1. 32 mm dia MP PIPELINE (Directional drilling) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required
[ ] CRI
minus supply cost (item 1.2 below) [ ] CRI
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! [ ] CRI
Testing & commissioning #VALUE!
Traffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration
1.00
66.00
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI
Information contained with
as Restricted Information b
-
5/21/2018 comcom-mppipelinecostingspreadsheet
2/68
[ ] CRI[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20%#DIV/0!
#DIV/0! #DIV/0!
Subtotal per meter #DIV/0!
Rounded to [ ] CRI
1.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
2. 32 mm dia MP PIPELINE (Trenched) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
2.1 Excavation & backfill
Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces) [ ] CRI
minus supply cost (item 2.2 below) [ ] CRI
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! [ ] CRI
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI2.2 Supply & install pipeline [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
3/68
2.3 Restoration
0.30Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI
[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20.0%
Rounded to [ ] CRI #DIV/0!
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!TOTAL COST #VALUE! 20%
3. 32 mm dia MP PIPELINE (Average)
Item Decription PBA Rate
($/m)
Supporting
figures
Base unit price, before scale factor #VALUE! 0.40
Base unit price, with scale factor #VALUE! 0.60
Rounded to 40.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
4/68
m Installation length assumed
Source data
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.3, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.3,
distance exceeding 2000m) : $ [ ] CRI/m
Included in standard drilling rate
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls" - Sheet "32nbpe SES",items 1.2 & 1.3 (based on 1000m sample). Adjusted
for 7 connections, instead of 14.
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items
6.53 to 6.56). Item 6.3 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price provided
for 1000 m installation) - Sheet "32nbpe SES", items1.4, 1.5 & 1.6
each (2 allowed)
each (8 allowed)each
Rounded up for consistency with 50mm pipe sizerate (same drilling cost)
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.9, distance
exceeding 2000m) : $ [ ] CRI/m
Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.9,
distance exceeding 2000m) : $ [ ] CRI/m
Assumed size of insertion or trial holes (m)
Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore
Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. However, Powerco calculation (item 2.4,spreadsheet "Main PE unit cost Trenchless SES
v1.3.xls", Sheet "32nbpe SES" indicates $[ ]
CRI/m. Assume $[ ] CRI/mPowerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.3 however already includes commissioning.
in square brackets [ ] CRI has been designated
y the Commission under the s100 Order
-
5/21/2018 comcom-mppipelinecostingspreadsheet
5/68
Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)
Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
m Installation length assumed
Source data
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.5, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.5,
distance exceeding 2000m) : $ [ ] CRI/m
Included in standard excavation rate
Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "32nbpe SES", items1.2 & 1.3 (based on 1000m sample). Adjusted for 7tie-ins, instead of 14.
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items
6.53 to 6.56). Item 6.6 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price provided
for 1000 m installation) - Sheet "32nbpe SES", items1.4, 1.5 & 1.6
each (2 allowed)each (8 allowed)each
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.9, distance
exceeding 2000m) : $ [ ] CRI/m
Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.9,
distance exceeding 2000m) : $ [ ] CRI/m
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item
6.6 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
6/68
Assumed trench width (m)Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassed
berm. Powerco calculation (item 2.4, spreadsheet"Main PE unit cost Trenchless SES v1.3.xls", Sheet
"32nbpe SES" indicates $[ ] CRI/m. Assume 50%
of this.
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.48 - 6.52)Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)
Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restore
Average restoration cost / m
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factorScale factor
Source data
Assumed proportion of trenched installation
Assumed proportion of trenchless installation
-
5/21/2018 comcom-mppipelinecostingspreadsheet
7/68
1. 50 mm dia MP PIPELINE (Directional drilling) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required
[ ] CRI
minus supply cost (item 1.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! #VALUE!
Testing & commissioning #VALUE!
Traffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration1.00
66.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
8/68
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20%#DIV/0!
#DIV/0! #DIV/0!Subtotal per meter #DIV/0!
Rounded to [ ] CRI1.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
2. 50 mm dia MP PIPELINE (Trenched) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
2.1 Excavation & backfill
Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)
[ ] CRI
minus supply cost (item 2.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! #VALUE!
Testing & commissioning #VALUE!Traffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
9/68
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
2.2 Supply & install pipeline [ ] CRI
2.3 Restoration
0.30
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI
[ ] CRI[ ] CRI[ ] CRI
[ ] CRI#DIV/0!
[ ] CRIRounded to [ ] CRI #VALUE!
