GENERAL NOTES: DESIGN EXCEPTION(S): None. Scale: ˆ" = 1'-0" General notes continued on sheet 2. Class I. CRR Steel, Class III, may be substituted for Class II. steel schedule. CRR Steel, Class II or Class III, may be substituted for on this project are noted on the plan sheets and in the reinforcing Section 223 of the Specifications. The Classes of CRR steels required CRR steels shall conform to one or more of the three Classes listed in construction tolerances. bars except where otherwise noted and are subject to fabrication and reinforcing bar dimensions on the detailed drawings are to centers of (CRR) which shall conform to Section 223 of the Specifications. All Grade 60 except for steels noted as Corrosion Resistant Reinforcing All reinforcing steel shall be deformed and shall conform to ASTM A615 with Section 217.12(a). Concrete in abutments and piers shall be Class A3. terminal walls, shall be Low Shrinkage Class A4 Modified in accordance Concrete in superstructure, including parapets, median barriers and Plate girders shall be curved by heat curving. the shop plans. The spacing and height of stud shear connectors shall be shown on and shall be unpainted. All structural steel, including bearings, shall be ASTM A709, Grade 50W Design loading includes 15 psf allowance for future wearing surface. and construction methods. Design loading includes 20 psf allowance for construction tolerances documents. Specifications and Special Provisions included in the contract These plans are incomplete unless accompanied by the Supplemental Bridge Standards, 2016; including all current revisions. Standards: Virginia Department of Transportation Road and 2014; and VDOT Modifications. Design: AASHTO LRFD Bridge Design Specifications, 7th Edition, Bridge Specifications, 2016. Construction: Virginia Department of Transportation Road and Specifications: Drainage area: 42.3 sq. mi. Capacity: HL-93 loading. Span layout: 107.75' - 97.75' continuous steel plate curved girder spans 82'-0" face-to-face of curbs Width: 40'-0" roadway, 2'-0" median, 40'-0" roadway. Overall width Katie Lynch David Escoto Tewolde Iyob REVISIONS For Table of Revisions, COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION No. Description Date COORDINATED: SUPERVISED: DESIGNED: DRAWN: CHECKED: PLANS BY: ROUTE FEDERAL AID PROJECT ROUTE PROJECT STATE SHEET NO. and Scour Code: FHWA Construction UPC No. VA. STATE Federal Oversight Code: NBIS Number: Approved: c Recommended for Approval: State Structure and Bridge Engineer Date: Chief Engineer PROPOSED BRIDGE ON _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date Date b29518001 . dgn 0220-080-121, B601 1 ATHAVALE, LYSTAD & ASSOC. Inc. STRUCTURAL ENGINEER McLean, Virginia 220 82193 PROJ. 0220-080-121, B601 ROANOKE CO. - 4.45 MI. S. INT. ROUTE 419 ROUTE 220 (FRANKLIN RD.) OVER BACK CREEK X071-S8 295-18 Tewolde Iyob NFO 000000000029515 2016, Commonwealth of Virginia see Sheet 2. STP-5128(371) Jack Bayne _ _ _ _ _ _ _ _ _ _ _ _ ORIGINAL SIGNATURES ON TITLE SHEET OF ROAD PLANS Sheet 1 of 68 January 11, 2017 Athavale, Lystad & Assoc. PLAN S p a n a S p a n b R t e . 2 2 0 C on s t r . M ea s u r e d a l ong B L Radial Radial Radial Pier C L To Rocky Mt. To Roanoke Constr. Rte. 220 B L curb Face of Sta. 124+05.00 Pier median curb Face of curb Face of R=1410.00' CR EE K B AC K Buried approach slab Buried approach slab Sta. 125+02.75 Abutment B End of slab Sta. 122+97.25 Abutment A End of slab Edge of stream stream Edge of 968.85 Elev. 969.87 Elev. 969.33 Elev. Wingwall Wingwall in its entirety to be removed Existing bridge Wingwall Wingwall stream Edge of stream Edge of Guardrail Guardrail curb median Face of to remain abandoned bridge Existing wingwall of 40' - 0" 40' - 0" 1 ' - 8 " 1 ' - 8 " 97 ' - 9 " 107 ' - 9 " 20 2 ' - 0" 15 ' - 0 " 15 ' - 0 " 12 " 12 " wall MSE retaining 19 53 ' 18 " fill Toe of fill Toe of cl. II 38" typ. Dry riprap wall MSE retaining 20 06 ' 4 2 " Exp. Exp. Fix. Span a Span b ABUTMENT A ABUTMENT B PIER DEVELOPED SECTION ALONG CONSTR. B L Finished grade Cut Cut Rte. 220 Constr. Existing profile along B L Sta. 122+97.25 End of Slab Beginning of bridge Sta. 125+02.75 End of slab End of bridge Year 1879 Elev. 959.50 High water Finished grade cl. II 38" typ. Dry riprap Elev. 941.03 Ordinary high water -0.5% 205'-6"

Upload: others

Post on 13-Feb-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • GENERAL NOTES:

    DESIGN EXCEPTION(S):

    None.

    Scale: ˆ" = 1'-0"

    General notes continued on sheet 2.

    Class I. CRR Steel, Class III, may be substituted for Class II.

    steel schedule. CRR Steel, Class II or Class III, may be substituted for

    on this project are noted on the plan sheets and in the reinforcing

    Section 223 of the Specifications. The Classes of CRR steels required

    CRR steels shall conform to one or more of the three Classes listed in

    construction tolerances.

    bars except where otherwise noted and are subject to fabrication and

    reinforcing bar dimensions on the detailed drawings are to centers of

    (CRR) which shall conform to Section 223 of the Specifications. All

    Grade 60 except for steels noted as Corrosion Resistant Reinforcing

    All reinforcing steel shall be deformed and shall conform to ASTM A615

    with Section 217.12(a). Concrete in abutments and piers shall be Class A3.

    terminal walls, shall be Low Shrinkage Class A4 Modified in accordance

    Concrete in superstructure, including parapets, median barriers and

    Plate girders shall be curved by heat curving.

    the shop plans.

    The spacing and height of stud shear connectors shall be shown on

    and shall be unpainted.

    All structural steel, including bearings, shall be ASTM A709, Grade 50W

    Design loading includes 15 psf allowance for future wearing surface.

    and construction methods.

    Design loading includes 20 psf allowance for construction tolerances

    documents.

    Specifications and Special Provisions included in the contract

    These plans are incomplete unless accompanied by the Supplemental

    Bridge Standards, 2016; including all current revisions.

    Standards: Virginia Department of Transportation Road and

    2014; and VDOT Modifications.

    Design: AASHTO LRFD Bridge Design Specifications, 7th Edition,

    Bridge Specifications, 2016.

    Construction: Virginia Department of Transportation Road and

    Specifications:

    Drainage area: 42.3 sq. mi.

    Capacity: HL-93 loading.

    Span layout: 107.75' - 97.75' continuous steel plate curved girder spans

    82'-0" face-to-face of curbs

    Width: 40'-0" roadway, 2'-0" median, 40'-0" roadway. Overall width

    Katie Lynch

    David Escoto

    Tewolde Iyob REVISIONS

    For Table of Revisions,

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    No. Description DateCOORDINATED:

    SUPERVISED:

    DESIGNED:

    DRAWN:

    CHECKED:

    PLANS BY:

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    and Scour Code:

    FHWA Construction

    UPC No.

    VA.

    STATE

    Federal Oversight Code:

    NBIS Number:

    Approved:

    c

    Recommended for Approval:

    State Structure and Bridge Engineer

    Date:

    Chief Engineer

    PROPOSED BRIDGE ON

    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

    Date

    Date

    b29518001.d

    gn

    0220-080-121, B601 1

    ATHAVALE, LYSTAD & ASSOC. Inc.

    STRUCTURAL ENGINEER

    McLean, Virginia

    220

    82193

    PROJ. 0220-080-121, B601

    ROANOKE CO. - 4.45 MI. S. INT. ROUTE 419

    ROUTE 220 (FRANKLIN RD.) OVER BACK CREEK

    X071-S8

    295-18Tewolde Iyob

    NFO

    000000000029515

    2016, Commonwealth of Virginiasee Sheet 2.

    STP-5128(371)

    Jack Bayne

    _ _ _ _ _ _ _ _ _ _ _ _

    ORIGINAL SIGNATURES ON TITLE SHEET OF ROAD PLANS

    Sheet 1 of 68January 11, 2017

    Athavale, Lystad & Assoc.

    PLAN

    Span a Span b

    Rte. 220 Constr.

    Measured along

    BL

    Radial

    Radial

    Radial

    PierCL

    To Rocky Mt.

    To Roanoke

    Constr.

    Rte. 220BL

    curb

    Face of

    Sta. 124+05.00

    Pier

    median curb

    Face of

    curb

    Face of

    R=1410.00'

    CR

    EE

    KB

    AC

    K

    Buried approach slab

    Buried approach slab

    Sta. 125+02.75

    Abutment B

    End of slab

    Sta. 122+97.25

    Abutment A

    End of slab

    Edge of stream

    stream

    Edge of

    968.85

    Elev.

    969.87

    Elev.

    969.33

    Elev.

    Wingwall

    Wingwall

    in its entirety

    to be removed

    Existing bridge

    WingwallWingwall

    stream

    Edge of

    stream

    Edge of

    GuardrailGuardrail

    curb

    median

    Face of

    to remain

    abandoned bridge

    Existing wingwall of

    40'-

    0"

    40'-

    0"

    1'-

    8"

    1'-

    8"

    97'-9"107'-9"

    20

    2'-

    0"

    15'-0"

    15'-0"

    12"

    12"

    wall

    MSE retaining

    19 53'

    18"

    fill

    Toe of

    fill

    Toe of

    cl. II 38" typ.

    Dry riprap

    wall

    MSE retaining

    20 06'42"

    Exp. Exp.Fix.Span a Span b

    ABUTMENT A ABUTMENT BPIER

    DEVELOPED SECTION ALONG CONSTR. BL

    Finished grade

    Cut Cut

    Rte. 220 Constr.

    Existing profile alongBL

    Sta. 122+97.25

    End of Slab

    Beginning of bridge

    Sta. 125+02.75

    End of slab

    End of bridge

    Year 1879

    Elev. 959.50

    High water

    Finished grade

    cl. II 38" typ.

    Dry riprap

    Elev. 941.03

    Ordinary high water

    -0.5%

    205'-6"

    supportVA - Tewolde Iyob

  • Neat

    LBCY

    Footing

    Steel

    Reinforcing

    Neat

    Neat

    Total

    Footing

    Footing

    2

    Class A3

    Concrete

    Sheet No.

