45
CONCORD BLUE – THERMAL BASED WASTE TO ENERY PRESENTATION Copyright © 2011 ROCHEM ENVIRONMENTALLY FRIENDLY W2E SOLUTION UNSEGREGATED MSW FOR MUNICIPAL CORPORATION

Upload: hathu

Post on 14-Feb-2017

255 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – THERMAL BASED WASTE TO ENERY PRESENTATION

Copyright © 2011 ROCHEM

ENVIRONMENTALLY FRIENDLY W2E SOLUTION UNSEGREGATED MSW FOR MUNICIPAL

CORPORATION

Page 2: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

THE TEAM

PRAYAS GOEL • GROUP HEAD

PRERAK GOEL • DIRECTOR – FINANCE

DR. H.J. MUHLEN • ADVISOR – CONCORD BLUE

CHARLIE THANNHAUSER • CEO – CONCORD BLUE

DR. H. MODAK • GROUP PRESIDENT

Page 3: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

LOCATIONS

CORPORATION OFFICE - BANDRA CONCORD BLUE - THANE

MANUFACTURING FACILITY - VASAI REGIONAL OFFICE - NAGPUR

CORPORATE OFFICE • BANDRA, MUMBAI

CONCORD BLUE OFFICE • THANE, MUMBAI

MANUFACTURING FACILITY • VASAI, MUMBAI

REGIONAL OFFICE • NAGPUR

Page 4: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – A THERMAL BASED SOLID WASTE TO ENERGY SOLUTION

CONCORD BLUE TECHNOLOGY (I) PVT. LTD.

Page 5: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

ABOUT CONCORD BLUE

• World-wide patented (filed) staged

reforming waste disposal technology: CONCORD BLUE TOWER™ • The only global Concord Blue Tower

general contractor and manufacturer. • German-Indian Engineering &

Manufacturing company with offices in UAE, India, USA, Germany & Turkey

• Currently building six Concord Blue

Towers in India, Germany and the USA.

• We develop turn key waste-to-energy solutions for municipalities, private industries, states and even countries.

• Focus on Waste to Energy with non conventional Feedstock

Page 6: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

Concord Blue – History

1. 2007 – Technology Transfer with DM2

Germany, company with operating plants on Japan & German since 2004.

2. 2007-2008 – Joint Technology Development between Indian & German Partners led to development of CBR2 patented Gasification system for low CV MSW streams.

3. 2011 – Over 10,000 hours Pilot operation on various waste streams, process validation & fine tuning. 3 CBR2 pilots supplied & commissioned in Las Vegas (USA), Herten (Germany) and Mumbai (India).

Page 7: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

MSW PROJECTS UNDER EXECUTION

Page 8: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PROJECTS UNDER EXECUTION contd.

CUMULATIVE TONNAGE CONTRACTED PER DAY

MW

PO

WE

R G

EN

ER

AT

ED

0.8

1.0

1.2

3.2

4.2

5.5

8.5

10.0

TOTAL –

34 MW 50 70 100 250 300 400 600 700

TOTAL –

2470 tpd

Page 9: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

FEATURS OF OUR WASTE MANAGEMENT SOLUTION

•No Smell / Open dumping of Waste

•No mixing of Leachate with Ground Water

•No Burning of Waste

•Minimal Rejects to Landfill

• Minimum Space utilized for waste disposal

Page 10: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

SOME OF THE INDUSTRIES WE CATER TO 1 P a g e | 1

SOME OF THE INDUSTRIES THAT WE CATER TO:

ROCHEM GREEN ENERGY

MSW DISTILLERIES MISCELLANEOUS

PHARMA

BIO-MEDICAL

AGRI WASTE

POULTRY LITTER

INDUSTRIES

CONCORD BLUE

Page 11: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

WASTE TO POWER THE TECHNOLOGY

CONCORD BLUE

Page 12: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

MIXED SOLID WASTE (MSW) – CHALLENGES

The problems associated with MSW management are complex because of the

quantity and diversity of the nature of waste and financial limitations on public

services in large cities. The problem is not only confined to land, it includes air and

water as well. Some of them are:

Health Hazards • Skin and eye infections are common

• Dust in the air at dumpsites can cause breathing problems in children and adults

• Flies breed on uncovered piles of rotting garbage and spread diseases like diarrhoea, dysentery,

typhoid, hepatitis, and cholera. Mosquitoes transmit many types of diseases like malaria and

yellow fever.

