CITY of ALBUQUERQUE TRAFFIC NEWS This report does not contain any of the road or lane closures resulting from New Mexico Department of Transportation Projects. Traffic News For 28-Apr-18 through 06-May-18 All Scheduled Work is Weather Permitting NORTHEAST North of Central and East of RR Tracks Permit Number Location Project : : : 2018020656EXC 2ND and MENAUL INTERSECTION Emergency valve installation. 04/18/2018 through 04/29/2018 ABCWUA - Paul Sanchez, (505) 289-3546 Contact : Project Date(s) : : Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternate route. LANE CLOSURE FROM 7:00 PM TO 6:00 AM ONLY Southbound lane closure on 2nd south of Menaul. Permit Number Location Project : : : 2018020716EXC ALAMEDA west of LOUISIANA Widen road. 04/23/2018 through 05/11/2018 FRANKLIN'S- Howard Ross, (505) 884-6947 Contact : Project Date(s) : : Details Westbound shoulder closure on Alameda west of Louisiana. Construction permitted between 7AM and 10PM. Closures are continuous until construction is complete Permit Number Location Project : : : 2018020878EXC ALAMEDA and SAN MATEO INTERSECTION Bore fiber. 05/03/2018 through 05/11/2018 KELLY CABLE - James Richardson, (505) 343-1144 Contact : Project Date(s) : : Details Eastbound right lane and sidewalk closure on Alameda east of San Mateo. Traffic will be maintained in the inside lanes. LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY. Construction Services Division Department of Municipal Development Office (505) 924-3400 Fax (505) 924-3408 www.cabq.gov/construction/report.html Fri, April 27 2018 Page 1 of 26

Upload: doanthu

Post on 15-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020656EXC

2ND and MENAUL INTERSECTION

Emergency valve installation.

04/18/2018 through 04/29/2018

ABCWUA - Paul Sanchez, (505) 289-3546Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

LANE CLOSURE FROM 7:00 PM TO 6:00 AM ONLY

Southbound lane closure on 2nd south of Menaul.

Permit NumberLocationProject

:

:

:

2018020716EXC

ALAMEDA west of LOUISIANA

Widen road.

04/23/2018 through 05/11/2018

FRANKLIN'S- Howard Ross, (505) 884-6947Contact :

Project Date(s) :

:Details Westbound shoulder closure on Alameda west of Louisiana.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020878EXC

ALAMEDA and SAN MATEO INTERSECTION

Bore fiber.

05/03/2018 through 05/11/2018

KELLY CABLE - James Richardson, (505) 343-1144Contact :

Project Date(s) :

:Details Eastbound right lane and sidewalk closure on Alameda east of San Mateo. Traffic will bemaintained in the inside lanes.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 1 of 26

Page 2: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020752EXC

CENTRAL From SAN PABLO To MESILLA

Replace two handicap ramps, sidewalk, and curb/gutter.

04/25/2018 through 05/04/2018

FRANKLIN'S- Howard Ross, (505) 884-6947Contact :

Project Date(s) :

:Details Westbound right lane closure on Central at its intersection with Espanola.Total closure on Espanola at its intersection with Central.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Follow detour

Permit NumberLocationProject

:

:

:

2018020893EXC

CONSTITUTION and GEORGIA INTERSECTION

Repair gas main.

05/03/2018 through 05/11/2018

NM GAS - Steve Baca, (505) 401-7540Contact :

Project Date(s) :

:Details Eastbound closure with eastbound traffic being maintained in the center two way left turn laneon Constitution between Georgia and Illinois.Total street closure on Georgia south of Constitution.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Follow detour

Permit NumberLocationProject

:

:

:

2018019854EXC

8100 CONSTITUTION PL NE

Install bulb-out curbs, wheelchair ramps, and sidewalk.

03/19/2018 through 05/02/2018

FRANKLIN'S- Howard Ross, (505) 884-6947Contact :

Project Date(s) :

:Details Eastbound and Westbound parking lane and sidewalk closures on Constitution Pl. betweenConstitution and Wyoming.

