rhyll boat ramp functional design - final concept · job no: awm 3470 drowing: scale: date: final...

1
Job No: AWM 3470 Drowing: Scale: Date: Final Concept Design NTS 20/02/2020 Rhyll Boat Ramp Functional Design - Final Concept Better Boating Victoria 1 2 3 4 5 6 7 8 8 12 9 10 1 2 3 4 5 6 7 8 9 10 11 Replace existing jetty New larger southern pontoon Duplicate jetty and pontoon to north Rigging areas Standard Car Trailer Unit space size Edge protection along revetment & Timber board walk Boat ramp access (all tide access) Improved pedestrian footpaths LEGEND Existing Trees Proposed Trees Proposed Foot Path Green Area Overflow parking locations 13 3 no. public car park space removed 12 14 Permanent main exit 14 13 8 Dinghy & Kayak launching Ramp (indicative) Webcam Location Boardwalk Relocation & upgrade playground facilities, Picnic & BBQ (indicative) Wash Down Facilities Fender Pile Lighting 4 Parking Type Number of spaces Car Trailer Units 43 Car park spaces lost 5 Northern Overflow 6 Southern Overflow 48 WSUD Principles to apply Provide emergency service parking spaces Map Insert - Overflow Parking Locations Northern Overflow Parking Southern Overflow Parking Rhyll Boat Ramp Rhyll 11 * Fish cleaning facility location to be confirmed 15 Soft planting / scrub barrier 15

Upload: others

Post on 22-Jul-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rhyll Boat Ramp Functional Design - Final Concept · Job No: AWM 3470 Drowing: Scale: Date: Final Concept Design NTS 20/02/2020 Rhyll Boat Ramp Functional Design - Final Concept Better

Job No: AWM 3470Drowing:Scale:Date:

Final Concept Design NTS20/02/2020

Rhyll Boat Ramp Functional Design - Final Concept Better Boating Victoria

1

2

3

4

5

6

7

8

8

12

9

10

1

2

3

4

5

6

7

8

9

10

11

Replace existing jetty

New larger southern pontoon

Duplicate jetty and pontoon to north

Rigging areas

Standard Car Trailer Unit space size

Edge protection along revetment &Timber board walk

Boat ramp access (all tide access)

Improved pedestrian footpaths

LEGENDExisting Trees

Proposed Trees

Proposed Foot Path

Green Area

Overflow parking locations

13

3 no. public car park space removed

12

14

Permanent main exit

14

13

8

Dinghy & Kayak launching Ramp (indicative)

Webcam Location

Boardwalk

Relocation & upgrade playground facilities,Picnic & BBQ (indicative)

Wash DownFacilities

Fender Pile

Lighting

4

Parking Type Number ofspaces

Car Trailer Units 43

Car park spaces lost5

Northern Overflow 6

Southern Overflow 48

WSUD Principles to apply

Provide emergency service parking spaces

Map Insert - Overflow Parking Locations

Northern

Overflow

Parking

Southern

Overflow

Parking

Rhyll Boat

Ramp

Rhyll

11

* Fish cleaning facility location to be confirmed

15 Soft planting / scrub barrier