commercial aligned capability team - ways of working [updated 2010-07-09]
TRANSCRIPT
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
1/42
1
Commercial Aligned Capability TeamCommercial Aligned Capability Team
Ways of WorkingWays of Working
Workshop materials presentingWorkshop materials presenting::
Organisation StructureOrganisation StructureProject RoadmapProject Roadmap
Roles & ResponsibilitiesRoles & Responsibilities
RACI ChartRACI Chart
Prepared byPrepared by
David Lau & Karuna PujarDavid Lau & Karuna Pujar
Commercial Aligned Capability PMOCommercial Aligned Capability PMO
Jul 2010Jul 2010
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
2/42
2
WorkshopWorkshop ObjectivesObjectives::
TEAM STRUCTURE & PROJECT DELIVERY ROADMAP:review CAC team organization & confirm roles within team
KEY RESPONSIBILITIES: define and agree ownership of
tasks & deliverables required for successful project delivery
WAYS OF WORKING: establish a clear framework forefficient cooperation within our team & with other teams
Desired workshop outcomes: Crystal clarity on each team members role & ownership Other teams understanding of who is doing what Improved external and internal team communication channels Empowerment across the team
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
3/42
3
Detailed Guides for Team Org Structure,Detailed Guides for Team Org Structure,
R&Rs, RACI Chart, Project RoadmapR&Rs, RACI Chart, Project Roadmap
Commercial AlignedCapability Team Org Chart
Team Roles &Responsibilities
Commercial AlignedCapability RACI Chart
Roadmap Methodology/Deliverables by Team and byProject Phase
link
link
link
link
NOTE: Please submit access request to IJSFA Connectware database via GSK Apps Thank you
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/148D86526F836A02802575BE0026F6A0http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77Chttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77Chttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/148D86526F836A02802575BE0026F6A0 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
4/42
Glossary of Terms (1)Glossary of Terms (1)
4
Abbreviation Definition
BA Business Analyst
BR Business Requirements
CAC Commercially Aligned Capability Team
CCPO Change Control Process Owner
CMP Configuration Management Plan
CR Change Request
CCF Change Request Form
CRB Change Request Board
DEV Development
DMiP Data Migration Interface Plan
DMiR Data Migration Interface Report
DMP Document Management Plan
Doc Admin Document Administrator
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
5/42
Glossary of Terms (2)Glossary of Terms (2)
5
Abbreviation Definition
DS Design Specification
GSFA Global Sales Force Automation IJSFA, Insight and Salsa
IMP Incident Management Plan
M&A Merger & Acquisition
PM Project Manager
PMO Programme Management office
PQP Project Quality PlanPQR Project Quality Report
QA Quality Assurance
RACI Responsible, Accountable, Consult, Inform
SCS Systems Communications & Services
SIT System Integration Testing
SME Subject Matter ExpertSR System Requirements
TAM Technical Architecture Manager
TIP Technical Installation Plan
TIR Technical Installation Report
UAT User Acceptance Testing
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
6/42
1.1. Team OrganisationTeam Organisation
2. Roles & Responsibilities2. Roles & Responsibilities3. Ways of Working3. Ways of Working
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
7/427
Commercial Aligned CapabilityCommercial Aligned Capability Team -Team -
Agreed Org Structure- ByAgreed Org Structure- By PeoplePeople Q1 2010 Q1 2010
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
8/428
How do we fit together?How do we fit together?
THEBU
SINE
SS
SCS
LOCAL MARKET
SAL
ES&
STRA
T
APP
LICA
TION
SER
VICES
DELIVERY TEAMPM
BA
SME
DEV
TEST
DIRECTOR
TAM
ARCHITECT
PMO
REQUIREMENTS GATHERING DESIGN BUILDSIT
UAT
DEPL.
