connect the tank to water points ], rehabilitation of 1 nb 13

33
Line item no. رﻗم اﻟﻣﺎدةDescription of Goods / Services وﺻف اﻟﻣواد / اﻟﺧدﻣﺎت اﻟﻣطﻠوﺑﺔ(add attachment for technical specification if very detailed) ( ﯾﺿﺎف ﻣﻠﺣﻘﺎت ﻓﻲ ﺣﺎل وﺟود ﺗﻔﺎﺻﯾل ﺗﻘﻧﯾﺔ) Unit / Form اﻟوﺣدةQuantity required اﻟﻛﻣﯾﺔ اﻟﻣطﻠوﺑﺔCurrency اﻟﻌﻣﻠﺔUnit Price ﺳﻌر اﻟوﺣدةTotal Price اﻟﺳﻌر اﻟﻛﺎﻣلAvailability date ﺗﺎرﯾﺦ ﺗوﻓر اﻟﻣواد1 Transport and/or Installation of water tanks construction of tank platform, install the tank and] connect the tank to water points], rehabilitation of latrines, Construction of latrines, construction of septic in Tall Hayat-Akkar as mentioned in the bill of quantities NB 13 (إن وﺟدت) ﺿرﯾﺑﺔ اﻟﻣﺑﯾﻌﺎت(إن وﺟدت) ﻗﯾﻣﺔ اﻟﺷﺣن(إن وﺟدت) ﺗﻛﺎﻟﯾف أﺧرى اﻟﻣﺟﻣوع اﻟﻛﺎﻣلTOTAL For supplier to fill in: ﯾﺗم ﺗﻌﺑﺋﺗﮭﺎ ﻣن ﻗﺑل اﻟﻣزودLRCU24F092021 Sales tax (if applicable) Delivery charge (if applicable) Other charges (if applicable) Form ID:1231d0d0cfa08d5a2f4588c06fcb2b162a941d929c7e2cfc0b211574a3e07e4d

Upload: others

Post on 11-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: connect the tank to water points ], rehabilitation of 1 NB 13

Line item no.رقم المادة

Description of Goods / Servicesوصف المواد / الخدمات المطلوبة(add attachment for technical specification if very detailed)( یضاف ملحقات في حال وجود تفاصیل تقنیة)

Unit / Formالوحدة

Quantity required

الكمیة المطلوبة

Currency العملة

Unit Priceسعر الوحدة

Total Priceالسعر الكامل

Availability date تاریخ توفر المواد

1

Transport and/or Installation of water tanks construction of tank platform, install the tank and] connect the tank to water points], rehabilitation of

latrines, Construction of latrines, construction of septic in Tall Hayat-Akkar as mentioned in the bill of

quantities

NB 13

ضریبة المبیعات (إن وجدت)

قیمة الشحن (إن وجدت)

تكالیف أخرى (إن وجدت)

TOTALالمجموع الكامل

For supplier to fill in:یتم تعبئتھا من قبل المزود

LRCU24F092021

Sales tax (if applicable)

Delivery charge (if applicable)

Other charges (if applicable)

Form ID:1231d0d0cfa08d5a2f4588c06fcb2b162a941d929c7e2cfc0b211574a3e07e4d

Page 2: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

kfar melki 029

1

+ Supply and install a full latrine with Concrete Slab (inside and in front) + tap+ paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 3

2

Reinstallation of latrine+concrete slab (in & out)+install zink sheetpaint + tap+(lamp+switch) +threshold+perforated steel 3mm+foam+ان نكو +د ب الواح ز ة ( داخله و خارجه)+اترك لاطة الاسمن ب حمام + اعادة ترك

ة + برطاش ة)+فوم+حنف سة و لم ل 10 م +ك ا د مخرم 3 مم+ ( ل+حد اله

NB 2

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل 1.50×1.5×0.15 م +حسب الخرا

NB 5

5Supply and Install of steel rope for water tank from two sides

ت الخزان من الجهت ب ل فولاذ لت ت ح ب د ت تزوNB 5

6 Supply and install zinc " 5 doz" door reinforced with hollow steel tube 5x2.5

cmد الفارغ 5×2.5 سم . الحد م مقوى نكو 5 دوز اب ز ب د و ترك تزو

NB 2

7Supply and install a zinc sheet 85x250 cm

نكو 85×250 سم ح ز ب ل د و ترك تزوNB 12

8

Dismantle of the latrine, by removing the concrete slab and move it awayfrom the site.Keep the latrine in the site

جب ترك الحمام اطون خارج الموقع . ة و نقل ال لاطة الاسمن ق ازالة ال ازالة الحمام ,عن طالارض

NB 2

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 7

15supply and spread gravel in m3

حص 1م3 د و فرش تزوm3 10

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 10

19.… ,Make welding for hinges, Steel sheet

د م المفاصل, صفائح الحد تلحNB 10

20. Supply and install a door tongue which prevent the sway of the door

منعه من التارجح اب الحمام الذي ب لسان ل د و ترك تزوNB 4

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 6

د اطون والحد ال

ة اعمال الصح

Page 3: connect the tank to water points ], rehabilitation of 1 NB 13

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 50

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brand

طا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزوNB 4

39Supply and install a Cover for water tank

ب غطاء خزان د و ترك تزوNB 3

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 5

50Supply and install a flexible pipe 1.5" + all accessories

سسوارات ش + مع الا يج راصور 1.5 ا ب ن د و ترك تزوNB 2

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 150

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 80

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube withall connection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 50