Contractor may not leave open excavation unattended

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 2 of 26

Page 3: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020855EXC

6725 EDITH NE

Dig out two valve collars

04/29/2018 through 05/14/2018

ABCWUA - Paul Sanchez, (505) 289-3546Contact :

Project Date(s) :

:Details Southbound right lane closure on Edith north of Bear Canyon.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020641EXC

EUBANK From SPAIN To ACADEMY

Place conduit.

04/26/2018 through 05/09/2018

ADB- Royal Harrison, (505) 934-1175Contact :

Project Date(s) :

:Details Northbound right lane and sidewalk closure on Eubank between Spain and Academy. Trafficwill be maintained in the inside left lane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018020766EXC

3809 EUBANK NE

Repair asphalt.

04/30/2018 through 05/01/2018

RODGERS PLUMBING - Norm, (505) 243-9703Contact :

Project Date(s) :

:Details Phase 1: Southbound center lane and left lane closure on Eubank between Pitt and SanGabriel. Traffic will be maintained in the right lane.Phase 2: Southbound right lane closure on Eubank between Pitt and San Gabriel. Traffic will bemaintained in the center and left lanes.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 3 of 26

Page 4: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020041EXC

GIRARD From LOMAS To INDIAN SCHOOL

Replace pavement markings.

03/26/2018 through 05/04/2018

GANDYDANCER LLC - Lupita Pena , (505) 873-2222Contact :

Project Date(s) :

:Details Northbound and southbound lane closure on Girard between Lomas and Indian School usingmobile operation. Two way traffic maintained at all times.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

This traffic control setup includes a flagging operation, use caution and be prepared to stop.

Permit NumberLocationProject

:

:

:

2018020620SE

LOMAS From ALVARADO to LOUISIANA

04/26/2018 through 04/28/2018

NEW MEXICO STATE FAIR- Larry Trujillo, (505) 222-9727Contact :

Project Date(s) :

:Details GATHERING OF NATIONS 2018Eastbound right lane restriction on Lomas between San Pedro and Louisiana to provide accessto Gate 7.Southbound right lane restriction on Louisiana south of Lomas to provide access to Gate 8.All residential streets confined by Lomas, San Pedro, Copper, and Alvarado will be closed tothru traffic.Closures are continuous until event completion.

Permit NumberLocationProject

:

:

:

2018020544EXC

LOMAS From CHELWOOD PARK To EUBANK

Retrofit LED fixtures to streetlights.

04/15/2018 through 05/15/2018

BIXBY- Chris Perez, (505) 366-4660Contact :

Project Date(s) :

:Details Phase 1: Eastbound and Westbound lane and sidewalk closure using mobile operation onLomas between Eubank and Chelwood Park.Traffic will be maintained in the inside lanes.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 4 of 26

Page 5: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020666SU

LOMAS From TRAMWAY To EUBANK

Retrofit LED fixtures on streetlights.

04/17/2018 through 05/17/2018

BIXBY- Chris Perez, (505) 366-4660Contact :

Project Date(s) :

:Details Eastbound and Westbound right lane and sidewalk closure using Truck mounted mobileoperation on Lomas between Eubank and Tramway. Traffic will be maintained in the inside lanein both directions.

LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY

Permit NumberLocationProject

:

:

:

2018020559SU

MONTGOMERY and SAN PEDRO INTERSECTION

Place machinery to pave parking lot.

05/03/2018 through 05/03/2018

CUSTOM GRADING INC - Edward Martinez, (505) 897-4225Contact :

Project Date(s) :

:Details Eastbound right lane and sidewalk closure on Montgomery west of San Pedro extendingsouthbound to right lane closure on San Pedro.

LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY

Permit NumberLocationProject

:

:

:

2018020730EXC

5800 MONTGOMERY BLVD NE

Sidewalk and Drivepad Replacement.

04/25/2018 through 05/04/2018

G & H Construction CO- Rick Hughes, (505) 821-9173Contact :

Project Date(s) :

:Details Eastbound sidewalk closure only on Montgomery between Madiera and San Pedro,continuously until complete

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 5 of 26

Page 6: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020847EXC

MONTGOMERY and PITT INTERSECTION

Nondescript sidewalk, curb and gutter work.