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
3. 50 mm dia MP PIPELINE (Average)
Item Decription PBA Rate
($/m)
Supporting
figures
Base unit price, before scale factor #VALUE! 0.40
Base unit price, with scale factor #VALUE! 0.60
Rounded to 42.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
10/68
m Installation length assumed
Source data
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.2, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.2,
distance exceeding 2000m) : $ [ ] CRI/m
Included in standard drilling rate
Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "50nbpe SES", items
1.2 & 1.3 Total cost noted $[ ] CRI, howeveradjusted for consistency to 33.3% increase over32mm pipes.Price based on 1000m sample. Adjusted for 7 tie-
ins, instead of 14.
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.2 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items1.4, 1.5 & 1.6
each (2 allowed)each (8 allowed)each
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.8, distance
exceeding 2000m) : $ [ ] CRI/m
Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.8,
distance exceeding 2000m) : $ [ ] CRI/m
Assumed size of insertion or trial holes (m)
Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.2 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
11/68
Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. However, Powerco calculation (item 2.4,spreadsheet "Main PE unit cost Trenchless SES
v1.3.xls", Sheet "50nbpe SES" indicates $[ ]
CRI/m. Assume $[ ] CRI/m
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
m Installation length assumed
Source data
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.5, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.5,
distance exceeding 2000m) : $ [ ] CRI/m
Included in standard excavation rate
Powerco - Spreadsheet "Main PE unit cost Open cutSES v1.3.xls"- Sheet "50nbpe SES", items 1.2 & 1.3
Total cost noted $[ ] CRI, however PBA does not
accept this magnitude of increase is justified.Therefore adjusted increase to 33.3% over 32mmpipe rates.
Price based on 1000m sample. Adjusted for 7 tie-ins, instead of 14.
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.5 however already includescommissioning
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item
6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
12/68
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items1.4, 1.5 & 1.6
each (2 allowed)each (8 allowed)
each
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.8, distance
exceeding 2000m) : $ [ ] CRI/m
Vector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.8,
distance exceeding 2000m) : $ [ ] CRI/m
Assumed trench width (m)
Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. Powerco calculation (item 2.4, spreadsheet"Main PE unit cost Trenchless SES v1.3.xls", Sheet
"50nbpe SES" indicates $[ ] CRI/m. Assume 50%
of this.
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.48 - 6.52)Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)
Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / m
Powerco rate : 12% on-cost on SES rates; Australian
average 15%
Before applying scale factor
Scale factor
Source data
Assumed proportion of trenched installation
Assumed proportion of trenchless installation
-
5/21/2018 comcom-mppipelinecostingspreadsheet
13/68
1. 80 mm dia MP PIPELINE (Directional drilling) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill #VALUE!
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration
1.006
6.00
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI[ ] CRI[ ] CRI
[ ] CRI#DIV/0!
20%
#DIV/0!#DIV/0! #DIV/0!
Subtotal per meter #DIV/0!
Rounded to [ ] CRI
1.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
2. 80 mm dia MP PIPELINE (Trenched) 2000
Item Decription PBA Rate($/m) Supportingfigures
2.1 Excavation & backfill #VALUE!
2.2 Supply & install pipeline [ ] CRI
2.3 Restoration
0.30Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI
[ ] CRI[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20.0%
Rounded to [ ] CRI #DIV/0!
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
-
5/21/2018 comcom-mppipelinecostingspreadsheet
14/68
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
3. 80 mm dia MP PIPELINE (Average)
Item Decription PBA Rate
($/m)
Supporting
figures
Base unit price, before scale factor #VALUE! 0.40Base unit price, with scale factor #VALUE! 0.60
Rounded to 53.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
15/68
m Installation length assumed
Source data
This is the interpolated value between the 50mmand 100mm PE pipe size drilling cost
Interpolated from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit. Calculated value $[] CRI, rounded. (See interpolation graph.)
Assumed size of insertion or trial holes (m)Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore
Same as rate for 50mm pipe
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)
Road sealing (/m)
Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restore
Average restoration cost / mRestoration cost / 100 m pipeline
Powerco rate : 12% on-cost on SES rates
Before applying scale factor
Scale factor
m Installation length assumed
Source data
Average value between the 50mm and 100mm PE
pipe size excavation cost
Interpolated from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit. Calculated value $[
] CRI. (See interpolation graph.)
Assumed trench width (m)Based on price for 50mm pipe
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)
Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)
Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / m
Powerco rate : 12% on-cost on SES rates; Australian
average 15%
-
5/21/2018 comcom-mppipelinecostingspreadsheet
16/68
Before applying scale factor
Scale factor
Source data
Assumed proportion of trenched installationAssumed proportion of trenchless installation
-
5/21/2018 comcom-mppipelinecostingspreadsheet
17/68
1. 100 mm dia MP PIPELINE (Directional drilling) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required
[ ] CRI
minus supply cost (item 1.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! [ ] CRI
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRI
Council charges, mains location, additional
site visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration
1.00
66.00
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI[ ] CRI[ ] CRI[ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
18/68
#DIV/0!
20%#DIV/0!
