classroom bldgs science sf theater 9,457 sf pe sf … · modernize/re-purpose space demolish space...
TRANSCRIPT
LR
LR
Lab
Uni
vers
ity H
igh
Scho
olFa
cilit
ies
Mas
ter P
lan–
Uni
vers
ity H
igh
Scho
ol47
71 C
ampu
s D
r |
Irvin
e, C
A 9
2612
SCALE 1:200
N
1ST FLOOR
C
2ND FLOOR
UHS CAPACITY 77 Teaching Stations+8 SDC
=85 Teaching Stations
12 DHH Teaching Stations
Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment
SCHOOL STATISTICS
9-1225771971199642.0
4± 6282600
Project 1
PROPOSED SCOPE
Modernization
Reconfiguration
New Construction
New Site Work
Demolition
UTILIZATION LEGEND
Classroom Clusters
Science
Business/Design/Engineering
Special Ed (SDC/SH)
DHH
Physical Education
Performing Arts/Multi Media
ASB/Library/Student Union
Portable (Color based on Program)
Other Spaces
Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts
Play Apparatus
Parking
Trees
LEGEND
Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible
Main Quad
AcademicQuad
MODERNIZE (E) CLASSROOM BLDGSSCIENCE 12,444 SFTHEATER 9,457 SFPE 18,670 SF
PLAYFIELDS
HARDCOURTS
THEATRE
AUX GYM
POOL
BLACK BOX
ELD
SP ED
SP ED
AMIN.
FOOD SVC.
PARKING(+/‐ 241)
PARKING(+/‐ 168)
ENGLISH
FOREIGN LANGUAGE
SCIENCE
MATH
SCIENCE
ENGLISH & MATH
HUMANITIES
HOME
MTU
MAIN GYMLIBRARY/
MEDIA
RR
RR
RR
PARKING(+/‐ 219)
Oct 2015
UPGRADE THEATER LIGHTING, RIGGING, AND AV SYSTEMS
The
MasterPlan
forthis
site
isconceptual
inna
ture
and
show
spo
tential/po
ssible
facility
improvem
entsat
thesitealignedto
IUSD
Educationa
lSpecifications.Fund
ingan
dprioritizationof
thescop
eof
worklistedwilldeterm
ineho
wtheMasterP
lanforthe
siteisim
plem
ented.
COUNSELING
MPR
LR
LR
Lab
Uni
vers
ity H
igh
Scho
olFa
cilit
ies
Mas
ter P
lan–
Uni
vers
ity H
igh
Scho
ol47
71 C
ampu
s D
r |
Irvin
e, C
A 9
2612
C
UHS CAPACITY 85 Teaching Stations-4 Teaching Stations
+5 Teaching Stations86 Teaching Stations
SCHOOL STATISTICS
Project 2
PROPOSED SCOPE
Modernization
Reconfiguration
New Construction
New Site Work
Demolition
UTILIZATION LEGEND
Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts
Play Apparatus
Parking
Trees
LEGEND
Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible
SCALE 1:200
N
Main Quad
AcademicQuad
Athletic Plaza Stadium
Entry
2ND FLOOR
RR
RR
PLAYFIELDS
HARDCOURTS
THEATRE
AUX GYM
POOL
ELD
SP ED
SP ED
ADMIN.
FOOD SVC.
SP ED
ELDSP ED
PARKING(+/‐ 168)
ENGLISH
FOREIGN LANGUAGE
SCIENCE
MATH
SCIENCE
ENGLISH & MATH
HUMANITIES
MAIN GYM
PARKING(+/‐ 219)
REMOVE EXISTING RESTROOM & CLASSOOMBUILDINGS & RELOS
BLACK BOX
1ST FLOOR
PARKING(+/‐ 241)
C
HOME
MTU
Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment
9-1225771971199642.0
4± 6282600
LIBRARY/MEDIA
LIBRARY/MEDIA/
CR
IL
NEW 2‐STORYLIBRARY/MEDIA CENTER/(5) TS CLASSROOM BLDGCLASSROOMS 8,991 SFLIBRARY 12,165 SFCOPY 1,000 SFNew building to include Student & Staff Restrooms
Classroom Clusters
Science
Business/Design/Engineering
Special Ed (SDC/SH)
DHH
Physical Education
Performing Arts/Multi Media
ASB/Library/Student Union
Portable (Color based on Program)
Other Spaces
12 DHH Teaching Stations
Oct 2015
The
MasterPlan
forthis
site
isconceptual
inna
ture
and
show
spo
tential/po
ssible
facility
improvem
entsat
thesitealignedto
IUSD
Educationa
lSpecifications.Fund
ingan
dprioritizationof
thescop
eof
worklistedwilldeterm
ineho
wtheMasterP
lanforthe
siteisim
plem
ented.
