation  to  the  Lagoon  islands.    This  report  is  a  compilation  of  the  inspections  conducted  in  June  2015  as  well  as  those  assessments  performed  in  April  2015.    Please  reference  the  report  titled,  ‘Typhoon  Maysak  Preliminary  Storm  Damage  Assessments  of  Critical  Infrastructure’,  for  additional  support  information.    

Map  of  Chuuk  Lagoon:  

    School       Dispensary     Dock  or  Sea  Wall  

 (Larger  version  of  map  is  included  in  the  Appendix)    

 

Chuuk  State  –  TM  Storm  Damage  Assessments  3    

June  2015  

 

Recommendations  In  preparation  of  these  recommendations,  we  attempted  to  list  schools  and  other  facilities  in  the  order  of  repair  magnitude  from  the  most  minor  to  the  most  critical.    Materials,  labor,  mobilization  (i.e.,  location  accessibility)  and  school  population  have  been  considered  for  the  compilation  of  this  list;  however,  it  is  only  intended  to  serve  as  a  guide  for  timing  and  progress  of  repair  work  and  not  a  strict  order  of  completion.    Other  factors  may  influence  the  order  and  timing  of  repairs.      At  this  time,  only  the  Chuuk  Lagoon  has  been  evaluated.      Due  to  the  larger  population  of  students  affected  and  ease  of  location  in  relation  to  acquiring  materials,  it  is  suggested  to  complete  repair  works  on  Weno  Island  first.    The  following  assessed  schools  have  varying  degrees  of  damage:    Table  1  –  Weno  Island:    

Name  of  Facility   Summary  of  Damages   Cost  Estimate  (approximate)  

Sapuk  Elementary   Peak  of  roof  partially  removed;  power  meter  support  detached   $1,000  

P&P  Elementary   Hole  in  roof  over  the  principal’s  office   $7,000  

*  St.  Cecilia  School  Severe  damage  to  upper  classroom  building  roof;  covered  walkway  missing  sections  of  roofing;  outdoor  student  meeting  area  lost  roof  cover  

$120,000  

Mwan  Elementary   Gutter  damage;  roofing  missing;  roof  overhang  panels  missing  underside   $2,250  

Neouo  Elementary   Internal  classroom  partitions  temporarily  propped  into  place;  small  amount  of  roofing  damage   $4,500  

*  Critical  damages  requiring  extensive  construction  effort  in  order  to  bring  school  online  before  school  year    

               Sapuk  –  View  of  roof  damage  along  the  peak   Sapuk  –    Power  meter  detached  

from  building  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  4    

June  2015  

 

                         

 

                       

                     

     

P&P  –  Showing  hole  in  roof  over  principal’s  office   P&P  –  View  of  hole  in  roof  from  inside  the  building  

St.  Cecilia  –  Upper  classroom  building  roof  damage   St.  Cecelia  –  View  inside  upper  classroom  building  

St.  Cecelia  –  Missing  sections  of  walkway  covering   St.  Cecelia  –  Student  meeting  area  with  missing  roof  covering  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  5    

June  2015  

 

                       

 

                         

Mwan  –  View  of  gutter  and  roof  damage   Mwan  –  Missing  roofing  panels  

Neouo  –  View  of  pealing  roof  panel   Neouo  –  Classroom  partitions  are  unstable  and  temporarily  braced  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  6    

June  2015  

 Table  2  –  Chuuk  Lagoon:    

Name  of  Facility   Summary  of  Damages   Cost  Estimate  (approximate)  

Etan  Island  -­‐  School   Gutters  are  missing  or  partially  detached   $1,300  

*  Dublon  (Tonoas)  Island  -­‐  School  

School  building  destroyed;  large  hole  in  roof  of  principal’s  office;  solar  panel  cracked  atop  toilet  facility   $41,400  

*  Uman  Island  –  School  and  dock  

Critical  roof  damage  to  a  one-­‐third  of  roof;  toilet  roofing  damaged;  partial  collapse  of  dock  

Dock:    $2,000  

School:    $44,319  

*  Fefen  Island  -­‐  School   Critical  roof  damage  to  upper  school  building;  toilet  facility  destroyed   $65,246  

Parem  Island  –  School  and  dock  

Minimal  roof  damage  to  school;  portion  of  concrete  dock  collapsed   Dock:    $11,587  

