City of Appleton Stormwater Management Update
Presented to the
January 22, 2013
Utilities Committee
Ongoing ProjectsCONSTRUCTION PROJECTS: Reid Golf Course Ponds, Channel Modifications, and
Bridges
FLOOD STUDY PROJECTS: CTH OO Basin Manitowoc Road Study Area
CAPITAL PROJECTS: Douglas and Outagamie Streets (Spencer Locust
Basin) Ballard Road Urbanization/Lightning Drive
Construction
STORMWATER MANAGEMENT PLAN UPDATE
GREEN TIER WATER RESOURCES
SITE DEVELOPMENT STORMWATER REVIEWS
Reid Golf Course Ponds and Channel Modifications
Construction started early November 2012 Earthwork wrapped up for winter on January
18, 2013. South Pond retaining wall work will extend into early February.
Start again in March/April – weather permitting
CTH OO Basin Study
Revised memo submitted to City for review. Inlet capacity analysis for Ballard Road is
complete.
Manitowoc Road Study
City reviewing draft memo. Reviewing options in conjunction with
future 441 reconstruction. Discussions with WisDOT ongoing.
Douglas and Outagamie Design Assistance
City reviewing draft memo outlining revised alternatives for Spencer Locust area.
Ballard Road Urbanization and Lightning Drive Alignment Evaluation
City reviewing draft memo for stormwater quality and quantity management measures to meet NR 151 and NR 216 requirements. Also evaluated options for compliance with floodplain and wetlands requirements.
Updated WinSLAMM model based on WDNR guidance documents.
Continuing to interact with WDNR on TMDL implementation and modeling for compliance with Waste Load Allocations.
Revised base load and existing conditions TSS and phosphorus loadings was completed in October. Revising street sweeping based on new street sweeping routines.
Waiting for further direction from WDNR for comparison with TMDL numbers.
Stormwater Management Plan Update
Reviewing Green Tier Water Resources Requirements
WDNR evaluating program
Plan may not be needed
Developing project list to identify key issues and program coordination needs
Green Tier Water Resources
Appleton Northeast Storage
Grand Central Station
Stormwater Reviews – New and Redevelopment