Revision Number 0 Date 15 th August 2016 Checked by A part of BMT in Energy and Environment G:\Admin\B22205.g.skh._Clump Point Development Plan\Development Plan Appendices\B22205_Technical Note - Sediment Sampling & Analysis.docx Technical Note Clump Point Boat Ramp Development Plan Sediment Sampling and Analysis Grab sampling of surface sediments was performed at the 12 locations shown in Figure D-1 on 22 July 2016. The samples were collected from the BMT WBM vessel Resolution II using a small van Veen grab. The results of sample analysis are attached below. BMT WBM Pty Ltd Level 8, 200 Creek Street Brisbane Qld 4000 Australia PO Box 203, Spring Hill 4004 Tel: +61 7 3831 6744 Fax: + 61 7 3832 3627 ABN 54 010 830 421 www.bmtwbm.com.au

Upload: others

Post on 01-Jan-2022

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Clump Point Boat Ramp Development Plan

Revision Number 0

Date 15th August 2016

Checked by

A part of BMT in Energy and Environment G:\Admin\B22205.g.skh._Clump Point Development Plan\Development Plan Appendices\B22205_Technical Note - Sediment Sampling & Analysis.docx

Technical Note Clump Point Boat Ramp Development Plan

Sediment Sampling and Analysis

Grab sampling of surface sediments was performed at the 12 locations shown in Figure D-1 on 22 July

2016. The samples were collected from the BMT WBM vessel Resolution II using a small van Veen grab.

The results of sample analysis are attached below.

BMT WBM Pty Ltd Level 8, 200 Creek Street Brisbane Qld 4000 Australia PO Box 203, Spring Hill 4004 Tel: +61 7 3831 6744 Fax: + 61 7 3832 3627 ABN 54 010 830 421 www.bmtwbm.com.au

Page 2: Clump Point Boat Ramp Development Plan
Page 3: Clump Point Boat Ramp Development Plan

0 0.00 True

Environmental

CERTIFICATE OF ANALYSISWork Order : Page : 1 of 5EN1602780

:: LaboratoryClient BMT WBM GROUP LTD Environmental Division Newcastle

: :ContactContact MS LYN LEGER John Pickering

:: AddressAddress PO BOX 203 SPRING HILL

BRISBANE QLD 4004

5/585 Maitland Road Mayfield West NSW Australia 2304

:Telephone +61 07 3831 6744 :Telephone +61 7 3552 8634

NATA Accredited Laboratory 825

Accredited for compliance with

ISO/IEC 17025.

:Project B22205 Clump Point Date Samples Received : 04-Aug-2016 09:40

:Order number ---- Date Analysis Commenced : 10-Aug-2016

:C-O-C number ---- Issue Date : 11-Aug-2016 22:27

Sampler : CONOR JONES

Site : ----

Quote number : ----

12:No. of samples received

12:No. of samples analysed

This report supersedes any previous report(s) with this reference. Results apply to the sample(s) as submitted.

This Certificate of Analysis contains the following information:

l General Comments

l Analytical Results

Additional information pertinent to this report will be found in the following separate attachments: Quality Control Report, QA/QC Compliance Assessment to assist with

Quality Review and Sample Receipt Notification.

SignatoriesThis document has been electronically signed by the authorized signatories below. Electronic signing is carried out in compliance with procedures specified in 21 CFR Part 11.

Signatories Accreditation CategoryPosition

Peter Keyte Newcastle Manager Newcastle - Inorganics, Mayfield West, NSW

R I G H T S O L U T I O N S | R I G H T P A R T N E R

Page 4: Clump Point Boat Ramp Development Plan

2 of 5:Page

Work Order :

:Client

EN1602780

B22205 Clump Point:Project

BMT WBM GROUP LTD

General Comments

The analytical procedures used by the Environmental Division have been developed from established internationally recognized procedures such as those published by the USEPA, APHA, AS and NEPM. In house

developed procedures are employed in the absence of documented standards or by client request.

Where moisture determination has been performed, results are reported on a dry weight basis.

Where a reported less than (<) result is higher than the LOR, this may be due to primary sample extract/digestate dilution and/or insufficient sample for analysis.

Where the LOR of a reported result differs from standard LOR, this may be due to high moisture content, insufficient sample (reduced weight employed) or matrix interference.

When sampling time information is not provided by the client, sampling dates are shown without a time component. In these instances, the time component has been assumed by the laboratory for processing purposes.