Eot  Island  –  School  and  dock   Small  roof  damage  to  school  including  peak;  portion  of  concrete  dock  collapsed  

Dock:    $5,040  

School:    $32,623  

Udot  Island  –  School   No  school  or  dispensary  damage.    Note:    the  school  WiFi  tower  was  damaged  and  non-­‐functioning   -­‐-­‐-­‐-­‐  

Romanum  Island  –  Dispensary  

Minimal  roof  damage  to  dispensary.    Note:  the  radio  tower  is  bent  over  due  to  the  storm   $1,500  

Patta  Island  –  School   2-­‐classroom  plus  storage  room  school  building  lost  roof  and  portions  of  siding   $14,902  

*  Onei  Island  –  School  and  dispensary  

Critical  loss  of  entire  roof  on  2-­‐story  school;  first  floor  mold  on  ceilings;  loss  of  half  of  dispensary  roof  

Dispensary:    $10,018  

School:    $68,933  Fanapanges  Island  –  Dispensary  

Small  roof  damage  to  dispensary   $5,000  

*  Critical  damages  requiring  extensive  construction  effort  in  order  to  bring  school  online  before  school  year    

                   

   

Etan  –  Missing  gutters  on  school  building   Etan  –  Gutters  missing  that  feed  rain  water  catchment  tanks  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  7    

June  2015  

 

                         

 

                 

 

                                             

Dublon  –  School  building  damaged  and  unable  to  use;  walls  are  propped  up  to  prevent  collapse  

Dublon  –  Roof  damage  over  principal’s  office  

Uman  –  Sapou  –  Roof  damage  to  one-­‐third  of  school  building  

Uman  –  Sapou  –  View  of  roof  damage  from  underside  

Fefen  –  Inaka  –  Views  of  serious  roof  damage  from  the  front  of  the  building  <    from  inside  the  classroom  <<  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  8    

June  2015  

 

                                           

                                           

                                       

Parem  –  School  building  roof  damage  and  underside  of  roof  overhang  

Eot  –  Loss  of  roof  panels  on  school  building  <<    Cracking  in  floor  inside  classroom  <  

Udot  –  WiFi  antennae  leaning  and  non-­‐functioning  <<    Romanum  –  Roof  damage  on  dispensary  <  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  9    

June  2015  

 

                     

                       

 

                       

       

Patta  –  Loss  of  roof  for  two-­‐classroom  school  building   Patta  –  View  from  inside  classroom;  roof  damage  

Onei  –  Bokuku  –  Upper  floor  of  school  building  with  no  roof  

Onei  –  Missing  roof  panels  on  dispensary  

Fanapanges  –  Damaged  roof  on  dispensary   Fanapanges  –  Missing  sections  of  dispensary  roof  overhang  

 

Chuuk  State  –  TM  Storm  Damage  Assessments  10    

June  2015  

 

Conclusions  –  A  Way  Forward    The  FSM  National  Government  wishes  to  assist  in  the  typhoon  recovery  effort  sustained  from  Typhoon  Maysak.    In  an  effort  to  provide  immediate  support  and  assistance  to  those  public  facilities  in  need  of  repairs,  the  Department  of  Transportation,  Communication  &  Infrastructure  should  work  in  conjunction  with  the  Office  of  Emergency  and  Environmental  Management  to  discuss  logical  procedures  to  move  forward  and  to  arrange  the  procurement  of  materials  recommended  in  this  report.    These  materials  would  then  be  delivered  by  national  government  marine  vessels  to  the  appropriate  islands  and  facilities  and,  under  TC&I  or  Chuuk  State  Planning  supervision,  request  local  volunteers  to  assist  with  the  repairs  to  the  schools  and,  if  possible,  the  affected  dispensaries  as  well.    The  majority  of  these  facilities  are  on  private  or  leased  land  and  therefore,  would  require  the  cooperation  of  the  landowners.      Another  option  is  to  bid  the  work  out  to  local  contractors  to  procure  materials  and  repair  the  schools  in  time  for  the  start  of  the  next  school  year.    This  option  would  require  additional  time  to  prepare  bid  documents  as  well  as  advertising  the  project(s).    Contractors  have  more  professional  expertise  and  theoretically,  would  produce  a  higher  quality  product.    Land  ownership  issues  may  cause  delays  although  in  the  interest  of  repairing  the  public-­‐use  facilities,  this  would  seem  to  be  unlikely,  however,  the  possibility  exists.    TC&I  is  available  for  further  assistance  for  the  mission  to  repair  schools  and  other  facilities  damaged  by  Typhoon  Maysak.    We  stand  ready  to  provide  our  expertise  as  required  in  light  of  the  pending  of  the  new  school  year.              

