comcom-mppipelinecostingspreadsheet

68
1. 32 mm dia MP PIPELINE (Directional drilling) 2000 Item Decription PBA Rate ($/m) Supporting figures 1.1 Excavat ion & backfill 1.1 Drill ing, includi ng excavati on of insertion and exit holes, and trial holes as required [ ] CRI minus supply cost (item 1.2 below) [ ] CRI Road crossing tie-ins, branch main & pipeline, in-line mains connection #VALUE! [ ] CRI Testing & commissioning #VALUE! Traffic management #VALUE! [ ] CRI  As-builts #VALUE! [ ] CRI Council charges, mains location, additional site visits #VALUE! #VALUE! Location of main [ ] CRI  Additional site visits [ ] CRI Council charges [ ] CRI Subtotal per meter #VALUE! Rounded to [ ] CRI 1.2Supply & install pipeline [ ] CRI 1.3 Restoration 1.00  6  6.00  Restoration of non-finished surfaces [ ] CRI Restoration of finished surfaces [ ] CRI  Info rmation cont ain ed with as Res tric ted In formatio n b

Upload: sarah-dean

Post on 12-Oct-2015

1 views

Category:

Documents


0 download

DESCRIPTION

MP pipe line costings

TRANSCRIPT

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    1/68

    1. 32 mm dia MP PIPELINE (Directional drilling) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required

    [ ] CRI

    minus supply cost (item 1.2 below) [ ] CRI

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! [ ] CRI

    Testing & commissioning #VALUE!

    Traffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration

    1.00

    66.00

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI

    Information contained with

    as Restricted Information b

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    2/68

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20%#DIV/0!

    #DIV/0! #DIV/0!

    Subtotal per meter #DIV/0!

    Rounded to [ ] CRI

    1.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    2. 32 mm dia MP PIPELINE (Trenched) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    2.1 Excavation & backfill

    Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces) [ ] CRI

    minus supply cost (item 2.2 below) [ ] CRI

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! [ ] CRI

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI2.2 Supply & install pipeline [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    3/68

    2.3 Restoration

    0.30Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI

    [ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20.0%

    Rounded to [ ] CRI #DIV/0!

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!TOTAL COST #VALUE! 20%

    3. 32 mm dia MP PIPELINE (Average)

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    Base unit price, before scale factor #VALUE! 0.40

    Base unit price, with scale factor #VALUE! 0.60

    Rounded to 40.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    4/68

    m Installation length assumed

    Source data

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.3, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.3,

    distance exceeding 2000m) : $ [ ] CRI/m

    Included in standard drilling rate

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls" - Sheet "32nbpe SES",items 1.2 & 1.3 (based on 1000m sample). Adjusted

    for 7 connections, instead of 14.

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items

    6.53 to 6.56). Item 6.3 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price provided

    for 1000 m installation) - Sheet "32nbpe SES", items1.4, 1.5 & 1.6

    each (2 allowed)

    each (8 allowed)each

    Rounded up for consistency with 50mm pipe sizerate (same drilling cost)

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.9, distance

    exceeding 2000m) : $ [ ] CRI/m

    Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.9,

    distance exceeding 2000m) : $ [ ] CRI/m

    Assumed size of insertion or trial holes (m)

    Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore

    Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. However, Powerco calculation (item 2.4,spreadsheet "Main PE unit cost Trenchless SES

    v1.3.xls", Sheet "32nbpe SES" indicates $[ ]

    CRI/m. Assume $[ ] CRI/mPowerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.3 however already includes commissioning.

    in square brackets [ ] CRI has been designated

    y the Commission under the s100 Order

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    5/68

    Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)

    Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

    m Installation length assumed

    Source data

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.5, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.5,

    distance exceeding 2000m) : $ [ ] CRI/m

    Included in standard excavation rate

    Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "32nbpe SES", items1.2 & 1.3 (based on 1000m sample). Adjusted for 7tie-ins, instead of 14.

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items

    6.53 to 6.56). Item 6.6 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price provided

    for 1000 m installation) - Sheet "32nbpe SES", items1.4, 1.5 & 1.6

    each (2 allowed)each (8 allowed)each

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.9, distance

    exceeding 2000m) : $ [ ] CRI/m

    Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.9,

    distance exceeding 2000m) : $ [ ] CRI/m

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item

    6.6 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    6/68

    Assumed trench width (m)Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassed

    berm. Powerco calculation (item 2.4, spreadsheet"Main PE unit cost Trenchless SES v1.3.xls", Sheet

    "32nbpe SES" indicates $[ ] CRI/m. Assume 50%

    of this.