05/02/2018 through 05/02/2018

COA Herman Trujillo (Streets), (505) 764-1505Contact :

Project Date(s) :

:Details Westbound right lane and sidewalk closure on Montgomery west of Pitt. Traffic will bemaintained in the center and left lanes.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020340EXC

5505 OSUNA NE

Emergency meter repair.

03/30/2018 through 04/30/2018

ABCWUA- Fran Smull, (505) 259-3501Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

Westbound bike lane and sidewalk closure on Osuna between Seagull and San Mateo.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018020850EXC

MCLEOD southeast of PAN AMERICAN

Install hydrant tie ins.

04/30/2018 through 05/04/2018

FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :

Project Date(s) :

:Details Northbound right lane and sidewalk closure on Mcleod between Jefferson and Pan American.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Follow detour

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 6 of 26

Page 7: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020710EXC

6001 SAN MATEO NE

Splice fiber.

05/01/2018 through 05/05/2018

KELLY CABLE- Edwin Abeyta, (505) 974-1602Contact :

Project Date(s) :

:Details Southbound right lane, right turn lane and sidewalk closure on San Mateo north of Osuna.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018019356EXC

SAN PEDRO From GLENDALE To MODESTO

Utility Work

02/20/2018 through 05/04/2018

FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :

Project Date(s) :

:Details Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Total Street closure on San Pedro between Alameda and Florence from 3/20-3/21.

Permit NumberLocationProject

:

:

:

2018020851EXC

SAN PEDRO north of GLENDALE

Adjust storm manhole.

05/01/2018 through 05/01/2018

FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :

Project Date(s) :

:Details Northbound lane closure on San Pedro north of Glendale.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Follow detour

Permit NumberLocationProject

:

:

:

2018020862EXC

STAGECOACH From SOPLO To SAGEBRUSH

Bore power line.

04/30/2018 through 05/02/2018

KELLY CABLE- Saul Vasquez , (505) 343-1144Contact :

Project Date(s) :

:Details

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 7 of 26

Page 8: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHEAST North of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020725EXC

UNIVERSITY From CLAREMONT To MENAUL

Install meter vault and piping.

04/24/2018 through 05/04/2018

ABCWUA - Joshua Doyle, (505) 289-3331Contact :

Project Date(s) :

:Details Southbound double lane closure on University between Claremont and Menaul. Traffic will bemaintained in the inside left lane.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020516EXC

WYOMING and MENAUL INTERSECTION

Replace two streetlights.

04/30/2018 through 04/30/2018

WILSON CONST- Perez Ciddio, (503) 349-7679Contact :

Project Date(s) :

:Details Southbound right lane and sidewalk closure on Wyoming south of Menaul.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 8 of 26

Page 9: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020808EXC

2520 2ND NW

Emergency valve repair.

04/22/2018 through 05/04/2018

ABCWUA - Paul Sanchez, (505) 289-3546Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

Southbound right lane closure on 2nd St between Menaul and Prospect. Traffic will bemaintained in the inside lane.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020811EXC

4TH and SUMMER INTERSECTION

Emergency curbstone pull.

04/22/2018 through 05/04/2018

ABCWUA - Paul Sanchez, (505) 289-3546Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Northbound right lane and sidewalk closure on 4th St. north of Summer. Traffic will bemaintained in the inside lane.

Permit NumberLocationProject

:

:

:

2018020883EXC

4TH From VINEYARD To CAMINO ESPANOL

Access manhole.

05/02/2018 through 05/03/2018

CENTURY LINK- Jason Buckner, (505) 264-4073Contact :

Project Date(s) :

:Details Southbound right lane closure on 4th St. between Camino Espanol and Vineyard. Traffic will bemaintained in the inside lane.

LANE CLOSURE FROM 9:00 AM to 3:00 PM ONLY

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 9 of 26

Page 10: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020628SE

4TH From CENTRAL To COPPER

05/04/2018 through 05/06/2018

POSH NIGHTCLUB- Gerald Zamora, (505) 721-8589Contact :

Project Date(s) :

:Details CINCO DE MAYO WEEKEND BASH

Total closure of 4th St. between Central Ave and Copper Ave.Follow Detour6PM on 5/4/18 thru 4PM on 5/6/18.

Permit NumberLocationProject

:

:

:

2018020789EXC

1021 4TH NW

Nondescript service repair.