 

Chuuk  State  –  TM  Storm  Damage  Assessments  11    

June  2015  

 

           

APPENDIX  A    

MAP  of  CHUUK  LAGOON    

   

 

Chuuk  State  –  TM  Storm  Damage  Assessments  12    

June  2015  

 

    School       Dispensary     Dock  or  Sea  Wall  

   

 

Chuuk  State  –  TM  Storm  Damage  Assessments  13    

June  2015  

 

             

APPENDIX  B    

REPAIR  COST  ESTIMATES    

   

 

Chuuk  State  –  TM  Storm  Damage  Assessments  14    

June  2015  

 

     

TOTA

L COS

T

DOCK

DISP

ENSA

RYCO

MM

UNIT

Y HA

LLM

UNIC

IPAL

HA

LLSC

HOOL

SEA

WAL

LPU

BLIC

TO

ILET

(US $

)

1 1.1

SAPU

K1,

000.

001.

2M

WAN

2,

250.

001.

3NE

UOU

4,50

0.00

1.4

ST. C

ECILI

A E/

S12

0,00

0.00

1.5

P & P

ELEM

. SCH

L7,

000.

000.

000.

000.

000.

0013

4,75

0.00

0.00

0.00

134,

750.

00

2 2.1

INAK

A65

,245

.58

65,2

45.5

80.

000.

000.

000.

0065

,245

.58

0.00

0.00

65,2

45.5

8

3 3.1

PARE

M11

,587

.00

11,5

87.0

011

,587

.00

0.00

0.00

0.00

0.00

0.00

0.00

11,5

87.0

0

410

,017

.56

68,9

32.6

778

,950

.23

0.00

10,0

17.5

60.

000.

0068

,932

.67

0.00

0.00

78,9

50.2

3

5SA

PETA

14,9

01.5

214

,901

.52

0.00

0.00

0.00

0.00

14,9

01.5

20.

000.

0014

,901

.52

61,

500.

001,

500.

000.

000.

000.

000.

001,

500.

000.

000.

001,

500.

00

75,

000.

0030

,000

.00

35,0

00.0

00.

005,

000.

000.

0030

,000

.00

0.00

0.00

0.00

35,0

00.0

0

SUBJ

ECT :

COS

T SUM

MAR

Y OF T

YPHO

ON M

AYSA

K DA

MAG

E ASS

ESSM

ENT F

OR C

HUUK

STAT

E

S.N.

MUN

ICIP

ALIT

YVI

LLAG

E/

LOCA

TION

FACI

LITY/

INFR

ASTR

UCTU

RERE

MAR

KS

WEN

O

Subt

otal

(PAR

EM):

Subt

otal

(FEF

AN):

PARE

M

Subt

otal

(WEN

O):

FEFA

N

ONEI

Subt

otal

(ONE

I):

PAAT

ASu

btot

al (P

AATA

):

ROM

ANUM

Subt

otal

(ROM

ANUM

):

FANA

PANG

ESSu

btot

al (F

ANA

PANG

ES):

 

Chuuk  State  –  TM  Storm  Damage  Assessments  15    

June  2015  

 

     

TOTA

L COS

T

DOCK

DISP

ENSA

RYCO

MM

UNIT

Y HA

LLM

UNIC

IPAL

HA

LLSC

HOOL

SEA

WAL

LPU

BLIC

TO

ILET

(US $

)S.N

.M

UNIC

IPAL

ITY

VILL

AGE/

LO

CATI

ON

FACI

LITY/

INFR

ASTR

UCTU

RERE

MAR

KS

WEN

O8

5,04

0.00

32,6

23.0

037

,663

.00

5,04

0.00

0.00

0.00

0.00

32,6

23.0

00.

000.

0037

,663

.00

9 9.1

SAPO

U2,

000.

0044

,318

.92

46,3

18.9

22,

000.

000.

000.

000.