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.48 - 6.52)Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)

    Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restore

    Average restoration cost / m

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factorScale factor

    Source data

    Assumed proportion of trenched installation

    Assumed proportion of trenchless installation

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    7/68

    1. 50 mm dia MP PIPELINE (Directional drilling) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required

    [ ] CRI

    minus supply cost (item 1.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! #VALUE!

    Testing & commissioning #VALUE!

    Traffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration1.00

    66.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    8/68

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20%#DIV/0!

    #DIV/0! #DIV/0!Subtotal per meter #DIV/0!

    Rounded to [ ] CRI1.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    2. 50 mm dia MP PIPELINE (Trenched) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    2.1 Excavation & backfill

    Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)

    [ ] CRI

    minus supply cost (item 2.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! #VALUE!

    Testing & commissioning #VALUE!Traffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    9/68

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    2.2 Supply & install pipeline [ ] CRI

    2.3 Restoration

    0.30

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI

    [ ] CRI[ ] CRI[ ] CRI

    [ ] CRI#DIV/0!

    [ ] CRIRounded to [ ] CRI #VALUE!

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    3. 50 mm dia MP PIPELINE (Average)

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    Base unit price, before scale factor #VALUE! 0.40

    Base unit price, with scale factor #VALUE! 0.60

    Rounded to 42.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    10/68

    m Installation length assumed

    Source data

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.2, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.2,

    distance exceeding 2000m) : $ [ ] CRI/m

    Included in standard drilling rate

    Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "50nbpe SES", items

    1.2 & 1.3 Total cost noted $[ ] CRI, howeveradjusted for consistency to 33.3% increase over32mm pipes.Price based on 1000m sample. Adjusted for 7 tie-

    ins, instead of 14.

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.2 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items1.4, 1.5 & 1.6

    each (2 allowed)each (8 allowed)each

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.8, distance

    exceeding 2000m) : $ [ ] CRI/m

    Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.8,

    distance exceeding 2000m) : $ [ ] CRI/m

    Assumed size of insertion or trial holes (m)

    Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.2 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    11/68

    Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. However, Powerco calculation (item 2.4,spreadsheet "Main PE unit cost Trenchless SES

    v1.3.xls", Sheet "50nbpe SES" indicates $[ ]

    CRI/m. Assume $[ ] CRI/m

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

    m Installation length assumed

    Source data

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.5, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.5,

    distance exceeding 2000m) : $ [ ] CRI/m

    Included in standard excavation rate

    Powerco - Spreadsheet "Main PE unit cost Open cutSES v1.3.xls"- Sheet "50nbpe SES", items 1.2 & 1.3

    Total cost noted $[ ] CRI, however PBA does not

    accept this magnitude of increase is justified.Therefore adjusted increase to 33.3% over 32mmpipe rates.

    Price based on 1000m sample. Adjusted for 7 tie-ins, instead of 14.

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.5 however already includescommissioning

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item

    6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    12/68

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items1.4, 1.5 & 1.6

    each (2 allowed)each (8 allowed)

    each

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.8, distance

    exceeding 2000m) : $ [ ] CRI/m

    Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.8,

    distance exceeding 2000m) : $ [ ] CRI/m

    Assumed trench width (m)

    Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. Powerco calculation (item 2.4, spreadsheet"Main PE unit cost Trenchless SES v1.3.xls", Sheet

    "50nbpe SES" indicates $[ ] CRI/m. Assume 50%

    of this.

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.48 - 6.52)Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)

    Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / m

    Powerco rate : 12% on-cost on SES rates; Australian

    average 15%

    Before applying scale factor

    Scale factor

    Source data

    Assumed proportion of trenched installation

    Assumed proportion of trenchless installation

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    13/68

    1. 80 mm dia MP PIPELINE (Directional drilling) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill #VALUE!

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration

    1.006

    6.00

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI

    [ ] CRI#DIV/0!

    20%

    #DIV/0!#DIV/0! #DIV/0!

    Subtotal per meter #DIV/0!

    Rounded to [ ] CRI

    1.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    2. 80 mm dia MP PIPELINE (Trenched) 2000

    Item Decription PBA Rate($/m) Supportingfigures

    2.1 Excavation & backfill #VALUE!

    2.2 Supply & install pipeline [ ] CRI

    2.3 Restoration

    0.30Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20.0%

    Rounded to [ ] CRI #DIV/0!