04/20/2018 through 05/03/2018

ABCWUA - Nikhil Lucas Kamat, (505) 289-3536Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

Southbound right lane and sidewalk closure on 4th St. between Mountain and Granite.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018019754EXC

BEAR ARROYO TRAIL near CHAPPELL and OSUNA

Repair pedestrian bridge.

03/12/2018 through 04/30/2018

FRANKLIN'S- Howard Ross, (505) 884-6947Contact :

Project Date(s) :

:Details Bicycle and Pedestrian trail closed on Bridge across North Diversion Channel south of Osuna.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Follow detour

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 10 of 26

Page 11: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020901EXC

CANDELARIA and RIO GRANDE INTERSECTION

Pothole utilites.

05/02/2018 through 05/11/2018

COBB FENDLEY Mac Bowen, (505) 264-1531Contact :

Project Date(s) :

:Details Various short duration lane closures at the intersection of Rio Grande and Candelaria.

LANE CLOSURE FROM 9:00 AM to 3:00 PM ONLY

Follow detour

Permit NumberLocationProject

:

:

:

2018020898EXC

1450 CANDELARIA NW

Pull fiber.

04/30/2018 through 04/30/2018

KELLY CABLE - James Richardson, (505) 343-1144Contact :

Project Date(s) :

:Details Eastbound and Westbound right lane and sidewalk closure on Candelaria west of PanAmerican. Traffic will be maintained in the inside lanes in both directions.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018020886EXC

CENTRAL From 5TH To 6TH

Replace HVAC unit with crane.

05/02/2018 through 05/02/2018

MOUNTAIN STATES CRANE- Doss Gunter, (505) 252-0555Contact :

Project Date(s) :

:Details Total street closure on Central between 5th and 6th.

LANE CLOSURE FROM 4:00 AM TO 7:00 AM ONLY

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 11 of 26

Page 12: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020835EXC

COAL From ELM To LEAD

Clean sewer main.

05/01/2018 through 05/03/2018

ABCWUA - Angelo R. Baca, (505) 228-7428Contact :

Project Date(s) :

:Details Eastbound right lane closure on Coal between Elm and Oak. Traffic will be maintained in the leftlane.Northbound right lane closure on Oak between I25 Ramp and Lead.Traffic will be maintained in the left lane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018020745EXC

EAGLE RANCH From COORS To CORRALES MAIN CANAL

Multi-use path construction

04/18/2018 through 06/18/2018

STAR PAVING - Don Edwards , (505) 710-7292Contact :

Project Date(s) :

:Details LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Permit NumberLocationProject

:

:

:

2018020722EXC

EDITH From MONTANO To CANDELARIA

Nondescript Conduit and box work.

04/27/2018 through 05/11/2018

MWI- Christina J. Mahboub, (505) 508-0744Contact :

Project Date(s) :

:Details Northbound right lane and sidewalk closure on Edith between Claremont and Montano. CityJurisdiction is between Claremont and Pope, Industrial and Rankin, Rankin and Comanche.Traffic will be maintained in the inside lane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 12 of 26

Page 13: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020908EXC

area encompassed by GOLF COURSE, WESTSIDE, IRVING, and UNIVERSE

Retrofit LED fixtures to streetlights.

05/04/2018 through 05/25/2018

B & D Industries, Inc. - Richard Yardman, (505) 299-4464Contact :

Project Date(s) :

:Details Right lane and sidewalk closure in both directions on McMahon between Universe and GolfCourse using Mobile operation. Traffic will be maintained in the inside lane in both directions.

Right lane and sidewalk closure in both directions on Irving between Universe and Golf Courseusing Mobile operation. Traffic will be maintained in the inside lane in both directions.

Residential lane and sidewalk closures using Truck Mounted mobile operation in the areaencompassed by Irving in the south, Golf Course in the east, Westside in the north andUniverse in the west.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY FOR RESIDENTIAL AREAS ONLY.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Bicycles Follow the posted detour

Permit NumberLocationProject

:

:

:

2018020712EXC

LEAD From ARNO To 2ND

Patch and repair bridge deck.

