community resource representatives

23

Upload: others

Post on 10-Dec-2021

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Community Resource Representatives
Page 2: Community Resource Representatives

Community Resource Representatives

Andrea’ Watson205.297.2066 (O)205.873.1158 (C)andrea’.watson@ birminghamal.gov

2

Jasmine Fells205.297.8336 (O)205.492.8366 (C)

jasmine.fells@ birminghamal.gov

Melony Martin205.254.2535 (O)205.873.5904 (C)

melony.martin @birminghamal.gov

Herman Lumzy, Jr.205.297.8244 (O)205.213.2150 (C)[email protected]

Page 3: Community Resource Representatives

Demolition Cases

247Structures demolished in District 9 since

January 1, 2018

• City-contracted demolitions (235) • Private demolitions (12)

3

Page 4: Community Resource Representatives

Noteworthy Demolitions in District 9

• 709 19TH ST 35218• 601 19TH ST 35218– Blighted commercial structure in Downtown

Ensley Near Ramsay McCormack

• 3928 7TH AVE WL 35224– Blighted Wylam Baptist Church near Wylam K8

School

4

Page 5: Community Resource Representatives

These include properties reported to be in violation of the City’s Property Maintenance Code and include violations such as deteriorated roof systems,

damaged windows or doors, chipped exterior paint, damaged or deteriorated facades, and inadequate utility service.

2,215Housing code inspections conducted in

District 9 since January 2020

Housing Code Inspections

5

Page 6: Community Resource Representatives

Condemnation Cases

• Central Pratt (2)• East Thomas (2)• Enon Ridge (1)• Ensley (8)

• Evergreen (1)• Sandusky (1)• Sherman

Heights (1)

• Wylam (1)

17Structures condemned & identified for demolition

in District 9 neighborhoods

6

Page 7: Community Resource Representatives

Zoning Enforcement Cases

35Active zoning enforcement cases with

45 closed cases in District 9

This includes violations such as Business Use of Residential Property, Outside Storage, Home Occupation Violations, Fence Violations, and some Inoperable Vehicle cases.

7

Page 8: Community Resource Representatives

Weed Abatements

1,788Lots cut or cleaned in District 9 since January 1, 2020

There are 931 vacant properties active in the Weed Bill for District 9. These are properties that are either waiting to be put on a contractor list or still being processed.

• 1,562 Private and City Lots• 226 Contract Service

8

Page 9: Community Resource Representatives

Red Maple Homes

The city’s Team North Brush and Trash Crew cleaned up this illegal dumpsite after receiving a complaint.

– 2nd Ct. and 2nd Terrace North and 3rd St. North– More than 117 tons of litter, trash and tires were removed.

9

Page 10: Community Resource Representatives

Birmingham Police Department

10

North Precinct CaptainMichelle Pruitt205-254-2860

West Precinct CaptainAnja Doyle205-254-2682

Page 11: Community Resource Representatives

11

Crime Prevention Officers

South Precinct Devoris [email protected](205) 254-2793

East and North PrecinctsJessica [email protected]: (205) 254-2684

West PrecinctFelicia Watkins Mearon [email protected]: (205) 254-2682

Page 12: Community Resource Representatives

1212

• BPD’s “Operation Right of Way” program, targets abandonedand inoperable vehicles on the City’s right of way. – In the last two weeks, BPD has targeted 83 vehicles for towing.

• BPD has started a new pilot program with One Roof called, “HOPE.” – Officers partner with Homeless Outreach Teams to provide assistance

and solutions to issues involving the homeless population.

BPD PROGRAM UPDATES

Page 13: Community Resource Representatives

• Recently, the court ordered that a person caught selling drugs at a complaint property in District 9, be evicted. – To report a problem property, call 205-254-2369.

– Weekdays from 8 a.m. to 5 p.m.

Since its inception in 2020, the city’s new Drug Nuisance Abatement Team has addressed several drug nuisance properties.

1313

Drug Nuisance Abatement Team

Page 14: Community Resource Representatives

14

• Acipco-Finley (2)• Dolomite (1)• East Thomas (4)• Enon Ridge (1)• Ensley (10)

• Evergreen (2)• Hooper City (5)• North Birmingham (7)• North Pratt (2)• Oak Ridge (1)

• Sandusky (1) • Sherman Heights (1)• Smithfield Estates (2)• Wylam (4)

