communication and design practices group §team members §dan vargas -group leaderteac §peter...

9
Communication and Design Practices Group Team Members Dan Vargas -Group Leader Teac Peter Hurley Rockwell Collins Joe Golley Thomson - CFS John Ojala BCAG Allen Stewart MAS Mike Quary Weber Aircraft Curtis Byrd BAS Kevin Luschei BCAG Sam Movsesian BAS Tom Aliffi Delta Air Lines

Upload: arthur-lawson

Post on 17-Jan-2016

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Practices Group

Team Members Dan Vargas -Group Leader Teac Peter Hurley Rockwell Collins Joe Golley Thomson - CFS John Ojala BCAG Allen Stewart MAS Mike Quary Weber Aircraft Curtis Byrd BAS Kevin Luschei BCAG Sam Movsesian BAS Tom Aliffi Delta Air Lines

Page 2: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Mission Statement

To define a Process and Vehicle that will identify roles, responsibilities,activities and information required from all participants to support the total program from pre-kickoff to aircraft delivery

Page 3: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Responsibility Matrix

A brainstorming session produced the basic requirements of each party to prepare for and participate in an ITCM for seat integration

The draft material produced will be formatted and updated individually via e-mail

Page 4: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Airline

Supplier Selections (adhere to selection dates) Supplier notification Inter-Supplier communication Equipment definition finalized Contractual agreement between customers and suppliers LOPA System requirements

Page 5: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Airframer and/or System Integrator

Adhere to supplier select dates Seat and equipment Installation specifications Integration and Installation schedule ITCM Checklist (Boeing Cabin systems Seat/IFE integration procedure IV)

• Coordination meeting expectations Notification of schedule and long lead requirements

Page 6: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

IFE Supplier NDAs List of IFE equipment and part numbers Seat equipment installation specification and requirements Seat Equipment Interface control documents ITCM Checklist Functional Test Procedure Seat equipment wiring block diagram and installation template Seat supplier requirements list request: Data requirements and schedule Coordination meeting expectations Notification of schedule and long lead requirements

Page 7: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Seat Supplier

List of fit and test equipment requirements Preliminary Seat envelope drawings with electrical component

layout: IFE components, Seat power, PC power, monitor arms,

console stowage, telephones, reading lights, seat and accessory control buttons and switches.

List of electrical components including supplier names Notification of schedule and long lead requirements

Page 8: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Resource Material

Boeing Cabin Systems Payloads Integration Team Interim Agreement

This document will be edited to be a general reference guideline for cabin systems/IFE/seat integration and provided to waea.org/workinggroups web site in January.

Page 9: Communication and Design Practices Group §Team Members §Dan Vargas -Group LeaderTeac §Peter HurleyRockwell Collins §Joe GolleyThomson - CFS §John OjalaBCAG

Communication and Design Process Group

Future Plans

The completed matrix will be published on the waea.org/workinggroups web site.

The draft material produced will be formatted and updated individually via e-mail