#DIV/0! #DIV/0!
Subtotal per meter #DIV/0!
Rounded to [ ] CRI
1.4 SIDSF factor allowance (12% ofconstruction total) #VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
2. 100 mm dia MP PIPELINE (Trenched) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
2.1 Excavation & backfill
Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)
[ ] CRI
minus supply cost (item 2.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! [ ] CRI
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
2.2 Supply & install pipeline [ ] CRI
2.3 Restoration
0.45
-
5/21/2018 comcom-mppipelinecostingspreadsheet
19/68
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI
[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20.0%
Rounded to [ ] CRI #DIV/0!
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
3. 100 mm dia MP PIPELINE (Average)
Item Decription PBA Rate
($/m)
Supporting
figures
Base unit price, before scale factor #VALUE! 0.40
Base unit price, with scale factor #VALUE! 0.60
Rounded to 65.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
20/68
m Installation length assumed
Source data
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.1, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003), item 6.1,
distance exceeding 2000m) : $ [ ] CRI/m
Included in standard drilling rate
Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "100nbpe SES",items 1.2 & 1.3 Total cost noted $[ ] CRI.
Vector - Siemens Field Services Contract (FAS-002
: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.1 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit cost
Trenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "100nbpe SES",items 1.4, 1.5 & 1.6
each (2 allowed)
each (8 allowed)each
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.7, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :Price Schedule 2002 (rev 1C, June 2003, item 6.7,
distance exceeding 2000m) : $ [ ] CRI/m
Assumed size of insertion or trial holes (m)
Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore
Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. Powerco calculation (item 2.4, spreadsheet
"Main PE unit cost Trenchless SES v1.3.xls", Sheet
"100nbpe SES" indicates $[ ] CRI/m. Assume $[Powerco, Vector - Siemens Field Services Contract
(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)
Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item
6.1 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
21/68
Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline
Powerco rate : 12% on-cost on SES rates
Before applying scale factor
Scale factor
m Installation length assumed
Source data
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.4, distance
exceeding 2000m) : $ [ ] CRI/mVector - Siemens Field Services Contract (FAS-002 :
Price Schedule 2002 (rev 1C, June 2003), item 6.4,distance exceeding 2000m) : $ [ ] CRI/m
Included in standard excavation rate
Powerco - Spreadsheet titled "Main PE unit costOpen cut SES v1.3.xls"- Sheet "100nbpe SES",
items 1.2 & 1.3 Total cost noted $ [ ] CRI/m
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items
6.53 to 6.56). Item 6.5 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price provided
for 1000 m installation) - Sheet "100nbpe SES",items 1.4, 1.5 & 1.6
each (2 allowed)each (8 allowed)each
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, item 6.9, distance
exceeding 2000m) : $ [ ] CRI/m
Vector - Siemens Field Services Contract (FAS-002 :
Price Schedule 2002 (rev 1C, June 2003, item 6.9,
distance exceeding 2000m) : $ [ ] CRI/m
Assumed trench width (m)
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
22/68
Basic reinstatement cost already in item 6.3 ofSiemens Field Service Contract - includes grassedberm. Powerco calculation (item 2.4, spreadsheet"Main PE unit cost Trenchless SES v1.3.xls", Sheet
"100nbpe SES" indicates $[ ] CRI/m. Assume
50% of this.
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)
Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / m
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
Source data
Assumed proportion of trenched installation
Assumed proportion of trenchless installation
-
5/21/2018 comcom-mppipelinecostingspreadsheet
23/68
1. 150 mm dia MP PIPELINE (Directional drilling) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required
[ ] CRI
minus supply cost (item 1.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! #VALUE!
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration
1.20
67.20
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI
[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20%#DIV/0!
#DIV/0! #DIV/0!Subtotal per meter #DIV/0!
Rounded to [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
24/68
1.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
2. 150 mm dia MP PIPELINE (Trenched) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
2.1 Excavation & backfill
Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)
#VALUE!
minus supply cost (item 2.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! #VALUE!
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
2.2 Supply & install pipeline [ ] CRI
2.3 Restoration
0.60Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI[ ] CRI[ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
25/68
[ ] CRI#DIV/0!
20.0%
Rounded to [ ] CRI #DIV/0!
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
3. 150 mm dia MP PIPELINE (Average)
Item Decription PBA Rate
($/m)
Supporting
figures
Base unit price, before scale factor #VALUE! 0.40
Base unit price, with scale factor #VALUE! 0.60
Rounded to 103.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
26/68
m Installation length assumed
Source data
Interpolated from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit. Calculated value $[
] CRI, adapted upward to reflect actual experience
with larger pipe sizes. (See interpolation graph.)
