CITY GATE
Phase 1: Project assessment and functional analysis (3 weeks)
- Functions and Operations – identify business functions of each building, and its essential operations
- Access – define the access requirements and restrictions – by day, times and location – of authorized users necessary to enable the intended function of the building
- Interdependence – identify interdependencies and access requirements of authorized and revenue to the common areas, restricted areas and secure/prohibited areas.
- Shared risks – define the shared risks and single points of failure created by business functions and building infrastructure together with the access requirements of authorized users.
1st week 2- day meeting with the Design teamTabletop discussion regarding the findings (with the internals) Clarificatory meetings
2nd week Report writing and analysisWednesday: Consultation (initial report)
3rd week Monday: Submission of final report RevisionsFinal report (Wednesday - morning)
Phase 2: Risk assessment (6 weeks)
- Asset characterization- Risk classification- Threat characterization
External ( political, socio economic, terrorism and extremism, criminal, natural disasters) Internal ( safety hazards, stakeholders)
- Profiling of protective forces and support groups- Risk exposure and vulnerability assessment- Risk matrix
1st week Field observation/ ocular/ interviewData gatheringMeeting (re: findings)
2nd week Data gathering (desktop/field)3rd week Risk analysis (risk matrix)
Threat analysis4th week Report writing
Initial report deadline (Saturday)5th week Report writing
Submission of final report (Wednesday)Revisions
6th week Final report (Monday)
Phase 3: Design documents and Workshop for the final approval of design studies (8 weeks)
- Physical security- Access control and integration- Building requirements
1st week Ocular/ documentation
2nd week Table top discussion3rd week Planning
Market researchDesign concept and guidelines
4th week Design of detailed project security systemSaturday: Initial reportMeeting with the team (initial presentation for approval)
5th week PolishingFinal reportPresentation and discussion
6th Revisions
Phase 4: Security Management Plan (6 – 8 weeks)
1st week Discussion/ brainstormAnalysis
2nd week BrainstormSecurity plan development
3rd week Security plan development4th week Presentation/ report (status)5th week Security plan and development6th week Report writing
Friday (Initial report)7th week Revisions
Final report
Phase 5: Consultation fine tuning and adjustments of designs (1 week)