    The coal-handling system of Sino-Java Power Plant of Indonesia is

    designed according to the qualification of 2300MW coal-fired

    generator unit. Coal-handling system is mainly made up with

    program control, coal-handling equipment, coal unloading

    equipment and coal yard equipment.

    Installed capacity(MW) 2300

    Coal storage quantity (Ton) 182.000

    Hour coal consumption(t/h) 2152

    Day coal consumption (t/d) 6080

    Year coal consumption(t/y) 182.410

    Notice: Its calculated by 20 hours per day and 6000 hours per year.

  • 8/13/2019 Coal Handling Operational

    3/12

    Hardcoal,The caloriec value above 5700 kcal/kg (23,26 MJ/kg). Hardcoal terdiridari batubara steam, batubara coking, bituminous dan antrasit.

    Steam CoalGros Caloric Value above 23.865,0 kJ/kg (5700 kcal/kg) use for steamgenerator

    1. Antrasit

    2. Bituminous

    Cooking CoalGros Caloric Value greater than 23.865,0 kJ/kg (5700 kcal/kg) with dustfreeuse to made cocas raw reductor for blast furnace

    Antrasit Coal - Gros Caloric Value 6900 kcal/kghave characteristic like steam coal withhigh quality and high caloric

    Brown coal, low caloric value category, common use for power plant Subbituminous,

    Gross Calorific value between17.435,0 kJ/kg (4165 kcal/kg) and 23.860,0 kJ/kg (5700 kcal/kg). Lignit (Low Rank Coal/Brown Coal), Gross Calorific value under 4.165 kcal/kg (17,44MJ/kg) with volatile matter above 31% at dry condition

  • 8/13/2019 Coal Handling Operational

    4/12

    Save Coal Bunker Level, with scheduled

    fetching

    Arrange coal mixing

    Stacking schedule for under 3 days and

    finished it with reference optimum sea

    level

    Comand and coordinate with ABC subcontractor

  • 8/13/2019 Coal Handling Operational

    5/12

    Belt Conveyor Ship Unloader Stacker Reclaimer Coal Crusher Roller screen Coal Plough Buffer air lock Rainwater scraper Electric triple damper Vibrator Belt iron remover Disc iron remover

    Sewage pump Mechanical sampling equipment Three position telescopic head Automatic tensioning device Dedusting

  • 8/13/2019 Coal Handling Operational

    6/12

    Fetching Coal transport Process from Coal Yard or from

    Ship Unloader to Coal Bunker

    Stacking

    Coal transport Process from Ship Unloader to

    Coal Yard

  • 8/13/2019 Coal Handling Operational

    7/12

  • 8/13/2019 Coal Handling Operational

    8/12

  • 8/13/2019 Coal Handling Operational

    9/12

  • 8/13/2019 Coal Handling Operational

    10/12

  • 8/13/2019 Coal Handling Operational

    11/12

    C7 interlock only with C3A, can not interlock with C3B C1,C2, interlock with C3A & C3B can not interlock with one

    of them. C7 and C8 can not remote stacking, local only In case C3A already runing and another lines C6B to C3B

    will running, the normal sequence is C6B running first toC3B, but C6B and C3B will running first, it is not secured.Same case if C3B already running.

    After flow chart is selected and already press Auto Start, allwill automatically running. The process can not be stop,although we unselected to cancel process. The solution is

    press stop the selected motor manually. The operator mustbe know this, to prevent accident, because incidentally lateinformation from local site.