cm window haryanacmharyanacell.nic.in/office/docs/2016-may-12 rohtak div...window haryana c.m....

34
ONLINE GRIEVANCES REDRESSAL SYSTEM 12.05.2016 (DCs) CM WINDOW HARYANA

Upload: nguyenhanh

Post on 25-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

ONLINE GRIEVANCESREDRESSAL SYSTEM

12.05.2016 (DCs)

CM WINDOW

HARYANA

2C.M. Grievance's Cell

At a Glance

C.M. Greivances Cell 3

C.M. Greivances Cell 4

Deputy Commissioner Total Receipt Overdue ATR Sent Clarification

Panipat 4516 266 20 138

Karnal 3004 360 32 112

Sonepat 2267 295 199 60

Rohtak 2215 206 43 88

Jhajjar 1695 255 42 97

C.M. Greivances Cell 5

Deputy Commissioner Total Receipt Overdue %age

Karnal 3004 360 12

Sonepat 2267 295 13

Panipat 4516 266 5

Jhajjar 1695 255 15

Rohtak 2215 206 9

Overdue-wise

C.M. Greivances Cell 6

CLARIFICATION SOUGHT BY C.M. OFFICE

Deputy Commissioner

Total Receipt

Overdue ATR Sent Clarification %age

Panipat 4516 266 20 138 87

Karnal 3004 360 32 112 77

Jhajjar 1695 255 42 97 70

Rohtak 2215 206 43 88 67

Sonepat 2267 295 199 60 24

C.M. Greivances Cell 7

PENDING FOR SUBORIDNATE MARKING

Deputy Commissioner Pending for marking

Jhajjar 15

Panipat 11

Karnal 4

Rohtak 3

Sonipat 0

C.M. Greivances Cell 8

Deputy Commissioners Grievances pending

Jhajjar 3

Panipat 2

Karnal 1

GRIEVANCES REGISTERED IN 2014

C.M. Greivances Cell 9

GRIEVANCES REGISTERED IN 2015

Deputy commissioner Grievances Pending

Karnal 106

Sonipat 73

Panipat 59

Jhajjar 48

Roahtak 38

Brief

On the qualitative defects in the ATRs beingreceived from different departments.

Now that majority of the ATRs are being receivedwithin the stipulated time frame, anotherproblem regarding qualitative aspect of theaction taken is a cause of concerned. By seeingthe various reports being submitted the defectsin the ATR received can be categorized (eventhough not exhaustively) into nine categoriesbriefed.

10C.M. Greivances Cell

CATEGORIES OF DEFECTS IN ATR’S RECEIVED

• Disposal on Interim reply. • Incomplete and vague replies.• Disposed off citing non availability of record or persons

or officers or complainant or the delinquent.• Non joining of the complainant• No action even then disposed off.• Wrong attachments / incorrect details or attachments /

Absence of attachments mentioned to or referred to in the reply.

• Delinquent found guilty yet no action.• Overdue without any reason.• Enquiry marked to the same official against whom the

complaint was made.

11C.M. Greivances Cell

C.M. Greivances Cell 12

BDPO concerned wrote letter to sarpanch concerned thereafter no action.

C.M. Greivances Cell 13

Complaint of poordrainage due constructionof road resultantly theplinth of the road gotincreased. Matter ispending since dec 2014.

C.M. Greivances Cell 14

00807/2015DSP concerned specificallymentioned in his report that thematter relates to DC office . Butstill DC jhajjar is seekingclarifications from the SPconcerned

C.M. Greivances Cell 15

Matter was dispose of by DC office without going through the report.

C.M. Greivances Cell 16

27445/2015Matter of encroachment insome village. Matter is pendingfor demarcation since march2015. Whenever clarification issought matter is being disposeof with this type of stereotypereply.

C.M. Greivances Cell 17

KARNALOrder of police help wasmade on 21.05.2014 till thedistrict administration failedto get the police help. Matterof encroachment.

C.M. Greivances Cell 18

16370/2015BDPO has sent a letter toDC concerned that matterrelates to tehsildargharaunda still the DCconcerned soughtclarification from theBDPO.

C.M. Greivances Cell 19

Reply was sent after 15 months that too interim in nature.

C.M. Greivances Cell 20

The factory is stillrunning in aclandestinemanner as per thecomplainant heeven showed thephotographs fromwhich it can beclearly bedeciphered thatfactory is runningeven after thesealingproceedings. Asper the instructionissued by theDirector ULB whilesealing a factory itis mandatory forthe officer todisconnect theelectricityconnection.

C.M. Greivances Cell 21

01849/2014 karnalSubsidy not paid. Was shown in previous meeting too.

C.M. Greivances Cell 22

13250/2015Complaint ofencroachment.Unsigned report. Noaction after this reporteven after so manyclarification from CMO.

C.M. Greivances Cell 23

Panipat 04433/15Complaint of someemployee. Reportforwarded by DCconcenred ismisleaeding andsame verycarelessly croppedit can’t bedeciphered haswho has preparedthe same. Noaction was doneeven after 4-5clarifications.

C.M. Greivances Cell 24

All the interimreplies are same.BDPO bapoli failedto the police helpsince jan 2015.These sorts ofreport are beingforwarded by theDC office withouteven goingthrough thecontents. File hasmoved more than125 times.

C.M. Greivances Cell 25

Pending for sub ordinate marking since january 2015.

C.M. Greivances Cell 26

Rohtak 112911/2015Complaint striking off thename of complainant frompensioner’s list. Interimreply. There after noprogress even afterclarifications .

C.M. Greivances Cell 27

16677/2015Dispose of on nonavailability of record.

C.M. Greivances Cell 28

As per report matter is pending withDC concerned but the same is beingdispose of the DC without goingthrough the report. No reply wassent even after repeatedclarifications

C.M. Greivances Cell 29

SonipatNon payment of salary of a operator and matter was dispose of this reply.

C.M. Greivances Cell 30

Unsigned report.

C.M. Greivances Cell 31

Order of court tocorrect the mutationbut till date tehsildarsonipat is unable totrack the record.Pending since may2015.

C.M. Greivances Cell 32

Pending with tehsildar sonipat without any reason.

C.M. Greivances Cell 33

There were 2 greivances in asingle complaint. But the DCconcerned is not using themultiple marking system anddisposing off the same in thisreply.

Thanks

34C.M. Greivances Cell