    INDEX OF SHEETS

    Description

    AND INDEX OF SHEETS

    ESTIMATED QUANTITIES

    accordance with current Road and Bridge Specifications.

    Denotes items to be paid for on the basis of plan quantities in

    Sheet No. Description

    INDEX OF SHEETS CONT'D

    LUMP SUM BID ITEMS

    Mobilization LS

    LS

    LS

    Construction Surveying

    MISCELLANEOUS/ROAD ITEMS

    (Str. No. 1039)

    Dismantle and Remove Existing Structure

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER2

    Item Units Quantity

    CY

    LF

    ESTIMATED QUANTITIES - SUPERSTRUCTURE ONLY

    Bridge Deck Grooving SY

    SY

    LB

    *

    *

    LB

    Denotes

    accordance with current Road and Bridge Specifications.

    Denotes items to be paid for on the basis of plan quantities in

    LBClass III

    Corrosion Resistant Reinforcing Steel,

    Concrete Parapet

    Pier

    Abutment A

    Abutment B

    LF

    Parapet

    Concrete

    LF LFLB SY TONTON

    ESTIMATED QUANTITIES - SUBSTRUCTURE ONLY

    DateSheets RevisedRev. No.

    TABLE OF REVISIONS

    LFBridge Median Barrier Ty. MC

    ASTM A709 Grade 50W

    Structural Steel Plate Girder

    Reinf. Steel Bridge Approach Slab

    GENERAL NOTES (CONTINUED):

    Backfill

    Aggregate

    Lightweight

    NS

    (MSE Wall)

    Structure

    Retaining

    NS

    SF

    42

    41

    40

    39

    38

    37

    36

    35

    34

    33

    32

    31

    30

    29

    28

    27

    26

    25

    24

    23

    22

    21

    20

    19

    18

    17

    16

    15

    14

    13

    12

    11

    10

    9

    8

    7

    6

    5

    4

    3

    2

    1414.7

    337.8

    274.2

    140.3

    358.5

    319.3

    30,340

    35,270

    18,800

    27,810

    112,220

    74

    111

    185

    930

    48,620

    745

    687

    683

    6,284

    CY

    Excavation

    Structure

    329

    409

    344

    753

    511.2

    42,730

    120,450

    416

    206

    707,660

    1,816

    1,205

    3,350

    1,023

    1,169

    2,192

    1,072

    2,002

    28,710

    19,910

    2,640

    3,644

    1,185

    1,868

    Girder Details (2 of 2)

    Girder Details (1 of 2)

    Framing Plan

    Deck Reinforcement Details

    Transverse Section

    Bearing Details

    Pier Footing Reinforcing Plan and Details

    Pier Elevation Reinforcing Steel

    Pier Plan, Elevation, and End View

    Abutment Details

    Wingwall Sections (3 of 3)

    Wingwall Sections (2 of 3)

    Wingwall Sections (1 of 3)

    Abutment B West Wingwall Plan and Elevation

    Abutment B East Wingwall Plan and Elevation (2 of 2)

    Abutment B East Wingwall Plan and Elevation (1 of 2)

    Abutment B Section and Details

    Abutment B Footing Reinforcing Plan (2 of 2)

    Abutment B Footing Reinforcing Plan (1 of 2)

    Abutment B Pile Layout Plan

    Abutment B Elevation

    Abutment B Plan

    Abutment A West Wingwall Plan and Elevation

    Abutment A East Wingwall Plan and Elevation

    Abutment A Section and Details

    Abutment A Footing Reinforcing Plan (2 of 2)

    Abutment A Footing Reinforcing Plan (1 of 2)

    Abutment A Pile Layout Plan

    Abutment A Elevation

    Abutment A Plan

    Existing Abutment B Removal Details

    Existing Abutment A Removal Details

    Existing Pier Removal Details

    Sequence of Construction (3 of 3)

    Sequence of Construction (2 of 3)

    Sequence of Construction (1 of 3)

    Existing and Proposed Transverse Sections

    Curved Bridge Layout

    Substructure Layout

    Select Backfill Detail and Slope Protection Detail

    Estimated Quantities and Index of Sheets

    Title Sheet: Plan, Section, Design Exceptions and General Notes

    STP-5128(371)

    1,844.8

    1,872

    195

    6"

    Underdrain

    Pipe

    LF

    98

    97

    1,432

    Class I

    Steel,

    Reinforcing

    Resistant

    Corrosion

    For quantities, see roadway plans

    for rub plates.

    Lump sum weight includes 32 lbs of stainless steel ASTM 276 Type 316

    Wraps

    Polymer

    Reinforced

    Fiber

    SF

    38"

    Class II,

    Riprap

    Dry

    EA

    Cofferdam

    3

    1

    4

    Concrete Class A4 Bridge Appr. Slab CY 203.8

    Cover Depth Survey

    SY

    90

    90

    1,948

    68

    67

    66

    65

    64

    63

    62

    61

    60

    59

    58

    57

    56

    55

    54

    53

    52

    51

    50

    49

    48

    47

    46

    45

    44

    43

    Concrete Low Shrinkage Class A4 Modified

    NBIS Access, Under Bridge-B601 Day 2

    LSNS Temporary Retaining Structure

    Repair

    Surface

    Substructure

    Concrete

    LB

    Class III

    Steel,

    Reinforcing

    Resistance

    Corrosion

    Wall Drain

    composite

    Geo-

    12"

    Piles,

    Steel

    Pile

    (24" dia.)

    Preboring

    NS

    **

    **

    3,710

    7,400

    11,110

    1,572

    1,572

    Approach Slab B

    Approach Slab A

    Engineering Geology (7 of 7)

    Engineering Geology (6 of 7)

    Engineering Geology (5 of 7)

    Engineering Geology (4 of 7)

    Engineering Geology (3 of 7)

    Engineering Geology (2 of 7)

    Engineering Geology (1 of 7)

    Reinforcing Steel Schedule (5 of 5)

    Reinforcing Steel Schedule (4 of 5)

    Reinforcing Steel Schedule (3 of 5)

    Reinforcing Steel Schedule (2 of 5)

    Reinforcing Steel Schedule (1 of 5)

    Cast-In-Place Concrete Median Barrier (F-shape)

    Cast-In-Place Concrete Parapet (F-Shape) East Approaches

    Cast-In-Place Concrete Parapet (F-Shape) West Approaches

    Deck Slab Elevations

    Deck Slab Extension Details

    Concrete Placement Schedule

    Deck Slab Plan and Details

    Top of Slab Elevations along CL Girder

    Dead Load Deflections

    Camber Diagram

    Cross Frame Details

    Bolted Splice Details

    more details.

    B.M.: Control I.D. 080-0191, Elevation 1013.13'. See roadway sheet IF(1) for

    Bridge Standards and obtained from the District Structure and Bridge Office.

    The Bridge Date Plate shall be installed in accordance with VDOT's Road and

    storage.

    purpose during construction, including construction traffic, staging, and

    The abandoned structure downstream of Route 220 shall not be used for any

    Structural approach slabs are included in the bridge contract.

    finished grade.

    All existing bridge substructure elements to be removed at least 2'-0" below

    Bridge No. of existing bridge is 1039. Plan Nos. are 94-20, 94-20A and 94-20B.

    the work area completely dry.

    proposed layout and information about the pumps to be used in order to keep

    shall submit to the Engineer for approval the cofferdam installation details,

    at Abutment B will require VDOT permitted and approved cofferdams. Contractor

    Work performed along the stream edge for the existing and proposed piers and

    additional information.

    Table on sheets 15 and 23 and Pre-Bored Pile Notes on sheet 26 for

    grout the full length of the pre-bored holes. Refer to Pre-Bored Pile Data

    bottom of the abutment footings. VDOT Class T3 concrete shall be used to

    sheets 15 and 23. The minimum required pile length is 10 feet below the

    minimum tip elevations shown in the Pre-Bored Pile Data Table presented on

    in pre-bored holes. Pre-Boring shall penetrate fill and original ground to the

    the Pre-Bored Pile Data Table on sheets 15 and 23. H-piles shall be installed

    H-piles in abutments A and B have a factored resistance as presented in

    All H-piles shall be ASTM A709, Grade 50 steel.

    see the Spread Footing Data Table on sheet 35.

    Footing for pier shall bear on competent bedrock. For bearing requirements,

    Retaining Structure, see sheets 11 and 12.

    For notes and payment details for Temporary

    LS(Str. No. 1039)

    Environmental and Worker Protection

    ***

    ***

    Sections 411 and 413 of the Specifications.

    The conduit shall be removed in accordance with

    and any coatings that it may have are unknown.

    the existing structure. The age of the conduit

    There is an abandoned utility conduit carried by

    ***

    ***LS

    (Str. No. 1039 and Type B)

    Material Disposal

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518002.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    SupportVA - Tewolde Iyob

  • SECTION THROUGH ABUTMENT

    End of slab

    25'-0"

    7"

    Back of backwall1'-5ƒ"

    Not to scale

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER3

    3

    10'-0"

    the Specifications

    as per Section 305.03(a) of

    Minimum density for top 6"

    Subgrade 1'-3"

    Buried approach slab

    Limits of ro

    ad

    way appro

    ach cut

    Benched

    structural excavation.

    To be paid for as

    Edge of berm

    Detail A

    RIPRAP SLOPE PROTECTION DETAIL

    End of slab

    1

    min.

    material

    Geotextile bedding

    3'-2" min.

    2•

    run aggregate

    6" no. 25 or 26 crusher

    2'-0"

    3'-0"

    min.

    12" embedment

    20'-0" Abutment A

    Top of deck slab

    DETAIL

    AND SLOPE PROTECTION

    SELECT BACKFILL DETAIL

    DETAIL A

    1

    12

    min. typ.

    6" embedment

    Back of backwall

    cl. II 38"

    Dry riprap

    22'-6" Abutment B

    45'-10" Abutment A

    50'-6" Abutment B

    28'-

    7"

    avg.

    Abut

    me

    nt

    A

    existing grade.

    Abutment A to match

    Abutment B. Slope at

    Normal to abutment at

    Abutment A is similar but opposite hand.

    Riprap at Abutment B is shown. Riprap at

    embankment material placed and finished as required.

    The top 3'-4ƒ" of the embankment side slopes shall be regular

    305 of the Specifications.

    Material shall be compacted in accordance with Sections 303 and

    with Special Provisions for Lightweight Aggregate Backfill.

    The backfill material shall be lightweight aggregate in accordance

    26'-

    6"

    avg.

    Abut

    me

    nt

    B

    1'-11"

    see notes.

    backfill zone,

    aggregate

    Light weight

    approach slab

    Top of buried

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518003.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER4

    4

    SUBSTRUCTURE LAYOUT

    Scale: ˆ" = 1'-0"

    Denotes boring location

    Legend:

    For boring logs, see engineering geology sheets 60 to 66.