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    14/68

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    3. 80 mm dia MP PIPELINE (Average)

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    Base unit price, before scale factor #VALUE! 0.40Base unit price, with scale factor #VALUE! 0.60

    Rounded to 53.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    15/68

    m Installation length assumed

    Source data

    This is the interpolated value between the 50mmand 100mm PE pipe size drilling cost

    Interpolated from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit. Calculated value $[] CRI, rounded. (See interpolation graph.)

    Assumed size of insertion or trial holes (m)Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore

    Same as rate for 50mm pipe

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)

    Road sealing (/m)

    Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restore

    Average restoration cost / mRestoration cost / 100 m pipeline

    Powerco rate : 12% on-cost on SES rates

    Before applying scale factor

    Scale factor

    m Installation length assumed

    Source data

    Average value between the 50mm and 100mm PE

    pipe size excavation cost

    Interpolated from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit. Calculated value $[

    ] CRI. (See interpolation graph.)

    Assumed trench width (m)Based on price for 50mm pipe

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)

    Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)

    Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / m

    Powerco rate : 12% on-cost on SES rates; Australian

    average 15%

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    16/68

    Before applying scale factor

    Scale factor

    Source data

    Assumed proportion of trenched installationAssumed proportion of trenchless installation

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    17/68

    1. 100 mm dia MP PIPELINE (Directional drilling) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required

    [ ] CRI

    minus supply cost (item 1.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! [ ] CRI

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRI

    Council charges, mains location, additional

    site visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration

    1.00

    66.00

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI[ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    18/68

    #DIV/0!

    20%#DIV/0!

    #DIV/0! #DIV/0!

    Subtotal per meter #DIV/0!

    Rounded to [ ] CRI

    1.4 SIDSF factor allowance (12% ofconstruction total) #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    2. 100 mm dia MP PIPELINE (Trenched) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    2.1 Excavation & backfill

    Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)

    [ ] CRI

    minus supply cost (item 2.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! [ ] CRI

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    2.2 Supply & install pipeline [ ] CRI

    2.3 Restoration

    0.45

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    19/68

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI

    [ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20.0%

    Rounded to [ ] CRI #DIV/0!

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    3. 100 mm dia MP PIPELINE (Average)

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    Base unit price, before scale factor #VALUE! 0.40

    Base unit price, with scale factor #VALUE! 0.60

    Rounded to 65.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    20/68

    m Installation length assumed

    Source data

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.1, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.1,

    distance exceeding 2000m) : $ [ ] CRI/m

    Included in standard drilling rate

    Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "100nbpe SES",items 1.2 & 1.3 Total cost noted $[ ] CRI.

    Vector - Siemens Field Services Contract (FAS-002

    : Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.1 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit cost

    Trenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "100nbpe SES",items 1.4, 1.5 & 1.6

    each (2 allowed)

    each (8 allowed)each

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.7, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.7,

    distance exceeding 2000m) : $ [ ] CRI/m

    Assumed size of insertion or trial holes (m)

    Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore

    Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. Powerco calculation (item 2.4, spreadsheet

    "Main PE unit cost Trenchless SES v1.3.xls", Sheet

    "100nbpe SES" indicates $[ ] CRI/m. Assume $[Powerco, Vector - Siemens Field Services Contract

    (FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)

    Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item

    6.1 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    21/68

    Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline

    Powerco rate : 12% on-cost on SES rates

    Before applying scale factor

    Scale factor

    m Installation length assumed

    Source data

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.4, distance

    exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :

    Price Schedule 2002 (rev 1C, June 2003), item 6.4,distance exceeding 2000m) : $ [ ] CRI/m

    Included in standard excavation rate

    Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "100nbpe SES",

    items 1.2 & 1.3 Total cost noted $ [ ] CRI/m

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items

    6.53 to 6.56). Item 6.5 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price provided

    for 1000 m installation) - Sheet "100nbpe SES",items 1.4, 1.5 & 1.6

    each (2 allowed)each (8 allowed)each

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.9, distance

    exceeding 2000m) : $ [ ] CRI/m

    Vector - Siemens Field Services Contract (FAS-002 :

    Price Schedule 2002 (rev 1C, June 2003, item 6.9,

    distance exceeding 2000m) : $ [ ] CRI/m

    Assumed trench width (m)

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    22/68

    Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. Powerco calculation (item 2.4, spreadsheet"Main PE unit cost Trenchless SES v1.3.xls", Sheet

    "100nbpe SES" indicates $[ ] CRI/m. Assume

    50% of this.

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)

    Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / m

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

    Source data

    Assumed proportion of trenched installation

    Assumed proportion of trenchless installation

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    23/68

    1. 150 mm dia MP PIPELINE (Directional drilling) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required

    [ ] CRI

    minus supply cost (item 1.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! #VALUE!