• Oxidation of plastics (pvc) lead to emissions of dioxins and furans

Ground water pollution An extremely serious problem is groundwater contamination. As water filters through any material,

chemicals in the material may dissolve in the water, a process called leaching. The resulting mixture

is called leachate. Contaminated water can have serious repercussions on biological life forms

Air pollution When waste is burnt heavy metals like lead, toxic gases and smoke spreads over residential areas.

The wind also carries waste, dust and gases caused by decomposition. Putrefaction of waste in

sunlight during daytime results in bad smells and reduced visibility.

Page 13: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

SOLID WASTE - CHARACTERISTICS

MOISTURE

SAMPLE REPORTS

INFERENCE FROM

REPORTS OF MSW

ANALYSIS ASH

CV

Page 14: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

WHY IS CBR SUITABLE FOR DISPOSAL OF MIXED SOLID WASTE

NO OPEN DUMPING OF WASTE – HENCE NO INGRESS

OF VECTORS FOR SPREAD OF DISEASES

COMPLETELY SEALED STORAGE UNIT – NO SMELL;

COMPLETE LEACHATE CONTROL BY ROCHEM’S R.O

SYSTEM

SEGREGATION INVOLVES REMOVAL OF METALS,

GLASS AND INERTS –MUCH SIMPLER THAN SORTING

OF BIODEGRADABLES FROM NON-BIODEGRADABLES

NO OXIDATION/BURNING OF WASTE – NO AIR

POLLUTION; ONLY PHASE CHANGE FROM SOLID TO

GAS; SAFE DISPOSAL OF PLASTICS INCLUDING PVC

CLEAN GREEN HYDROGEN RICH GAS FROM WASTE

FOR POWER PRODUCTION

LEAST AMOUNT OF SPACE REQUIRED FOR SYSTEM

MINIMAL REJECTS TO LANDFILL – INCREASES ITS LIFE

Page 15: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

WHAT IS GASIFICATION

1. Non Incineration Thermal Waste to Energy Solution 2. Thermal Phase Change from Solid to Gas Phase in

complete absence of Oxygen 3. Produces as SYNGAS FUEL ! This can be used to

Generate electricity. WHY IS GASIFICATION FEASIBLE ? 1. Since it uses the Gas Cycle to convert fuel to Electric. 2. High efficiency (proven) Reciprocating Gas Engines are

used, as against lower efficiency Medium pressure Steam Turbines 3. Waste Heat is used efficiently to Create a viable feed-

stock from MSW. Since non-incineration it is safe to use plastics, which

augment feed CV.

Page 16: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

FEATURES OF A 600 TONNES PER DAY UNSEGREGATED MSW TO ENERGY PLANT (AS AN ILLUSTRATION)

Sr. No. Description Value

1. AMOUNT OF WASTE RECEIVED (TONNES PER DAY - UNSEGREGATED)

600

2. TOTAL WASTE DISPOSED PER DAY (TONNES PER DAY)

600

3 TOTAL ELECTRIC POWER GENERATED (MWel) 8.0

4 TOTAL NO. OF DAYS THAT WASTE WOULD BE RECEIVED PER YEAR

365

5 TOTAL NO. OF HOURS PER ANNUM OF ELECTRICITY GENERATION

7500

6 TOTAL NET SELLABLE POWER GENERATED PER ANNUM (MWel)

60,000

6. TOTAL SPACE REQUIRED (METER SQUARE/ACRES) 12000-16000/3.0-4.0

7 TOTAL REJECTS TO LANDFILL (% OF WASTE RECEIVED – INCLUDING C & D WASTES)

<15

8 TOTAL TIME TAKEN TO IMPLEMENT THE PROJECT (MONTHS)

10-12**

**Subject to approvals and favorable climatic conditions

Page 17: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

The ABC of the Concord Blue Solution

A B C

PRECONDITIONING STEAM GASIFICATION POWER GENERATION

• Unsegregated MSW delivered to designated waste disposal site;

• Waste stored at enclosed storage facility;

• The waste is segregated in a fully automated segregation and sorting m/c and the recyclables/inerts are separated and sold to appropriate buyers/disposed;

• The waste is subsequently dried by utilizing the waste heat from the system, and shredded to make it input ready for the Concord Blue System;

• The Preconditioned Waste is conveyed in enclosed conveyors to the Concord Blue System;

• The waste undergoes a thermo-chemical degradation by high temperature heat transfer in completely inertized chamber in the CBS;

• This results into a producer gas which is steam reformed to finally result into a hydrogen intensive syngas;

• The syngas is subsequently cooled and cleaned of pollutants and supplied to the gas engine for power generation;

• The engine processes this clean gas to produce Green Power that can be evacuated to the Grid.

