commonwealth of kentucky transportation cabinet department of highways - district 5

32
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer

Upload: alida

Post on 12-Jan-2016

50 views

Category:

Documents


3 download

DESCRIPTION

Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer. Highway Maintenance Work District 5. Signs Pothole Patching Lighting Mowing Guardrail Striping Drainage Signals - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Commonwealth of KentuckyTransportation Cabinet

Department of Highways - District 5

The Slow Uphill Climb

Matt Bullock, P.E.

Chief District Engineer

Page 2: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 3: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 4: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 5: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 6: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Highway Maintenance Work District 5

•Signs

•Pothole Patching

•Lighting

•Mowing

•Guardrail

•Striping

•Drainage

•Signals

Agreements with Local Agencies (Non-Interstate)

Page 7: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Panel SignInstallation

Mowing

Striping

Lighting

GuardrailRepair

StreetSweeping

PotholePatching

Page 8: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Highway Construction Work District 5

2008 Recommended Highway Plan

Formally - “Six Year Plan” Programs the funds for the next two years

The “Biennium”

Approximately $70 million Federal Stimulus

-For Dist. 5 road projects

Approximately $23 million Federal Stimulus

- For projects in the KIPDA Planning area

Page 9: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Westport Road / Westport Road / InterchangeInterchange

• Widen Westport between Hubbards Ln. and Watterson• Full Interchange at the Watterson

• Single Point Urban Interchange (Bardstown Rd.)• Hall Contracting• Fall 2008 to May 2010• $47 Million

Page 10: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 11: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 12: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 13: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 14: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

I-65 Major RehabI-65 Major Rehab

•Complete removal of Concrete Sections•Replace With Asphalt

•Traffic Control•Contractor?????•December 2009 Completion•Approx. $30 Million•Stimulus Funded

Page 15: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 16: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Cable Rail InstallationCable Rail Installation

•Installation on KY 841 from I-65 to Dixie Highway•I-65 in Bullitt, Hart, and Barren Counties

•Gibraltor System – (4 wires)•RMD Holdings•Fall 2009 Completion•$3.1 Million

Page 17: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 18: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

I-65 Patching & I-65 Patching & Diamond GrindingDiamond Grinding

• Patch Bad Concrete Areas from MP 118.5 to 127.5• Grind Surface

• Faulkner Construction• Fall 2009 Completion• $5.7 Million• Stimulus Funded

Page 19: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 20: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

I-64 WideningI-64 Widening

• Widen I-64 between I-265 and Shelby Co. Line• 3 Lanes in each direction – Barrier Median

• Gohmann Asphalt & Construction• Fall 2010 Completion• $34 Million

Page 21: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 22: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 23: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Eastern ParkwayEastern Parkway

• “Road Diet” and Pedestrian Safety• Bridge over Floyd and Brook Streets Rehab• Warnock Ramp Reconfiguration• Over-Height Truck detection system

• MAC Construction (Low bid – not yet awarded)• January 2010 Completion• $7.1 Million

Page 24: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 25: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 26: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 27: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Preston Highway (KY61)Preston Highway (KY61)

• 4-Lane Widening• From Jefferson County Line to John Harper Highway• One of Four Sections• Stimulus Funded

• Flynn Brothers Contracting• January 2010 Completion• $6.2 Million

Page 28: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 29: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 30: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

Shawnee Expressway Shawnee Expressway BridgeBridge

• I-264 West to I-64 West Bridge• Mainly for Rehab• Lane Configuration stays the same

• Faulkner Construction• May 2010 Completion• $5.6 Million

Page 31: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5
Page 32: Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5

QUESTIONQUESTIONS?S?

[email protected]

(502) 210-5400

Transportation.ky.gov