0044

,318

.92

0.00

0.00

46,3

18.9

2

10 10.1

ETAN

1,34

0.00

1,34

0.00

0.00

0.00

0.00

0.00

1,34

0.00

0.00

0.00

1,34

0.00

11 11.1

DUBL

ON41

,400

.00

41,4

00.0

00.

000.

000.

000.

0041

,400

.00

0.00

0.00

41,4

00.0

0

18,6

27.0

015

,017

.56

0.00

30,0

00.0

040

5,01

1.69

0.00

0.00

468,

656.

25

Subt

otal

(EOT

):EO

T

TOTA

L COS

T (US

$):

DUBL

ON

Subt

otal

(DUB

LON)

:

UMAN

Subt

otal

(UM

AN):

ETAN Subt

otal

(ETA

N):

 

Chuuk  State  –  TM  Storm  Damage  Assessments  16    

June  2015  

 

           

APPENDIX  C    

SUMMARY  OF  MATERIALS        

 

Chuuk  State  –  TM  Storm  Damage  Assessments  17    

June  2015  

 

 

     

TOTA

L

One

i El

em.

Schl

One

i Di

sp.

Inak

a El

em

Sch,

Fe

fen

Sap

ou

Elem

Sc

h,

Uman

Sap

eta

Elem

. Sc

hool

, Pa

ata

Sap

uk

Elem

. Sc

h,

Wen

o

Mwa

n El

em

Sch,

W

eno

Neu

ou

Elem

Sc

h.,

Wen

o

St.

Ceci

lia

Elem

. Sc

h,

Wen

o

P&P

El

em

Sch,

W

eno

Eot

El

emSc

h,

Eot

Dub

lon

Elem

. Sc

h,

Dubl

on E

tan

Elem

. Sc

h.

Par

em

Elem

Sc

h

(App

rox.

quan

tity)

U

nit

Cost

T

otal

Cost

(U

S $)

11.

1ba

g28

28

10

.50

294.0

01.

2cu

.yd2

2 40

.00

80.00

1.3

cu.yd

4 4

80.0

0 32

0.00

1.4

pc.

50

50

15.7

4 78

7.00

1.5

pc.

31

31

5.24

16

2.44

1.6

lb.20

20

1.

65

33.00

1.7

pc.

20

20

13.6

4 27

2.80

1.8

pc.

12

12

12.0

0 14

4.00

1.9

lb.6

6 1.

75

10.50

2,103

.74

2

2.1

pc.

120

112

56

20

168

120

20

616

25.1

9 15

,517.0

4

2.2

pc.

45

42

21

54

63

45

15

285

13.6

4 3,8

87.40

2.3

pc.

15

9 15

8

9 21

15

92

31

.49

2,897

.08

2.4

pc.

115

54

125

63

33

161

115

666

13.6

4 9,0

84.24

2.5

pc.

42

9 42

21

4

59

42

5 22

4 8.

39

1,879

.36

2.6

pc.

7 7

3 3

10

7 37

41

.99

1,553

.63

2.7

lb70

0 30

70

0 40

0 20

0 85

0 70

0 50

3,6

30

1.75

6,3

52.50

4

1,171

.25

3

3.1

pc.

360

358

179

504

`36

0 20

1,7

61

8.39

14

,774.7

9

3.2

pc.

105

110

55

14

147

105

6 53

6 32

.00

17,15

2.00

CWN

asso

rted

SUBT

OTAL

:

CEIL

ING/

PAR

TITI

ON W

ORKS

2"x 2

"x16'T

reat

ed L

umbe

r

(ceil

ing jo

ist)

Plyw

ood

1/4

x 4 x

8 Tr

eate

d/

Hard

iflex

2"x 6

"X16

' Tre

ated

Lum

ber

(Top

/bot

tom

chor

d)2"

x 4"X

16' T

reat

ed L

umbe

r (we

b m

embe

rs)

2"x1

0"X1

6' Tr

eate

d Lu

mbe

r (fa

scia

bd.)

2"x 4

"X16

' Tre

ated

Lum

ber

(pur

lins)

2"x 2

"x16'T

reat

ed L

umbe

r (p

urlin

co

nnec

tor)

Plyw

ood

1/2"

x 4'

x 8' tr

eate

d (g

usse

t plat

e)

Tie w

ire #

16

2"x 4

"x16'

Form

lum

ber

Plyw

ood

1/2"

x 4'

x 8' U

ntrea

ted

CWN

Asso

rted

SUBT

OTAL

: R

OOF

FRAM

ING

WOR

KS

CONC

RETE

WOR

KSCe

men

t Typ

e 1

Whit

e Sa

nd

Grav

el 3/

4#

5x20

' RSB

# 3x

20' R

SB

Subj

ect :

SUM

MARY

OF

MATE

RIAL

S

S.N.

