commercial aligned capability team - ways of working [updated 2010-07-09]

Upload: vaishali-bhangale

Post on 05-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    1/42

    1

    Commercial Aligned Capability TeamCommercial Aligned Capability Team

    Ways of WorkingWays of Working

    Workshop materials presentingWorkshop materials presenting::

    Organisation StructureOrganisation StructureProject RoadmapProject Roadmap

    Roles & ResponsibilitiesRoles & Responsibilities

    RACI ChartRACI Chart

    Prepared byPrepared by

    David Lau & Karuna PujarDavid Lau & Karuna Pujar

    Commercial Aligned Capability PMOCommercial Aligned Capability PMO

    Jul 2010Jul 2010

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    2/42

    2

    WorkshopWorkshop ObjectivesObjectives::

    TEAM STRUCTURE & PROJECT DELIVERY ROADMAP:review CAC team organization & confirm roles within team

    KEY RESPONSIBILITIES: define and agree ownership of

    tasks & deliverables required for successful project delivery

    WAYS OF WORKING: establish a clear framework forefficient cooperation within our team & with other teams

    Desired workshop outcomes: Crystal clarity on each team members role & ownership Other teams understanding of who is doing what Improved external and internal team communication channels Empowerment across the team

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    3/42

    3

    Detailed Guides for Team Org Structure,Detailed Guides for Team Org Structure,

    R&Rs, RACI Chart, Project RoadmapR&Rs, RACI Chart, Project Roadmap

    Commercial AlignedCapability Team Org Chart

    Team Roles &Responsibilities

    Commercial AlignedCapability RACI Chart

    Roadmap Methodology/Deliverables by Team and byProject Phase

    link

    link

    link

    link

    NOTE: Please submit access request to IJSFA Connectware database via GSK Apps Thank you

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/148D86526F836A02802575BE0026F6A0http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77Chttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77Chttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/148D86526F836A02802575BE0026F6A0
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    4/42

    Glossary of Terms (1)Glossary of Terms (1)

    4

    Abbreviation Definition

    BA Business Analyst

    BR Business Requirements

    CAC Commercially Aligned Capability Team

    CCPO Change Control Process Owner

    CMP Configuration Management Plan

    CR Change Request

    CCF Change Request Form

    CRB Change Request Board

    DEV Development

    DMiP Data Migration Interface Plan

    DMiR Data Migration Interface Report

    DMP Document Management Plan

    Doc Admin Document Administrator

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    5/42

    Glossary of Terms (2)Glossary of Terms (2)

    5

    Abbreviation Definition

    DS Design Specification

    GSFA Global Sales Force Automation IJSFA, Insight and Salsa

    IMP Incident Management Plan

    M&A Merger & Acquisition

    PM Project Manager

    PMO Programme Management office

    PQP Project Quality PlanPQR Project Quality Report

    QA Quality Assurance

    RACI Responsible, Accountable, Consult, Inform

    SCS Systems Communications & Services

    SIT System Integration Testing

    SME Subject Matter ExpertSR System Requirements

    TAM Technical Architecture Manager

    TIP Technical Installation Plan

    TIR Technical Installation Report

    UAT User Acceptance Testing

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    6/42

    1.1. Team OrganisationTeam Organisation

    2. Roles & Responsibilities2. Roles & Responsibilities3. Ways of Working3. Ways of Working

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    7/427

    Commercial Aligned CapabilityCommercial Aligned Capability Team -Team -

    Agreed Org Structure- ByAgreed Org Structure- By PeoplePeople Q1 2010 Q1 2010

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    8/428

    How do we fit together?How do we fit together?

