cmm future demands – measurement at the edge · measurement? 13 thank you for your attention any...

13
1 ©2011 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc. This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies. CMM future demands – measurement at the edge Nick Orchard Manufacturing Process Owner – Dimensional Measurement Content About Rolls-Royce The cost of measurement Future development needs

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

1

©2011 Rolls-Royce plcThe information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of Rolls-Royce plc.This information is given in good faith based upon the latest information available to Rolls-Royce plc, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon Rolls-Royce plc or any of its subsidiary or associated companies.

CMM future demands – measurement at the edge

Nick OrchardManufacturing Process Owner – Dimensional Measuremen t

Content

� About Rolls-Royce� The cost of measurement� Future development needs

Page 2: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

2

What does Rolls-Royce Make?

� Engines for –− Civil Aircraft− Military Aircraft− Ships− Power generation plant− Nuclear submarines

� Power Systems

Visit www.Rolls-Royce.com for the bigger picture

Key drivers in engine manufacture

Cost

QualitySafety

Page 3: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

3

Manufacturing objective - make things the right size!

� You don’t have to make another one� You don’t have to correct it� It fits properly� It works as the designer intended it to� It doesn’t break or fall apart

But it’s not as simple as that!

� It has to be done at minimum cost� How do we really know if it’s the right size?

Measurement’s role in manufacture

� Protect the customer− We cannot afford to deliver non-conforming parts

� Provide key information to enable the machining processes to operate to their full potential

− Be the eyes of the process� Don’t get in the way – try to be invisible.

Page 4: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

4

The headline objective for measurement:

“100% customer protection at zero cost”

Dr Hamid Mughal

EVP Manufacturing Engineering and Technology for Rolls-Royce

Trent XWB

Page 5: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

5

‘Every part of this ship was built by the low bidde r’ – Alan Shepard

The stages of Process Improvement

Stage 1 – Where we start – the status quoStage 2 – Investment in new equipmentStage 3 – Process developmentStage 4 – Continuous improvementStage 5 – Where we end – the target state

Page 6: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

6

What happens when we invest in new measurement technology?

Following investment in new measurement capability, would you expect the overall process capability to:

a) Go up?b) Go down?c) Stay the same?d) Don’t know?e) Don’t care?

Process cost

60 60 55 5040

2540

40

25

5

0

20

40

60

80

100

120

140

Stage 1 - wherewe started

Stage 2 - newinvestment

Stage 3 -process

development

Stage 4 -continuous

improvement

Stage 5 - Target

Re-work

Scrap

Inspection

Machining

Page 7: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

7

Effect of machining development

60 60 55 5040

20

2540

40

25

5

5

0

20

40

60

80

100

120

140

Stage 1 -where westarted

Stage 2 - newinvestment

Stage 3 -process

development

Stage 4 -continuous

improvement

Stage 5 -Target

Stage 6 -Machining

development

Re-work

Scrap

Inspection

Machining

Choices – is it…?

Or

Page 8: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

8

..or more realistically is it …?

Or

Cutting it fine..

Page 9: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

9

Measurement Capability v tolerance

Lower spec limit

Upper spec limit

Process limits increase with reducing measurement uncertainty

Nominal size

The cost/capability trade-off

� Would using a lower capability (cost) measuring instrument compromise the overall process cost?

� We want to use the ‘worst possible’ measurement system!

Page 10: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

10

…but..

� How confident are we that we know where the limits of capability lie?

� Can we be sure that the measurement system will perform to expectations?

ISO 10360 Test set up

Page 11: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

11

Real world – we need to measure a hidden bore

Is this better than… …this?

Page 12: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

12

…or this?

Our current problems…solutions please

� We need a much better understanding of task-specific measurement uncertainty

� How do we verify CMM programs? � How do we compare measurements on two CMMs and

decide if they correlate?� How can we make very high precision measurement

on small features but then relate them to distant datum features?

� Do we know enough about machine tool measurement uncertainty to be able to dispense with any further measurement?

Page 13: CMM future demands – measurement at the edge · measurement? 13 Thank you for your attention Any questions? Nick Orchard contact details: Nick.orchard@rolls-royce.com Tel mobile:

13

Thank you for your attentionAny questions?

Nick Orchard contact details:

[email protected]

Tel mobile: +44 (0) 777 222 4511