04/23/2018 through 05/11/2018

HASSE CONTRACTING CO- Leroy Molina, (505) 242-9226Contact :

Project Date(s) :

:Details Phase 1: Westbound left lane and sidewalk closure on Lead between Arno and 2nd St. Trafficwill be maintained in the right lane.Phase 2: Eastbound right lane and sidewalk closure on Lead between Arno and 2nd. Traffic willbe maintained in the left lane.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 13 of 26

Page 14: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020399EXC

LOCUST and CENTRAL INTERSECTION

After the fact U-turn loop cut.

04/05/2018 through 05/03/2018

BRADBURY STAMM- Enrique Torres, (505) 249-7967Contact :

Project Date(s) :

:Details Eastbound U turn lane closure only on Central at Locust.

Barricades will remain in place continuously for this project and work will generally take placebetween 7:00 AM and 5:00 PM Monday-Friday, unless otherwise specified

Permit NumberLocationProject

:

:

:

2018020830EXC

LOMAS From 2ND To EDITH

Adjust manholes.

04/27/2018 through 04/30/2018

GANDYDANCER LLC - Lupita Pena , (505) 873-2222Contact :

Project Date(s) :

:Details Westbound right lane, center lane and sidewalk closure on Lomas between Railroad tracks and2nd St. Traffic will be maintained in the inside left lane.Northbound right lane closure on 2nd St. south of Lomas. Traffic will be maintained in the leftlane.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020568EXC

MENAUL From 2ND To TRAMWAY

Retrofit LED fixtures to streetlights.

04/13/2018 through 05/13/2018

BIXBY- Chris Perez, (505) 366-4660Contact :

Project Date(s) :

:Details Eastbound and Westbound lane and sidewalk closure using mobile operation on Menaulbetween 2nd St. and Tramway. Traffic will be maintained in the inside lanes in both directions.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 14 of 26

Page 15: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020480EXC

RIO GRANDE From FLORAL To MOUNTAIN

Bore fiber.

04/16/2018 through 05/07/2018

MWI- Christina J. Mahboub, (505) 508-0744Contact :

Project Date(s) :

:Details Northbound right lane, bike lane and sidewalk closure on Rio Grande between Mountain andFloral.Closure will be in the increments of 1600' maximum. Traffic will be maintained in the insidelane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018020839EXC

RIO GRANDE and BELLAMAH INTERSECTION

Emergency valve repair.

04/23/2018 through 04/30/2018

ABCWUA - Ron Vigil, (505) 289-3583Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

Eastbound right lane closure on Bellamah east of Rio Grande.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020736EXC

TIERRA PINTADA From STORMCLOUD To ARROYO VISTA

Install irrigation system, trees, and shrubbery in median and easment.

04/23/2018 through 05/30/2018

WESTWIND LANDSCAPE- Alicia Peterson, (505) 881-8925Contact :

Project Date(s) :

:Details Phase 1: Inside lane closures on Tierra Pintada between Mirehaven and Stormcloud.Phase 2: Inside lane closure on Tierra Pintada between Storm cloud and Arroyo Vista.Traffic will be maintained in outside lane in both directions.Phase 3: Southbound right lane and sidewalk closure on Tierra Pintada between Mirehaven andArroyo Vista.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 15 of 26

Page 16: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

NORTHWEST North of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020902EXC

WESTSIDE west of GOLF COURSE

Bore service lines.

04/30/2018 through 05/11/2018

FRANKLINS - Jeff Armstrong, (505) 234-1722Contact :

Project Date(s) :

:Details Westbound bike lane closure on Westside west of Golf Course.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Bicycles Follow the posted detour

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 16 of 26

Page 17: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHEAST South of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018019945EXC

CENTRAL From UNIVERSITY To STANFORD

ART- PUNCH LIST.

03/15/2018 through 05/31/2018

BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :

Project Date(s) :

:Details Eastbound and Westbound right lane and sidewalk closure on Central between University andStanford as per needed basis.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Intermittent lane closures due to roadway paving. Be prepared to stop

Permit NumberLocationProject

:

:

:

2018020857EXC

CENTRAL From WELLESLEY To HERMOSA

Replace cable.

