cmo-mah integration challenges & success...
TRANSCRIPT
1© 2017 TraceLink Inc. Confidential with No Further Distribution
Stanley Samuel, Group Manager, EMEA (CMO/3PL)
CMO-MAH Integration Challenges & Success Factors
2© 2017 TraceLink Inc. Confidential with No Further Distribution
Global Track and Trace Becoming Business as Usual
N. & S. America
Asia
EMEA
Additional Draft Regulations in DevelopmentEgypt, UAE, Mexico, Columbia, Libya, Algeria, South Africa, Albania, Cameroon, Ukraine, and more
Argentina Argentina
US US US US
China China China (new?)
S. Korea S. Korea S. Korea S. KoreaIndia
India India India
Saudi Arabia Saudi Arabia
Brazil
European Union
Turkey
75+% of global medicines covered by barcoding, track and trace regulations in 20192014 2016 2018
2015 2017 2019
France
Belgium
Italy
Nigeria
Kenya
Philippines
Chile
Iran Italy Russia Russia
Jordan
Australia Taiwan?Japan
Pakistan?
Jordan
India (domestic?)
Japan
Argentina
Pakistan
3© 2017 TraceLink Inc. Confidential with No Further Distribution
Countries Following or Align with EU FMD
• EU Member States
• European Economic Area countries− Norway− Iceland− Liechtenstein
• Switzerland
• Countries with serialisation/coding schemes in place can get additional 6 year transition time− Belgium (likely to align with 2019)− Greece (likely to align with 2019)− Italy (likely to use extended time)
4© 2017 TraceLink Inc. Confidential with No Further Distribution
EU Serialisation, Reporting, Verification ModelHigh Level Data Exchange Structure
EuropeanHub
ParallelImporter/Distributor
Wholesaler Pharmacy Wholesaler Pharmacy
NationalSystem NationalSystem
� Manufacturer packages and serialises drug product, manages serialisation events in internal and 3PL distribution sites� Manufacturer submits Product, Packaging, Status data into European Hub
- Regulation provides for submission directly to a National System� Parallel Importer / Distributors submit Product, Packaging, Status data into European Hub� European Hub pushes information such as pack data to the National Systems� Pharmacies perform verification inquiries against a National System� Wholesalers and Parallel Distributors perform risk-based verification queries against a National System
Packaging Site CMO 3PL
PharmaManufacturer
5© 2017 TraceLink Inc. Confidential with No Further Distribution
6© 2017 TraceLink Inc. Confidential with No Further Distribution
18 months or more
12-18 months
How far in advance of regulatory deadline should the CMO have ordered upgrades/software to support your organization?
7© 2017 TraceLink Inc. Confidential with No Further Distribution
Readiness, Concurrency and Resource Conflicts#
Part
ners
to O
nboa
rd
Resource Capability
Procurement Spike
OnboardingSpike
1. Resource peaks are beyond industry and company capabilities and extend project timelines
2. No company can onboard more than a few partners in parallel
3. There are many opportunities for delay at each phase of the project
8© 2017 TraceLink Inc. Confidential with No Further Distribution
The Integration Challenge
9© 2017 TraceLink Inc. Confidential with No Further Distribution
Serialization Data Exchange & Provider LandscapeSerialization Framework: ISA-95 Model (OpenSCS)
•Enterprise Software• Inconsistent Regulations•Evolving Interfaces•Frequent Updates (Validation)•High Scalability
•Packaging Equipment• Insulated from Regulations•Fixed Interfaces• Implement and ‘don’t touch it’•Focus on OEE
10© 2017 TraceLink Inc. Confidential with No Further Distribution
Integration Requirements & ApproachesInternal system design leads to unique and complex integration
NETWORK TENANT• Single connection to network• 1 * 9-month integration• Integration included
Minimize resources intensive integration and validation requirement
PharmaCompany
CMO Integration
1 Simple
2 Not defined
3 Not defined
4 COMPLEX
5 COMPLEX
6 COMPLEX
… COMPLEX
# Companies Top-40COMPLEX 10
Not defined 11
TraceLink Integration 19
POINT-TO-POINT
• Connection to each customer• N * 9-month integration• $20,000 per integration
11© 2017 TraceLink Inc. Confidential with No Further Distribution
We’d like to split and combine messages by content and event type!We’d like to send messages by event type or
chronological sequence!We’d like to add a “last file transmission” marker!We’d like to add a few extra data fields!
