City of Oak Harbor Clean Water Facility NW Biosolids Presentation – September 9, 2019 Brett Arvidson PE City of Oak Harbor

Upload: others

Post on 01-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

City of Oak HarborClean Water Facility

NW Biosolids Presentation – September 9, 2019

Brett Arvidson PECity of Oak Harbor

Page 2: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

• Oak Harbor is a city of 22,000 located on Whidbey Island

• Since 2005 all wastewater treatment was at a lagoon

• 2010 NPDES permit included a deadline for developing a facilities plan

• The facilities plan resulted in the decision to build a new treatment plan

Project Background

9/9/2019NW Biosolids Conference 2

Page 3: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

What is Oak Harbor CWF?• Liquid Stream

• Flow• Startup: 1.9 MGD Average Annual• Buildout: 3.7 MGD AA

• Coarse/Fine Screening + Grit Removal• Membranes• UV Disinfection

• Solid Stream• Load

• Startup: 2,500 PPD AA• Buildout: 5,500 PPD AA

• No anaerobic digesters• Centrifuge dewatering• Belt dryer to produce Class A

9/9/2019NW Biosolids Conference 3

Page 4: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

• In 2014 design started on the treatment plant with Carollo Engineers

• In 2014 the city selected Hoffman Construction as the GC/CM contractor

• 2015 Construction begins• 2018 city began liquid stream treatment operation• 2019 biosolids operations started

Project History

9/9/2019NW Biosolids Conference 4

Page 5: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Aerial View June 2015

9/9/2019NW Biosolids Conference 5

Page 6: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Aerial View July 2019

9/9/2019NW Biosolids Conference 6

Page 7: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Site Layout: Compact, Efficient, Accessible

9/9/2019 7NW Biosolids Conference

Page 8: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

• Design-Bid-Build – Traditional Public Works Process

• General Contractor / Construction Manager (GC/CM) – Alternative Public Works Process

General Contractor /Construction Manager

Design Bid Build

DesignBring on Contractor

Build9/9/2019NW Biosolids Conference 8

Page 9: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Biosolids

9/9/2019NW Biosolids Conference 9

• The city did not have a biosolids program• The city would have to design and build a new

biosolids facility from scratch• Beyond technology installation, the city would have to

implement a beneficial reuse system• Operator training, SCADA implementation and neighbor

relations were primary concerns.

Page 10: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Oak Harbor’s Decision Drivers• Cost• Site Issues-geotechnical, area, surrounding uses, aesthetics, and

archaeology• Odors• Washington State beneficial use requirement for their biosolids. • Oak Harbor is located on an island which increases biosolids

handling costs.• Drying biosolids reduces biosolids volume and weight.• Class A solids allows Oak Harbor the most flexibility in disposal of

biosolids. Provides a hedge against future cost or disposal location risks.

Page 11: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

What alternatives were considered?• “Base Case”: Beneficial Reuse of Class A Biosolids- Construct on-site dewatering and thermal drying to Class A- Beneficial reuse of biosolids on Whidbey Island

• Alternative 1: Beneficial Reuse of Class B Biosolids- Construct on-site dewatering- Digestion had high capital cost- Construct off-site treatment with lime stabilization to Class B- Haul lime-stabilized biosolids for beneficial reuse in Eastern

Washington9/9/2019NW Biosolids Conference 11

Page 12: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Summary of Solids Alternatives

9/9/2019NW Biosolids Conference 12

Page 13: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Oak Harbor Biosolids Building Odor Control

Centrifuges

Dryer Feed Hopper

Biosolids Dryer

Dryer Room Truck Bay

To Biofilter

600 CFM

200 CFM

750 CFM

800 CFM (all conveyors)

500 CFM

2,350 CFMTo Strobic Fans

17,300 CFM (6 ACH)

To Strobic Fans

4,750 CFM

9/9/2019NW Biosolids Conference 13

Page 14: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Oak Harbor Belt Dryer Concerns and Decisions

Concerns• Heating Method and

Operation Temperature• Odor and Dust Control• Footprint• Operation Shift Duration

Decision• Any heating method.• Point instead of area

treatment with dust collector.• Tight facility was expected.• Hold off on continuous

operation till the future.

9/9/2019NW Biosolids Conference 14

Page 15: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Dryer System Overview

Burner

Extruder

Discharge Conveyor

Centrifuge

Dryer Feed Hopper

Dryer Belts Condenser

Fuel/Air

Crusher

Hauling Truck

Plant Drain

9/9/2019NW Biosolids Conference 15

Page 16: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

• The CC/CM contractor solicited proposals from manufacturers• Four manufacturers provided proposals to Hoffman• Proposals were evaluated by a selection committee• Proposals are for equipment and design services only• Installation was part of a future contract (GMP)• Proposals evaluated based on:

Equipment Procurement

9/9/2019NW Biosolids Conference 16

• Capital Costs• Operation Costs• Overall Footprint• Product Quality

• Heating Source• US Installations• Technician Location

Page 17: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Proposal Results

9/9/2019NW Biosolids Conference 17

Manufacturer AmountHaarslev Industries $ 1,879,205 Huber Technologies $ 2,650,000 Andritz $ 3,964,685 J. Kruger $ 5,119,000 Package Estimate $ 3,500,000

Page 18: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Biosolids Site Plan

WAS STORAGE

SOLIDS BUILDING

TRUCK LOADING

DEWATERING

9/30/2015City Council Special Workshop 18

Page 19: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

9/9/2019NW Biosolids Conference 19

December 2015 January 2018

Page 20: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

9/9/2019NW Biosolids Conference 20

December 2015 January 2018

Page 21: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

9/9/2019NW Biosolids Conference 21

December 2015 January 2018

Page 22: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

9/9/2019NW Biosolids Conference 22

December 2015 January 2018

Page 23: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Results

9/9/2019NW Biosolids Conference 23

• GC/CM proved successful for Oak Harbor• Dryer system proved more complex to install than anticipated• Issues with the dryer have delayed implementation of the

biosolids program• City is in the process of eliminating odors from solids system• Material produced has been classified as Class A• The dryer has not achieved reliable operation but we are

working to resolve those concerns.• Despite implementation problems, the city is feeling positive

about the long term use of the dryer

Page 24: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Oak Harbor CWF

9/9/2019NW Biosolids Conference 24

Page 25: City of Oak Harbor Clean Water Facility · City of Oak Harbor Clean Water Facility. NW Biosolids Presentation – September 9, 2019. Brett Arvidson PE. City of Oak Harbor • Oak

Questions?