COUNSELING
MPR
RR
LR
LR
Lab
Uni
vers
ity H
igh
Scho
olFa
cilit
ies
Mas
ter P
lan–
Uni
vers
ity H
igh
Scho
ol47
71 C
ampu
s D
r |
Irvin
e, C
A 9
2612
1ST FLOOR
C
UHS CAPACITY 86 Teaching Stations+1 ASB
=87 Teaching Stations
SCHOOL STATISTICS
Project 3
PROPOSED SCOPE
Modernization
Reconfiguration
New Construction
New Site Work
Demolition
UTILIZATION LEGEND
Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts
Play Apparatus
Parking
Trees
LEGEND
Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible
SCALE 1:200
N
BLACK BOX
Main Quad
AcademicQuad
LIBRARY/MEDIA
RECONFIGURE LIBRARY/MEDIA CENTER (7,000 SF) TO MPR/STUDENT UNION & ASB EXPANSION(2,289 SF) Athletic
Plaza Stadium Entry
CONSTRUCT NEW ATHLETIC PLAZA/STADIUM ENTRY
2ND FLOOR
PARKING(+/‐ 241)
PLAYFIELDS
HARDCOURTS
THEATRE
AUX GYM
POOL
ELD
SP ED
SP ED
ADMIN.
FOOD SVC.
SP ED
ELDSP ED
PARKING(+/‐ 168)
ENGLISH
FOREIGN LANGUAGE
SCIENCE
MATH
SCIENCE
ENGLISH & MATH
HUMANITIES
MAIN GYM
PARKING(+/‐ 219)
REMOVE (3) COURTS
ENTRY IMPROVEMENT
HOME
MTU
Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment
9-1225771971199642.0
4± 6282600
LIBRARY/MEDIA/(5) CR
IL
LUNCH CANOPIES9600 SF
FOOD KIOSK100 SF
STUDENT UNION
ASB
Classroom Clusters
Science
Business/Design/Engineering
Special Ed (SDC/SH)
DHH
Physical Education
Performing Arts/Multi Media
ASB/Library/Student Union
Portable (Color based on Program)
Other Spaces
12 DHH Teaching Stations
Oct 2015
COUNSELING
MPR
The
MasterPlan
forthis
site
isconceptual
inna
ture
and
show
spo
tential/po
ssible
facility
improvem
entsat
thesitealignedto
IUSD
Educationa
lSpecifications.Fund
ingan
dprioritizationof
thescop
eof
worklistedwilldeterm
ineho
wtheMasterP
lanforthe
siteisim
plem
ented.
LR
LR
Lab
Uni
vers
ity H
igh
Scho
olFa
cilit
ies
Mas
ter P
lan–
Uni
vers
ity H
igh
Scho
ol47
71 C
ampu
s D
r |
Irvin
e, C
A 9
2612
1ST FLOOR
C
UHS CAPACITY 87 Teaching Stations-2 Teaching Stations(Music)
+4 Teaching Stations (PA)+4 Teaching Stations (Tech Arts)
=93 Teaching Stations
SCHOOL STATISTICS
Project 4
PROPOSED SCOPE
Modernization
Reconfiguration
New Construction
New Site Work
Demolition
UTILIZATION LEGEND
Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts
Play Apparatus
Parking
Trees
LEGEND
Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible
STUDENT UNION
SCALE 1:200
N
BLACK BOX
Main Quad
AcademicQuad
Athletic Plaza Stadium
Entry
2ND FLOOR
PARKING(+/‐ 241)
PLAYFIELDS
HARDCOURTS
THEATRE
AUX GYM
POOL
ELD
SP ED
SP ED
ADMIN.
FOOD SVC.