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration

    1.20

    67.20

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI

    [ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20%#DIV/0!

    #DIV/0! #DIV/0!Subtotal per meter #DIV/0!

    Rounded to [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    24/68

    1.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    2. 150 mm dia MP PIPELINE (Trenched) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    2.1 Excavation & backfill

    Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)

    #VALUE!

    minus supply cost (item 2.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! #VALUE!

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    2.2 Supply & install pipeline [ ] CRI

    2.3 Restoration

    0.60Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    25/68

    [ ] CRI#DIV/0!

    20.0%

    Rounded to [ ] CRI #DIV/0!

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    3. 150 mm dia MP PIPELINE (Average)

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    Base unit price, before scale factor #VALUE! 0.40

    Base unit price, with scale factor #VALUE! 0.60

    Rounded to 103.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    26/68

    m Installation length assumed

    Source data

    Interpolated from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit. Calculated value $[

    ] CRI, adapted upward to reflect actual experience

    with larger pipe sizes. (See interpolation graph.)

    Included in standard drilling rate

    Based on 100mm pipeline costs, increased by 33.3%

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.2 however already includescommissioning

    Idential to figure used for 32mm, 50mm and 100mmpipelines

    each (2 allowed)each (8 allowed)each

    Interpolation from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit results in price of $[

    ] CRI/m. Extrapolation of prices for 50mm and

    100mm pipes results in price of $[ ] CRI/m. For

    consistency with these figures and the smaller pipesizes costs, assumed price of $[ ] CRI/mm.

    Assumed size of insertion or trial holes (m)

    Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore

    Same rate as for 100mm pipe

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)

    Chip & seal (/m)Road sealing (/m)Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.2 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    27/68

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

    m Installation length assumed

    Source data

    Rate based on extrapolated trenching rate for100mm pipe (assumed 600mm size trench),adjusted for supply & install cost for pipe. Reducedby 5% to reflect lower relative setup costs for largertrench.Included in standard excavation rate

    Based on 100mm pipeline costs, increased by 33.3%

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.5 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items

    1.4, 1.5 & 1.6

    each (2 allowed)

    each (8 allowed)each

    Interpolation from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit results in price of $[

    ] CRI/m. Extrapolation of prices for 50mm and

    100mm pipes results in price of $[ ] CRI/m. Forconsistency with these figures and the smaller pipe

    sizes costs, assumed price of $[ ] CRI/mm.

    Assumed trench width (m)Based on 100mm pipeline costs, adapted for

    600mm wide trench

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item

    6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    28/68

    Cobblestone (/m)Average cost for finished surface (/m)

    Assumed proportion of finished surface to restore

    Average restoration cost / m

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

    Source data

    Assumed proportion of trenched installation

    Assumed proportion of trenchless installation

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    29/68

    1. 200 mm dia MP PIPELINE (Directional drilling) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required

    [ ] CRI

    minus supply cost (item 1.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! #VALUE!

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration

    1.20 6

    7.20

    Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI

    [ ] CRI#DIV/0!

    20%#DIV/0!

    #DIV/0! #DIV/0!

    Subtotal per meter #DIV/0!

    Rounded to [ ] CRI

    1.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    30/68

    2. 200 mm dia MP PIPELINE (Trenched) 2000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    2.1 Excavation & backfill

    Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)

    [ ] CRI

    minus supply cost (item 2.2 below) #VALUE!

    Road crossing tie-ins, branch main & pipeline,in-line mains connection

    #VALUE! #VALUE!

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRI

    Council charges, mains location, additionalsite visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    2.2 Supply & install pipeline [ ] CRI

    2.3 Restoration

    0.60Restoration of non-finished surfaces [ ] CRI

    Restoration of finished surfaces

    [ ] CRI[ ] CRI[ ] CRI[ ] CRI[ ] CRI

    #DIV/0!

    20.0%

    Rounded to [ ] CRI #DIV/0!2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    3. 200 mm dia MP PIPELINE (Average)

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    31/68

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    Base unit price, before scale factor #VALUE! 0.40

    Base unit price, with scale factor #VALUE! 0.60

    Rounded to 139.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    32/68

    m Installation length assumed

    Source data

    Interpolated from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit. Calculated value $[

    ] CRI. (See interpolation graph.)Included in standard drilling rate

    Based on 150mm pipeline costs, increased by 33.3%

    Vector - Siemens Field Services Contract (FAS-002

    : Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.2 however already includescommissioning

    Idential to figure used for 32mm, 50mm and 100mmpipelines

    each (2 allowed)each (8 allowed)

    each

    Interpolation from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit results in price of $[

    ] CRI/m. Extrapolation of prices for 50mm and

    100mm pipes results in price of $[ ] CRI/m. For

    consistency with these figures and the costs of the

    smaller pipe sizes, assumed price of $[ ] CRI/mm.