    THEBU

    SINE

    SS

    SCS

    LOCAL MARKET

    SAL

    ES&

    STRA

    T

    APP

    LICA

    TION

    SER

    VICES

    DELIVERY TEAMPM

    BA

    SME

    DEV

    TEST

    DIRECTOR

    TAM

    ARCHITECT

    PMO

    REQUIREMENTS GATHERING DESIGN BUILDSIT

    UAT

    DEPL.

    or RETROFIT

    ON-GOING

    MAINTENANCE

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    9/429

    Programme StructureProgramme Structure

    FINANCEFINANCE

    LOCALLOCAL

    MARKETSMARKETS

    SCSSCSAPPLICATIONAPPLICATION

    SERVICESSERVICES

    CACCAC

    SALES &SALES &

    STRATEGIESSTRATEGIES

    THETHE

    BUSINESSBUSINESS

    STEERINGSTEERING

    TEAMTEAM

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    10/4210

    Project StructureProject Structure

    STEERING TEAM

    PROJECT MANAGEMENT TEAM

    LOCAL

    MARKETSCS CAC

    APPLICATION

    SERVICES

    PM BASMEDEVTEST

    THE BUSINESSSALES

    & STRATEGIE

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    11/4211

    CAC Team in ProjectsCAC Team in Projects

    BA

    DEV

    PMO

    SME

    CACDIR

    TEST

    PM

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    12/42

    1. Team Organisation1. Team Organisation

    2.2. Roles & ResponsibilitiesRoles & Responsibilities3. Ways of Working3. Ways of Working

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    13/4213

    Key Responsibilities by RoleKey Responsibilities by Role

    CAC DIRECTOR:

    Overall responsibility for programmesolution delivery, resources & budget

    Aligning project prioritisation tobusiness strategy

    Managing Sponsors & Local Marketexpectations, vendor management &contractual negotiations

    Responsible for risks & issuesescalated by PM

    Preventing scope creep

    Follow the link for details on your R&Rs: link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    14/42

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    15/4215

    Key Responsibilities by RoleKey Responsibilities by Role

    CAC PMO:

    Responsible for best practices &ways of working: consistentmethodology across all projects

    Owns Change Managementprocess & reporting, documentmanagement [and training]

    Owns CCP, IMP, CMP, PQP, DMP

    Follow the link for details on your R&Rs: link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    16/4216

    Key Responsibilities by RoleKey Responsibilities by Role

    Follow the link for details on your R&Rs: link

    CAC PM:Overall responsibility for projectdelivery, resources & budgetaccording to agreed planIdentifies risks & issues and developsmitigation plan, manages projectconflictsFacilitates dialogue & decisionmaking, ensures agreement isreached and communicatedManages scope creepCaptures and shares project learning

    Ownsproject plan, weekly statusreports, risks & issue log, projectresource plan, project PQP, projectPQR

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    17/4217

    Key Responsibilities by RoleKey Responsibilities by Role

    CAC BA:

    Single point of contact for business/marketrequirements

    Ownership of the requirements & the releasescope

    Accountable for Defining and prioritising market requirements Requirements are assessed and documented with

    dependencies & cross functional impacts Championing & communicating scope approval Assisting market in defining training needs UAT ownership: engaging Local Market, tracing

    changes through tests & defect resolution

    Owns BR, SR, Traceability Matrix, UATdocumentation; DMiP, DMiR

    Follow the link for details on your R&Rs: link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    18/4218

    Key Responsibilities by RoleKey Responsibilities by Role

    CAC SME:

    Single point of contact for technicalrelated matters on design, build anddeployment

    Responsible for technical assessment

    (incl. dependencies, impacts, risks &issues) of all proposed changes

    Responsible for technical delivery

    Owns Configuration DS., DesignReview Report, System Access Plan

    Follow the link for details on your R&Rs: link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    19/4219

    Key Responsibilities by RoleKey Responsibilities by Role

    CAC DEV:

    Ensures codes produced adhere toCMPand are unit tested againstappropriate unit design specification

    Ensures technical installation and

    deployment of codes from DEV->SIT->QA/UAT is supported by approvedTIPs and TIRs

    Ensures testing defects areremediated and risks and issuesreported to SME

    Follow the link for details on your R&Rs: link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    20/4220