• The Flue gas from the Engine is

treated and the heat from therein is utilized for the captive requirements of the CBS;

Concord-Blue_final_flash_Presentation.exe

Page 18: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

The ABC of the Concord Blue Solution

PRECONDITIONING

Unsegregated Waste to Storage Facility

Inerts Storage Silos

Segregation & Sorting

Drying & Shredding

PYROLYSER

Heat Carrier Media

Biochar

HEAT CARRIER BUNKER

REFORMER

Char Combustor

GASIFICATION

Steam Generator

Re-circulating media

Gas Cooler

Gas Cleaning

POWER GENERATION

Gas Engine Grid Ash for

sale/disposal

Pre-Conditioned

Waste

Page 19: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

FEASIBILITY OF MSW GASIFICATION – CONCORD BLUE GASIFICATION – Energy Balance

Page 20: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PRECONDITIONING OF SOLID WASTE

SEG – SORT in CBS

MSW

Input to

Automated

Seg-Sort

system

PRIMARY SHREDDER

Primary Drier

Size

Reductio

n occurs Moisture

Removal

SEGREGATION – SORTING UNIT

Manual Picking

Recycled/Dispo

sed

Trommel

Screens

Inerts for

Disposal

Magnetic and Eddy Current

Separators

Recyclables for

Sale

Manual

Picking

Recycled/Dispo

sed

SEGREGA

TED

WASTE

Preconditione

d Feed to the

Concord Blue

System

Secondary Drier

Moisture

Removal

Secondary

Shredder

Pre-Dried

Waste

Size

Reductio

n occurs

Page 21: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PRECONDITIONING OF SOLID WASTE

SEGREGATION SORTING EQUIPMENT

DRYER SHREDDER SHREDDER

Page 22: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

GASIFICATION OF PRECONDITIONED WASTE

Page 23: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

THE PROCESS FLOW

UNSEGREGATED WASTE FROM

DUMP TRUCKS TO WASTE STORAGE

UNITS

WASTE STORAGE

UNIT

STACK

Waste to Primary

Shredder

Primary Shredder

Primary Drier

Waste from Primary

Shredder to Stage I drier

Automated Segregation/Sorting UNIT

Segregated Waste to Secondary Shredder

& Drier

Waste to Segregation Unit

Secondary Drier & Shredder

Inerts/Ash Removal < 15%

Preliminary Storage for Preconditioned Waste

Preconditioned Waste from 2nd. Stage Drier +

Shredder to Storage Bunker

C B S

Preconditioned Waste to CBS facility

Ash Silos

Ash from the Silos for Disposal

Ash from CBS facility

Gas Cleaning Unit

Gas from CBS facility to Cleaning Unit

ENGINE ROOM

Cooled & Cleaned Gas to Engine

Power to Switch Yard for Grid Upload

Switch Yard

Utilities

Utilities to Engine Room & CBS facility

Flue Gas from Engine to Stack

600 tpd

Page 24: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

Layout of the Waste Disposal Facility

LAYOUT FOR A WASTE TO ENERGY FACILITY UTILIZING THE REVOLUTIONARY CONCORD BLUE TECHNOLOGY

Concord Blue Reformer

Storage, Segregation & Sorting Unit –

Power Generation Unit –

Page 25: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

ANY ORGANIC WASTE

OUTPUT INPUT

Municipal Solid Waste/Bio-garbage/ Restaurant-food waste

Sewage sludge/waste

Animal manure, other animal wastes like carcasses

Any agricultural biomass waste (including plant residuals)

Hazardous Industry Wastes

Plastic Wastes

Bio Medical Wastes

High quality, high energy value syngas: Hydrogen: Already proven to be one of the most efficient energy carriers; Electricity: Turn key system creates electricity via proprietary syngas firing gas-motors Bio Char: Is currently used in fertilizer and as a soil amendment

Ash, for the Cement Industry

Page 26: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

Our W2E FACILITIES

VASAI

PUNE

MAHAD

Page 27: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

VASAI – 250 KWTH. W2E PLANT

CONCORD BLUE

Page 28: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – VASAI PLANT

Operation details of HJ2.1 for 19th Aug.

Feedstock = Pre-conditioned

MSW

Feed rate = Raw MSW

equivalent 100 kg/hr.