Included in standard drilling rate
Based on 100mm pipeline costs, increased by 33.3%
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.2 however already includescommissioning
Idential to figure used for 32mm, 50mm and 100mmpipelines
each (2 allowed)each (8 allowed)each
Interpolation from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit results in price of $[
] CRI/m. Extrapolation of prices for 50mm and
100mm pipes results in price of $[ ] CRI/m. For
consistency with these figures and the smaller pipesizes costs, assumed price of $[ ] CRI/mm.
Assumed size of insertion or trial holes (m)
Assumed number of holes per 100m pipelinem per 100 m of pipeline to restore
Same rate as for 100mm pipe
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)
Chip & seal (/m)Road sealing (/m)Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.2 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
27/68
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
m Installation length assumed
Source data
Rate based on extrapolated trenching rate for100mm pipe (assumed 600mm size trench),adjusted for supply & install cost for pipe. Reducedby 5% to reflect lower relative setup costs for largertrench.Included in standard excavation rate
Based on 100mm pipeline costs, increased by 33.3%
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.5 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items
1.4, 1.5 & 1.6
each (2 allowed)
each (8 allowed)each
Interpolation from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit results in price of $[
] CRI/m. Extrapolation of prices for 50mm and
100mm pipes results in price of $[ ] CRI/m. Forconsistency with these figures and the smaller pipe
sizes costs, assumed price of $[ ] CRI/mm.
Assumed trench width (m)Based on 100mm pipeline costs, adapted for
600mm wide trench
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item
6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
28/68
Cobblestone (/m)Average cost for finished surface (/m)
Assumed proportion of finished surface to restore
Average restoration cost / m
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
Source data
Assumed proportion of trenched installation
Assumed proportion of trenchless installation
-
5/21/2018 comcom-mppipelinecostingspreadsheet
29/68
1. 200 mm dia MP PIPELINE (Directional drilling) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
1.1 Drilling, including excavation of insertion andexit holes, and trial holes as required
[ ] CRI
minus supply cost (item 1.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! #VALUE!
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration
1.20 6
7.20
Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI[ ] CRI[ ] CRI
[ ] CRI#DIV/0!
20%#DIV/0!
#DIV/0! #DIV/0!
Subtotal per meter #DIV/0!
Rounded to [ ] CRI
1.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
-
5/21/2018 comcom-mppipelinecostingspreadsheet
30/68
2. 200 mm dia MP PIPELINE (Trenched) 2000
Item Decription PBA Rate
($/m)
Supporting
figures
2.1 Excavation & backfill
Trenching (average soil conditions), backfilling& reinstatement (non-finished surfaces)
[ ] CRI
minus supply cost (item 2.2 below) #VALUE!
Road crossing tie-ins, branch main & pipeline,in-line mains connection
#VALUE! #VALUE!
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRI
Council charges, mains location, additionalsite visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
2.2 Supply & install pipeline [ ] CRI
2.3 Restoration
0.60Restoration of non-finished surfaces [ ] CRI
Restoration of finished surfaces
[ ] CRI[ ] CRI[ ] CRI[ ] CRI[ ] CRI
#DIV/0!
20.0%
Rounded to [ ] CRI #DIV/0!2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
3. 200 mm dia MP PIPELINE (Average)
-
5/21/2018 comcom-mppipelinecostingspreadsheet
31/68
Item Decription PBA Rate
($/m)
Supporting
figures
Base unit price, before scale factor #VALUE! 0.40
Base unit price, with scale factor #VALUE! 0.60
Rounded to 139.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
32/68
m Installation length assumed
Source data
Interpolated from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit. Calculated value $[
] CRI. (See interpolation graph.)Included in standard drilling rate
Based on 150mm pipeline costs, increased by 33.3%
Vector - Siemens Field Services Contract (FAS-002
: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.2 however already includescommissioning
Idential to figure used for 32mm, 50mm and 100mmpipelines
each (2 allowed)each (8 allowed)
each
Interpolation from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit results in price of $[
] CRI/m. Extrapolation of prices for 50mm and
100mm pipes results in price of $[ ] CRI/m. For
consistency with these figures and the costs of the
smaller pipe sizes, assumed price of $[ ] CRI/mm.
Assumed size of insertion or trial holes (m)Assumed number of holes per 100m pipeline
m per 100 m of pipeline to restore
Same rate as for 150mm pipe
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)
Average cost for finished surface (/m)
Assumed proportion of finished surface to restoreAverage restoration cost / mRestoration cost / 100 m pipeline
Powerco rate : 12% on-cost on SES rates
Before applying scale factor
Scale factor
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item
6.2 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
33/68
m Installation length assumed
Source data
Based on same trench as for 150mm pipe, adaptedfor supply & installation cost of pipe
Included in standard excavation rate
Based on 150mm pipeline costs, increased by 33.3%
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items
6.53 to 6.56). Item 6.5 however already includescommissioning
Powerco - Spreadsheet titled "Main PE unit costTrenchless SES v1.3.xls". (Powerco price providedfor 1000 m installation) - Sheet "50nbpe SES", items1.4, 1.5 & 1.6
each (2 allowed)each (8 allowed)each
Adapted upwards to reflect trend from smaller pipe-sizes
Interpolation from 32, 50 and 100 mm pipe sizes,
allowing for polynomial data fit results in price of $[
] CRI/m. Extrapolation of prices for 50mm and
100mm pipes results in price of $[ ] CRI/m. For
consistency with these figures and the costs of the
smaller pipe sizes, assumed price of $[ ] CRI/mm.