    Key Responsibilities by RoleKey Responsibilities by Role

    CAC QA/TEST:

    Owns Test Strategy

    Assist in planning andresponsible SIT & UAT activities

    are performed on time and toquality, any defects are tracked,tackled and closed

    Ensures testing defects areremediated and risks and issues

    reported to SME

    Follow the link for details on your R&Rs: link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    21/4221

    RACI ChartRACI Chart

    Assures everyones participation in completing tasks & deliverables

    Describes the level of responsibility: from a decision-making stanceto always being kept in the loop

    R RESPONSIBLE The Doer; the person who isassignedto do the work

    A ACCOUNTABLE The Owner/Approver; theperson who makes the finaldecision and has the ultimateownership

    C CONSULTED The person that must beconsulted before a decision oraction is taken

    I INFORMED The person that must benotified that a decision or actionhas been taken

    link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77Chttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77C
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    22/4222

    1.1. Team OrganisationTeam Organisation

    2. Roles & Responsibilities2. Roles & Responsibilities

    3. Ways of Working3. Ways of Working

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    23/4223

    How does it work?How does it work?

    CAC

    DIR

    SME

    BA

    PMO

    TEST

    DEV

    PM

    LOCAL

    MARKET

    THE

    BUSINESS

    SERVICE

    TEAM

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    24/42

    CR Tools CR FormCR Tools CR Form

    24

    CR Form completed by requestor Send to

    [email protected] Automatically logged on CR DB Assignment done by PMO

    following resource allocationmeeting

    Tech assessment completed inthe CR DB by BAs / Tech Teamin preparation for CRB

    Outcome updated by PMO in theCR DB post CRB

    mailto:[email protected]:[email protected]
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    25/42

    Change Control ProcessChange Control Process

    25

    New

    Markets

    Live

    Markets

    ServiceTeam

    SFACRDB

    Corrective

    Change ControlForm

    Pre-ChangeReview Board

    Other

    SRTicket

    / Email CR form

    Email CR Form

    BAs Config, Data, Arch,

    CCPO, Service & Insight BA toattend

    Run discussions by Category

    Revisit Type

    Assessment & h/l

    Estimate /Suggest closed-

    duplicate

    Update CRB Date

    Indicate Dependency

    Update Owner

    Update status

    Submitted

    SR Ticket

    Corrective

    Pre-CRB

    Report

    Pre-CRB

    Report

    Detailed Assessment

    Assessed

    Enhancement

    Operational

    Early notification from Market ofplanned dates

    Schedule in appropriate

    environment / escalate conflicts

    Update status

    Validate with BA only if required

    Service Manager to approve for

    implementation

    Alternatively if Dev is required,

    follow standard process

    Update Assign to

    Update Type

    Operational

    Create corrective CRClose SR Ticket

    All to validate BR

    Validate with BAs

    Trigger new enhancement if

    Operation CR requires dev

    work

    Service Manager to approve

    for implementation

    Alternatively if Dev is

    required, follow standard

    process

    Assessed for reporting

    impact

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    26/42

    Change Control ProcessChange Control Process

    26

    Postponed

    Approved

    Escalated

    Close - Rejected

    Close- Duplicate

    SteeringCommittee

    SystemSpecification

    DesignSpecification

    Corrective

    Enhancement

    Operational

    Change Review

    Board

    CRB

    Report

    CRB

    Report

    Academy/CCoE; SFA Dir, SFA

    Del Dirs, Services, Business

    Process Owner, PMs/BAs to

    attend

    Review Assessment &

    Estimation

    Update Decision/Comments

    Update Status & Reason

    Update Release

    Update Type

    Update Priority

    Categorised by Business Process

    Update Date

    Update Date

    Update Release

    Propose Release

    Postponed

    Close-Rejected

    Approved

    Market

    Report

    Market

    Report

    BA to Complete Config to Complete

    Develop

    Test

    Deploy

    Deploy

    Config to update Status

    Config provide Tip to

    Service team for sign off

    SRN

    Closed - Accepted

    Distribute to CRB Members

    Service Team to updateStatus

    Service Team to update

    Cameleon

    Inform Steering Committeeof approved CRs

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    27/42

    27

    PMO

    Change Request lets get cooking!Change Request lets get cooking!

