cogeneration facility overview energy services

Download Cogeneration Facility Overview Energy Services

If you can't read please download the document

Upload: faith-sitton

Post on 15-Dec-2015

222 views

Category:

Documents


2 download

TRANSCRIPT

  • Slide 1

Cogeneration Facility Overview Energy Services www.energy.unc.edu Slide 2 History Slide 3 Joshua Walker Gore (1852-1908) and Gore Building at Cogeneration Facility Came to Chapel Hill in 1882, taught philosophy, physics and engineering Designed 1 st campus steam plant in 1895 Located near old Venable Hall Burned coal and wood Started cogeneration using a small steam turbine in 1901 New plant built on same site around 1920 Slide 4 Original Cameron Avenue plant Constructed in 1941 Commitment to coal, 2 pulverized coal boilers Slide 5 1978 Cameron Avenue Plant in 1974 Open coal pile Bag houses to address stack emissions Slide 6 Cameron Avenue Plant in 2005 Slide 7 District Energy System Slide 8 U.S. Average Generating Efficiencies 100% 80% 60% 40% 20% 0% UNC Cogen Traditional thermal electric plant 65% of energy goes to a cooling tower, lake, etc. Slide 9 Slide 10 Slide 11 Slide 12 Plant Operation Slide 13 Built to utility standards, complete redundancy throughout 2 circulating fluidized bed boilers, 250,000 lbs/hour Only boilers capable of operating the turbine generator Lower temperature than pulverized coal or gas, inhibits NOx Limestone injection limits SO 2 but creates CO 2 40 minutes before pressure incident if tripped 1 natural gas/oil boiler, 250,000 lbs/hour Fuel and boiler diversity to increase reliability 10 minutes before pressure incident if tripped Slide 14 NSPS 40CFR60, Subpart Db ConstituentPermit LimitTypical Operation Sulfur Dioxide90% reduction 1.2 lbs/MMBtu 92% reduction 0.2 lbs/MMBtu Nitrogen Oxide0.6 lbs/MMBtu0.4 lbs/MMBtu Mercury0.000003 lbs/ MMBtu 0.00000075 lbs/ MMBtu Hydrogen Chloride 435 lbs/hour4.4 lbs/hour Particulate0.5 lbs/MMBtu0.01 lbs/MMBtu Opacity20%3% Slide 15 Finances Slide 16 How Expenses Are Paid Type of CostCarolinaOther Schools Capital ProjectsDebt retired by utility revenues* State appropriated capital project Renewal and Replacement Debt retired by utility revenues State appropriated R&R allocation Operations and Maintenance Utility revenuesState appropriated building operating reserve Fuel costs or direct purchases of power Utility revenuesState utility operating budget * Utility revenue comes from state appropriated budget for state-supported buildings Slide 17 Revenue Sources Slide 18 Major Rate Components Debt Principal and Interest 34% of total budget $94 million remaining on debt to construct plant, paid in 2022 Fixed Costs Do not vary with amount of steam produced Examples: labor, maintenance Variable Costs Fuel is 30% of total budget Natural gas is purchased at the interruptible rate Slide 19 State of NC Requires Lowest Cost Operation All-in cost includes limestone and ash disposal, and adjusted for lower efficiency of natural gas Slide 20 State Recaptures Any Savings Office of State Budget and Management Determines increase factor Adds to prior years actual expenditures Example Assume state appropriated utility budget is $100 million Assume actual expenditures are $95 million Assume OSBM increase factor is 10% Increase = $9.5 million (calculated on $95 million) $95 million + $9.5 million = $104.5 million new budget Appropriated utility budget increased by $4.5 million Slide 21 State Inadvertently Recaptures Energy Budgets for New Buildings When a new building comes on line mid-year Partial years funding received for the 1 st year Funding for remainder of full year s cost provided in 2nd year If the first years partial funding is not spent, then it is recaptured in the increase procedure and permanently lost Partial year funds normally are not spent because Utility costs are transferred from the contractor when the building is accepted and move-in occurs later so usage is low Consumption is not uniform, may miss a summer or winter peak No debt service or fixed cost components in the utility rates in the first year of a buildings operation Slide 22 Alternative Energy Slide 23 Climate Action Plan UNC was an early adopter of the American College and University Presidents Climate Commitment Pledged climate neutrality by 2050 Climate Action Plan adopted by University in September 2009 Alternative Energy Study, looked at alternatives to coal, began 2 years before Climate Action Plan issued Slide 24 Transportation Conservation Energy Green Building Behavior Supply Chain Offsets Slide 25 Slide 26 Slide 27 A. Biomass Gasification at Carolina North (CN) B. 100% Coal Substitute C. 50% Coal Substitute D. Plasma Gasification of MSW - Syngas E. Shops and Informal Contract Recycling F. 50% Natural Gas, 50% Coal Substitute G. Plasma Gasification of MSW: Syngas + Natural Gas H. 50% Natural Gas I. Biomass Gasification w/ Biochar Production (CN) J.Energy Conservation (Mid-High Investment) K. Large Scale Biomass L. Biomass Gasification at CN (Phase II) M.Solar Thermal (CN) N. Solar Thermal to Electricity (Troughs) (CN) O. Solar Thermal to Electricity (Dish Sterling) (CN) P. Demo Scale Concentrating Solar PV (CN) Slide 28 A. Biomass Gasification at Carolina North (CN) B. 100% Coal Substitute C. 50% Coal Substitute D. Plasma Gasification of MSW - Syngas E. Shops and Informal Contract Recycling F. 50% Natural Gas, 50% Coal Substitute G. Plasma Gasification of MSW: Syngas + Natural Gas H. 50% Natural Gas I. Biomass Gasification w/ Biochar Production (CN) J.Energy Conservation (Mid-High Investment) K. Large Scale Biomass L. Biomass Gasification at CN (Phase II) M.Solar Thermal (CN) N. Solar Thermal to Electricity (Troughs) (CN) O. Solar Thermal to Electricity (Dish Sterling) (CN) P. Demo Scale Concentrating Solar PV (CN) Slide 29 50% Natural Gas 50% Coal Substitute 100% Coal Substitute Large Scale BiomassPlasma Gasification Near-Term PortfolioLong-Term Common Long-Term Alternative LFG Banked Offsets Additional Projects Slide 30 Biomass Issues Fuel supply chain and cost Front end fuel handling Storage Feed systems Impact on combustion and heat transfer surface Baghouse impacts Ash disposal impacts Slide 31 Biomass Plan Test protocols February 2010 Dried wood pellets tests Spring 2010 Torrified wood tests Fall to Winter 2010/2011 Evaluation and implementation plan development 2010/2011 Burn 2012 Dependent upon fuel supply reliability and extent of required modifications Slide 32 Questions