or RETROFIT
ON-GOING
MAINTENANCE
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
9/429
Programme StructureProgramme Structure
FINANCEFINANCE
LOCALLOCAL
MARKETSMARKETS
SCSSCSAPPLICATIONAPPLICATION
SERVICESSERVICES
CACCAC
SALES &SALES &
STRATEGIESSTRATEGIES
THETHE
BUSINESSBUSINESS
STEERINGSTEERING
TEAMTEAM
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
10/4210
Project StructureProject Structure
STEERING TEAM
PROJECT MANAGEMENT TEAM
LOCAL
MARKETSCS CAC
APPLICATION
SERVICES
PM BASMEDEVTEST
THE BUSINESSSALES
& STRATEGIE
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
11/4211
CAC Team in ProjectsCAC Team in Projects
BA
DEV
PMO
SME
CACDIR
TEST
PM
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
12/42
1. Team Organisation1. Team Organisation
2.2. Roles & ResponsibilitiesRoles & Responsibilities3. Ways of Working3. Ways of Working
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
13/4213
Key Responsibilities by RoleKey Responsibilities by Role
CAC DIRECTOR:
Overall responsibility for programmesolution delivery, resources & budget
Aligning project prioritisation tobusiness strategy
Managing Sponsors & Local Marketexpectations, vendor management &contractual negotiations
Responsible for risks & issuesescalated by PM
Preventing scope creep
Follow the link for details on your R&Rs: link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
14/42
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
15/4215
Key Responsibilities by RoleKey Responsibilities by Role
CAC PMO:
Responsible for best practices &ways of working: consistentmethodology across all projects
Owns Change Managementprocess & reporting, documentmanagement [and training]
Owns CCP, IMP, CMP, PQP, DMP
Follow the link for details on your R&Rs: link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
16/4216
Key Responsibilities by RoleKey Responsibilities by Role
Follow the link for details on your R&Rs: link
CAC PM:Overall responsibility for projectdelivery, resources & budgetaccording to agreed planIdentifies risks & issues and developsmitigation plan, manages projectconflictsFacilitates dialogue & decisionmaking, ensures agreement isreached and communicatedManages scope creepCaptures and shares project learning
Ownsproject plan, weekly statusreports, risks & issue log, projectresource plan, project PQP, projectPQR
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
17/4217
Key Responsibilities by RoleKey Responsibilities by Role
CAC BA:
Single point of contact for business/marketrequirements
Ownership of the requirements & the releasescope
Accountable for Defining and prioritising market requirements Requirements are assessed and documented with
dependencies & cross functional impacts Championing & communicating scope approval Assisting market in defining training needs UAT ownership: engaging Local Market, tracing
changes through tests & defect resolution
Owns BR, SR, Traceability Matrix, UATdocumentation; DMiP, DMiR
Follow the link for details on your R&Rs: link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
18/4218
Key Responsibilities by RoleKey Responsibilities by Role
CAC SME:
Single point of contact for technicalrelated matters on design, build anddeployment
Responsible for technical assessment
(incl. dependencies, impacts, risks &issues) of all proposed changes
Responsible for technical delivery
Owns Configuration DS., DesignReview Report, System Access Plan
Follow the link for details on your R&Rs: link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
19/4219
Key Responsibilities by RoleKey Responsibilities by Role
CAC DEV:
Ensures codes produced adhere toCMPand are unit tested againstappropriate unit design specification
Ensures technical installation and
deployment of codes from DEV->SIT->QA/UAT is supported by approvedTIPs and TIRs
Ensures testing defects areremediated and risks and issuesreported to SME
Follow the link for details on your R&Rs: link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
20/4220
Key Responsibilities by RoleKey Responsibilities by Role
CAC QA/TEST:
Owns Test Strategy
Assist in planning andresponsible SIT & UAT activities
are performed on time and toquality, any defects are tracked,tackled and closed
Ensures testing defects areremediated and risks and issues
reported to SME
Follow the link for details on your R&Rs: link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/016A249AB0390D0C802575BE002729E5 -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
21/4221
RACI ChartRACI Chart
Assures everyones participation in completing tasks & deliverables
Describes the level of responsibility: from a decision-making stanceto always being kept in the loop
R RESPONSIBLE The Doer; the person who isassignedto do the work
A ACCOUNTABLE The Owner/Approver; theperson who makes the finaldecision and has the ultimateownership
C CONSULTED The person that must beconsulted before a decision oraction is taken
I INFORMED The person that must benotified that a decision or actionhas been taken
link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77Chttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/78C5BAB65D84DE12802575DE0051E77C -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
22/4222
1.1. Team OrganisationTeam Organisation
2. Roles & Responsibilities2. Roles & Responsibilities
3. Ways of Working3. Ways of Working
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
23/4223
How does it work?How does it work?