    PMO facilitates a dialogue to process a

    Change Request from CR submissionthrough the assessment, then approvalor rejection, all the way toimplementation. Maintains the CR log/database chairs Pre-CRB & CRB meetings Provides necessary tools: CR Form, Traceability

    Matrixetc

    Local Market recognizes theirrequirements gaps and describes theirneeds to a BA

    Local Market turns to a BA forrecommendation.

    LOCALMARKET We feel peckish. Wewish

    Can we have

    something to eatPerhaps a cheesecake?

    Have they booked a table?Are they paying together?

    Order number EU-

    09_08_1234

    LOCAL

    MARKET

    LOCAL

    MARKET

    LOCAL

    MARKET

    LOCAL

    MARKET

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    28/42

    28

    Change Request lets get cooking!Change Request lets get cooking!

    BA works with the Market to andworks with the SME to assess thesolution appropriate to the Marketand Business demands.

    BA has the ultimate ownership ofthe CR/requirement and theRelease Scope Fills in Traceability Matrix Writes Business Requirements

    SME is responsible for technicalassessment of each ChangeRequest indicating theimplementation effort, risks,

    impacts etc

    SME is responsible for reviewingdependency assessment acrossall systems

    BA

    Thats not good for yourdiet. But I understandyou are hungry. Hmm,let me see what can bedone for you. Leave it

    with me.

    SME

    Take 2

    spoonfuls

    of sugar

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    29/42

    29

    Change RequestChange Request lets get cookinglets get cooking!!

    PM is responsible for theengagement of all teams (SCS,Services etc) to propose a planof implementation to beapproved by the CRB

    PM is responsible to plan thedelivery of the approved CRs

    BA owns the scope and

    ensures new requirements donot creep and affect agreeddelivery timeline

    PM

    write a recipe,

    cook it, try, it,serve it let meseeyeah, itlltake about 20

    minutes

    BA

    We areserving a 12course meal

    Are the silverknives and

    forks ready?

    12 courses

    only!

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    30/42

    30

    At Pre-CRB the team reviews

    whether the list of CRsproposed for approval and theimplementation plan are inplace for the Business toaccept or reject.

    Change Request lets get cooking!Change Request lets get cooking!

    CAC

    DIRSME

    BAPMO

    PM

    Got this

    Gotthat!

    Were ready.

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    31/42

    31

    Change Request lets get cooking!Change Request lets get cooking!

    At CRB a decision is madebased on the business benefitwhether the Change Requestspresented as a Release Scopetogether with an Implementation

    Plan should be approved.

    THE

    BUSINESS

    OK. Thats seems healthy.Lets do it.

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    32/42

    32

    Change Request lets get cooking!Change Request lets get cooking!

    DEV TEAM develops the codeensuring it adheres to CMP

    DEV TEAM ensures all buildactivities are supported byapproved TIPs and TIRs

    DEV

    READY,

    STEADY,COOK!

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    33/42

    33

    Change Request lets get cooking!Change Request lets get cooking!

    QA/TEST TEAM coordinatesSIT & UAT activities ensuringthat they are completed on timeand to quality

    While testing design solutionsTest Team is responsible for Making sure the requirements are

    traceable from Build to SIT Defects are tracked, monitored to

    resolution

    Any risks and issues are reported toSME

    Deep ruby in colour withhints of violet and an intense,

    complex, inky bouquet ofplum and blackberries, red

    fruit jam, spices and bayleaves. Velvety in the mouthwith a mellow structure andsweet tannins which make it

    effortlessly elegant with along finish, but...