    For abutment and pier details, see sheets 13 thru 36.

    the footing of abutments and pier.

    This layout is to be used only for the purpose of locating

    removal details, see sheets 11 and 12.

    For temporary retaining structure requirements and abutment

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518004.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    SUBSTRUCTURE LAYOUT

    15'-0"

    97'-9"107'-9"

    BR-02

    BR-06

    BR-08

    BR-09

    2'-1•"

    13'-0"

    14'-

    0"

    10'-0

    "

    Span aSpan bSta. 122+97.25

    Abutment A

    End of slabSta. 12

    5+02.75Abutme

    nt BEnd of

    slab

    Sta. 124+05.00Pier

    5'-0"

    5'-0"

    Radial

    Radial

    Radial

    90 typ.

    20

    PierCL

    R= 1410.00'

    End of slab

    End of slab Constr.

    Rte. 220BL

    130

    BR-04

    BR-05

    40'-

    7‚

    "

    7'-2"

    6'-1

    0"

    14'-0"

    8'-2"

    6'-10"

    footing typ.

    Constr. joint in

    5'-1…

    "

    137'-

    8"

    94'-

    8"

    47'-

    "

    47'-

    3‚

    "

    33'-

    11"

    33'-

    7"

    13'-

    "13'-

    8‚

    "

    in footing typ.

    Constr. joint

    6'-1

    1"

    21'-10…"

    90

    Elev. 945.00

    berm

    Edge of

    9'-1

    0"

    Elev. 948.00

    Elev. 948.00

    9'-10"

    berm

    Edge of

    2'-

    "

    12'-

    8‡

    "15'-

    11‡

    "

    80

    70

    14'-

    1•

    "

    2'-

    6‚

    "

    70

    5'-

    5•

    "

    stream

    Edge of

    stream

    Edge of

    90

    45'-

    2…

    "

    108 47'13"

    9014'-1"

    29'-8†"

    14'-

    0"

    Stage 1

    Stage 2

    Stage 3

    BR-07/BR-07A

    RW-06

    RW-07

    MSE wall

    Face of

    MSE wall

    Face of

    BR-01

    BR-03

    20 06'42"19 53'18"

    Co

    nstr.

    Co

    nstr.

    Co

    nstr.

    5'-

    2"

    69 57'08"

    48'-

    4•

    "

    89'-

    3•

    "

    93'-

    4"

    48'-

    3‚

    "

    45'-

    "

    32'-

    0•

    "

    34'-

    "

    41'-

    3„

    "

    76'-

    3†

    "

    35'-

    0•

    "

    19'-

    6•

    "

    31'-10†"

    13'-

    0‚

    "

    119'-

    1‡

    "89'-

    3•

    "

    29'-

    10

    …"

    76'-

    6†

    "

    32'-

    4†

    "

    Elev. 955.00

    step

    1'-

    6"

    in footing typ.

    Constr. joint

    CR

    EE

    KB

    AC

    K

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER5

    5

    CURVED BRIDGE LAYOUT

    Scale: ‘" = 1'-0"

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518005.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    BL

    Span bSpan a

    Sta. 124+05.00

    Sta. 122+97.25 Sta. 125+02.75

    PierCL

    Radial

    Radial

    Radial

    CURVED BRIDGE LAYOUT

    Constr.

    Rte. 220

    97'-9"107'-9"

    3'-

    11ƒ

    "

    Abutment A

    End of slab

    Abutment B

    End of slab

    99'-0…"106'-3…"

    R= 1410.00'

    chord

    Long

    205'-3ƒ"

    long chord

    Measured along

    Rte. 220 Constr.

    Measured along

    BL

    69 47'49" 65 56'11"105 56'11"

    supportVA - Tewolde Iyob

  • Scale: ‚" = 1'-0"

    6

    6

    TRANSVERSE SECTIONS

    EXISTING AND PROPOSED

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER

    Notes:

    with the superstructure during Stage 3 removal.

    carried by the existing bridge. These are to be removed

    There are three (3) existing abandoned conduits that are

    For deck reinforcement, see sheet 39.

    For sequence of construction, see sheets 7 thru 9.

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518006.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    EXISTING TRANSVERSE SECTION

    2'-0"

    +-

    61'-5"

    3'-3•"6'-11" 6'-11"

    3'-3•"6 spaces @ 6'-10" = 41'-0"

    Rte. 220 Constr. BL

    beam (typ.)

    Existing concrete

    existing Rte. 220CL

    Varies

    18'-4•" min.

    typ.

    attachment

    STD BR-GR 24

    2'-8•" 2'-8•"

    typ.

    1'-0•"

    Out-to-out

    27'-0"27'-0"

    NB RoadwaySB Roadway

    0.08/ft Slope

    see notes

    Existing conduits,

    4 spaces @ 7'-6" = 30'-0" 6 spaces @ 8'-6" = 51'-0" 2'-2"2'-2"

    PROPOSED TRANSVERSE SECTION

    Face of curb Face of curbFace of median curb

    2'-0" median

    8•" slab

    Rte. 220 Constr. BL

    85'-4"

    Out-to-out

    40'-0" 40'-0"

    SB Roadway NB Roadway

    Face of median curb

    12" 12"

    1'-8" 1'-8"

    typ.

    parapet

    F-shape

    6.4% Slope

    6.4% Slope

    44" web typ.

    Proposed steel

    2'-0"

    SupportVA - Tewolde Iyob

  • Scale: ‚" = 1'-0" 7

    7

    structure to be removed

    Indicates portion of existing

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER

    CONSTRUCTION (1 OF 3)

    SEQUENCE OF

    Notes:

    unless otherwise noted

    CONRETE PARAPET (DOUBLE FACE)

    TRAFFIC BARRIER SERVICE

    o/

    Notes:

    Bottom of deck

    2" min.

    Top of deck

    5.

    4.

    3.

    2.

    1.

    system shall be re-tested.

    barriers are needed beyond 1 year, the anchor

    Barriers may be in service a maximum of 1 year. If

    to manufacturer's recommendations.

    minimum pullout of 32,000 lbs. and installed according

    Anchor system shall be tested to provide a

    EP-4.

    surface and fill recess with epoxy bonding compound

    or threaded rod as low as practical below roadway

    After removing Temporary barrier, cut ‡" bolt

    road plans.

    Concrete Double Face Parapet is included in the

    Standards MB-11A. Cost of Traffic Barrier Service

    For details not shown, see VDOT Road and Bridge

    Bolt down side adjacent to traffic.

    Not to scale

    removal.

    removed with the superstructure during Stage 3

    are carried by the existing bridge. These are to be

    There are three (3) existing abandoned conduits that

    Stage 2 portion of existing bridge.

    Shift NB traffic to new Stage 1 bridge to remove

    on existing bridge.

    Construct Stage 1 while maintaining all traffic

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518007.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    Stage 1 Construction

    STAGE 1 CONSTRUCTION

    28'-1"

    12'-0" 12'-0" 2'-0" 12'-0" 12'-0" 2'-0"2'-0"

    61'-5"

    3'-3•" 3'-3•"

    3 spaces @ 8'-6" = 25'-6"

    6'-11" 6'-11"6 spaces @ 6'-10" = 41'-0"

    2'-2"5"

    2'-5‚" min.

    Varies

    existing Rte. 220CL

    6.4% Slope

    SB Lane SB Lane NB Lane NB Lane2'-8•" 2'-8•"

    Existing bridge

    +-0.08/ft Slope

    Shdr.

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    8

    9

    10

    11typ.

    number

    Girder

    see notes

    Existing conduits,

    Lane Lane

    SB Traffic Stage 2

    2'-2"5"

    12'-0" 12'-0" 2'-0"2'-0"

    28'-8"32'-9"

    3'-3•"6'-11" 3 spaces @ 6'-10" = 20'-6"

    3 spaces @ 8'-6" = 25'-6"

    2'-0•"

    28'-1"

    NB Traffic Stage 2

    Lane Lane

    11'-0" 11'-0"2'-5"

    2'-0"

    2'-5‚" min.

    Varies

    existing Rte. 220CL

    +-0.08/ft Slope

    2'-8•"

    face, MB-11A

    parapet double

    service concrete

    Temporary barrier

    1'-8"

    6.4% Slope

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    Shdr.

    12"

    8

    9 10

    11

    Stage 2 Removal

    STAGE 2 REMOVAL

    typ.

    number

    Girder

    see notes

    Existing conduits,

    SupportVA - Tewolde Iyob

  • Scale: ‚" = 1'-0" 8

    8

    CONSTRUCTION (2 OF 3)

    SEQUENCE OF

    structure to be removed

    Indicates portion of existing

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER

    o/

    Notes:

    4.

    3.

    2.

    1.

    CONRETE PARAPET (SINGLE FACE)

    TRAFFIC BARRIER SERVICE

    to manufacturer's recommendations.

    minimum pullout of 32,000 lbs. and installed according

    Anchor system shall be tested to provide a

    EP-4.

    surface and fill recess with epoxy bonding compound

    or threaded rod as low as practical below roadway

    After removing Temporary barrier, cut ‡" bolt

    Standards MB-10A.

    For details not shown, see VDOT Road and Bridge

    Bolt down side adjacent to traffic.

    Bottom of deck

    Top of deck

    2" min.

    unless otherwise noted

    Not to scale

    removal.

    removed with the superstructure during Stage 3

    are carried by the existing bridge. These are to be

    There are three (3) existing abandoned conduits that

    to remove remainder of existing bridge.

    Shift SB traffic to Stage 2 portion of new bridge

    to construct Stage 2 of new bridge.

    SB traffic on existing SB portion of existing bridge

    Maintain NB traffic on Stage 1 of new bridge and

    (Double Face) details, see sheet 7.

    For Traffic Barrier Service Concrete Parapet

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518008.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    25'-6" 28'-1"

    NB Traffic Stage 2

    Lane

    STAGE 2 CONSTRUCTION

    3 spaces @ 8'-6" = 25'-6" 2'-2"3 spaces @ 8'-6" = 25'-6"

    5"

    Lane

    11'-0" 11'-0"

    Stage 2 Construction

    2'-5"

    2'-0"

    32'-9"

    SB Traffic Stage 2

    3 spaces @ 6'-10" = 20'-6"6'-11"3'-3•"

    2'-0•"

    Lane Lane

    12'-0" 12'-0" 2'-0"2'-0"

    Varies

    min.

    5'-5"

    Rte. 220 Constr. BL

    existing Rte. 220CL

    +-0.08/ft Slope

    2'-8•"1'-8"

    6.4% Slope

    face, MB-11A

    parapet double

    service concrete

    Temporary barrier

    median barrier

    Dowel for

    Shdr.