    Assumed size of insertion or trial holes (m)Assumed number of holes per 100m pipeline

    m per 100 m of pipeline to restore

    Same rate as for 150mm pipe

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)

    Average cost for finished surface (/m)

    Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline

    Powerco rate : 12% on-cost on SES rates

    Before applying scale factor

    Scale factor

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item

    6.2 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    33/68

    m Installation length assumed

    Source data

    Based on same trench as for 150mm pipe, adaptedfor supply & installation cost of pipe

    Included in standard excavation rate

    Based on 150mm pipeline costs, increased by 33.3%

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items

    6.53 to 6.56). Item 6.5 however already includescommissioning

    Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items1.4, 1.5 & 1.6

    each (2 allowed)each (8 allowed)each

    Adapted upwards to reflect trend from smaller pipe-sizes

    Interpolation from 32, 50 and 100 mm pipe sizes,

    allowing for polynomial data fit results in price of $[

    ] CRI/m. Extrapolation of prices for 50mm and

    100mm pipes results in price of $[ ] CRI/m. For

    consistency with these figures and the costs of the

    smaller pipe sizes, assumed price of $[ ] CRI/mm.

    Assumed trench width (m)Based on 150mm pipeline costs (/m)

    Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)

    Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)

    Average cost for finished surface (/m)

    Assumed proportion of finished surface to restore

    Average restoration cost / mPowerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    34/68

    Source data

    Assumed proportion of trenched installation

    Assumed proportion of trenchless installation

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    35/68

    From Powerco & Vector SES schedules :

    Sizes Drill Supply Trench

    32 [ ] CRI [ ] CRI [ ] CRI50 [ ] CRI [ ] CRI [ ] CRI

    100 [ ] CRI [ ] CRI [ ] CRI

    Trench size assumedPipe size Width Excavation cost Extrapolated

    32 [ ] CRI #VALUE!50 [ ] CRI #VALUE!80 [ ] CRI

    100 [ ] CRI #VALUE!150 [ ] CRI #VALUE!200 [ ] CRI #VALUE!

    Interpolated values - P80mm150mm200mm

    Interpolated values - E80mm150mm200mm

    Interpolated values - P80mm150mm

    200mmInterpolated values - E

    80mm

    -

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    0 20

    -

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    0 20

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    36/68

    150mm200mm

    Interpolated values - P80mm

    150mm200mm

    Interpolated values - E80mm150mm200mm

    -0.100.200.300.400.500.600.700.800.901.00

    0 20

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    37/68

    olynomial fit Size Extrapolation from 50& 100 mm pipe sizes[ ] CRI 80[ ] CRI 150 #VALUE![ ] CRI 200 #VALUE!

    ponential fit

    [ ] CRI[ ] CRI[ ] CRI

    olynomial fit Cost Size Extrapolation from 50& 100 mm pipe sizes

    [ ] CRI 80

    [ ] CRI 150 #VALUE!

    [ ] CRI 200 #VALUE! ponential fit

    [ ] CRI

    y = 0

    40 60 80 100 120

    Supply & install

    y = 0

    40 60 80 100 120

    Drilling

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    38/68

    [ ] CRI[ ] CRI

    olynomial fit Cost Size

    [ ] CRI 80

    [ ] CRI 150[ ] CRI 200

    ponential fit[ ] CRI

    [ ] CRI[ ] CRI

    y = 0

    40 60 80 100 120

    Trenching

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    39/68

    1. 50 mm dia IP PIPELINE (Trenched) [ ] CRI

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    Trenching (average soil conditions),backfilling & reinstatement (non-finishedsurfaces)

    #VALUE! 1.43

    #VALUE!

    Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    2.2 Supply & install pipeline

    Supply & install steel pipe #VALUE! [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! 185.00

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    40/68

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 99.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    41/68

    m Installation length assumed

    Source data

    Escalation factor - based on excavation rate for50mm MP, adjusted for trench depth of 1000mm(instead of 700mm deep)Calculated cost for trenching, adjusted down by 10%to account for no increase in surface reinstatement,unchanged set-up cost

    Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 50 mm IP sheet, items 1.7, 1.8& 1.9

    each (2 allowed)each (8 allowed)each

    Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 50mm IP pipe), item 1.2.Rate based on Rawlinson's (2004). Powercoassumptions w.r.t. installation costs are considered

    liberal, unit rate reduced by 5%.