04/30/2018 through 05/04/2018

KELLY CABLE - James Richardson, (505) 343-1144Contact :

Project Date(s) :

:Details Eastbound right lane and sidewalk closure on Central between Wellesley and Hermosa. Trafficwill be maintained in the left lane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018019946EXC

CENTRAL From MONROE To SAN MATEO

ART - PUNCH LIST.

03/15/2018 through 05/31/2018

BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :

Project Date(s) :

:Details Eastbound and Westbound right lane and sidewalk closure on Central between Monroe andSan Mateo as per needed basis.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Intermittent lane closures due to roadway paving. Be prepared to stop

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 17 of 26

Page 18: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHEAST South of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018019944EXC

CENTRAL From ALVARADO To SAN PEDRO

ART - PUNCH LIST.

03/15/2018 through 05/31/2018

BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :

Project Date(s) :

:Details Eastbound and Westbound right lane and sidewalk closures on Central between Alvarado andSan Pedro as per needed basis.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Intermittent lane closures due to roadway paving. Be prepared to stop

Permit NumberLocationProject

:

:

:

2018020288EXC

CENTRAL From SAN PEDRO To LOUISIANA

ART: Punch List Work

03/28/2018 through 05/31/2018

BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :

Project Date(s) :

:Details Eastbound and westbound right lane and sidewalk closure on Central Ave between San PedroDr. and Louisiana Blvd. Traffic will be reduced to one lane and on-street parking will remainavailable.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018019607EXC

CENTRAL From MONTCLAIRE To SIERRA

Pour concrete and place steel.

03/01/2018 through 07/06/2018

KLINGER CONSTRUCTORS - Brent Callahan , (505) 980-1552Contact :

Project Date(s) :

:Details Eastbound lane closure on Central west of Montclaire. Traffic will be maintained in the ART buslane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 18 of 26

Page 19: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHEAST South of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018019943EXC

CENTRAL From SAN MATEO To ALVARADO

ART - PUNCH LIST.

03/15/2018 through 05/31/2018

BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :

Project Date(s) :

:Details Eastbound and Westbound right lane and sidewalk closure on Central between San Mateo andAlvarado as per needed basis.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Intermittent lane closures due to roadway paving. Be prepared to stop

Permit NumberLocationProject

:

:

:

2018020872EXC

13140 CENTRAL SE

Pull fiber.

05/02/2018 through 05/03/2018

KELLY CABLE - James Richardson, (505) 343-1144Contact :

Project Date(s) :

:Details Eastbound sidewalk and left turn lane to Shopping Center closure on Central just west ofTramway.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Permit NumberLocationProject

:

:

:

2018020831EXC

GIBSON behind address, east of YALE

Nondescript inlet repair.

04/25/2018 through 05/01/2018

FRANKLIN'S- Howard Ross, (505) 884-6947Contact :

Project Date(s) :

:Details Westbound right lane, bike lane and sidewalk closure on Gibson between Girard and Yale.Traffic will be maintained in the center and left lanes.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 19 of 26

Page 20: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHEAST South of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020795EXC

401 EUBANK SE

Bore Fiber to Address.

05/01/2018 through 05/04/2018

KELLY CABLE - James Richardson, (505) 343-1144Contact :

Project Date(s) :

:Details Eastbound lane closure with eastbound traffic being maintained in the westbound left lane onBell west of Eubank extending south on Eubank to sidewalk and right lane closure. Traffic onEubank will be maintained in the inside left lane.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Permit NumberLocationProject

:

:

:

2018020335EXC

GEORGE From UNIVERSITY To YALE

Line ditches.

04/02/2018 through 05/04/2018

ARMOUR PAVEMENT- Samuel Marshall, (505) 239-7795Contact :

Project Date(s) :

:Details Phase 1: Westbound lane closure with westbound traffic being maintained in the center laneand partially in eastbound left lane on George between Yale and University.Phase 2: Eastbound total closure with eastbound traffic being maintained in the eastboundinside lane on George between University and Yale.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020483EXC

CENTRAL From GIRARD To CARLISLE

Punch List.

04/09/2018 through 05/31/2018

BRADBURY STAMM- Travis Chavez, (505) 589-8025Contact :

Project Date(s) :

:Details LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Eastbound right lane and sidewalk closure. ADA accessible pedestrian access must bemaintained.