Where a result is required to meet compliance limits the associated uncertainty must be considered. Refer to the ALS Contact for details.

CAS Number = CAS registry number from database maintained by Chemical Abstracts Services. The Chemical Abstracts Service is a division of the American Chemical Society.

LOR = Limit of reporting

^ = This result is computed from individual analyte detections at or above the level of reporting

ø = ALS is not NATA accredited for these tests.

~ = Indicates an estimated value.

Key :

EA151: ALS does not hold NATA accreditation for Settleability.l

Page 5: Clump Point Boat Ramp Development Plan

3 of 5:Page

Work Order :

:Client

EN1602780

B22205 Clump Point:Project

BMT WBM GROUP LTD

Analytical Results

54321Client sample IDSub-Matrix: SOIL

(Matrix: SOIL)

[22-Jul-2016][22-Jul-2016][22-Jul-2016][22-Jul-2016][22-Jul-2016]Client sampling date / time

EN1602780-005EN1602780-004EN1602780-003EN1602780-002EN1602780-001UnitLORCAS NumberCompound

Result Result Result Result Result

EA150: Particle Sizing

68 63 60 70 86%1----+75µm

31 20 12 12 46%1----+150µm

21 14 8 7 31%1----+300µm

11 11 6 5 7%1----+425µm

10 7 3 2 6%1----+600µm

2 2 <1 <1 <1%1----+1180µm

<1 <1 <1 <1 <1%1----+2.36mm

<1 <1 <1 <1 <1%1----+4.75mm

<1 <1 <1 <1 <1%1----+9.5mm

<1 <1 <1 <1 <1%1----+19.0mm

<1 <1 <1 <1 <1%1----+37.5mm

<1 <1 <1 <1 <1%1----+75.0mm

EA150: Soil Classification based on Particle Size

14 15 16 12 9%1----Clay (<2 µm)

10 11 11 6 4%1----Silt (2-60 µm)

75 73 73 82 87%1----Sand (0.06-2.00 mm)

1 1 <1 <1 <1%1----Gravel (>2mm)

<1 <1 <1 <1 <1%1----Cobbles (>6cm)

EA151: Settleability 10%

1.44ø 1.45 1.41 1.46 1.55g/cm30.01----Underflow Density

43.5ø 46.1 44.2 49.0 53.6%0.1----Underflow Solids

13.4ø 13.8 7.20 18.4 29.8mm/min0.001----Settling Rate @ 50% of Settlement

0.200ø 0.200 0.267 0.800 20.0mm/min0.001----Settling Rate @ 90% of Settlement

Clearø Clear Clear Clear Clear------Clarity

EA152: Soil Particle Density

2.63ø 2.64 2.64 2.66 2.68g/cm30.01----Soil Particle Density (Clay/Silt/Sand)

Page 6: Clump Point Boat Ramp Development Plan

4 of 5:Page

Work Order :

:Client

EN1602780

B22205 Clump Point:Project

BMT WBM GROUP LTD

Analytical Results

109876Client sample IDSub-Matrix: SOIL

(Matrix: SOIL)

[22-Jul-2016][22-Jul-2016][22-Jul-2016][22-Jul-2016][22-Jul-2016]Client sampling date / time

EN1602780-010EN1602780-009EN1602780-008EN1602780-007EN1602780-006UnitLORCAS NumberCompound

Result Result Result Result Result

EA150: Particle Sizing

79 70 66 25 34%1----+75µm

42 28 6 4 8%1----+150µm

28 21 2 1 3%1----+300µm

14 16 1 1 2%1----+425µm

7 13 1 <1 1%1----+600µm

2 10 <1 <1 <1%1----+1180µm

1 7 <1 <1 <1%1----+2.36mm

<1 4 <1 <1 <1%1----+4.75mm

<1 <1 <1 <1 <1%1----+9.5mm

<1 <1 <1 <1 <1%1----+19.0mm

<1 <1 <1 <1 <1%1----+37.5mm

<1 <1 <1 <1 <1%1----+75.0mm

EA150: Soil Classification based on Particle Size

10 14 14 32 30%1----Clay (<2 µm)

5 7 9 31 26%1----Silt (2-60 µm)

84 71 77 37 44%1----Sand (0.06-2.00 mm)

1 8 <1 <1 <1%1----Gravel (>2mm)

<1 <1 <1 <1 <1%1----Cobbles (>6cm)

