• Develop implementation and recommendation to carry conception, renovation and management of energy systems in neighborhood and cities
• The approach focuses on the user so it can ensure application and implementation respond to user different needs (citizens, decision maker, building manager...)
• 3 pilot sites will allow to test the CITYOPT solutions during the different phases of a neighborhoud lifecycle• Finland : during conception phase (new neighborhood to build)• Austria : during renovation phase (existing neighborhood to renovate)• France : during operation management phase (existing neighborood pre-
equipped)
2
Project description
CITYOPT
7 partners from 4 countries :
• VTT – Technical Research Centre of Finland - Finland – Coordinator
• AIT – Austrian Institute of Technology – Austria• CSTB – Centre Scientifique et Technique du Bâtiment – France• Experientia – Italy• EDF – Électricité de France – France• City of Helsinki– Finland• Métropole Nice Côte d’Azur – France
3
Consortium
CITYOPT
Call identifier
FP7-SMARTCITIES-2013
Starting date
1 st February 2014
Duration
36 months
Budget
3 913 397 €
4
Characteristics
CITYOPT
• A set of applications and guidelines supporting efficient planning, detailed design and operation of energy system in urban districts
• Energy system optimization in different lifecycle phases, considering user and stakeholder characteristics
5
Project objectives
CITYOPT
The project adresses energy system optimisation in
different licecycle phases, supported by a user-centered
design approach.
Stakeholders : - City decision makers facility involved in all project
phases- Managers- Citizens
8
The approach
CITYOPT
Within GRID4EU program, EDF has previously worked for NICE GRID, a 30M€ project equipping :
-Residential customers ERDF linky smart meters;- Tertiary buildings with netSeenergy meters; - Installing local photovoltaic energy production units and storage (thermal and battery) units all before the end of 2013.
Project was held in the city of CARROS, within Métropole NCA territory
9
From NICE GRID to CITYOPT
CITYOPT
Focus on optimization scenarios related to demand response services, more especially load shedding, to reinforce the continuity of service in a fragile electricity supply network.
Users will play a key role by participating in the specifications (participatory design) of the technological solution (especially of user interfaces for impact visualisation), and behaviors will be carefully assessed during the test phase.
11
Objectives for Nice Côte d’Azur
CITYOPT
EDF Electricity metering
Social energy
network
CITYOPT SERVER
NCA Pilot infrastructure
Consomption
OR
EDF provides information on
consomption under a defined format
CITYOPT
Evaluate different electricity storage solutions/business models in the Kalasatama area of Helsinki.
Different technologies, sizing and placement of electric storage solutions will be analyzed and the optimal storage solution will be examined by using the CITYOPT applications.
The use of the applications in a district planning phase will be tested and analysed in this demonstration case.
14
Helsinki objectives
CITYOPT
Vienna objectives
AIT (Austrian Institute of Technology),RTA (Rail Tec Arsenal) and WWFF (Vienna
Business Agency), will investigate the optimal design and possible implementation of a concept to integrate the buildings, their existing energy supply and storage systems and use the waste heat to cover the office buildings demand for heating and cooling
Reduce RTA expenses for cooling
It will include the requirements on the thermal storage to match the time dependence of waste heat production with that of heat demand.
16
CITYOPT
Next steps for NCA pilot
– July 2014 – December 2014: Recruitment (50 households with electrical heating and smart meter)
– 1st semester 2015 : beginning of the experimentation