West bound right lane and sidewalk closures. ADA accessible pedestrian access must bemaintained.

Closure on Central between Girard and Carlisle.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 20 of 26

Page 21: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHEAST South of Central and East of RR Tracks

Permit NumberLocationProject

:

:

:

2018020609EXC

LOMAS From SAN PEDRO To VIRGINIA

Place conduit.

04/23/2018 through 05/08/2018

ADB- Royal Harrison, (505) 934-1175Contact :

Project Date(s) :

:Details Eastbound right lane and sidewalk closure on Lomas between San Pedro and Virginia.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Permit NumberLocationProject

:

:

:

2018020823EXC

SAN MATEO and CENTRAL INTERSECTION

Retire damaged gas service.

04/30/2018 through 05/11/2018

NM GAS - Steve Baca, (505) 401-7540Contact :

Project Date(s) :

:Details Eastbound right lane and sidewalk closure on Central east and west of San Mateo. Traffic willbe maintained in the inside lane.

LANE CLOSURE FROM 7:00 AM to 7:00 PM ONLY

Permit NumberLocationProject

:

:

:

2018020786EXC

UNIVERSITY From INDIAN SCHOOL To I40 EASTBOUND

Resurface road and mill curb.

04/25/2018 through 05/11/2018

CUTLER REPAVING - Douglas Cutler , (505) 350-3983Contact :

Project Date(s) :

:Details Phase I: Northbound double lane closure on University Blvd between I40 and Indian School Rd.NB traffic will be reduced to one lane and will shift to the center turn lane.Phase II: Southbound double lane closure on University Blvd between I40 and Indian SchoolRd. SB traffic will be reduced to one lane and will shift to the center turn lane.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 21 of 26

Page 22: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHWEST South of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2017012999EXC

1ST From COPPER To CENTRAL

Install precast and structural steel.

05/01/2017 through 05/01/2018

KLINGER CONST- Adam Leyba, (505) 379-0249Contact :

Project Date(s) :

:Details Total closure of 1st St. between Central Ave and Copper Ave.

Closures are continuous until construction is complete

Follow detour

Permit NumberLocationProject

:

:

:

2018020080SE

ATLANTIC From 8TH To 10TH

05/06/2018 through 05/06/2018

NEW MEXICO BIOPARK SOCIETY- Taylor Pellegrini, (505) 764-6227Contact :

Project Date(s) :

:Details RUN FOR THE ZOO 2018

Various outside lane closures and intermittent traffic control along various streets andintersections throughout the Barelas Neighborhood (near ABQ Biopark Zoo). Expect delays onBridge Blvd, 8th St., Tingley Dr., and the Paseo Del Bosque Trail.6AM to 2PMUSE EXTREME CAUTION AND WATCH FOR PEDESTRIANS!

Permit NumberLocationProject

:

:

:

2018020882EXC

ATRISCO From DRAXTON To SAN SAULO

Nondescript boring activity.

05/01/2018 through 05/07/2018

M3 COMMUNICATIONS LLC - Roberto Magana , (505) 977-2205Contact :

Project Date(s) :

:Details Southbound sidewalk closure and lane closure using flagging operation on Atrisco betweenDraxton and San Saulo.

LANE CLOSURE FROM 9:00 AM to 3:00 PM ONLY

This traffic control setup includes a flagging operation, use caution and be prepared to stop.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 22 of 26

Page 23: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHWEST South of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020869EXC

BLAKE and UNSER INTERSECTION

Install power pole to clear traffic signal.

05/02/2018 through 05/02/2018

WILSON CONSTRUCTION COMPANY - Russel Lacy , (505) 347-0435Contact :

Project Date(s) :

:Details Westbound right lane, bike lane and sidewalk closure with westbound traffic being maintained inthe center two way left turn lane on Blake west of Unser.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020870EXC

CENTRAL and UNSER INTERSECTION

Maintain power poles.

05/03/2018 through 05/03/2018

WILSON CONST- Perez Ciddio, (503) 349-7679Contact :

Project Date(s) :

:Details Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Sidewalk closure only on Central west of Unser, continuously until complete

Permit NumberLocationProject

:

:

:

2018020896EXC

CENTRAL and EDITH INTERSECTION

Replace ADA ramp.