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    12"

    2'-0"

    8

    9 10

    11

    76

    5

    typ.

    number

    Girder

    see notes

    Existing conduits,

    2'-2"

    5"

    6 spaces @ 8'-6" = 51'-0"

    53'-7"

    11'-0" 11'-0"

    2'-0"

    Stage 3 Traffic

    11'-0"11'-0"1'-11"

    3'-3•"6'-11" 3 spaces @ 6'-10" = 20'-6" 2'-0•"

    32'-9" Varies

    min.

    5'-7‚"

    BLRte. 220 Constr.

    existing Rte. 220CL

    SB Lane SB Lane NB Lane NB Lane

    1'-8"

    face, MB-11A

    parapet double

    service concrete

    Temporary barrier

    barrier

    median

    Dowel for6.4% Slop

    eface, MB-10A

    parapet single

    service concrete

    Temporary barrier

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    12"

    2'-0"

    5

    6 7

    8

    9 10

    11

    Stage 3 Removal

    STAGE 3 REMOVAL

    typ.

    number

    Girder

    see notes

    Existing conduits,

    SupportVA - Tewolde Iyob

  • Scale: ‚" = 1'-0" 9

    9

    CONSTRUCTION (3 OF 3)

    SEQUENCE OF

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER

    See notes on sheets 38 and 54 for couplers at median barrier.

    median barrier in Stage 4.

    Shift SB traffic to Stage 3 portion of new bridge to construct

    to construct Stage 3.

    Maintain traffic on Stage 1 and Stage 2 portions of new bridge

    see sheet 8.

    For Traffic Barrier Service Concrete Parapet (Single Face) details,

    see sheet 7.

    For Traffic Barrier Service Concrete Parapet (Double Face) details,

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518009.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    Stage 3 Construction

    STAGE 3 CONSTRUCTION

    2'-2"6 spaces @ 8'-6" = 51'-0"2'-2" 4 spaces @ 7'-6" = 30'-0"

    53'-7"

    11'-0" 11'-0"

    Stage 3 Traffic

    11'-0"

    31'-9"

    1'-11"

    Rte. 220 Constr. BL

    1'-8"SB Lane SB Lane NB Lane NB Lane

    1'-8"

    6.4% Slope

    face, MB-11A

    parapet double

    service concrete

    Temporary barrier

    2'-0"

    11'-0"

    face, MB-10A

    parapet single

    service concrete

    Temporary barrier

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    12"

    2'-0"

    5

    6 7

    8

    9 10

    11

    4 3

    2

    1

    typ.

    number

    Girder

    barrier

    for median

    couplers

    Dowel with

    STAGE 4 CONSTRUCTION

    2'-2"6 spaces @ 8'-6" = 51'-0"2'-2" 4 spaces @ 7'-6" = 30'-0"

    30'-6"

    11'-0" 11'-0"11'-0"

    Rte. 220 Constr. BL

    SB Lane SB Lane NB Lane NB Lane

    1'-8"

    face, MB-11A

    parapet double

    service concrete

    Temporary barrier

    2'-0"

    6.4% Slope

    1'-8" 11'-0"

    face, MB-10A

    parapet single

    service concrete

    Temporary barrier

    15'-6" 15'-0"

    Median barrier

    Work area

    Shdr.

    12"

    Shdr.

    12"

    Shdr.

    12"

    2'-0"

    5

    4 3

    2

    1

    6 7

    8

    9 10

    11typ.

    number

    Girder

    Shdr.

    12"

    1'-6"

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER10

    10

    Scale: ‰" = 1'-0"

    REMOVAL DETAILS

    EXISTING PIER

    unless otherwise noted

    Legend:

    Denotes FRP Wrap repair

    Fiber Reinforced Polymer (FRP) Wrap Notes:

    specified in Section 412.

    The FRP wrap supplier shall determine limits and required details as

    FRP Wrap limits shown are approximate and the details are schematic.

    flexural capacity to the existing pier cap.

    The FRP Wrap shall provide a minimum of 150 kip-ft of additional

    existing beam seat.

    of providing additional flexural capacity to the cap beneath the

    For this application, FRP Wraps shall be used only for the purpose

    within the cap as shown.

    repair are complete. All existing piers are to receive FRP Wrap repairs

    prior to the removal of the pier cap in Stage 2 and after all surface

    FRP Wrap is to be installed per manufacturer's recommendations

    Standard Specifications.

    FRP Wrap is to be provided in accordance with Section 412 of the

    Notes:

    at that location and contact the Engineer.

    the limits shown, the Contractor shall stop all demolition operations

    with the proposed girders. If the amount of removal required exceeds

    hatched, will be required to be removed in Stage 2 due to conflict

    A portion of the cap within the Stage 3 removal limits, shown

    during Stage 3.

    Stage 2 and to remove the columns and foundations as required

    The Contractor may elect to remove only the existing cap during

    is a minimum of 2'-0" below finished ground.

    otherwise noted, provided that the top of the remaining portion

    The foundations of the existing piers may remain in place, unless

    before any pier removal will be allowed.

    The Contractor shall complete the pier repairs as shown on the plans

    Existing piers are numbered south to north.

    Concrete Substructure Surface Repair Notes:

    load prior to installation of the FRP Wrap.

    compromise the capacity of the structure to carry the imposed

    exceeds 6 inches, or in any case where removal of concrete may

    Contractor shall notify the Engineer If removal depth on pier caps

    surface repairs shall be Class A4 Self Consolidating Concrete (SCC).

    No shotcrete repairs will be allowed on this project. All concrete

    the Standard Specifications.

    Concrete surface repair shall be in accordance with Section 412 of

    the Engineer.

    in accordance with the 2016 Bridge Inspection Report and approved by

    of substructure surface repair shall be determined by the Contractor

    surface that meets the FRP Wrap manufacturer's specifications. Limit

    in the location of proposed FRP Wraps in order to provide a concrete

    The Contractor shall repair the surface of the existing pier caps

    removal required in Stage 2

    Denotes additional concrete

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518010.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    EXISTING PIER 1 REMOVAL

    constr.

    Rte. 220

    Stage 3 removal Stage 2 removal

    +- +-

    +- +-

    +-58'-10"

    BL

    9"

    12"

    38'-8" 20'-2"

    8'-11" 11'-3"

    A

    Aof FRP Wrap

    Approximate limit removal, see notes

    Additional Stage 2

    EXISTING PIER 2 REMOVAL

    Stage 3 removal Stage 2 removal

    +- +-

    +- +-

    +-58'-10"

    38'-7" 20'-3"

    9'-7" 10'-8"

    constr.

    Rte. 220

    BL

    12"

    1'-3"

    in its entirety

    to be removed

    Existing foundation

    A

    A

    of FRP Wrap

    Approximate limit removal, see notes

    Additional Stage 2Stage 3 removal Stage 2 removal

    +- +-

    +- +-

    +-58'-10"

    38'-8" 20'-2"

    10'-1" 10'-1"

    1'-

    3"

    constr.

    Rte. 220

    BL

    EXISTING PIER 3 REMOVAL

    1'-6"

    A

    A

    of FRP Wrap

    Approximate limitremoval, see notes

    Additional Stage 2

    SECTION A - A

    1 •"

    +-2'-9"

    + -3'-

    3"

    12" +-

    +-

    +-2'-6"

    Scale: „" = 1'-0"

    manufacturer's specifications.

    to concrete as per the

    FRP Wrap to be bonded

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER11

    11

    Scale: ‰" = 1'-0"

    REMOVAL DETAILS

    EXISTING ABUTMENT A

    Notes:

    Temporary Retaining Structure Notes:

    see sheets 15 thru 17.

    For proposed abutment footing plan and details,

    complete the work.

    include all labor, equipment and materials necessary to

    per linear foot for the pre-boring pile pay item and shall

    cost for this work shall be incidental to the unit cost

    to clear conflict with the proposed piles as needed. The

    The Contractor may pre-bore through the existing footing

    below proposed ground.

    in place, provided that they are buried a minimum of 2'

    and footings. The existing abutment footing may remain

    Staged removal shall include the existing wingwall stem

    stage of removal and construction.

    to tie with the proposed abutment and to allow for the next

    between stages of excavation and backfilling as needed

    Contractor shall adjust the temporary retaining structure

    unknown obstructions.

    additional measures required to install the wall due to

    construction. Payment will include costs associated with any

    retaining structure when no longer needed for the staged

    or complete demolition, removal and disposal of the temporary

    Payment will also include all cost associated with the partial

    the temporary retaining structure during construction.

    materials and incidentals necessary to construct and maintain

    structure and includes furnishing all labor, tools, equipment,

    design, detailing, and construction of the temporary retaining

    shall be full compensation for any subsurface investigation,

    sum price for temporary retaining structure. Sush payment

    Temporary Retaining Structure will be paid for as a lump

    conditions and design specifics.

    locations are to be determined in the field based on site

    are for bidding purposes only. Actual dimensions and

    pertaining to the retaining structure are approximate and

    The dimensions and locations shown on these plans

    approval before installation.

    and shall be furnished to the Department for review and

    to practice engineering in the commonwealth of Virginia,

    sealed by a Professional Engineer holding a valid license

    Working drawings for the structure shall be signed and

    Abutment A and B during all phases of construction.

    support the adjacent roadway and maintain traffic at

    provided by the Contractor and shall be sufficient to

    The design of the Temporary Retaining Structure shall be

    shall be placed in accordance with VDOT Specifications.

    Engineer`s approval. Temporary Retaining Structure

    no additional cost to the Department and with the

    drawings. Contractor may erect a different structure at

    construction. A sheet pile wall has been shown on these

    A Temporary Retaining Structure will be required during

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518011.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    ABUTMENT A REMOVAL PLAN

    30'-2‚"26'-2" 62'-6•"

    BL

    CL

    guardrail typ.

    Existing

    Stage 3 removalStage 1 removal Stage 2 removal

    18'-1‚" 12'-1"

    +-+- +-

    +- +- +-3'-1"footing

    Proposed abutment

    Abutment A

    existing

    Stag

    e 2

    Stag

    e 3

    Stag

    e 1

    constru

    ction

    constru

    ction

    constru

    ction

    structure typ.

    Temporary retaining

    Constr.

    Rte. 220

    Constr.