CAC
DIR
SME
BA
PMO
TEST
DEV
PM
LOCAL
MARKET
THE
BUSINESS
SERVICE
TEAM
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
24/42
CR Tools CR FormCR Tools CR Form
24
CR Form completed by requestor Send to
[email protected] Automatically logged on CR DB Assignment done by PMO
following resource allocationmeeting
Tech assessment completed inthe CR DB by BAs / Tech Teamin preparation for CRB
Outcome updated by PMO in theCR DB post CRB
mailto:[email protected]:[email protected] -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
25/42
Change Control ProcessChange Control Process
25
New
Markets
Live
Markets
ServiceTeam
SFACRDB
Corrective
Change ControlForm
Pre-ChangeReview Board
Other
SRTicket
/ Email CR form
Email CR Form
BAs Config, Data, Arch,
CCPO, Service & Insight BA toattend
Run discussions by Category
Revisit Type
Assessment & h/l
Estimate /Suggest closed-
duplicate
Update CRB Date
Indicate Dependency
Update Owner
Update status
Submitted
SR Ticket
Corrective
Pre-CRB
Report
Pre-CRB
Report
Detailed Assessment
Assessed
Enhancement
Operational
Early notification from Market ofplanned dates
Schedule in appropriate
environment / escalate conflicts
Update status
Validate with BA only if required
Service Manager to approve for
implementation
Alternatively if Dev is required,
follow standard process
Update Assign to
Update Type
Operational
Create corrective CRClose SR Ticket
All to validate BR
Validate with BAs
Trigger new enhancement if
Operation CR requires dev
work
Service Manager to approve
for implementation
Alternatively if Dev is
required, follow standard
process
Assessed for reporting
impact
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
26/42
Change Control ProcessChange Control Process
26
Postponed
Approved
Escalated
Close - Rejected
Close- Duplicate
SteeringCommittee
SystemSpecification
DesignSpecification
Corrective
Enhancement
Operational
Change Review
Board
CRB
Report
CRB
Report
Academy/CCoE; SFA Dir, SFA
Del Dirs, Services, Business
Process Owner, PMs/BAs to
attend
Review Assessment &
Estimation
Update Decision/Comments
Update Status & Reason
Update Release
Update Type
Update Priority
Categorised by Business Process
Update Date
Update Date
Update Release
Propose Release
Postponed
Close-Rejected
Approved
Market
Report
Market
Report
BA to Complete Config to Complete
Develop
Test
Deploy
Deploy
Config to update Status
Config provide Tip to
Service team for sign off
SRN
Closed - Accepted
Distribute to CRB Members
Service Team to updateStatus
Service Team to update
Cameleon
Inform Steering Committeeof approved CRs
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
27/42
27
PMO
Change Request lets get cooking!Change Request lets get cooking!
PMO facilitates a dialogue to process a
Change Request from CR submissionthrough the assessment, then approvalor rejection, all the way toimplementation. Maintains the CR log/database chairs Pre-CRB & CRB meetings Provides necessary tools: CR Form, Traceability
Matrixetc
Local Market recognizes theirrequirements gaps and describes theirneeds to a BA
Local Market turns to a BA forrecommendation.
LOCALMARKET We feel peckish. Wewish
Can we have
something to eatPerhaps a cheesecake?
Have they booked a table?Are they paying together?
Order number EU-
09_08_1234
LOCAL
MARKET
LOCAL
MARKET
LOCAL
MARKET
LOCAL
MARKET
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
28/42
28
Change Request lets get cooking!Change Request lets get cooking!
BA works with the Market to andworks with the SME to assess thesolution appropriate to the Marketand Business demands.
BA has the ultimate ownership ofthe CR/requirement and theRelease Scope Fills in Traceability Matrix Writes Business Requirements
SME is responsible for technicalassessment of each ChangeRequest indicating theimplementation effort, risks,
impacts etc
SME is responsible for reviewingdependency assessment acrossall systems
BA
Thats not good for yourdiet. But I understandyou are hungry. Hmm,let me see what can bedone for you. Leave it
with me.
SME
Take 2
spoonfuls
of sugar
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
29/42
29
Change RequestChange Request lets get cookinglets get cooking!!
PM is responsible for theengagement of all teams (SCS,Services etc) to propose a planof implementation to beapproved by the CRB
PM is responsible to plan thedelivery of the approved CRs
BA owns the scope and
ensures new requirements donot creep and affect agreeddelivery timeline
PM
write a recipe,
cook it, try, it,serve it let meseeyeah, itlltake about 20
minutes
BA
We areserving a 12course meal
Are the silverknives and
forks ready?
12 courses
only!
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
30/42
30
At Pre-CRB the team reviews
whether the list of CRsproposed for approval and theimplementation plan are inplace for the Business toaccept or reject.
Change Request lets get cooking!Change Request lets get cooking!
CAC
DIRSME
BAPMO
PM
Got this
Gotthat!
Were ready.
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
31/42
31
Change Request lets get cooking!Change Request lets get cooking!
At CRB a decision is madebased on the business benefitwhether the Change Requestspresented as a Release Scopetogether with an Implementation
Plan should be approved.
THE
BUSINESS
OK. Thats seems healthy.Lets do it.
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
32/42
32
Change Request lets get cooking!Change Request lets get cooking!