    Powerco unit price, as per spreadsheet "Main PE

    unit cost Trenchless SES v1.3.xls", (50mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "IP Main Steel Unit costopen cut v1.3.xls", item 1.3 (sheet for 50 mm IP

    pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (50mm IP sheet),item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (50mm IP sheet),

    item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Adjusted downward for consistency with 80mm and100mm pipe supply & install prices and sizeincrements

    Same as figure for MP trenched installation

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    42/68

    Powerco rate : 12% on-cost on SES rates;Australian average 15%

    Before applying scale factor

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    43/68

    1. 80 mm dia IP PIPELINE (Trenched) 2,000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill [ ] CRI

    2.2 Supply & install pipelineSupply & install steel pipe [ ] CRI [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! [ ] CRI

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 130.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    44/68

    m Installation length assumed

    Source data

    Interpolated between price for 50mm and 100mmpipe-sizes.

    Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 80mm IP pipe), item 1.2.Rate based on Rawlinson's (2004).

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (80mm IP sheet),item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "Main PE unit cost

    Trenchless SES v1.3.xls", item 1.3 (sheet for 80 mmIP pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (80mm IP sheet),item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (80mm IP sheet),item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Same as figure for MP trenched installation

    Powerco rate : 12% on-cost on SES rates;Australian average 15%

    Before applying scale factor

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    45/68

    1. 100 mm dia IP PIPELINE (Trenched) 2,000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    Trenching (average soil conditions),backfilling & reinstatement (non-finishedsurfaces)

    #VALUE! 1.43

    #VALUE!

    Testing & commissioning - [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI

    2.2 Supply & install pipeline

    Supply & install steel pipe [ ] CRI [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! [ ] CRI

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    46/68

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 152.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    47/68

    m Installation length assumed

    Source data

    Escalation factor - based on excavation rate for100mm MP, but adjusted for trench depth of1000mm (instead of 700mm deep)Calculated cost for trenching, adjusted down by2.5% to account for no increase in surfacereinstatement, unchanged set-up cost. (Lowerdiscount than for smaller sizes allows for reducedimpact of setup costs on larger trench.)

    Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 100 mm IP sheet, items 1.7,

    1.8 & 1.9

    each (2 allowed)each (8 allowed)each

    Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 100mm IP pipe), item 1.2.

    Rate based on Rawlinson's (2004).

    Powerco unit price, as per spreadsheet "IP Main

    Steel Unit cost open cut v1.3.xls", (100mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 100

    mm IP pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (100mm IPsheet), item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (100mm IP

    sheet), item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Adjusted upwards to be consistent with trend fromsmaller pipe-sizes

    Same as figure for MP trenched installation

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    48/68

    Powerco rate : 12% on-cost on SES rates;Australian average 15%

    Before applying scale factor

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    49/68

    1. 150 mm dia IP PIPELINE (Trenched) 2,000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    Trenching (average soil conditions),backfilling & reinstatement (non-finished

    surfaces)

    #VALUE! 1.43

    #VALUE!

    Testing & commissioning - [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI2.2 Supply & install pipeline

    Supply & install steel pipe [ ] CRI [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! [ ] CRI

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 233.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    50/68

    m Installation length assumed

    Source data

    Escalation factor - to adjust for trench depth of1000mm (instead of 700mm deep)

    Calculated cost for 150mm MP trenching.

    Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 100 mm IP sheet, items 1.7,1.8 & 1.9

    each (2 allowed)each (8 allowed)each

    Adjusted to same rate as trench for 200mm pipe

    Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 150mm IP pipe), item 1.2.Rate based on Rawlinson's (2004).

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (150mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000m

    pipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 150mm IP pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (150mm IPsheet), item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP Main

    Steel Unit cost open cut v1.3.xls", (150mm IPsheet), item 1.5

    Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Same as figure for MP trenched installation

    Powerco rate : 12% on-cost on SES rates;

    Australian average 15%Before applying scale factor

    Scale factor

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    51/68

    1. 200 mm dia IP PIPELINE (Trenched) 2,000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    Trenching (average soil conditions),backfilling & reinstatement (non-finished

    surfaces)

    #VALUE! 1.43

    #VALUE!

    Testing & commissioning - [ ] CRITraffic management #VALUE! [ ] CRI

    As-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits

    #VALUE! #VALUE!

    Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI

    Subtotal per meter #VALUE!