    Rte. 220CLBL

    Stage 2 removal Stage 3 removal

    +-

    Stage 1 removal

    +- +-

    +- +- +-

    3'-1"

    Abutment A

    existing

    18'-1‚" 12'-1"

    62'-6•"30'-2‚"26'-2"

    ABUTMENT A REMOVAL ELEVATION

    Top of footing

    Elev. 938.72 +-

    Elev. 939.42

    Top of footing

    +-

    Top of footing

    Elev. 940.01+-

    3'-

    0"

    3'-

    0"

    3'-

    0"

    3'-

    0"

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER Scale: ‰" = 1'-0"

    REMOVAL DETAILS

    EXISTING ABUTMENT B

    Notes:

    12

    12

    see sheets 23 thru 25.

    For proposed abutment footing plan and details,

    new footing.

    stem and portion of footings that are in conflict with the

    removal shall include the existing abutment stem, wingwall

    are buried a minimum of 2' below proposed ground. Stage 3

    The existing footings may remain in place, provided that they

    shall include the existing abutment stem to the limits shown.

    The existing footings may remain in place. Stage 2 removal

    Stage 1 removal shall include the existing wingwall stem.

    Temporary Retaining Structure Notes:

    stage of removal and construction.

    to tie with the proposed abutment and to allow for the next

    between stages of excavation and backfilling as needed

    Contractor shall adjust the temporary retaining structure

    unknown obstructions.

    additional measures required to install the wall due to

    construction. Payment will include costs associated with any

    retaining structure when no longer needed for the staged

    or complete demolition, removal and disposal of the temporary

    Payment will also include all cost associated with the partial

    the temporary retaining structure during construction.

    materials and incidentals necessary to construct and maintain

    structure and includes furnishing all labor, tools, equipment,

    design, detailing, and construction of the temporary retaining

    shall be full compensation for any subsurface investigation,

    sum price for temporary retaining structure. Sush payment

    Temporary Retaining Structure will be paid for as a lump

    conditions and design specifics.

    locations are to be determined in the field based on site

    are for bidding purposes only. Actual dimensions and

    pertaining to the retaining structure are approximate and

    The dimensions and locations shown on these plans

    approval before installation.

    and shall be furnished to the Department for review and

    to practice engineering in the commonwealth of Virginia,

    sealed by a Professional Engineer holding a valid license

    Working drawings for the structure shall be signed and

    Abutment A and B during all phases of construction.

    support the adjacent roadway and maintain traffic at

    provided by the Contractor and shall be sufficient to

    The design of the Temporary Retaining Structure shall be

    shall be placed in accordance with VDOT Specifications.

    Engineer`s approval. Temporary Retaining Structure

    no additional cost to the Department and with the

    drawings. Contractor may erect a different structure at

    construction. A sheet pile wall has been shown on these

    A Temporary Retaining Structure will be required during

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518012.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    ABUTMENT B REMOVAL PLAN

    62'-6•" 30'-2‚" 26'-2"

    Stage 1 removalStage 2 removalStage 3 removal

    14'-6" 15'-8‚" 3'-1" +- +- +-

    guardrail typ.

    Existing

    +- +- +-

    CL

    BL

    footing

    Proposed abutmentAbutment B

    existing

    constr

    ucti

    on

    Stag

    e 1

    constr

    ucti

    on

    constr

    ucti

    on

    Stag

    e 2

    Stag

    e 3

    structure typ.

    Temporary retaining

    Constr.

    Rte. 220

    +- 15'-8‚" +-

    Stage 2 removalStage 3 removal Stage 1 removal

    62'-6•" 30'-2‚" 26'-2"

    CL

    BL

    +- +-+-

    3'-1"

    Abutment B

    existing

    +-14'-6"

    Constr.

    Rte. 220

    Top of footing

    Elev. 940.01 +-

    ABUTMENT B REMOVAL ELEVATION

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER13

    13

    ABUTMENT A PLAN

    Scale: ‚" = 1'-0" unless otherwise noted

    TABLE OF ANGLES

    Girder

    1

    2

    4

    5

    3

    6

    7

    8

    10

    11

    9

    69 22'55"

    69 29'58"

    69 36'56"

    69 43'48"

    69 50'36"

    69 58'13"

    70 05'44"

    70 13'10"

    70 20'29"

    70 27'44"

    70 34'52"

    For Abutment A footing, see sheets 15 thru 17.

    For Abutment A section, see sheet 18.

    For Abutment A elevation, see sheet 14.

    For bearing details, see sheet 37.

    Notes:

    *

    see Abutment A section on sheet 18.

    approach slab. For location and termination notes,

    The 6" dia. pipe underdrain is located above the

    ANCHOR BOLT OFFSET

    Girder A

    10‚"

    10…"

    10…"

    B

    1 - 3

    4 - 9

    10 - 11

    1'-6"1'-6"

    bolt typ.

    1‚" dia, anchor

    backwall

    Face of

    ANCHOR BOLT LAYOUT

    Scale: •" = 1'-0"

    girderCL

    of bearing

    Line thru centers

    1'-

    3"

    1'-

    3"2'-

    6"

    AA

    BB

    3‡"

    3ƒ"

    3†"

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518013.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    PLAN

    28'-7„" 14'-4‡"

    typ.

    Girder 1CL Girder 2CL Girder 3CL Girder 4CL Girder 5CL

    Girder 6CL

    Girder 7CL Girder 8CL Girder 9CLCLCL Girder 11

    of bearing

    Line thru centers

    backwall

    Face of

    2 spa. @ 9'-0‚" = 18'-0•" 9'-0…"2'-0"

    1'-10•"

    2'-6‡"

    36'-0†"

    Stage 1 construction Stage 2 construction

    Constr.

    Rte. 220BL

    1'-

    3"

    1'-

    3"

    3'-

    0"

    2'-

    6"

    7"

    12"

    7'-0•" 7'-4•" 9'-0†"2'-0"

    5'-11‡" 8'-0" 2 spa. @ 8'-0„" = 16'-0‚"5'-0•"

    12"

    Wingwall

    1'-6" 1'-6"

    typ.typ.

    1" exp. joint

    backwall

    Back of

    Win

    gwall

    7'-

    11"

    Stage 3 construction

    31'-7‚"

    12'-8ƒ"

    R= 1410.00'

    1'-

    7"

    3'-1ƒ"

    typ.

    weephole

    6" dia.

    1'-1„"

    6"

    27'-1†"32'-9ƒ"

    6"

    6"

    70

    80

    4'-4…"

    underdrain

    6" dia. pipe*

    3'-8‡"

    8"

    1'-9‚"

    2'-2"

    1'-8"

    tangent

    to local

    see sheet 20

    For plan

    1'-8"

    underdrain

    6" dia. pipe

    Cap end of

    12"

    12"

    2'-3"

    1"

    2'-

    10‡

    "

    in footing

    Constr. joint

    Sta. 122+98.67

    local tangent

    20 03'15" to

    in stem

    Constr. joint

    in footing

    Constr. jointin stem

    Constr. joint

    15'-

    0"

    see sheet 19

    For pla

    n,

    bolt typ.

    Anchor

    Girder 10

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER14

    14

    Scale: ‚" = 1'-0" unless otherwise noted

    ABUTMENT A ELEVATION

    SECTION B-B

    Scale: •" = 1'-0"

    SECTION D-D

    Scale: •" = 1'-0"

    AB0504

    AB0503

    7"

    12"

    7"

    12"

    1'-

    7"

    AB0506

    AH0535

    AH0521

    AB0502

    AW0501

    1'-8"

    AH0532

    2'-

    6"

    backwall

    Face ofAB0502

    AW0508

    1" Exp. joint

    AB0505

    backwall

    Face of

    AW

    0904

    F.F.

    AW

    0503

    N.F.

    AH0538

    AW07 series F.F.

    AW05 series N.F.

    E.F.

    AH0523

    F.F. denotes for face.

    N.F. denotes near face.

    E.F. denotes each face.

    to pertinent reinforcing steel pay item.

    Cost for mechanical couplers shall be incidental

    For bearing details, see sheet 37.

    For Abutment A section, see sheet 18.

    For Abutment A footing, see sheets 15 thru 17.

    For Abutment A plan, see sheet 13.

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518014.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    ELEVATION

    Stage 1 construction Stage 2 construction Stage 3 construction

    Elev. 969.49

    Elev. 967.90

    Elev. 966.03

    Elev. 971.13

    3"spa.

    4 eq.

    5 eq. spa.6 eq. spa. 5 eq.

    spa.

    6" typ.

    6" typ.3"

    Elev. 944.00

    Elev. 940.00

    Elev. 967.14

    Elev. 963.56

    Elev. 966.61

    Elev. 964.56

    Elev. 963.10 Elev. 962.63

    Elev. 962.17

    Elev. 964.03

    Elev. 965.56

    Elev. 966.09

    Elev. 965.09

    = 15'-

    7"

    typ.

    AV0501

    slope

    parallel to cross

    Top of backwall

    Elev. 962.09

    Elev. 967.06

    4" typ. 4" typ.

    hole typ.

    in 24" dia. pre-bored

    HP 12x53 steel pile

    3'-10" lap

    A14 33

    C3314

    coupler typ.

    Mechanical

    typ.

    weephole

    6" dia.

    in stem

    Constr. joint

    min. typ.

    slab seat

    Approach

    5-AH0617

    2 spa. @ 10'-0" = 20'-0" 2'-10‚"

    joint in stem

    Constr.

    6"

    11•" = 4'-9•"

    AB0506

    5 spa. @

    2 spa. @ 10'-0" = 20'-0"

    3"

    = 1'-8"

    2 eq. spa.

    7'-0" 5'-9ƒ"

    AH0616 E.F.

    28-AF0835 lap w/ AV0804 eq. spa. F.F. = 26'-5†" 37-AF0835 lap w/ AV0806 eq. spa. F.F. = 35'-7"

    typ. at pads

    5 spa. @ 6" = 2'-6"

    typ. bet. G1 to G4

    G5 to G10

    typ. bet.

    5 eq. spa.

    at top of seat

    18-

    AH0607

    @ 11"

    E.F.

    spa.

    @ 11"

    = 15'-

    7"

    spa.

    @ 11"

    = 15'-

    7"

    29-AB0501 @ 12" F.F. = 28'-0" 27-AB0501 @ 12" F.F. = 26'-0"

    4'-

    0"

    ty

    p.

    typ.

    E.F.

    AH0602

    5-AH0604 5-AH0605

    5-AH0606

    E.F.

    AH0607

    AH0608 E.F.5-AH0609

    5-AH0610

    5-AH0611

    E.F.

    AH0615

    5-AH06185-AH0619

    5-AH0620

    eq. spa. E.F.

    5-AH0521

    spa. E.F.

    5-AH0523 eq.

    joint typ.

    AH0614 at

    AH0601 E.F.

    18-

    AH0601

    E.F.

    18-

    AH0612

    E.F.

    joint typ.

    AH0613 at

    joint typ.

