city center ii proposal — studio intrigue architects

Upload: lansingstatejournal

Post on 03-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    1/19

    PARK DISTRICT PROPOSALCITY OF EAST LANSING

    FEBRUARY 08, 2013

    URBAN CULTURAL AND ARTS DISTRICT, LLC

    AUTHORIZED REPRESENTATIVE:

    STUDIO [INTRIGUE] ARCHITECTS, LLC

    1114 S. WASHINGTONLANSING, MI 48910

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    2/19

    TABLE OF CONT

    PROJECT DESCRIPTION

    GREEN BUILDING PRACTICES

    LOCATION MAP

    PRELIMINARY SITE SKETCH

    PRELIMINARY SITE PLAN

    BIRDS-EYE SITE RENDERING

    INITIAL HIGHRISE ELEVATIONS FACING WEST

    PRELIMINARY MATERIAL SELECTIONS AND ELEVATIONS OF

    CONDO/APARTMENT HIGHRISE

    PRELIMINARY MATERIALS SELECTIONS AND

    PERSPECTIVE OF HOTEL HIGHRISE

    PRELIMINARY MATERIALS SELECTIONS AND

    ELEVATION OF APARTMENTS

    RENDERED PERSPECTIVE OF HIGHRISES

    FACING NORTHWEST

    RENDERED APARTMENT PERSPECTIVE FACING

    EAST

    RENDERED FARMERS MARKET PERSPECTIVE

    FACING NORTHWEST

    RENDERED PERSPECTIVE FACING NORTHWEST

    CHARETTE EXPERIENCE

    QUALITY DESIGN AND MATERIALS

    SITE PLAN ANALYSIS

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    3/19

    PROJECT DESCRIP

    Vision StatementThe City of East Lansing has offered up a unique opportunity to re-imagine a very dif ficult canvas.

    The site, sandwiched between the citys urban center and its Park District, has challenging topography,

    restrictive dimensions and infrastructure that is lacking capacity. How do you take this opportunity and

    deliver a successful project that benefits both the private and public sector?

    Success of a project in any community can be measured in many waysovercoming areas of

    underutilization; achieving common goals of community and developer; re-enforcement of sense-of-place;

    increase tax base while providing opportunity for return-for-risk, and job creation (among many others).

    The vision of our proposed development addresses these many measures of success:

    Overcoming underutilization. This project will transform an area that is clearly short of being used

    for its highest and best use, into a vibrant, mixed use center

    Achieving common goals. This mixed use project will strengthen the neighborhood; provide housing

    opportunities for people of all ages; improve the quality and vitality of the Citys commercial/

    downtown district; promote a growing economy, and will sustain greater density and integration of

    uses.

    Reinforcement of sense-of-place. Home to the 8th largest public university in the country, East

    Lansings sense-of-place is a unique blend of comfort, opportunity and energy. Whether a long

    time resident or casual visitor, the city has a way of leaving a lasting impression. This project willreinforce the citys sense-of-place.

    Financial. This public/private partnership opportunity will increase the citys tax base while

    providing a reasonable return-on-investment.

    Job creation. The project will create several hundred short-term construction jobs while securing

    several dozen part and full time jobs.

    1.

    2.

    3.

    4.

    5.

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    4/19

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    5/19

    Charette ExperienceThe entitys Architect has a long history of coordinating and leading project development discussion with

    groups at all levelsneighborhood, general public and faculty.

    Lansing City Market (Lansing)

    This project was a very controversial development effort. Deeply rooted passion on both-sides-of-the

    table resulted in a process that had a very public face to it. The Architect worked alongside the US

    Dept of Agriculture to listen and respond to concerns/desires of many. Attendees included city officials,

    vendors, angry nahsayers, anti-development subgroups, avid supporters, interested citizens, developers and

    designers. Several Charette meetings took place over a 4 month schematic design period and resulted in a

    design that many felt they owned a piece of.

    Midtown Mixed-use Center (Lansing)

    This project is currently in the construction documents phase. Located on the site that once occupied the

    Silver Dollar Saloon, this project is highly complex project due to the 6-0 deep, 100 year floodplain. At

    the request of City Officials, the Architect met with the residents of Friendship Manor to address concerns

    about lighting, connectivity, views, etc

    The Charette was a productive exchange discussing: construction in a flood plain (most did not realize that

    their building was in a flood plain as well); dark sky lighting systems; traffic; building management, and

    aesthetic appeal.

    Spine Center (East Lansing)

    The ultimate NIMBY project. A properly zoned use-by-right proposal, this project took over a year to earn

    its city council approval.The Architects office, alongside the City of East Lansing Planning Department, worked with adjacent

    residents to overcome concerns regarding buffering, aesthetics, operating hours, traffic, noise and lighting

    glare.

    CHARETTE EXPERI

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    6/19

    QUALITY DESIGN AND MATE

    QUALITY DESIGN AND MATERIALSThe entitys Architect has a proven history of implementing quality design and

    materials into projects.

    Local projects include:

    3515 N. Coolidge (in East Lansings Northern Tier)

    The Spine Center

    The Residences

    Lansing Board of Water and Light Headquarters (Architect desig

    shell of building)

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    7/19

    LOCATION

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    8/19

    SITE PLAN ANA

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    9/19

    PRELIMINARY SITE PLAN SK

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    10/19

    PRELIMINARY SITE

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    11/19

    BIRDS-EYE SITE RENDE

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    12/19

    INITIAL HIGHRISE ELEVATIONS FACING W

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    13/19

    PRELIMINARY MATERIAL SELECTIONS AND ELEVATIONS OF CONDO/APARTMENT HIGH

    SOUTH ELEVATION EAST ELEVATION

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    14/19

    PRELIMINARY MATERIAL SELECTIONS AND PERSPECTIVE OF HOTEL HIGH

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    15/19

    PRELIMINARY MATERIAL SELECTIONS AND ELEVATION OF APARTM

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    16/19

    RENDERED PERSPECTIVE OF HIGHRISES FACING NORTHW

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    17/19

    RENDERED PERSPECTIVE FACING NORTHW

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    18/19

    RENDERED APARTMENT PERSPECTIVE FACING

  • 7/29/2019 City Center II Proposal Studio Intrigue Architects

    19/19

    RENDERED FARMERS MARKET PERSPECTIVE FACING NORTHW