DEV TEAM develops the codeensuring it adheres to CMP
DEV TEAM ensures all buildactivities are supported byapproved TIPs and TIRs
DEV
READY,
STEADY,COOK!
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
33/42
33
Change Request lets get cooking!Change Request lets get cooking!
QA/TEST TEAM coordinatesSIT & UAT activities ensuringthat they are completed on timeand to quality
While testing design solutionsTest Team is responsible for Making sure the requirements are
traceable from Build to SIT Defects are tracked, monitored to
resolution
Any risks and issues are reported toSME
Deep ruby in colour withhints of violet and an intense,
complex, inky bouquet ofplum and blackberries, red
fruit jam, spices and bayleaves. Velvety in the mouthwith a mellow structure andsweet tannins which make it
effortlessly elegant with along finish, but...
TEST
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
34/42
Boston MatrixBoston Matrix
Value
IT Effort
Business
Value
High
Low
HighLow
2 CCRs
8 CCRs
6 Enhancements
1 CCR 5 CCRs
2 Enhancements
PROPOSED
TO BE DECIDED
REJECTED
4 CCRs2 Enhancements
1 Enhancement2 CCRs
1 Enhancement
2 Enh2 Enh5 CCR
1 CCR2 Enh
2 CCR
1 CCR 3CCR
1Enh 1 CCR
Total: 34
Approve: 17
Postpone: 14
TBC: 3
2 CCR1 Enh
3 CCR
2 CCR2 Enh
ACCEPTED
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
35/42
35
Enhancement & Corrective CRsEnhancement & Corrective CRs
SYSTEM OWNER
Salsa Nick Garbutt
Insight Peter Yeung,Martin Krol,
Amit Chakrvarty
IJSFA Liz Cowley,Nigel Smith
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
36/42
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
37/42
37
Document Delivery Process &Document Delivery Process &
Assigned Responsibilities (1 out of 4)Assigned Responsibilities (1 out of 4)
PMO owns: PQPconsisting of a
comprehensivedeliverables list togetherwith the Authors/Team
responsible for documentdelivery DMPthat governs
document review &approval process with thedocument storage
PMO guides & trains ondocument approvalprocess
Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required
documentation and the team/role responsible for document delivery at a specified project phase.link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
38/42
38
Document Delivery Process &Document Delivery Process &
Assigned Responsibilities (2 out of 4)Assigned Responsibilities (2 out of 4)
AUTHORS & APPROVERShave the responsibility toread & understand relevantGSOPs and use the up-to-date iQMS templates
AUTHOR owns thedocument review processand is responsible for its atimely delivery to the DOCADMIN for a formal approval
APPROVERS must providetheir comments within thespecified review period
Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required
documentation and the team/role responsible for document delivery at a specified project phase.link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
39/42
39
Document Delivery Process &Document Delivery Process &
Assigned Responsibilities (3 out of 4)Assigned Responsibilities (3 out of 4)
PM assures the list ofdeliverables and schedule isincluded in the project plan
PM owns the Quality Gatesscheduled for each releaseimplementation to check thedocumentation delivery status;at minimum, a Quality Gate isscheduled during the end of aTest Phase & before the
Deployment takes place.
Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required
documentation and the team/role responsible for document delivery at a specified project phase.link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
40/42
40
Document Delivery Process &Document Delivery Process &
Assigned Responsibilities (4 out of 4)Assigned Responsibilities (4 out of 4)
DOCUMENT ADMINallocates unique doc IDs
Owns the process ofgathering & looking afterthe formal evidence ofapproval
Looks after the MasterFiles repository
Roadmap Methodology/ Deliverables by Team and by Project Phase illustratesin detail required
documentation and the team/role responsible for document delivery at a specified project phase.link
http://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5Ehttp://notes//BRESNAP104/802572250047308D/6263E48F3756A1D08525656F005D8BF2/D1098118FCA9A84D802575BE00273C5E -
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
41/42
Document Delivery ProcessDocument Delivery Process --
Documents Repository is Moving HomeDocuments Repository is Moving Home
CIT Mandate the use GCMS for all projects
Everyone should already attended a GCMS training
SalsaEv is already using GCMS
New projects such as CLM, Mobility, IJSFA 4.7+ and Insight 8.x+ shouldstart using GCSM
Existing Salsa, IJSFA and Insight documents are being migrated toGCMS since start of June. Target is to migrate all iQMS documents by
end of August
Migration team consists of; Karuna, Sandra Collins and Cindy Bennett
41
-
7/31/2019 Commercial Aligned Capability Team - Ways of Working [Updated 2010-07-09]
42/42
Question TimeQuestion Time