Pre-conditioned feed = 40 kg/hr

Syngas Production = 20-25 Nm3/hr

Syngas = > 35% H2 content by

GC analysis

Electric Engine operation = 15/30 kW

UTILITIES

FLARE ENGINE/COOLING TOWER

SITE FOR WASTE TO ETHANOL FACILITY

Page 29: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

MAHAD – 3 MWTH. W2E PLANT

• Fully automated Thermolysis unit; • 3MWth Capacity; • Self – Sustaining; • Centrally controlled SCADA based system; • Gas cooling and Cleaning ; • Automated char extraction system; •Gas Flaring System

CONCORD BLUE

Page 30: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – MAHAD – PROCESS FLOW

AUXILIARIES

Page 31: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – MAHAD – PROJECT MODALITIES

SCHEMATIC FLOW DIAGRAM

Digester

Overflow

EAT as

settling

tank

Polyelectrolyte

dozing

Clarifier

Sludge

Removal

TA10

RO Feed

Tank

(existing)

Permeate

RO

UNIT

TA80

DEGASSER

TANK

(existing)

PK21 TA110

RO Reject

Tank

(existing)

PK22

Multi

Effective

Evaporator

TA210

EVAP

Reject

TANK

Dryer

BIOMASS

STORAGE

CONCORD

BLUE

SYSTEM CHAR

OUTLET

STEAM STEAM

RO

Rejects

EMBIO SCOPE

PK221

HJ3 Design Inputs – Outputs

Input = 1 ton/hr (input ready)

= 3.5 MWth

Output= Syngas total Production

= > 700 Nm3/hr

= BioChar

= 6-8 tons/day

Page 32: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

SIKAR – 1.0 MWelec. (net sellable) W2E PLANT

CONCORD BLUE

Page 33: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE - SIKAR

Broad Input / Output Input – Unsegregated Municipal Solid Waste – 100

tonnes per day (36,500 tonnes per annum); Receipt of waste – 365 days a year; Plant Uptime (Defined as the amount of time for

production of electricity) – 7500 hours/annum; Amount of Electricity Produced – 1.0 MWel (Gross

electric power); Rejects from the system:

o Inerts & Recyclables - A function of the feed – estimated at APPROX 15% of the received waste

o Ash - A function of the feed – estimated at APPROX 1 TONS/DAY ( subject to actual feed analysis)

Space required - 28,000 square meters;

Page 34: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – SIKAR LAYOUT

Page 35: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PUNE – 10 MWelec. (net sellable) W2E PLANT

CONCORD BLUE

Page 36: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

The completed HJ4 CBR™ will be the largest of its kind waste to clean energy gasification facility in the world. With an in input of 700 tpd of fresh, unsegregated low calorific municipal solid waste, the HJ-4 CBR™ is expected to commence its first phase of commercial operations in October 2011. Today the construction site is about 85% completed.

CONCORD BLUE - PUNE

Broad Input / Output Input – Unsegregated Municipal Solid Waste – 700 tonnes per day (2,55,500 tonnes per annum); Receipt of waste – 365 days a year; Plant Uptime (Defined as the amount of time for production of electricity) – 7500 hours/annum; Amount of Electricity Produced – 11.0 MWel (Gross electric power); Rejects from the system:

o Inerts & Recyclables - A function of the feed – estimated at APPROX 15% of the received waste o Ash - A function of the feed – estimated at APPROX 6 TONS/DAY ( subject to actual feed analysis)

Space required - 10,000 square meters;

Page 37: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PUNE 10 MWelec - Associates

Page 38: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

SEGREGATION SORTING – UNIT LAYOUT

Page 39: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PUNE – PLANT SITE – PRECONDITIONING EQUIPMENT

Page 40: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

PUNE – PLANT SITE – PRECONDITIONING EQUIPMENT

Page 41: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

GAS ENGINE MANUFACTURERS

Gas Engine MWM - Germany

Page 42: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

The CBR produces an ultra clean gas due to reformation that does not produce any PoPs;

The DIOXINS and FURANS are not formed as the plastic (or any chlorinated) wastes are not burned, but thermo chemically degraded;

The engine emissions as well as the flue gas from syngas furnace chamber are treated with the state-of-the art control mechanisms like SCRs and Oxidative Catalysts to keep the emissions way below even the most stringent control norms;

EMISSIONS

Page 43: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

EMISSIONS

Page 44: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

WORK STREAM FOR DESIGNING A CBR FACILITY

Page 45: CONCORD BLUE – THERMAL BASED WASTE TO ENERY

CONCORD BLUE – BUILDING A BETTER TOMORROW