    AH0550 at

    joint typ.

    AH0551 at

    Elev. 972.42

    Elev. 967.33

    29-AB0502 @ 12" N.F. = 28'-0" 27-AB0502 @ 12" N.F. = 26'-0"

    2-AB0505 @ 10"

    AB0504

    @ 10"

    2-AB0503

    eq. spa. E.F.

    5-AH0522

    D D

    12"

    lap w/AF0634

    N.F.

    AV0603

    31-AB0501 @ 12" F.F.= 30'-0"

    31-AB0502 @ 12" N.F.= 30'-0"

    B5-AH0603

    B

    29-AF0835 lap w/ 29-AV0802 eq. spa. F.F. = 27'-1"

    29-AF0634 lap w/ 29-AV0603 eq. spa. N.F. = 27-1" 37-AF0634 lap w/ AV0607 eq. spa. N.F. = 35'-7"

    at side

    lap w/ 3-AV0607

    3-AF0634

    36'-0†"27'-1†"32'-9ƒ"

    28-AF0634 lap w/ AV0605 eq. spa. N.F. = 26'-5†"

    4'-3…"

    3'-0" lap

    min. typ.

    1'-6" min.

    at top of seat

    53-AV0501 N.F.

    40-AV0501 N.F.49-AV0501 N.F.

    at top of seat

    2 spa. @ 10'-0" = 20'-0"

    7'-1ƒ" 7'-10‡"

    AH0536

    AH0537

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER15Scale: ‚" = 1'-0"

    Notes:

    concrete

    Class T3

    2'-

    0"

    dia.

    min.

    TYPICAL PRE-BORED PILE SECTION

    Scale: 1" = 1'-0"

    HP12X53

    15

    unless otherwise noted

    Unit

    Substructure

    (Tons/pile)

    Resistance

    Axial

    Factored

    PRE-BORED PILE DATA TABLE

    Abutment A 180 930.00360

    Hole Elevation

    of Pre-Bored

    Tip and Bottom

    Estimated Pile

    (Tons/pile)

    Resistance

    Nominal

    Required

    PILE LAYOUT PLAN

    ABUTMENT A

    All reinforcing steel on this sheet is to be placed over the piles.

    All piles shall be HP12x53 and shall be pre-bored.

    For wingwall sections, see sheets 30 thru 32.

    For Abutment A section, see sheet 18.

    For footing reinforcing details, see sheets 16 and 17.

    For pre-bored pile notes, see sheet 26.

    For Detail A, see sheet 16.

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518015.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    BL

    over piles

    6" typ. centered

    over piles

    6" typ. centered

    4'-

    0"

    6'-

    0"

    backwall

    Face of

    1'-9•"

    R= 1410.00'

    1'-

    6"

    typ.

    HP12X53

    1'-

    6"

    PILE LAYOUT PLAN

    Stage 1 construction Stage 2 construction Stage 3 construction

    tangent

    to local

    20 03'15"

    2'-

    0"

    in footing

    Constr. joint

    in footing

    Constr. joint

    122+98.67

    Sta.

    4'-10ƒ" 2 spa. @ 4'-6"

    = 9'-0"

    2 spa. @ 4'-6" 3'-11„"

    1'-

    6"

    5'-

    1…

    "

    1'-6"

    1'-6"

    5'-6"

    5'-6"

    MA

    TC

    H

    LIN

    E

    A-

    A

    all wingwall piles

    AF0601 typ. at

    AF0603

    AF0607

    AF0605

    AF0606 typ.

    AF0607 AF0608

    AF0609

    AF0611

    AF0610

    AF0604

    AF0607

    AF0614 AF0615

    AF0613 typ.

    AF0612 typ.

    AF0602

    69 57'08"

    4'-6"

    32'-4†"

    9"

    1'-7‚"

    2'-10ƒ"1'-1„" 1'-4"

    = 9'-0"

    28'-8ƒ"

    5 spa. @ 5'-0" = 25'-0"4'-6" 11 spa. @ 5'-0" = 55'-0"

    76'-6†"

    4 spa.

    @ 5'-

    0"

    = 20'-

    0"

    8'-

    2†

    "

    2'-0†"

    Constr.

    Rte. 220

    3'-11ƒ"

    Detail A

    piles typ.CL

    backwall

    Face of

    4'-

    0"

    PILE LAYOUT PLAN

    1'-

    6"

    1'-

    6"

    6'-

    0"

    6'-

    0"

    Stage 3 construction

    2'-

    0"

    over piles

    6" typ. centered3'-10"

    typ.min. lap

    MA

    TC

    H

    LIN

    E

    A-

    A

    1'-10•"3 spa. @ 5'-3" = 15'-9"

    AF0606 typ.typ.

    HP12X53

    AF0615

    11 spa. @ 5'-0" = 55'-0"

    76'-6†"

    piles typ.CL

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER16

    16

    Scale: ‚" = 1'-0"

    Notes:

    (1 OF 2)

    FOOTING REINFORCING PLAN

    ABUTMENT A

    unless otherwise noted

    coupler

    Mechanical

    DETAIL A

    Not to scale

    Stage 1 Stage 2

    or Stage 2

    lap typ.

    or Stage 3

    AF06 seriesAF06 series

    AF0658

    AF0613 or

    AF0657

    AF0612 or

    joint

    Constr.

    3'-10" min.

    reinforcing steel pay item.

    Cost for mechanical couplers shall be incidental to pertinent

    For wingwall sections, see sheets 30 thru 32.

    notes, see sheet 26.

    For pre-bored pile section, see sheet 15. For pre-bored pile

    For Abutment A section, see sheet 18.

    For additional location of Detail A, see sheet 15.

    see sheet 15.

    For reinforcing steel details over piles and for pile spacing,

    to the Department.

    clear HP pile at no additional cost

    bottom bar AF0645 as needed to

    Note A: Contractor may field cut

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518016.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    8•"

    1'-

    6"

    4 eq.

    typ.

    1'-6"

    typ.

    4 eq.4"

    joint

    Constr.

    joint

    Constr.

    5 e

    q.

    = 4'-

    6"

    spa.

    5"

    5"

    4"

    typ.

    = 3'-

    6"

    spa.

    4"

    4" typ.

    Constr.

    Rte. 220BL

    SE

    E

    SH

    EE

    T 17

    MA

    TC

    H

    LIN

    E

    ABUTMENT A FOOTING REINFORCING PLAN

    typ.

    10•

    "

    4 eq.

    4 eq.

    and bottom

    AF0649 top

    typ.

    Detail A

    4"4"

    typ.

    = 3'-6"

    spa.

    = 3'-0"

    spa.

    4 eq.1'-6"

    typ.

    4 eq.

    typ.

    = 3'-0"

    spa.

    typ.

    = 3'-6"

    spa.

    1'-6"

    typ.

    = 2'-0"

    sheet 17 for spacing

    and sides, see

    AF0665 top, bottom

    4"

    spa.

    as sho

    wn

    10•

    "

    shown

    spa. as

    top and bot.

    shown

    spa. as

    top and bot.

    to

    p and bot.

    spa.

    as sho

    wn

    = 4'-

    6"

    spa.

    5 e

    q.

    and bottom

    AF0647 top

    and bottom

    AF0648 top

    at sides

    3-AF0659

    at sides

    3-AF0659

    and bottom

    AF0656 top

    and bottom

    AF0664 top

    spa. as shownspa. as shownspa. as shown

    and bottom

    AF0661 top

    1'-

    6"

    1'-

    6"

    1'-

    6"

    1'-6"

    1'-6"

    6-AF0638

    7-AF0636

    16-

    AF0645

    and bottom

    AF0646 top

    27-AF0651 top and bottom

    and bottom

    AF0641 top

    16-

    AF0640 botto

    m

    spa.

    as sho

    wn

    16-

    AF0942 top

    AF0652

    4-

    bot.

    and

    top

    26-AF0651 top and bottom 73-AF0651 top and bottom

    3 eq.

    and bottom

    AF0654 top

    1'-6"

    and bottom

    2-AF0662 top

    at sides

    3-AF0650

    at sides

    3-AF0650

    at sides

    3-AF0655

    and bottom

    2-AF0644 top

    at sides

    3-AF0637

    at sides

    3-AF0665

    at sides

    3-AF0665

    and bottom

    2-AF0643 top

    at side

    bottom and

    5-AF0639 top,

    = 3'-0"

    spa.

    2 eq. spa.

    = 2'-0"

    4"

    4"

    side typ.

    bottom and

    AF0658 top,

    side typ.

    bottom and

    AF0657 top, spa. as shown

    and bottom

    16-AF0659 top

    2 eq. spa. = 2'-0

    3-AF0653 top and bot.12"

    2 eq. spa.

    typ.

    = 4'-0"

    spa.

    5" typ.

    5"

    See Note A

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER17

    17

    Scale: ‚" = 1'-0"

    (2 OF 2)

    FOOTING REINFORCING PLAN

    ABUTMENT A

    Note:

    For notes, see sheet 16.

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518017.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    4"spa. as shown

    4"

    4 eq.

    ABUTMENT A FOOTING REINFORCING PLAN

    4"

    4 eq.1'-6" typ.

    typ.

    = 3'-6"

    spa.

    SE

    E

    SH

    EE

    T 16

    MA

    TC

    H

    LIN

    E

    5"

    5 e

    q.

    = 4'-

    6"

    spa.

    5"

    spa.

    as sho

    wn

    3'-10"

    = 3'-9"

    spa.

    4 eq.

    = 3'-9"

    spa.

    4 eq.

    = 3'-9"

    spa.at sides

    3-AF0665

    = 4'-

    6"

    spa.

    5 e

    q.

    1'-

    6"

    1'-

    6"

    1'-

    6"

    73-AF0651 top and bottom

    16-

    AF0666 to

    p and botto

    m

    lap with AF0666

    and bottom,

    AF0665 top

    at sides

    3-AF0665

    at side

    3-AF0660

    9•"

    typ.

    min. lap

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER Scale: •" = 1'-0" unless otherwise noted

    RUB PLATE DETAIL

    Scale: 3" = 1'-0"

    4 Required - 2 each acute corner

    8"

    2" 4" 2"

    3"

    3"

    Type 316.

    •" thick. ASTM 276

    Stainless steel plate

    ƒ" dia. x 4" long studs

    SECTION AND DETAILS

    ABUTMENT A

    18

    18

    rubber joint sealer

    •" expanded

    PART TRANSVERSE SECTION

    Scale: ƒ" = 1'-0"

    Rub plates

    joint filler

    1" preformed

    closure wall

    Abutment

    AH05 series

    For spacin

    g

    see

    win

    gwall ele

    vatio

    n

    Back of backwall

    CL

    Face of backwall

    4"

    7"

    12"

    4"

    4"

    4"

    1•"

    TYPICAL VERTICAL CONSTRUCTION JOINT DETAILScale: 1•" = 1'-0"

    waterstop

    6"x…"

    F.F. denotes for face.