04/27/2018 through 05/11/2018

BRADBURY STAMM- Enrique Torres, (505) 249-7967Contact :

Project Date(s) :

:Details LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

West bound right lane and sidewalk closure on Central west of Edith. ADA accessiblepedestrian access must be maintained.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 23 of 26

Page 24: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHWEST South of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020818EXC

CENTRAL and TINGLEY INTERSECTION

Emergency dangerous manhole repair.

04/23/2018 through 05/04/2018

ABCWUA- Felimon Martinez, (505) 977-1265Contact :

Project Date(s) :

:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020833SU

COAL From 8TH To 9TH

Set Up Crane in Streets to Access building.

05/02/2018 through 05/02/2018

TRAVERS MECHANICAL- Mike Youngman, (505) 604-3315Contact :

Project Date(s) :

:Details Total street closure on Coal between 8th and 9th.

LANE CLOSURE FROM 9:00 AM to 4:00 PM ONLY

Follow Detour

Permit NumberLocationProject

:

:

:

2018020905EXC

COAL From 2ND To BROADWAY

Repair bridge deck and joints.

05/01/2018 through 05/11/2018

HASSE CONTRACTING CO- Leroy Molina, (505) 242-9226Contact :

Project Date(s) :

:Details Pahse 1: Eastbound right lane and sidewalk closure on Coal between 2nd St. and Broadway.Traffic will be maintained in the center and left lane.Pahse 2: Eastbound left lane and sidewalk closure on Coal between 2nd St. and Broadway.Traffic will be maintained in the center and right lane.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 24 of 26

Page 25: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHWEST South of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2018020592EXC

COAL From 4TH To 5TH

Remove sidewalk.

04/16/2018 through 07/23/2018

CUSTOM GRADING INC - Edward Martinez, (505) 897-4225Contact :

Project Date(s) :

:Details Eastbound sidewalk closure on Coal between 5th and 4th extending south to sidewalk closureon 4th between Coal and alley.Southbound parking lane closure on 4th between Coal and alley to accommodate temporarypedestrian access.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Permit NumberLocationProject

:

:

:

2018020827SE

424 GOLD AV

Event barricading

05/01/2018 through 05/01/2018

CHRISTIAN DIAZ DE BEDOYA, (505) 227-2700Contact :

Project Date(s) :

:Details Westbound lane closure on Silver Ave between 5th St. and 4th St.Follow Detour.7AM to 7PM

Permit NumberLocationProject

:

:

:

2018020720EXC

OLD COORS From GONZALES To BRIDGE

Nondescript conduit and box work.

04/20/2018 through 05/03/2018

MWI- Christina J. Mahboub, (505) 508-0744Contact :

Project Date(s) :

:Details Southbound right lane, bike lane and sidewalk closure on Old Coors between Gonzales andBridge. Traffic will be maintained in the left lane.

LANE CLOSURE FROM 9:00 AM TO 4:00 PM ONLY.

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 25 of 26

Page 26: CITY of ALBUQUERQUE TRAFFIC NEWS : KELLY CABLE - James Richardson, (505) 343-1144 ... CHRISTIAN DIAZ DE BEDOYA, ... CITY of ALBUQUERQUE

CITY of ALBUQUERQUETRAFFIC NEWS

This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.

Traffic News

For 28-Apr-18 through 06-May-18

All Scheduled Work is Weather Permitting

SOUTHWEST South of Central and West of RR Tracks

Permit NumberLocationProject

:

:

:

2017013032EXC

800 SILVER SW

Barricade to provide site access and building construction

04/20/2017 through 05/20/2018

BRADBURY STAMM CONSTRUCTION- Adam Rael, (505) 998-9950Contact :

Project Date(s) :

:Details Sidewalk closures: On eastbound sSlver Ave from 9th St. to 8th St., On northbound 9th St. fromalley to Silver Ave, and on southbound 8th St. from Silver Ave to alley.

Construction permitted between 7AM and 10PM. Closures are continuous until construction iscomplete

Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408

www.cabq.gov/construction/report.html

Fri, April 27 2018Page 26 of 26