DESC

RIPT

ION

Unit

Mun

icipa

lity o

r Villa

ge/ In

frast

ruct

ure

1

 

Chuuk  State  –  TM  Storm  Damage  Assessments  18    

June  2015  

 

 

 

TOTA

L

One

i El

em.

Schl

One

i Di

sp. In

aka

Elem

Sc

h, Fe

fen

Sap

ou

Elem

Sc

h, Um

an

Sap

eta

Elem

. Sc

hool

, Pa

ata

Sap

uk

Elem

. Sc

h, W

eno

Mwa

n El

em

Sch,

Wen

o

Neu

ou

Elem

Sc

h.,

Wen

o

St.

Cecil

ia El

em.

Sch,

Wen

o

P&P

El

em

Sch,

Wen

o

Eot

El

emSc

h, Eo

t

Dub

lon

Elem

. Sc

h, Du

blon

Eta

n El

em.

Sch.

Par

em

Elem

Sc

h

(App

rox.

quan

tity)

Unit

Co

st T

otal

Cost

(US

$) S.

N.DE

SCRI

PTIO

NUn

it

Mun

icipa

lity or

Villa

ge/ In

frastr

uctu

re

3.3

pc.

48

48

48

68

48

260

4.19

1,0

89.40

3.4

Insec

t Scr

een 4

'ft

48

48

48

68

48

260

2.85

74

1.00

3.5

lb50

50

30

70

50

25

0 1.

75

437.5

0

3.6

lb30

30

20

42

30

15

2 1.

75

266.0

0

3.7

lb30

30

15

42

30

14

7 1.

85

271.9

5

3

4,732

.64

44.

1lf

1,42

2 1,

000

20

1,42

2 3,8

64

3.50

13

,524.0

0

4.2

pc.

10

9 1

10

30

35.0

0 1,0

50.00

4.3

pc.

18

18

18

54

40.0

0 2,1

60.00

4.4

pc.

10

10

10

30

35.0

0 1,0

50.00

4.5

pc.

34

34

68

20.9

9 1,4

27.32

4.

6pc

.17

10

13

4 10

17

15

20

3 23

.09

4,687

.27

4.7

pc.

40

17

134

17

15

223

26.2

4 5,8

51.52

4.

8pc

.8

10

18

35.0

0 63

0.00

4.9

pc.

5 4

4 10

4

17

5 3

52

35.0

0 1,8

20.00

4.

10lb

100

20

100

25

20

5 4

4 12

0 4

20

100

522

2.00

1,0

44.00

4.

11pc

.24

30

24

78

55

.00

4,290

.00

4.12

lf76

18

40

30

0 10

0 10

54

4 4.

50

2,448

.00

4.13

pc.

12

4 12

12

4

4 4

4 15

4

5 12

92

7.

50

690.0

0

40,6

72.11

11

8,679

.74

7,120

.78

12

5,800

.52

SUBT

OTAL

:

TOTA

L COS

T :

TOTA

L SAL

ES T

AX 6%

:

TOTA

L MAT

ERIA

L COS

T (U

S $)

:

GI S

ide F

lashin

g Ga

.26

x 10'

GI R

idge

Cap

Ga.2

6 x 1

0'

Roof

ing N

ails

PVC

3" D

owns

pout

Plas

tic G

utter

& a

cces

sorie

sSi

licon

e Se

alants

Pre-

paint

ed R

idge

Cap

10' x

Ga

.26

Pre-

paint

ed G

utter

10'

x Ga.

26

Pre-

paint

ed S

ide F

lashin

g 10

' x

Ga. 2

6GI

Cor

r. Ro

of G

a.26

x 8'

GI C

orr.

Roof

Ga.

26 x

10'

GI C

orr.

Roof

Ga.

26 x

12'

CWN

Finish

ing N

ail

Conc

rete

Nail

SUBT

OTAL

:RO

OFIN

G W

ORKS

Pre-

paint

ed R

oof G

a.26

1"x 2

"x16'

Lum

ber

2