    N.F. denotes near face.

    E.F. denotes each face.

    For approach slab details, see sheet 67.

    shown on the plans.

    and incidentals required for the satisfactory completion of the work

    bid price shall include all costs for labor, tools, materials, equipment

    shall be included in the cost of concrete for the approach slab. The

    The cost of perforated pipe underdrain, No. 57 stone and geotextile

    with geotextile, secured around the pipe to cover the outlet end.

    expansion joint of the west wingwall. The pipe end shall be wrapped

    the approach slab. The pipe underdrain shall terminate 12" past the

    The pipe underdrain shall follow the cross slope of the roadway over

    of the VDOT Road and Bridge Specifications.

    Pipe underdrain shall conform to the requirements of Section 232

    the deck slab extension.

    The •" expanded rubber joint filler shall extend the full length of

    bolts by 1" minimum.

    Contractor to adjust AH06 series and AV0501 bars to clear anchor

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518018.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    Varie

    s4'-

    0"

    7'-11" 3'-0"

    approach slab

    Buried

    End of slab

    7"12" 1'-3" 1'-3"

    4"

    15'-0"

    1'-6" 1'-6"6'-0" 6'-0"

    5 eq. spa. top and bottom

    AF06 series

    4" typ.5" typ.

    lap

    4'-

    11"

    min.

    lap

    2'-

    9"

    min.

    1'-

    6"

    min.

    AH06 series

    2'-

    2"

    min.

    typ.

    pre-bored hole

    pile in 24" dia.

    HP12x53 steel

    ABUTMENT A SECTION

    series

    AV08

    AH06 series

    AV06 series

    Elev. 940.00

    AV0501

    1'-

    6"

    min.

    over piles

    AF06 series

    1'-

    8"

    2'-

    6"

    1'-

    3•

    "

    AH05 series

    2

    12

    rigid tubing

    with 6" dia. non-

    Weephole formed

    wall drain

    Geocomposite

    from abutment

    drainage away

    feasible for free

    Lowest point

    side of abutment

    surface of fill on west

    underdrain, extend to

    6" dia. perforated pipe

    12"

    geotextile

    wrapped in a

    No. 57 stone

    2'-

    2"

    2•" cl.

    2•

    " cl.

    lap ty

    p.

    2•" cl. typ.

    Near face

    Far face

    AB0502

    AB0501

    AF0835

    AF0634

    (21'-

    10"

    min. to 26'-

    11‚

    " m

    ax.)

    of bearing

    Line thru centers

    AF06 series E.F.

    1'-6"

    typ.

    top and bottom

    = 4'-6" typ.

    2'-

    2"

    ty

    p.

    min. la

    p

    supportVA - Tewolde Iyob

  • Scale: ‚" = 1'-0"

    ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER

    PLAN AND ELEVATION

    ABUTMENT A EAST WINGWALL

    19

    19

    unless otherwise noted

    F.F. denotes for face.

    N.F. denotes near face.

    E.F. denotes each face.

    For pipe underdrain notes and details, see sheet 18.

    For Abutment A details, see sheets 13 thru 18.

    For buried approach slab details, see sheet 67.

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518019.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    Offset= 42.25' RT.

    Sta. 122+40.00

    R= 1452.25'

    Moment slab

    Constr.

    Rte. 220

    PLAN

    BL

    Limit of C.I.P. wall

    MSE wall

    Face of

    C.I.P. wall

    Face of

    123+00

    weephole typ.

    6" dia.

    underdrain

    6" dia. pipe

    on sheet 33

    See Detail Z

    of wall

    along face

    Measured

    Offset= 42.25' RT.

    Sta. 122+86.03

    41'-

    0"

    122+50

    24'-0†"23'-5…"

    47'-6"

    1" exp. joint

    joint

    Contraction

    10'-

    1"

    2'-

    3"

    underdrain

    6" dia. pipe

    Capped end of

    5"

    R= 1410.00'

    parapet

    1'-8"

    1'-

    8"

    26'-2•"

    69 57'08"

    2'-10‡"

    1"

    Limit of MSE retaining wall

    curb

    Face of

    2'-0" coping

    2'-8" parapeton Rte. 220

    Proposed grade

    Elev. 944.00

    leveling pad

    Top of

    Limit of C.I.P. wall

    Elev. 972.41

    Elev. 972.36

    Elev. 972.46Elev. 972.43

    of wall

    along face

    Measured

    3"

    3"

    ELEVATION

    Elev. 940.00

    Top of footing

    G19 30

    G19 30

    H19 30

    hole typ.

    in 24" dia. pre-bored

    HP12x53 steel pile

    3"

    weephole typ.

    6" dia.

    4'-

    6"

    Bottom of footing

    4'-2•"

    ty

    p.

    H19 30

    E E

    Elev. 972.42

    27-

    AW

    0406

    @ 12"

    max.

    N.F.

    wall

    Kink in

    groundline

    Proposed

    8"

    1'-6"

    3"

    26'-2•"

    1" exp. joint

    10-AB0504

    10"

    @ 11" F.F.

    2-AH0531

    FF

    3"

    12"

    2-AH0538 @ 11" N.F.

    2-AH0532 lap w/

    2-AH0530 @ 12" N.F.

    2-AH0529 lap w/

    4"

    53-AW0904 lapped w/AF0968 @ eq. spa. F.F. = 25'-8•"

    27-AW0503 lapped w/AF0567 @ eq. spa. N.F. = 25'-8•"

    27-

    AW

    0501

    @ 12"

    E.F.

    = 26'-

    0"

    12-AV0603 N.F.

    w/ 12-AF0634

    @ eq. spa. lap

    73'-9•"

    AW0405 N.F.

    slope of wall

    to follow

    2-AW0502 E.F.2-AH0537

    25-

    AH0528

    @ e

    q.

    spa.

    F.F.

    = 22'-

    3"

    25-

    AH0526 la

    p

    w/25-

    AH0527

    @ e

    q.

    spa.

    N.F.

    = 22'-

    3"

    47'-6"

    Limit of MSE retaining wall

    5'-

    6"

    2 spa. @ 10'-0" = 20'-0"2'-0"

    see sheet 30.

    embedment

    3'-0" min.

    AH0526

    AH0527

    typ.

    min. la

    p

    Scale: •" = 1'-0"

    1'-

    9"

    Scale: •" = 1'-0"

    AH0521

    AH0530

    AH0531

    AH0529

    AW0904 F.F.

    AW0503 N.F.

    AB0502

    1'-7"

    AB0501

    AW0501

    4'-1"

    2•" cl. ty

    p.

    AW0501

    AW0503 N.F.

    AW0904 F.F. AV0603 typ.

    1'-

    8"

    1'-

    9"

    AB0504

    AB0503

    AH0601

    1'-

    8"

    1'-

    9"

    AH0528

    AV0802

    F.F.

    AV0603

    N.F.

    SECTION E-E

    SECTION F-F

    1'-9" min.

    lap typ.

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER

    PLAN AND ELEVATION

    ABUTMENT A WEST WINGWALL

    Scale: …" = 1'-0"

    20

    20unless otherwise noted

    F.F. denotes for face.

    N.F. denotes near face.

    E.F. denotes each face.

    For pipe underdrain notes and details, see sheet 18.

    For Abutment A details, see sheets 13 thru 18.

    For buried approach slab detaills, see sheet 67.

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518020.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    PLAN

    1" exp. joint

    2'-0"

    40'-11"

    Near face of wall

    7'-

    11"

    5'-

    6"

    15'-

    0"

    1'-

    7"

    Far face of wallweephole typ.

    6" dia. of app. slab

    underdrain top

    6" dia. pipe

    ELEVATION

    follow slope of wall

    AW0509 E.F. to

    Top of wall

    Elev. 950.00

    Elev. 944.00

    Top of footing

    40'-11"

    2'-0"

    5"

    6"

    3"

    1" exp. joint

    3"

    Elev. 940.00

    3"

    footing

    Bottom of

    Bridge

    7-

    AW

    0507

    11"

    3"

    4"

    4'-

    0"

    3 spa. @ 10'-0" = 30'-0"

    weephole typ.

    6" dia.

    ty

    p.

    K

    L20 31

    L20 31

    M20 31

    M20 31

    Elev. 967.32

    Elev. 967.32

    @ 12" = 4'-0"

    J

    4'-

    3"

    2'-6" 8'-5"

    AW0510 E.F.

    J

    2"

    41-AW0712 lapped with AF0769 @ 6" F.F. = 20'-0"

    5-AH0535

    AV0806 F.F.

    E.F.

    4-AB0506

    with AF0634 @ 12" F.F. = 18'-0"

    19-AW0614 lapped

    with AF0567 @ 12" N.F. = 18'-0"

    19-AW0513 lapped 21-AW0511 lapped with AF0567 @ 12" N.F. = 20'-0"

    hole typ.

    in 24" dia. pre-bored

    HP12x53 steel pile

    2-AF0634

    lap with

    2-AV0607

    3-AW0515 lapped w/ AF0567 @ 9" N.F. = 1'-6"

    4-AW0716 lapped w/ AF0769 @ 6" F.F. = 1'-6"

    18-

    AW

    0508

    @ 11"

    E.F.

    = 15'-

    7"

    19-

    AH0533

    @ 11"

    F.F.

    = 16'-

    6"

    K

    @ 11"

    E.F.

    = 5'-

    6"

    3-AF0634

    lap with

    3-AV0607

    2-AH0536

    1'-9" min.lap

    19-

    AH0534

    @ 11"

    N.F.

    = 16'-

    6"

    AV0607 N.F.

    AH0612

    AV0607

    Scale: •" = 1'-0"

    Scale: •" = 1'-0"

    AH0533

    AH0534

    AH0612

    AV0607

    1'-9" min.

    1'-

    7"

    1'-9"

    1"12"

    AW0508

    AB0505

    backwall

    Face of

    AW0508

    AV0806 F.F.

    AV0607 N.F.

    4'-

    1"

    AH0535

    1'-

    7"

    AB0502

    AB0501 and

    E.F.

    AB0506 AW07 series F.F.

    AW05 series N.F.

    AW07 series F.F.

    AW05 series N.F.

    SECTION K-K

    SECTION J-J

    lap typ.