EA151: Settleability 10%

1.59ø 1.44 1.40 1.26 1.28g/cm30.01----Underflow Density

50.4ø 46.1 44.5 26.4 26.1%0.1----Underflow Solids

23.8ø 13.8 15.2 2.40 2.60mm/min0.001----Settling Rate @ 50% of Settlement

2.40ø 0.600 0.600 0.042 0.042mm/min0.001----Settling Rate @ 90% of Settlement

Clearø Clear Clear Clear Clear------Clarity

EA152: Soil Particle Density

2.66ø 2.65 2.62 2.54 2.57g/cm30.01----Soil Particle Density (Clay/Silt/Sand)

Page 7: Clump Point Boat Ramp Development Plan

5 of 5:Page

Work Order :

:Client

EN1602780

B22205 Clump Point:Project

BMT WBM GROUP LTD

Analytical Results

------------1211Client sample IDSub-Matrix: SOIL

(Matrix: SOIL)

------------[22-Jul-2016][22-Jul-2016]Client sampling date / time

------------------------EN1602780-012EN1602780-011UnitLORCAS NumberCompound

Result Result ---- ---- ----

EA150: Particle Sizing

76 57 ---- ---- ----%1----+75µm

16 13 ---- ---- ----%1----+150µm

3 4 ---- ---- ----%1----+300µm

2 2 ---- ---- ----%1----+425µm

2 2 ---- ---- ----%1----+600µm

<1 1 ---- ---- ----%1----+1180µm

<1 <1 ---- ---- ----%1----+2.36mm

<1 <1 ---- ---- ----%1----+4.75mm

<1 <1 ---- ---- ----%1----+9.5mm

<1 <1 ---- ---- ----%1----+19.0mm

<1 <1 ---- ---- ----%1----+37.5mm

<1 <1 ---- ---- ----%1----+75.0mm

EA150: Soil Classification based on Particle Size

10 16 ---- ---- ----%1----Clay (<2 µm)

5 16 ---- ---- ----%1----Silt (2-60 µm)

84 67 ---- ---- ----%1----Sand (0.06-2.00 mm)

1 1 ---- ---- ----%1----Gravel (>2mm)

<1 <1 ---- ---- ----%1----Cobbles (>6cm)

EA151: Settleability 10%

1.52ø 1.38 ---- ---- ----g/cm30.01----Underflow Density

50.7ø 40.2 ---- ---- ----%0.1----Underflow Solids

29.0ø 5.40 ---- ---- ----mm/min0.001----Settling Rate @ 50% of Settlement

21.0ø 0.117 ---- ---- ----mm/min0.001----Settling Rate @ 90% of Settlement

Clearø Clear ---- ---- ----------Clarity

EA152: Soil Particle Density

2.63ø 2.63 ---- ---- ----g/cm30.01----Soil Particle Density (Clay/Silt/Sand)

Page 8: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-001 / PSD

001PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 98%

0.600 90%

0.425 89%

0.300 79%

0.150 69%

0.075 32%

Particle Size (microns)

75 30%

56 22%

40 19%

20 17%

10 17%

5 16%

1 14%

Median Particle Size (mm)* 0.111

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.63 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

1

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 9: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-002 / PSD

002PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 99%

1.18 98%

0.600 93%

0.425 89%

0.300 86%

0.150 80%

0.075 37%

Particle Size (microns)

75 33%

56 25%

40 22%

20 19%

10 17%

5 16%

1 15%

Median Particle Size (mm)* 0.098

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.64 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

2

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND, SHELL

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 10: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-003 / PSD

003PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 99%

0.600 97%

0.425 95%

0.300 92%

0.150 88%

0.075 40%

Particle Size (microns)

75 30%

56 26%

40 23%

20 20%

10 20%

5 19%

1 16%

Median Particle Size (mm)* 0.091

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.64 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

3

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 11: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-004 / PSD

004PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 99%

0.600 98%

0.425 95%

0.300 93%

0.150 88%

0.075 30%

Particle Size (microns)

75 24%

55 16%

41 14%

20 14%

10 14%

5 12%

2 12%

Median Particle Size (mm)* 0.101

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.66 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

4

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 12: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-005 / PSD

005PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 99%

0.600 94%

0.425 93%

0.300 69%

0.150 54%

0.075 14%

Particle Size (microns)

75 14%

55 12%

41 11%

20 11%

10 10%

5 10%

2 9%

Median Particle Size (mm)* 0.143

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.68 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