    Rounded to [ ] CRI2.2 Supply & install pipeline

    Supply & install steel pipe [ ] CRI [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! [ ] CRI

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 296.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    52/68

    m Installation length assumed

    Source data

    Escalation factor - to adjust for trench depth of1000mm (instead of 700mm deep)

    Calculated cost for 200mm MP trenching.

    Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 100 mm IP sheet, items 1.7,1.8 & 1.9

    each (2 allowed)each (8 allowed)each

    Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 200mm IP pipe), item 1.2.Rate based on Rawlinson's (2004).

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (200mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 200mm IP pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", 200mm IP sheet),item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (200mm IPsheet), item 1.5

    Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Same as figure for MP trenched installation

    Powerco rate : 12% on-cost on SES rates;

    Australian average 15%Before applying scale factor

    Scale factor

    Powerco - Siemens Field Services Contract (FAS-

    002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    53/68

    1. 250 mm dia IP PIPELINE (Trenched) 2,000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill [ ] CRI

    2.2 Supply & install pipeline

    Supply & install steel pipe [ ] CRI [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! [ ] CRI

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 358.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    54/68

    m Installation length assumed

    Source data

    Same trench as for 200mm IP pipeline

    Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 250mm IP pipe), item 1.2.Rate based on Rawlinson's (2004). Price adjusteddown, as proposed increment from 200mm size

    appears unreasonable.

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000m

    pipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 250

    mm IP pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", 250mm IP sheet),item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IPsheet), item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Same trench size as for 200 mm pipePowerco rate : 12% on-cost on SES rates;Australian average 15%

    Before applying scale factor

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    55/68

    1. 300 mm dia IP PIPELINE (Trenched) 2,000

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill

    Rounded to [ ] CRI #VALUE!

    2.2 Supply & install pipeline

    Supply & install steel pipe [ ] CRI

    Install steel bends, with joints #VALUE! [ ] CRI

    [ ] CRI

    T, with joints #VALUE! [ ] CRI

    Radiographic tests of joints #VALUE! [ ] CRI

    #VALUE! [ ] CRI#VALUE!

    #VALUE!

    Rounded to [ ] CRI

    2.3 Restoration [ ] CRI [ ] CRI

    2.4 SIDSF factor allowance (12% of

    construction total)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to 421.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    56/68

    m Installation length assumed

    Source data

    Based on 250 mm pipeline trench cost, but adaptedfor wider trench (800mm).

    Based on linear curve fitted to data points for other IP

    pipe sizes (calculated value $ [ ] CRI/m)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IP sheet),item 1.3Number of bends required (for assumed installation).

    Based on Powerco figure for 1000m pipe, as perspreadsheet "Main PE unit cost Trenchless SES

    v1.3.xls", item 1.3 (sheet for 250 mm IP pipe)

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", 250mm IP sheet),item 1.4. 1 Unit assumed

    Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IP sheet),item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend

    Same as figure for 250 mm IP trenched installation

    Powerco rate : 12% on-cost on SES rates; Australianaverage 15%

    Before applying scale factor

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    57/68

    Pipe size Suppply & install

    50 #VALUE!80 [ ] CRI

    100 [ ] CRI150 [ ] CRI200 [ ] CRI

    250 [ ] CRI300

    Linear trend [ ] CRI (for 300mm pipe)

    y = 0-

    0.10

    0.20

    0.30

    0.40

    0.50

    0.60

    0.70

    0.80

    0.90

    1.00

    0 50 100 150 2

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    58/68

    0 250 300

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    59/68

    1. 20 mm dia MP Service connection Assumed in st

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill #VALUE!

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration #VALUE!

    2.4 SIDSF factor allowance (6% of constructiontotal)

    #VALUE!

    TOTAL COST #VALUE!

    TOTAL COST #VALUE! 20%

    Rounded to [ ] CRI

    2. Mains connection, riser & valve

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    POWERCO PRICING

    Connection to PE/cast iron main [ ] CRI

    Riser valve plus installation [ ] CRI

    Location of main [ ] CRI

    Testing & commissioning -Traffic management [ ] CRI

    As-builts [ ] CRI

    minus [ ] CRI

    -

    VECTOR PRICING

    [ ] CRI

    Testing & commissioning -Traffic management [ ] CRI

    As-builts [ ] CRI

    minus [ ] CRI

    -

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    60/68

    PBA Price, before scale factor [ ] CRI

    PBA price after scale factor #VALUE! 20%

    Rounded to [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    61/68

    ndard soil conditions

    Source data

    Based on cost for 32mm MP pipeline, assuming

    standard ground conditions (60:40 split of

    trenchless:trenched)Downward interpolation of PE pipe prices, for 20mmconnection

    Based on cost for 32mm MP pipe reinstatement,assuming standard ground conditions (60:40 split of

    trenchless:trenched)