    AH0523

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER21

    21

    ABUTMENT B PLAN

    Scale: ‚" = 1'-0"

    TABLE OF ANGLES

    Girder

    1

    2

    4

    5

    3

    6

    7

    8

    10

    11

    9

    69 22'55"

    69 29'58"

    69 36'56"

    69 43'48"

    69 50'36"

    69 58'13"

    70 13'10"

    70 20'29"

    70 27'44"

    70 34'52"

    70 05'44"

    For Abutment B footing, see sheets 23 thru 25.

    For Abutment B section, see sheet 26. For Abutment B elevation, see sheet 22.

    For bearing details, see sheet 37. Notes:

    unless otherwise noted

    *

    section on sheet 26.

    and termination notes, see Abutment B

    above the approach slab. For location

    The 6" dia. pipe underdrain is located

    ANCHOR BOLT OFFSET

    Girder A

    10‚"

    10…"

    10…"

    B

    3‡"

    3ƒ"

    3†"

    1 - 3

    4 - 9

    10 - 11

    1'-6"1'-6"

    bolt typ.

    1‚" dia, anchor

    backwall

    Face of

    ANCHOR BOLT LAYOUT

    Scale: •" = 1'-0"

    girderCL

    of bearing

    Line thru centers

    1'-

    3"

    1'-

    3"2'-

    6"

    AA

    BB

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518021.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    29'-5†"

    1'-8‡"

    8'-0"8'-0"8'-0„" 5'-11‡"

    2'-0"

    Girder 1CL Girder 2CL Girder 3CL Girder 4CL Girder 5CL Girder 6CL Girder 7CL Girder 8CL Girder 9CL CL CL

    7"

    1'-6" 1'-6"

    typ.typ.

    2'-

    6"

    3'-

    0"

    backwall

    Face of

    Constr.

    Rte. 220

    BL

    1'-10•"

    Win

    gwall

    PLAN

    Girder 10 Girder 11

    9'-0†" 6'-5•"

    Win

    gwall

    14'-

    0"

    6'-

    11"

    7'-0•"

    Stage 3 construction Stage 2 construction Stage 1 construction

    2'-6‚"

    1'-6"

    Sta. 125+01.33

    33'-8•"

    13'-6"

    typ.

    weephole

    6" dia.

    6"6"

    27'-1†"

    13'-7†" 30'-7"

    in footing

    1'-6" step

    70

    underdrain

    6" dia. pipe

    *

    underdrain

    of 6" dia. pipe

    Capped end

    1'-11"

    2'-0"

    1'-8"

    2'-7"

    2'-6"

    3'-8•"

    1'-9…"

    33'-1"

    1'-2"

    9'-0‚"9'-0…" 9'-0‚"2'-0" 4'-0„"

    2'-6„"12"

    tangent

    to local

    typ.

    stem and footing

    Constr. joint in 2'-7ƒ"

    in footing

    Constr. joint

    sheets 27 and 28

    For pla

    n,

    see

    For pla

    n, see sheet 29

    in stem

    Constr. joint

    R = 1410.00'

    tangent

    to local

    19 56'46"

    1'-

    3"

    1'-

    3"

    5‚"

    bolt typ.

    Anchor

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER22

    22

    Scale: ‚" = 1'-0"

    ABUTMENT B ELEVATION

    SECTION P-P

    Scale: •" = 1'-0"

    SECTION R-R

    Scale: •" = 1'-0"

    1'-6"

    7"

    12"

    2'-

    6"

    130

    7"

    12"

    2'-

    6"

    1'-8"

    1'-

    11†

    "

    AW0520

    AH0560 AB0511

    AH0564

    unless otherwise noted

    AH0566

    AH0562

    AB0513 typ.

    AB0502AB0512

    AW05 series

    N.F.

    AW08 series F.F.

    AW0529

    AB0502

    AW0524

    AB0510

    AW

    0723

    F.F.

    AW

    0522

    N.F.

    lap typ.

    1'-9" min.

    1'-

    0‡

    "

    F.F. denotes for face.

    N.F. denotes near face.

    E.F. denotes each face.

    to pertinent reinforcing steel pay item.

    Cost for mechanical couplers shall be incidental

    For bearing details, see sheet 37.

    For Abutment B footing, see sheets 23 thru 25.

    For Abutment B section, see sheet 26.

    For Abutment B plan, see sheet 21.

    Notes:

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518022.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    Elev. 943.00

    joint

    Constr.

    3'-10" min.

    lap typ.

    5 eq. spa.

    Elev. 965.01

    Elev. 961.64Elev. 962.11

    Elev. 962.57

    Elev. 961.09

    Elev. 963.04Elev. 963.57

    Elev. 964.10

    6 eq. spa.spa.5 eq.

    4"

    Elev. 939.00

    Elev. 948.00

    Elev. 964.57Elev. 965.09

    Elev. 965.62

    Elev. 966.15

    Elev. 966.06

    ELEVATION

    Elev. 961.18

    slope

    parallel to cross

    Top of backwall

    Elev. 970.10

    3 eq. spa.

    = 2'-6"

    typ.

    AV0501

    4"

    hole typ.

    in 24" dia. pre-bored

    HP12x53 steel pile

    Elev. 966.87 Elev. 968.46

    coupler typ.

    Mechanical

    4"4"

    2 spa. @ 10'-0" = 20'-0"

    2 spa. @ 9'-0" = 18'-0"

    typ.

    weephole

    6" dia.

    4'-

    0"

    ty

    p.

    5'-

    0" 6'-

    0"

    8'-

    0"

    7'-

    0"

    1'-1‚"

    spa.4 eq.

    = 3'-11"

    8'-9"

    1'-2ƒ"

    AH0641 E.F.

    AH0648 E.F.

    N22 33

    Q3322

    6" typ.

    = 5'-0"

    6" typ.

    11•

    "

    11•

    "

    11•

    "

    8"

    4"

    11•

    "

    11•

    "

    4"

    Elev. 944.00

    4'-

    0"

    3 spa. @ 9'-6" = 28'-6"

    at joint

    AH0550 typ.

    at joint

    AH0551 typ.

    4'-

    0"

    33'-8•"

    34-AF0769 lap w/ 34-AV0714 @ 12" max. F.F. = 32'-5‡"

    5 spa. @ 6"

    G1 to G4

    typ. bet.G5 and G10typ. bet.

    2 eq. spa.

    = 1'-8•"

    50-AV0501 at top of seat

    @ 11"

    E.F.

    19-

    AH0646

    39-AV0501 at top of seat

    50-AV0501 at top of seat

    at pads

    = 2'-6" typ.

    AH0653 E.F.

    5-AH06425-AH0643 5-AH0644

    5-AH0645

    = 16'-

    6"

    AH0647 E.F.

    5-AH0649

    5-AH0667 5-AH0668

    AH0654 E.F.

    5-AH06555-AH0656

    5-AH0657

    5-AH0658

    spa. = 4'-7‡"

    6-AH0659 E.F. eq.

    spa. E.F.

    5-AH0562 eq.

    spa. E.F.

    5-AH0561 eq.

    spa. E.F.

    5-AH0560 eq.

    R R

    Q3322

    PP

    N22 33

    5'-2„"

    27-AF0634 lap w/ 27-AV0611 @ 12" max. N.F. = 25'-3"

    4'-1‚"

    27'-1†"33'-8•"

    28-AF0769 lap w/ 28-AV0712 @ 12" max. F.F. = 26'-5†"

    28-AF0634 lap w/ 28-AV0613 @ 12" max. N.F. = 26'-5†"

    AH0613 typ.

    typ.

    AH0614

    34-AF0634 lap w/ 34-AV0615 @ 12" max. N.F. = 32'-5‡"

    10†"

    7'-10‡"

    4'-11•"

    4'-6„"

    F.F =

    eq. spa.

    6-AV0712

    6-AF0769/

    4'-6„"

    N.F. =

    eq. spa.

    6-AV0613

    6-AF0634/

    27-AF0634 lap w/ 27-AV0610 @ 12" max. F.F = 25'-3"

    19-

    AH0652

    @ 11"

    E.F.

    = 16'-

    6"

    18-

    AH0640

    @ 11"

    E.F.

    = 15'-

    7"

    2-AB0512 @ 12"

    30-AB0501 @ 12" F.F. = 29'-0"

    30-AB0502 @ 12" N.F. = 29'-0"

    27-AB0501 @ 12" F.F. = 26'-0"

    27-AB0502 @ 12" N.F. = 26'-0"

    31-AB0501 @ 12" F.F. = 30'-0"

    31-AB0502 @ 12" N.F. = 30'-0"

    2-AB0510 @ 11"

    AH0565

    AH0570

    min. typ.

    3'-0" lap

    Stage 3 construction Stage 2 construction Stage 1 construction

    AB0511

    AB0513

    supportVA - Tewolde Iyob

  • ATHAVALE, LYSTAD & ASSOC. Inc.

    McLean, Virginia

    STRUCTURAL ENGINEER Scale: ‚" = 1'-0"

    Notes:

    PILE LAYOUT PLAN

    ABUTMENT B

    23

    23

    concrete

    Class T3

    2'-

    0"

    dia.

    min.

    TYPICAL PRE-BORED PILE SECTION

    Scale: 1" = 1'-0"

    HP12X53

    Unit

    Substructure

    (Tons/pile)

    Resistance

    Axial

    Factored

    PRE-BORED PILE DATA TABLE

    180

    180

    Stage 1

    Abutment B

    Stages 2 & 3

    Abutment B

    931.00

    929.00

    Hole Elevation

    of Pre-Bored

    Tip and Bottom

    Estimated Pile

    (Tons/pile)

    Resistance

    Nominal

    Required

    360

    360

    unless otherwise noted

    All reinforcing steel on this sheet is to be placed over the piles.

    All piles shall be H12X53 and shall be pre-bored.

    For pre-bored pile notes, see sheet 26.

    For footing reinforcing details, see sheets 24 and 25.

    For wingwall sections, see sheets 30 thru 32.

    For Abutment B section, see sheet 26.

    For Detail C, see sheet 25.

    For Detail B, see sheet 24.

    Date Plan No. Sheet No.Designed: ...........

    Drawn: ................

    Checked: ............

    No. Description Date

    STRUCTURE AND BRIDGE DIVISION

    COMMONWEALTH OF VIRGINIA

    DEPARTMENT OF TRANSPORTATION

    Revisions

    ROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATEROUTE

    FEDERAL AID

    PROJECT ROUTE PROJECT

    STATE SHEET

    NO.

    VA.

    STATE

    b29518023.d

    gn

    220 0220-080-121, B601

    c 2016, Commonwealth of Virginia 295-18 68ofK.L.

    T.I. Jan. 2017D.E.

    8 spa.

    @ 5'-

    0"

    = 40'-

    0"

    4'-

    0"

    5'-

    6"

    backwall

    Face of

    MA

    TC

    H

    LIN

    E

    B-

    B