Neighborhood homes receiving work in 2021 via Community Development’s

Critical Repair Program

Page 15: Community Resource Representatives

Street Resurfacing ProjectsThe following District 9 street segments have been

resurfaced in the last 3 years• 23RD ST ENS FROM AVENUE E TO AVENUE D• 40TH AVE W FROM 1ST PL W TO CENTER ST• 16th ST N FROM 25TH AVE N TO 25TH CT N• JERSEY ST FROM 9TH AVE TO 5TH AVE• 24TH ST N FROM 29TH AVE N TO 19TH AVE N• 24TH ST N 39TH CT N TO DANIEL PAYNE DR• 4TH ST W FROM 34TH AV TO DANIEL PAYNE DR• 33RD AV N FROM 16TH ST TO ASPHALT CHANGE• 21ST ST ENS FROM AVENUE I TO AVENUE C• 22ND ST ENS FROM AVENUE F TO AVENUE C• BUFFALO ST FROM 9TH CT TO 9TH AVE• 30TH AVE N FROM 26TH ST N TO 25TH ST N• 12TH CT N FROM 4TH ST N TO I-65• 24TH ST ENS FROM AVENUE E TO AVENUE I• 32ND ST ENS FROM AVENUE F TO AVENUE I• Shady Grove Rd from City Limit South to City Limit

North

• 24TH ST N FROM 34TH AVE N TO 37TH AVE N• AVE G FROM 16TH ST TO 36TH ST• AVENUE D FROM 36TH ST ENS TO 29TH ST ENS (LESS

REPAVED AREAS)• GULFPORT ST FROM 15TH AVE TO 12TH AVE• INDIANA ST FROM 12TH AVE TO 15TH AVE• RICHMOND ST/10TH AVE WYL FROM 8TH AVE WYL

TO NEW PAVEMENT PAST SEATTLE ST• 29TH ST ENS FROM AVENUE D TO AVENUE C• AVENUE B FROM 27TH ST ENS TO NORTH END• 5TH AVE WYL FROM 7TH AVE WYL TO MEMPHIS ST• 5TH AVE WYL FROM BUFFALO ST TO ALBANY ST• 9TH AVE WYL FROM ERIE ST TO INDIANA ST• FRISCO ST FROM 5TH AVE TO 7TH AVE• FRISCO ST FROM 12TH AVE TO 14TH AVE• 30TH ST ENS FROM AVENUE E TO AVENUE I• 10TH AV WYL FROM ERIE ST TO INDIANA ST

15

Page 16: Community Resource Representatives

Street Resurfacing ProjectsThe following District 9 street segments have been

resurfaced in the last 3 years (continued)• 27TH ST ENS FROM AVENUE E TO AVENUE B• 27TH ST ENS FROM AVENUE J TO AVENUE H• RICHMOND ST/10TH AVE WYL FROM 8TH AVE WYL

TO NEW PAVEMENT PAST SEATTLE ST• 7TH AVE WYL FROM QUEBEC DR/ CITY LIMITS TO

LEXINGTON ST (LESS PARKING LANES)• 7TH AVE WYL FROM CAMBRIDGE ST TO BUFFALO ST• AVE V FROM 1ST ST TO 2ND St• 32ND AV N 24TH ST TO 26TH ST• AVENUE E FROM NORTH END TO 12TH ST ENS• 21ST ST N FROM FINLEY BLVD TO 26TH AVE N• 24TH AVE N FROM 25TH ST N TO 24TH ST N• 34TH AVE N FROM 26TH ST N TO 23RD ST N• 22ND AVE N FROM 26TH ST N TO 28TH ST N• 25TH ST N FROM 23RD CT TO 23RD AVE N• 1ST PL PRATT FROM WEST END TO AVENUE U

• 2ND ST PRATT FROM AVENUE T TO AVENUE U• AMORY RD FROM HIBERNIAN ST TO HIXON ST• MEEHAN AVE FROM HIBERNIAN ST TO TRILBY ST• 26TH ST ENS FROM AVENUE I TO AVENUE C• 36TH ST ENS FROM AVENUE G TO AVENUE F• AVENUE F FROM 36TH ST ENS TO 31ST ST ENS• AVENUE H FROM 33RD ST ENS TO 32ND ST ENS• HIBERNIAN ST LOGAN AV TO MEEHAN AV• 26TH CT N FROM 25TH ST N TO EAST END• HIXON ST FROM SHERIDAN RD TO MEEHAN AV• BLOUNT ST FROM EUTAW AVE TO HELENA AVE• 11TH CT N FROM 4TH PL N TO EAST END• 12TH AVE N FROM 5TH ST N TO 4TH PL W• 14TH AVE N FROM 3RD ST N TO 3RD PL N• 14TH CT N FROM 3RD ST N TO 3RD ST N• 5TH ST PRT AVENUE C TO WEST END

