comment s 2053 w12
DESCRIPTION
Comments that are for the W12 has been updated as a viewer.TRANSCRIPT
-
CBA'A B'
21 ELEVATION OF WALL (W1) - FLOOR (03~06)1: 50 22ELEVATION OF WALL (W3) - FLOOR (03~06)1: 50
( )TOC +12.380( )SSL +12.100
THK.
( )SSL +12.100 ( )SSL +12.100
THK.
( )TOC +12.600LEVEL 3
2026
THK.
( )SSL +12.100 ( )SSL +12.100
THK.
( )TOC +12.600LEVEL 3
2026( )TOC +12.380
( )TOC +20.780( )SSL +20.500
( )SSL +16.300 ( )SSL +16.300
( )TOC +16.800
( )SSL +20.500 ( )SSL +20.500
( )TOC +21.000
( )SSL +24.700 ( )SSL +24.700
( )TOC +25.200
12046
22047
32048
12046
22047
32048
( )SSL +16.300 ( )SSL +16.300
( )TOC +16.800
( )SSL +20.500 ( )SSL +20.500
( )TOC +21.000
( )SSL +24.700 ( )SSL +24.700
( )TOC +25.200
THK.
THK.
THK.
THK.
THK.
THK.
THK. THK.
THK. THK.
THK. THK.
( )TOC +24.980
( )TOC +20.780
( )TOC +16.580
B'A'
CBA'A B'
B'A'
00
KC-200-TE-DS-GT-2053
KACST-R-HQ-200-SD-S-2053
RIYADH, KSA
ABV :
DC
1/50
KEYPLAN
TO EXI
T 10 - E
ASTERN
RING R
D.
TO UM
M AL HAM
AM
TO EXIT 2 - NO
RTH RING RD.
Owner :
CONTRACTOR : SUBCONTRACTOR:
ISSUE:KACST Drawing
SCALE:
APPROVED BY:
No.CHECKED BY:
DRAWN BY:
LOCATION: JOB: KACST Headquarters
DRAWING TITLE:
CONSULTANT:
ISSUE DATE DESCRIPTION
TECHNOLOGY GENERAL DIRECTORATE of FACILITIES and PROJECTS
THE CONSTRUCTION of KING ABDULAZIZ CITYFOR SCIENCE & TECHNOLOGY HEADQUARTERS
ABV ROCK GROUP LIMITEDP.O. Box 89426, Riyadh 11682
Tel.: (+966-11) 403 7878Fax: (+966-11) 402 8800
ABV Drawing No :
LAVAnation Ltd c/oBin Shabib & Associates (BSA) LLC,DIFC Building 3, 6th floorP.O. Box 262 Dubai,U.A.E.
Submitted for Approval00
KEYPLAN
???????????? ?????????? ?????????? ??????????
?????
?????
?????
?????
?????
?????
?????
?????
MOHAMED F.
YASMIN G.
DATE : 28/05/2015
28 MAY 2015
CORE WALL CONCRETE DIMENSIONFROM (LEVEL 03) TO (LEVEL 06)
SHEET (19/22)
mocRectangle
mocRectangle
mocCalloutAs per drawing S-106 & 107, the thickness of FC4 wall is "250mm". Change accordingly in all relevant drawings.