EPCIS is Necessary but Not Sufficient
Line Management Systems (L1-2)
Site Server (L3)
Enterprise Repository “EPCIS” (L4)
Proprietary Interface
MaHMaHMAH
We’d like to use a specific file-naming convention that includes custom data parameters!
1. Push2. SOAP Request/Response3. SOAP Request/Async Response4. Full Async
CMO
SN Request/Response
Commission/Aggregation/Ship
Support multiple Data Formats
EPCIS versions
12© 2017 TraceLink Inc. Confidential with No Further Distribution
Network (L5)
SN Request/Response
Enterprise Repository “EPCIS” (L4)
CMO providesextra data fields andprocess triggers
StandardEvents
TraceLinkdeveloped/supported
plug-insSanofi Plug-In Teva Plug-In
Commission/Aggregation/ShipCMO
21 of Top 30 Require Custom InterfacesA combination of additional data fields and transaction choreography
13© 2017 TraceLink Inc. Confidential with No Further Distribution
The On-boarding Process
14© 2017 TraceLink Inc. Confidential with No Further Distribution
Program Resource Management Plan understanding the Constrained Market Resources
Strategy• Internal/External
• LMS/Enterprise
CMO Program Management
TraceLink Network Success
CMO 1 CMO 57In
tern
alIm
plem
enta
tion
Leve
l 4/5
Prof
essi
onal
Se
rvic
es
15© 2017 TraceLink Inc. Confidential with No Further Distribution© 2017 TraceLink Inc. Confidential with No Further Distribution
MAH TraceLink CMO/CPOPrioritize CMO onboarding:
readiness, volume, importance
Manage communication to CMOs including artwork
Communicate requirements to CMO(s)
Attend format testing calls
Work with CMO for data and choreography testing
Provide technical expertise for specs call
Establish integration with CMO
Create relationship and educate CMOs
Assist with format testing
Attend data and choreography testing call to provide technical
assistance
Serialize lines
Work with MAH on artwork changes
Prepare country, data and choreography requirements (IT)
Work with TraceLink to establish integration
Execute testing process
Internal Program Management / External Consulting Organisations Leverage efficienciesInformation collection
Best practices Guidelines Resources
Project coordination
16© 2017 TraceLink Inc. Confidential with No Further Distribution
TraceLink IntegrationSpecs Discussion
Serialization Tasks and OwnershipPrerequisites
MA
HC
MO
Trac
eLin
k
CMO & MAH Coordination
Line SerializationData and
Choreography Specs Discussion
Data and Choreography
Specs Overview
Send integration form to CMO
Complete integration form
Add CMO to network and begin
integration
Conduct educational call
Test file format to TraceLink
Test business data and choreography Go-Live
Assist with testing as needed
Note: If completed before, just contact NSM Receive TraceLink
Integration Completion Certificate
17© 2017 TraceLink Inc. Confidential with No Further Distribution
TraceLink IntegrationSpecs Discussion
Serialization Tasks and OwnershipPrerequisites
MA
HC
MO
Trac
eLin
k Assist with testing as needed
CMO & MAH Coordination
Line SerializationData and
Choreography Specs Discussion
Data and Choreography
Specs Overview
Send integration form to CMO
Complete integration form
Conduct educational call
Test file format to TraceLink
Test business data and choreography Go-Live
Trac
eLin
k
Receive form completed by CMO
Set up CMO/CPO company on network
Create TraceLink Admin User accounts and
CMO’s Company Admin accounts
Activate TraceLink accounts
Create Company Master Data for
CMO/CPO
Create case for NSMs to address integration
Verification Team Network Success Manager
Add CMO/CPO Company logo
Establish B2B connection with CMO/CPO (if applicable)
Add maps to company Schedule and conduct training with CMO/CPO
Contact brand owner to confirm set up is
complete
Add CMO to network and begin
integration
18© 2017 TraceLink Inc. Confidential with No Further Distribution
TraceLink IntegrationSpecs Discussion
Serialization Tasks and OwnershipPrerequisites
MA
HC
MO
Trac
eLin
k
CMO & MAH Coordination
Line SerializationData and
Choreography Specs Discussion
Data and Choreography
Specs Overview
Send integration form to CMO
Complete integration form
Add CMO to network and begin
integration
Conduct educational call
Test file format to TraceLink
Test business data and choreography Go-Live
Assist with testing as needed
Note: If completed before, just contact NSM Receive TraceLink
Integration Completion Certificate
19© 2017 TraceLink Inc. Confidential with No Further Distribution
• Automated Validation Manager
• EdgeTrac
Continuous Compliance….
20© 2017 TraceLink Inc. Confidential with No Further Distribution