    Reduced factor assumed for service installation, toreflect reduction in design, supervision, drawings &funds tied up in construction

    Before applying scale factor

    Scale factor

    Source data

    Powerco - Siemens Field Services Contract (FAS-

    002 : Price Schedule 2002, rev 1 July), item 7.1

    Powerco spreadsheet titled "Service PE Unit costTrenchless SES v1.3.xls", items 1.2, 1.3 (25 nbpesheet)Powerco spreadsheet titled "Service PE Unit cost

    Trenchless SES v1.3.xls", item 1.4(25 nbpe sheet)

    No allowance for council fees, as pricingmethodology assumes large number of connections,making this fee negligibleAssume new network construction - no hotconnections required

    Powerco price

    Vector - Siemens Field Services Contract (FAS-002 :Price Schedule June 2003, rev 1C), item 7.11(25mm). This is inclusive of material, mains location.

    Assume new network construction - no hotconnections required

    Vector price

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.6 however already includes commissioning.

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items

    6.53 to 6.56). Item 6.6 however already includescommissioning

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    62/68

    Based on higher of two estimates

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    63/68

    1. 32mm IP Service connection Assumed in st

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 Excavation & backfill [ ] CRI

    1.2 Supply & install pipeline [ ] CRI

    1.3 Restoration [ ] CRI

    2.4 SIDSF factor allowance (6% of constructiontotal)

    -

    TOTAL COST -

    TOTAL COST - 20%

    Rounded to 72.00

    2. Mains connection, riser & valve

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    POWERCO PRICING

    Connection to PE/cast iron main [ ] CRI

    Riser valve plus installation [ ] CRI

    Location of main [ ] CRI

    Bend & radiographic tests -Testing & commissioning #VALUE!Traffic management #VALUE!

    As-builts #VALUE!

    minus [ ] CRI

    #VALUE!

    VECTOR PRICING

    [ ] CRI

    Polyvalve [ ] CRI

    Testing & commissioning -Traffic management #VALUE!

    As-builts #VALUE!minus [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    64/68

    #VALUE!

    PBA Price, before scale factor [ ] CRI

    PBA price after scale factor #VALUE! 20%

    Rounded to 1,040.00

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    65/68

    ndard soil conditions

    Source data

    Based on cost for 32mm MP pipeline, open

    trenching

    Downward interpolation of steel pipe prices, for32mm connection, includes bends, radiographictests, etc

    Based on cost for 32mm MP pipe reinstatement,assuming standard ground conditions (60:40 split of

    trenchless:trenched)

    Reduced factor assumed for service installation, toreflect reduction in design, supervision, drawings &funds tied up in construction

    Before applying scale factor

    Scale factor

    Source data

    Powerco - Siemens Field Services Contract (FAS-

    002 : Price Schedule 2002, rev 1 July), item 7.2

    Powerco spreadsheet titled "IP Service steel Unitcost Trenchless SES v1.3.xls", items 1.2, 1.3 (32 nbsheet)Powerco spreadsheet titled "Service PE Unit cost

    open cut Tenix (PES) v1.3.xls", item 1.6 to 1.9 (32 nbsheet)Included in supply & install cost

    No allowance for council fees, as pricingmethodology assumes large number of connections,making this fee negligibleAssume new network construction - no hotconnections required

    Powerco price

    Vector - Siemens Field Services Contract (FAS-002 :Price Schedule June 2003, rev 1C), item 7.14 . This

    includes material, mains location.Vector - Siemens Field Services Contract (FAS-002 :Price Schedule June 2003, rev 1C), item 7.26 .

    Assume new network construction - no hotconnections required

    Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item

    6.6 however already includes commissioning.

    Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.6 however already includes

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    66/68

    Vector price

    [ ] CRI

    Scale factor

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    67/68

    METERS

    Item Decription PBA Rate

    ($/m)

    Supporting

    figures

    1.1 0-10 Cubic meters/hour [ ] CRI

    1.2 10-25 Cubic meters/hour #VALUE! [ ] CRI

    1.3 25-60 Cubic meters/hour #VALUE! [ ] CRI

  • 5/21/2018 comcom-mppipelinecostingspreadsheet

    68/68

    Source data

    Canberra DORC valuation, 1999

    Powerco meter set replacement cost, adapted for

    scale factorPowerco meter set replacement cost, adapted forscale factor