SP ED
ELDSP ED
PARKING(+/‐ 168)
ENGLISH
FOREIGN LANGUAGE
SCIENCE
MATH
SCIENCE
ENGLISH & MATH
HUMANITIES
MAIN GYM
PARKING(+/‐ 219)
RR
REMOVE RESTROOM BUILDING
DEMO (E) MUSIC BUILDING7,642 SF
NEW 2 STORY (8) TS PERFORMING/TECH ARTS BUILDING17,450 SF + 11,239 SFNew building to include Student & Staff Restrooms
CORE
CHORAL
C TECH ARTS
NEW LOBBY ADDITION1,417 SF
HOME
MTU
Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment
9-1225771971199642.0
4± 6282600
LIBRARY/MEDIA/
CR
IL
BLACK BOX
DANCE
INSTR
CORE
Classroom Clusters
Science
Business/Design/Engineering
Special Ed (SDC/SH)
DHH
Physical Education
Performing Arts/Multi Media
ASB/Library/Student Union
Portable (Color based on Program)
Other Spaces
12 DHH Teaching Stations
RELOCATE. PROVIDE NEW ELECTRICAL SWITCH GEAR
Oct 2015
COUNSELING
MPR
The
MasterPlan
forthis
site
isconceptual
inna
ture
and
show
spo
tential/po
ssible
facility
improvem
entsat
thesitealignedto
IUSD
Educationa
lSpecifications.Fund
ingan
dprioritizationof
thescop
eof
worklistedwilldeterm
ineho
wtheMasterP
lanforthe
siteisim
plem
ented.
LR
LR
Lab
Uni
vers
ity H
igh
Scho
olFa
cilit
ies
Mas
ter P
lan–
Uni
vers
ity H
igh
Scho
ol47
71 C
ampu
s D
r |
Irvin
e, C
A 9
2612
C
UHS CAPACITY 93 Teaching Stations-5 Teaching Stations (Elective Bldg)
+ 7 Reconfiguration (Elective Bldg)+ 5 Portables =100 Permanent Teaching Stations
SCHOOL STATISTICS
Project 5
PROPOSED SCOPE
Modernization
Reconfiguration
New Construction
New Site Work
Demolition
UTILIZATION LEGEND
Main Entry Secondary EntryDrop-OffPlayfields/ LandscapeHardcourts
Play Apparatus
Parking
Trees
LEGEND
Re-configure SpaceModernize/Re-Purpose SpaceDemolish SpaceAddition/ExpansionModernization Eligible
STUDENT UNION
SCALE 1:200
N
Main Quad
AcademicQuad
LIBRARY/MEDIA/
CR
Athletic Plaza Stadium
Entry
2ND FLOOR
PLAYFIELDS
HARDCOURTS
THEATRE
AUX GYM
POOL
ELD
SP ED
SP ED
ADMIN.
FOOD SVC.
SP ED
ELDSP ED
PARKING(+/‐ 168)
ENGLISH
FOREIGN LANGUAGE
SCIENCE
MATH
SCIENCE
ENGLISH & MATH
HUMANITIES
MAIN GYM
PARKING(+/‐ 219)
BLACK BOX
1ST FLOOR
PARKING(+/‐ 241)
CORE
C
C
C C
C
C
C
CONVERT (10) TS TO SHARED COMMONS AREAS
CONVERT BLACK BOX TO LECTURE HALL1,800 SF
RECONFIGURE TO SUPPORT ELECTIVE PROGRAM NEEDS12,100 SF
*LANDSCAPE UPGRADES THROUGHOUT
IL
HOME
MTU
Grades: 2014/15 Enrollment:Year Built:Modernization:Site Acreage: # Portables:Existing Parking:Targeted Enrollment
9-1225771971199642.0
4± 6282600
*SAFETY ISSUE: CAMPUS WIDE OUTDOOR LIGHTING UPGRADE
Classroom Clusters
Science
Business/Design/Engineering
Special Ed (SDC/SH)
DHH
Physical Education
Performing Arts/Multi Media
ASB/Library/Student Union
Portable (Color based on Program)
Other Spaces
12 DHH Teaching StationsCORE
CHORAL
CTECH ARTS
BLACK BOX
DANCE
INSTR
CORE
(5) NEW PORTABLES
Oct 2015
COUNSELING
MPR
The
MasterPlan
forthis
site
isconceptual
inna
ture
and
show
spo
tential/po
ssible
facility
improvem
entsat
thesitealignedto
IUSD
Educationa
lSpecifications.Fund
ingan
dprioritizationof
thescop
eof
worklistedwilldeterm
ineho
wtheMasterP
lanforthe
siteisim
plem
ented.