Assumed trench width (m)Based on 150mm pipeline costs (/m)
Powerco, Vector - Siemens Field Services Contract(FAS-002 : Price Schedule 2002, items 6.48 - 6.52)
Concrete footpath (/m)Asphalt footpath (/m)Chip & seal (/m)Road sealing (/m)Cobblestone (/m)
Average cost for finished surface (/m)
Assumed proportion of finished surface to restore
Average restoration cost / mPowerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
34/68
Source data
Assumed proportion of trenched installation
Assumed proportion of trenchless installation
-
5/21/2018 comcom-mppipelinecostingspreadsheet
35/68
From Powerco & Vector SES schedules :
Sizes Drill Supply Trench
32 [ ] CRI [ ] CRI [ ] CRI50 [ ] CRI [ ] CRI [ ] CRI
100 [ ] CRI [ ] CRI [ ] CRI
Trench size assumedPipe size Width Excavation cost Extrapolated
32 [ ] CRI #VALUE!50 [ ] CRI #VALUE!80 [ ] CRI
100 [ ] CRI #VALUE!150 [ ] CRI #VALUE!200 [ ] CRI #VALUE!
Interpolated values - P80mm150mm200mm
Interpolated values - E80mm150mm200mm
Interpolated values - P80mm150mm
200mmInterpolated values - E
80mm
-
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 20
-
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 20
-
5/21/2018 comcom-mppipelinecostingspreadsheet
36/68
150mm200mm
Interpolated values - P80mm
150mm200mm
Interpolated values - E80mm150mm200mm
-0.100.200.300.400.500.600.700.800.901.00
0 20
-
5/21/2018 comcom-mppipelinecostingspreadsheet
37/68
olynomial fit Size Extrapolation from 50& 100 mm pipe sizes[ ] CRI 80[ ] CRI 150 #VALUE![ ] CRI 200 #VALUE!
ponential fit
[ ] CRI[ ] CRI[ ] CRI
olynomial fit Cost Size Extrapolation from 50& 100 mm pipe sizes
[ ] CRI 80
[ ] CRI 150 #VALUE!
[ ] CRI 200 #VALUE! ponential fit
[ ] CRI
y = 0
40 60 80 100 120
Supply & install
y = 0
40 60 80 100 120
Drilling
-
5/21/2018 comcom-mppipelinecostingspreadsheet
38/68
[ ] CRI[ ] CRI
olynomial fit Cost Size
[ ] CRI 80
[ ] CRI 150[ ] CRI 200
ponential fit[ ] CRI
[ ] CRI[ ] CRI
y = 0
40 60 80 100 120
Trenching
-
5/21/2018 comcom-mppipelinecostingspreadsheet
39/68
1. 50 mm dia IP PIPELINE (Trenched) [ ] CRI
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
Trenching (average soil conditions),backfilling & reinstatement (non-finishedsurfaces)
#VALUE! 1.43
#VALUE!
Testing & commissioning [ ] CRI [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
2.2 Supply & install pipeline
Supply & install steel pipe #VALUE! [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! 185.00
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
40/68
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 99.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
41/68
m Installation length assumed
Source data
Escalation factor - based on excavation rate for50mm MP, adjusted for trench depth of 1000mm(instead of 700mm deep)Calculated cost for trenching, adjusted down by 10%to account for no increase in surface reinstatement,unchanged set-up cost
Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 50 mm IP sheet, items 1.7, 1.8& 1.9
each (2 allowed)each (8 allowed)each
Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 50mm IP pipe), item 1.2.Rate based on Rawlinson's (2004). Powercoassumptions w.r.t. installation costs are considered
liberal, unit rate reduced by 5%.
Powerco unit price, as per spreadsheet "Main PE
unit cost Trenchless SES v1.3.xls", (50mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "IP Main Steel Unit costopen cut v1.3.xls", item 1.3 (sheet for 50 mm IP
pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (50mm IP sheet),item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (50mm IP sheet),
item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Adjusted downward for consistency with 80mm and100mm pipe supply & install prices and sizeincrements
Same as figure for MP trenched installation
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
42/68
Powerco rate : 12% on-cost on SES rates;Australian average 15%
Before applying scale factor
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
43/68
1. 80 mm dia IP PIPELINE (Trenched) 2,000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill [ ] CRI
2.2 Supply & install pipelineSupply & install steel pipe [ ] CRI [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! [ ] CRI
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 130.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
44/68
m Installation length assumed
Source data
Interpolated between price for 50mm and 100mmpipe-sizes.
Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 80mm IP pipe), item 1.2.Rate based on Rawlinson's (2004).
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (80mm IP sheet),item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "Main PE unit cost
Trenchless SES v1.3.xls", item 1.3 (sheet for 80 mmIP pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (80mm IP sheet),item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (80mm IP sheet),item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Same as figure for MP trenched installation
Powerco rate : 12% on-cost on SES rates;Australian average 15%
Before applying scale factor
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
45/68
1. 100 mm dia IP PIPELINE (Trenched) 2,000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
Trenching (average soil conditions),backfilling & reinstatement (non-finishedsurfaces)
#VALUE! 1.43
#VALUE!
Testing & commissioning - [ ] CRITraffic management #VALUE! [ ] CRIAs-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI
2.2 Supply & install pipeline
Supply & install steel pipe [ ] CRI [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! [ ] CRI
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
46/68
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 152.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
47/68
m Installation length assumed
Source data
Escalation factor - based on excavation rate for100mm MP, but adjusted for trench depth of1000mm (instead of 700mm deep)Calculated cost for trenching, adjusted down by2.5% to account for no increase in surfacereinstatement, unchanged set-up cost. (Lowerdiscount than for smaller sizes allows for reducedimpact of setup costs on larger trench.)
Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 100 mm IP sheet, items 1.7,
1.8 & 1.9
each (2 allowed)each (8 allowed)each
Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 100mm IP pipe), item 1.2.
Rate based on Rawlinson's (2004).
Powerco unit price, as per spreadsheet "IP Main
Steel Unit cost open cut v1.3.xls", (100mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 100
mm IP pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (100mm IPsheet), item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (100mm IP
sheet), item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Adjusted upwards to be consistent with trend fromsmaller pipe-sizes
Same as figure for MP trenched installation
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
48/68
Powerco rate : 12% on-cost on SES rates;Australian average 15%
Before applying scale factor
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
49/68
1. 150 mm dia IP PIPELINE (Trenched) 2,000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
Trenching (average soil conditions),backfilling & reinstatement (non-finished
surfaces)
#VALUE! 1.43
#VALUE!
Testing & commissioning - [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI2.2 Supply & install pipeline
Supply & install steel pipe [ ] CRI [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! [ ] CRI
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 233.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
50/68
m Installation length assumed
Source data
Escalation factor - to adjust for trench depth of1000mm (instead of 700mm deep)
Calculated cost for 150mm MP trenching.
Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 100 mm IP sheet, items 1.7,1.8 & 1.9
each (2 allowed)each (8 allowed)each
Adjusted to same rate as trench for 200mm pipe
Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 150mm IP pipe), item 1.2.Rate based on Rawlinson's (2004).
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (150mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000m
pipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 150mm IP pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (150mm IPsheet), item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP Main
Steel Unit cost open cut v1.3.xls", (150mm IPsheet), item 1.5
Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Same as figure for MP trenched installation
Powerco rate : 12% on-cost on SES rates;
Australian average 15%Before applying scale factor
Scale factor
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
51/68
1. 200 mm dia IP PIPELINE (Trenched) 2,000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
Trenching (average soil conditions),backfilling & reinstatement (non-finished
surfaces)
#VALUE! 1.43
#VALUE!
Testing & commissioning - [ ] CRITraffic management #VALUE! [ ] CRI
As-builts #VALUE! [ ] CRICouncil charges, mains location,additional site visits
#VALUE! #VALUE!
Location of main [ ] CRIAdditional site visits [ ] CRICouncil charges [ ] CRI
Subtotal per meter #VALUE!
Rounded to [ ] CRI2.2 Supply & install pipeline
Supply & install steel pipe [ ] CRI [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! [ ] CRI
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 296.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
52/68
m Installation length assumed
Source data
Escalation factor - to adjust for trench depth of1000mm (instead of 700mm deep)
Calculated cost for 200mm MP trenching.
Powerco - Spreadsheet titled "IP Main Steel Unitcost open cut v1.3.xls". (Powerco price provided for1000 m installation) - 100 mm IP sheet, items 1.7,1.8 & 1.9
each (2 allowed)each (8 allowed)each
Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 200mm IP pipe), item 1.2.Rate based on Rawlinson's (2004).
