COUNTY SERVICE AREA (CSA) 2 SEWER REHABILITATION PROJECT Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe in order to: Reduce the potential for sewage spills from pipe blockage due to tree root intrusion at pipe joints. Reduce infiltration of groundwater from existing manholes, pipe joint problems/failures.

Upload: lucinda-leonard

Post on 05-Jan-2016

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe

COUNTY SERVICE AREA (CSA) 2 SEWER REHABILITATION PROJECT

Community of Aspendell (Elev. 8400)

Bishop Creek Area, Inyo County, CA

MAIN PROJECT OBJECTIVES

Replace existing sewer pipe and install new PVC sewer pipe in order to:• Reduce the potential for sewage spills from pipe blockage due to tree root intrusion

at pipe joints.• Reduce infiltration of groundwater from existing manholes, pipe joint

problems/failures.

Page 2: Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe

Project Construction DetailsContractor:

White Rock Construction, Inc.

Work Start Date: July 21,2014 Replaced 1420 LF-6” sewer mainReplaced 10 sewer manholes

Work End Date: September 23, 2014Notice of Completion: Issued December 2, 2014

Page 3: Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe

Temporary sewage bypass pipe (from one manhole to another)

Page 4: Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe

Removing large boulder from new sewer line trench

Large boulder prepared for blasting

Page 5: Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe

New sewer line trench/excavation with shoring and sand shading

New sewer manhole and trench alignment/excavationwith shoring

Page 6: Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe

Preparing to lift trench box into deep sewer line trench/excavation

New sewer line in deep trench with rock shading and trench box shoring