16

Page 17: Community Resource Representatives

Street Resurfacing ProjectsStreets to be resurfaced in Summer 2021• JASPER RD FROM BEALL ST TO PRATT HWY• BEALL ST FROM PAGE AVE TO JASPER RD• BEALL ST FROM MAPLE AVE TO PAGE AVE• 14TH CT FROM 3RD ST W TO 1ST ST N

17

Streets planned for resurfacing in the next 2 years• 26TH CT N FROM 22ND ST N TO 24TH ST N• 16TH CT N 5TH ST N TO 6TH ST• AVE E FROM 5TH ST TO 5TH WY• COURT R FROM 14TH ST ENS TO AVENUE S• PITTSBURGH AVE FROM MULGA RD AND MILLVALE ST

TO CITY LIMIT NORTH• SCRANTON AVE FROM LORAIN ST TO MULGA RD• HURON ST FROM 5TH AVE WYL TO 6TH AVE• 16TH ST ENS FROM AVENUE F TO AVENUE E• 5TH CT WYL FROM FRISCO ST TO HURON ST• 19TH ST N FROM SOUTH END TO 29TH AVE N• 20TH ST N FROM 35TH AVE N TO 36TH AVE N

• 22ND ST N FROM 27TH AVE N TO 26TH AVE N• 24TH CT N FROM 22ND ST N TO WEST END• 25TH ST N FROM 37TH AVE N TO ZONE LIMIT• 2ND PL PRATT FROM AVENUE Z TO EAST END• 4TH ST PRATT FROM AVENUE D TO COURT E• AVENUE C FROM 5TH PL PRATT TO 6TH ST PRATT• AVENUE D FROM 5TH WAY PRATT TO 5TH PL PRATT• COURT F FROM 3RD ST PRATT TO AVENUE G• ALDER AVE FROM 2ND PL PRATT TO 2ND ST PRATT• AVENUE Y FROM 2ND ST PRATT TO MITCHELL ST• AVENUE Z FROM 2ND PL PRATT TO MITCHELL ST• BEECH AVE FROM BANKHEAD HWY TO HIBERNIAN ST

Page 18: Community Resource Representatives

Street Resurfacing Projects

18

Streets planned for resurfacing in the next 2 years (Continued)

• CROOKED ST FROM MITCHELL ST TO CHURCH AVE• LACEY RD FROM HIBERNIAN RD TO TRILBY ST• NELSON AVE FROM HIBERNIAN ST TO HIXON ST• PAGE AVE FROM MITCHELL ST TO BEALL ST• ARKADELPHIA RD FROM NORTH END TO SOUTH END• 16TH AVE W FROM EAST END TO ARKADELPHIA RD• FL SHUTTLESWORTH DR FROM 20TH AVE N TO 28TH

ST N• 11TH AVE N FROM 1ST ST N TO WEST END• 1ST ST N FROM 11TH CT TO 12TH AVE N• 3RD ST W FROM 12TH AVE W TO SOUTH END• BANKHEAD HWY FROM 12TH AVE W TO 1ST ST W

• 3RD PL N FROM 14TH CT N TO 14TH AVE N• 3RD PL N FROM 12TH CT N TO 12TH TER N• 4TH ST N FROM SOUTH END TO 11TH CT N• 30TH ST ENS FROM AVENUE J TO EAST END• 14TH CT N FROM 4TH PL TO 6TH ST• Cherry Ave from Daniel Payne Dr to City Limits• 15TH ST ENS FROM AVENUE H TO AVENUE I• AVENUE B SOUTH END TO 29TH STREET• PITTSBURGH AVE FROM MULGA RD AND MILLVALE ST

TO CITY LIMIT NORTH• 5TH ST PRT CARLINE AVE TO AVENUE E• 36TH AVE N FROM 24TH ST N TO 25TH ST N

Page 19: Community Resource Representatives

Ramsay-McCormack Update

• Deconstruction of the Ramsay-McCormack Building should be completed by the end of April 2021.

• The building will serve as a mixed-use retail/commercial property. – The developers are currently developing

leasing options for the building.

• To become a tenant, contact Ensley District Developer at 919-451-7650 or [email protected]

19

Page 20: Community Resource Representatives

Ensley High School Update

Revitalizing the Ensley neighborhood is a top priority for the administration.

A proposed project for different types of housing for a range of family sizes and retail are being developed for the property.

20

Page 21: Community Resource Representatives

Potholes Repaired and Patching

1,631Potholes repaired in District 9 since January 2020

21

Page 22: Community Resource Representatives

Sidewalk Projects

5,100 linear feetDistrict 9 sidewalks to begin construction in 2021

(includes new and reconstructed curb ramps)

$375,000Investment to begin in 2021