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (200mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000mpipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 200mm IP pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", 200mm IP sheet),item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (200mm IPsheet), item 1.5
Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Same as figure for MP trenched installation
Powerco rate : 12% on-cost on SES rates;
Australian average 15%Before applying scale factor
Scale factor
Powerco - Siemens Field Services Contract (FAS-
002 : Price Schedule 2002, items 6.53 to 6.56).Item 6.5 however already includes commissioning.
-
5/21/2018 comcom-mppipelinecostingspreadsheet
53/68
1. 250 mm dia IP PIPELINE (Trenched) 2,000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill [ ] CRI
2.2 Supply & install pipeline
Supply & install steel pipe [ ] CRI [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! [ ] CRI
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 358.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
54/68
m Installation length assumed
Source data
Same trench as for 200mm IP pipeline
Supply & install steel pipe - Powerco rate, fromspreadsheet titled "IP Main Steel Unit Cost Opencut v1.3.xls" (sheet for 250mm IP pipe), item 1.2.Rate based on Rawlinson's (2004). Price adjusteddown, as proposed increment from 200mm size
appears unreasonable.
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IPsheet), item 1.3Number of bends required (for assumedinstallation). Based on Powerco figure for 1000m
pipe, as per spreadsheet "Main PE unit costTrenchless SES v1.3.xls", item 1.3 (sheet for 250
mm IP pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", 250mm IP sheet),item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IPsheet), item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Same trench size as for 200 mm pipePowerco rate : 12% on-cost on SES rates;Australian average 15%
Before applying scale factor
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
55/68
1. 300 mm dia IP PIPELINE (Trenched) 2,000
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill
Rounded to [ ] CRI #VALUE!
2.2 Supply & install pipeline
Supply & install steel pipe [ ] CRI
Install steel bends, with joints #VALUE! [ ] CRI
[ ] CRI
T, with joints #VALUE! [ ] CRI
Radiographic tests of joints #VALUE! [ ] CRI
#VALUE! [ ] CRI#VALUE!
#VALUE!
Rounded to [ ] CRI
2.3 Restoration [ ] CRI [ ] CRI
2.4 SIDSF factor allowance (12% of
construction total)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to 421.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
56/68
m Installation length assumed
Source data
Based on 250 mm pipeline trench cost, but adaptedfor wider trench (800mm).
Based on linear curve fitted to data points for other IP
pipe sizes (calculated value $ [ ] CRI/m)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IP sheet),item 1.3Number of bends required (for assumed installation).
Based on Powerco figure for 1000m pipe, as perspreadsheet "Main PE unit cost Trenchless SES
v1.3.xls", item 1.3 (sheet for 250 mm IP pipe)
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", 250mm IP sheet),item 1.4. 1 Unit assumed
Powerco unit price, as per spreadsheet "IP MainSteel Unit cost open cut v1.3.xls", (250mm IP sheet),item 1.5Allowance for site trips of test crewNumber of joints to be tested, based on 6m pipelengths, plus 1 joint per bend
Same as figure for 250 mm IP trenched installation
Powerco rate : 12% on-cost on SES rates; Australianaverage 15%
Before applying scale factor
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
57/68
Pipe size Suppply & install
50 #VALUE!80 [ ] CRI
100 [ ] CRI150 [ ] CRI200 [ ] CRI
250 [ ] CRI300
Linear trend [ ] CRI (for 300mm pipe)
y = 0-
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 50 100 150 2
-
5/21/2018 comcom-mppipelinecostingspreadsheet
58/68
0 250 300
-
5/21/2018 comcom-mppipelinecostingspreadsheet
59/68
1. 20 mm dia MP Service connection Assumed in st
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill #VALUE!
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration #VALUE!
2.4 SIDSF factor allowance (6% of constructiontotal)
#VALUE!
TOTAL COST #VALUE!
TOTAL COST #VALUE! 20%
Rounded to [ ] CRI
2. Mains connection, riser & valve
Item Decription PBA Rate
($/m)
Supporting
figures
POWERCO PRICING
Connection to PE/cast iron main [ ] CRI
Riser valve plus installation [ ] CRI
Location of main [ ] CRI
Testing & commissioning -Traffic management [ ] CRI
As-builts [ ] CRI
minus [ ] CRI
-
VECTOR PRICING
[ ] CRI
Testing & commissioning -Traffic management [ ] CRI
As-builts [ ] CRI
minus [ ] CRI
-
-
5/21/2018 comcom-mppipelinecostingspreadsheet
60/68
PBA Price, before scale factor [ ] CRI
PBA price after scale factor #VALUE! 20%
Rounded to [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
61/68
ndard soil conditions
Source data
Based on cost for 32mm MP pipeline, assuming
standard ground conditions (60:40 split of
trenchless:trenched)Downward interpolation of PE pipe prices, for 20mmconnection
Based on cost for 32mm MP pipe reinstatement,assuming standard ground conditions (60:40 split of
trenchless:trenched)
Reduced factor assumed for service installation, toreflect reduction in design, supervision, drawings &funds tied up in construction
Before applying scale factor
Scale factor
Source data
Powerco - Siemens Field Services Contract (FAS-
002 : Price Schedule 2002, rev 1 July), item 7.1
Powerco spreadsheet titled "Service PE Unit costTrenchless SES v1.3.xls", items 1.2, 1.3 (25 nbpesheet)Powerco spreadsheet titled "Service PE Unit cost
Trenchless SES v1.3.xls", item 1.4(25 nbpe sheet)
No allowance for council fees, as pricingmethodology assumes large number of connections,making this fee negligibleAssume new network construction - no hotconnections required
Powerco price
Vector - Siemens Field Services Contract (FAS-002 :Price Schedule June 2003, rev 1C), item 7.11(25mm). This is inclusive of material, mains location.