5

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND, SHELL

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 13: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-006 / PSD

006PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 99%

2.36 99%

1.18 98%

0.600 93%

0.425 86%

0.300 72%

0.150 58%

0.075 21%

Particle Size (microns)

75 16%

55 15%

39 13%

20 11%

10 11%

5 10%

2 10%

Median Particle Size (mm)* 0.134

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.66 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

6

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 14: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-007 / PSD

007PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 96%

2.36 93%

1.18 91%

0.600 87%

0.425 84%

0.300 79%

0.150 72%

0.075 30%

Particle Size (microns)

75 24%

55 20%

39 18%

20 16%

10 16%

5 15%

1 14%

Median Particle Size (mm)* 0.111

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.65 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

7

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND, STONE

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 15: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-008 / PSD

008PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 100%

0.600 99%

0.425 99%

0.300 98%

0.150 94%

0.075 34%

Particle Size (microns)

75 28%

56 22%

40 17%

20 16%

10 16%

5 16%

1 14%

Median Particle Size (mm)* 0.095

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.62 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

8

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 16: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-009 / PSD

009PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 100%

0.600 99%

0.425 99%

0.300 99%

0.150 96%

0.075 75%

Particle Size (microns)

75 65%

53 62%

37 59%

19 59%

10 49%

5 38%

2 31%

Median Particle Size (mm)* 0.011

0.00 5

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.54 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

9

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

FINES, SAND, VEG

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 17: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-010 / PSD

010PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 100%

1.18 99%

0.600 99%

0.425 98%

0.300 97%

0.150 92%

0.075 66%

Particle Size (microns)

74 60%

52 54%

37 52%

19 49%

10 43%

5 34%

2 29%

Median Particle Size (mm)* 0.030

0.00 8

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.57 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

10

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

FINES, SAND, VEG

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 18: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-011 / PSD

011PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 99%

1.18 99%

0.600 99%

0.425 98%

0.300 97%

0.150 84%

0.075 24%

Particle Size (microns)

75 16%

56 14%

41 12%

21 11%

11 11%

5 10%

2 10%

Median Particle Size (mm)* 0.108

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.63 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

11

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1

Page 19: Clump Point Boat Ramp Development Plan

ALS Environmental

Newcastle, NSW

CLIENT: DATE REPORTED: 11-Aug-2016

COMPANY: DATE RECEIVED: 4-Aug-2016

ADDRESS: REPORT NO: EN1602780-012 / PSD

012PROJECT: SAMPLE ID:

Particle Size Distribution Particle Size (mm)Percent Passing

150 100%

75 100%

37.5 100%

19.0 100%

9.50 100%

4.75 100%

2.36 99%

1.18 99%

0.600 98%

0.425 98%

0.300 96%

0.150 87%

0.075 43%

Particle Size (microns)

75 35%

54 30%

40 24%

20 22%

10 19%

5 16%

1 16%

Median Particle Size (mm)* 0.087

0.00 12

Sample Comments: Analysed:

Loss on Pretreatment NA Limit of Reporting: 1%

Sample Description: Dispersion Method Shaker

Test Method: Hydrometer Type ASTM E100TRUE

Soil Particle Density (<2.36mm) 2.63 g/cm3

Peter KeyteManager NewcastleAuthorised Signatory

Certificate of Analysis

Lyn Leger

12

8-Aug-16

BMT WBM GROUP LTD

Median Particle Size is not covered under the current scope of ALS's NATA accreditation.

B22205 Clump Point

PO BOX 203 SPRING HILL

Samples analysed as received.* Insufficient sample provided for Soil Particle Density analysis according to AS 1289.3.5.1—2006.

SAND

AS1289.3.6.3 2003

BRISBANE, QLD 4004

NATA Accreditation: 825 Site: NewcastleThis document is issued in accordance with NATA’s accreditation requirements.Accredited for compliance with ISO/IEC 17025. This document shall not be reproduced, except in full.

ALS Laboratory Group Pty Ltd5/585 Maitland RoadMayfield West, NSW 2304pH 02 4014 2500fax 02 4968 [email protected]

Clay | Silt | Sand | Gravel |

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0.00

1

0.00

4

0.01

6

0.06

4

0.25

6

1.02

4

4.09

6

16.3

84

65.5

36

262.

144

Grain Size (mm)

Template Version PKV6a-151125 Page 1 of 1