    TEST

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    34/42

    Boston MatrixBoston Matrix

    Value

    IT Effort

    Business

    Value

    High

    Low

    HighLow

    2 CCRs

    8 CCRs

    6 Enhancements

    1 CCR 5 CCRs

    2 Enhancements

    PROPOSED

    TO BE DECIDED

    REJECTED

    4 CCRs2 Enhancements

    1 Enhancement2 CCRs

    1 Enhancement

    2 Enh2 Enh5 CCR

    1 CCR2 Enh

    2 CCR

    1 CCR 3CCR

    1Enh 1 CCR

    Total: 34

    Approve: 17

    Postpone: 14

    TBC: 3

    2 CCR1 Enh

    3 CCR

    2 CCR2 Enh

    ACCEPTED

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    35/42

    35

    Enhancement & Corrective CRsEnhancement & Corrective CRs

    SYSTEM OWNER

    Salsa Nick Garbutt

    Insight Peter Yeung,Martin Krol,

    Amit Chakrvarty

    IJSFA Liz Cowley,Nigel Smith

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    36/42

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    37/42

    37

    Document Delivery Process &Document Delivery Process &

    Assigned Responsibilities (1 out of 4)Assigned Responsibilities (1 out of 4)

    PMO owns: PQPconsisting of a

    comprehensivedeliverables list togetherwith the Authors/Team

    responsible for documentdelivery DMPthat governs

    document review &approval process with thedocument storage

    PMO guides & trains ondocument approvalprocess

    Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required

    documentation and the team/role responsible for document delivery at a specified project phase.link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    38/42

    38

    Document Delivery Process &Document Delivery Process &

    Assigned Responsibilities (2 out of 4)Assigned Responsibilities (2 out of 4)

    AUTHORS & APPROVERShave the responsibility toread & understand relevantGSOPs and use the up-to-date iQMS templates

    AUTHOR owns thedocument review processand is responsible for its atimely delivery to the DOCADMIN for a formal approval

    APPROVERS must providetheir comments within thespecified review period

    Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required

    documentation and the team/role responsible for document delivery at a specified project phase.link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    39/42

    39

    Document Delivery Process &Document Delivery Process &

    Assigned Responsibilities (3 out of 4)Assigned Responsibilities (3 out of 4)

    PM assures the list ofdeliverables and schedule isincluded in the project plan

    PM owns the Quality Gatesscheduled for each releaseimplementation to check thedocumentation delivery status;at minimum, a Quality Gate isscheduled during the end of aTest Phase & before the

    Deployment takes place.

    Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required

    documentation and the team/role responsible for document delivery at a specified project phase.link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    40/42

    40

    Document Delivery Process &Document Delivery Process &

    Assigned Responsibilities (4 out of 4)Assigned Responsibilities (4 out of 4)

    DOCUMENT ADMINallocates unique doc IDs

    Owns the process ofgathering & looking afterthe formal evidence ofapproval

    Looks after the MasterFiles repository

    Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required

    documentation and the team/role responsible for document delivery at a specified project phase.link

    http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E
  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    41/42

    Document Delivery ProcessDocument Delivery Process --

    Documents Repository is Moving HomeDocuments Repository is Moving Home

    CIT Mandate the use GCMS for all projects

    Everyone should already attended a GCMS training

    SalsaEv is already using GCMS

    New projects such as CLM, Mobility, IJSFA 4.7+ and Insight 8.x+ shouldstart using GCSM

    Existing Salsa, IJSFA and Insight documents are being migrated toGCMS since start of June. Target is to migrate all iQMS documents by

    end of August

    Migration team consists of; Karuna, Sandra Collins and Cindy Bennett

    41

  • 7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]

    42/42

    Question TimeQuestion Time