Assume new network construction - no hotconnections required
Vector price
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item6.6 however already includes commissioning.
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items
6.53 to 6.56). Item 6.6 however already includescommissioning
-
5/21/2018 comcom-mppipelinecostingspreadsheet
62/68
Based on higher of two estimates
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
63/68
1. 32mm IP Service connection Assumed in st
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 Excavation & backfill [ ] CRI
1.2 Supply & install pipeline [ ] CRI
1.3 Restoration [ ] CRI
2.4 SIDSF factor allowance (6% of constructiontotal)
-
TOTAL COST -
TOTAL COST - 20%
Rounded to 72.00
2. Mains connection, riser & valve
Item Decription PBA Rate
($/m)
Supporting
figures
POWERCO PRICING
Connection to PE/cast iron main [ ] CRI
Riser valve plus installation [ ] CRI
Location of main [ ] CRI
Bend & radiographic tests -Testing & commissioning #VALUE!Traffic management #VALUE!
As-builts #VALUE!
minus [ ] CRI
#VALUE!
VECTOR PRICING
[ ] CRI
Polyvalve [ ] CRI
Testing & commissioning -Traffic management #VALUE!
As-builts #VALUE!minus [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
64/68
#VALUE!
PBA Price, before scale factor [ ] CRI
PBA price after scale factor #VALUE! 20%
Rounded to 1,040.00
-
5/21/2018 comcom-mppipelinecostingspreadsheet
65/68
ndard soil conditions
Source data
Based on cost for 32mm MP pipeline, open
trenching
Downward interpolation of steel pipe prices, for32mm connection, includes bends, radiographictests, etc
Based on cost for 32mm MP pipe reinstatement,assuming standard ground conditions (60:40 split of
trenchless:trenched)
Reduced factor assumed for service installation, toreflect reduction in design, supervision, drawings &funds tied up in construction
Before applying scale factor
Scale factor
Source data
Powerco - Siemens Field Services Contract (FAS-
002 : Price Schedule 2002, rev 1 July), item 7.2
Powerco spreadsheet titled "IP Service steel Unitcost Trenchless SES v1.3.xls", items 1.2, 1.3 (32 nbsheet)Powerco spreadsheet titled "Service PE Unit cost
open cut Tenix (PES) v1.3.xls", item 1.6 to 1.9 (32 nbsheet)Included in supply & install cost
No allowance for council fees, as pricingmethodology assumes large number of connections,making this fee negligibleAssume new network construction - no hotconnections required
Powerco price
Vector - Siemens Field Services Contract (FAS-002 :Price Schedule June 2003, rev 1C), item 7.14 . This
includes material, mains location.Vector - Siemens Field Services Contract (FAS-002 :Price Schedule June 2003, rev 1C), item 7.26 .
Assume new network construction - no hotconnections required
Powerco - Siemens Field Services Contract (FAS-002 : Price Schedule 2002, items 6.53 to 6.56). Item
6.6 however already includes commissioning.
Vector - Siemens Field Services Contract (FAS-002: Price Schedule 2002 (rev 1C, June 2003), items6.53 to 6.56). Item 6.6 however already includes
-
5/21/2018 comcom-mppipelinecostingspreadsheet
66/68
Vector price
[ ] CRI
Scale factor
-
5/21/2018 comcom-mppipelinecostingspreadsheet
67/68
METERS
Item Decription PBA Rate
($/m)
Supporting
figures
1.1 0-10 Cubic meters/hour [ ] CRI
1.2 10-25 Cubic meters/hour #VALUE! [ ] CRI
1.3 25-60 Cubic meters/hour #VALUE! [ ] CRI
-
5/21/2018 comcom-mppipelinecostingspreadsheet
68/68
Source data
Canberra DORC valuation, 1999
Powerco meter set replacement cost, adapted for
scale factorPowerco meter set replacement cost, adapted forscale factor