68Supply and install a lamp 30 W

ة 30 وات ب لم د و ترك تزوNB 3

69Supply and install a water proof switch and lamp holder

ة مع دو ب فقسة مط د و ترك تزوNb 3

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessoriesك لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة ا

سسوارات اە المطبخ مع جميع التوصلات والا ف م لت

NB 10

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessoriesك لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة ا

سسوارات اە المطبخ مع جميع التوصلات والا ف م لت

NB 3

73 . Marbleك رخام m3 6

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 20

83 Supply and install an arabic seat with vent elbow + concrete around to

fix the seatر ت ال ب اطون لت حة + ع ر ب كر عر مع ك د و ترك تزو

NB 1

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 4: connect the tank to water points ], rehabilitation of 1 NB 13

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanks

ف املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح االص

NB 4

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 4

المواصلات

Page 5: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Kfar melki 038

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 3

2

Reinstallation of latrine+concrete slab (in & out)+install zink sheetpaint + tap+(lamp+switch) +threshold+perforated steel 3mm+foam+ان نكو +د ب الواح ز ة ( داخله و خارجه)+اترك لاطة الاسمن ب حمام + اعادة ترك

ة + برطاش ة)+فوم+حنف سة و لم ل 10 م +ك ا د مخرم 3 مم+ ( ل+حد اله

NB 12

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 6

6 Supply and install zinc " 5 doz" door reinforced with hollow steel tube 5x2.5

cmد الفارغ 5×2.5 سم . الحد م مقوى نكو 5 دوز اب ز ب د و ترك تزو

NB 10

7 Supply and install a zinc sheet 85x250 cmنكو 85×250 سم ح ز ب ل د و ترك تزو

NB 35

8

Dismantle of the latrine, by removing the concrete slab and move it away fromthe site.Keep the latrine in the site

جب ترك الحمام اطون خارج الموقع . ة و نقل ال لاطة الاسمن ق ازالة ال ازالة الحمام ,عن طالارض

NB 16

10

Construction of reinforced Manhole 60x60x60 cm / concrete cover 80x80 cmAll thickness 10 cm

اس 80×80 سم. ق اس 60×60×60 سم مع غطاء اسمن ق اطون المسلح غار من ال شاء ر اة 10 سم طان و الارض ة الح سما

NB 20

11

Construction of reinforced Manhole 80x80x80 cm / concrete cover 100x100cm . All thickness 10 cm

اس 100×100 سم. ق اس 80×80×80 سم مع غطاء اسمن ق اطون المسلح غار من ال شاء ر اة 10 سم طان و الارض ة الح سما

NB 20

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 20

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 40

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 25

23 Supply and screed 1m3 of concrete without reinforcement (7 bags of

(cement for eachل م ) اس من الاسمنت ل اطون الغ مسلح (7 ا د وصب 1م3 من ال تزو

m3 20

24

Paint the steel structure, the flat plate using Epoxy paint by aircompressor. The color of the epoxy must be gray

كون جب ان ق فرد الرش . استخدام مادة الابوك عن ط ل والصاجه ان اله دان لون رمادي الد

kilo 20

د اطون والحد ال

Page 6: connect the tank to water points ], rehabilitation of 1 NB 13

32

& Supply and install a steel cover 180x180 cm with thickness 1.95 mm reinforced with steel 2.5x2.5 cm with an opening 20x20 cm for

. dislodgingد 2.5×2.5 الحد ة 1.95 مم مقوى دي 180×180 سم سما ب غطاء حد د و ترك تزو

اس 20×20 سم للشفط ا الغطاء ق سم مع فتحة

NB 12

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 250

36

Supply and install a HDPE pipe 1 inch specifically for portable water use have several properties that make them well suited for, and easy to use in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or

, steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light weight and also chemical resistanance and connect .to latrine/washbasin/water

tank/tent- from water sourceا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 1 ا ب ن د و ترك تزو

ع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 200

37

Supply and install a HDPE pipe 1 1/2 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

دة تجعله ب له خصائص عد اە ال ش مخصص لاستخدام م يج 1/2 1 ا ب ن د و ترك تزوع ا HDPE حوا لغ مقاومة الخض ب . (ت اە ال ا تماما و سهل الاستخدام أنظمة م مناس

ب المرونة والوزن س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI 1/50 من مقاومةم- من له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م ف , و كذلك مقاوم للمواد ال الخف

اە. مصدر الم

l.m 0

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 35

46 Supply and install a tap Nuss Brand(made in turky) or Riz Brand (made in

tailand) in the toiletلندي) الحمام ع رايز (تا ع نص (تر ) او ن ة ن ب حنف د و ترك تزو

NB 31

47 Supply and install a short- galvanized-pipe mounted with butterfly valve

(italy brand)طا ع ا بق مع سكر فراشة ن ة من القسطل الم ة قص ب حنف د و ترك تزو

NB 10

48 Supply and install a butterfly valve 1/2 inchش ب سكر فراشة 1/2 ا د و ترك تزو

NB 10

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 30

50Supply and install a flexible pipe 1.5" + all accessories

سسوارات ش + مع الا يج راصور 1.5 ا ب ن د و ترك تزوNB 10

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 400

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 300

ة اعمال الصح

Page 7: connect the tank to water points ], rehabilitation of 1 NB 13

54 Supply and install a PVC pipe 6" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 6 ا د و ترك تزو

l.m 400

58

Supply and install a HDPE N-16 Black (Haykal Plast) 1.25 inch + excavation 30 cm + all accessories

ش لاست) 1.25 ا ل يج زرا N-16 اسود ( ب ن د و ترك تزوسسوارات+مع الحفر 30 سم + الا

l.m 250

62 Supply and install a grinder pump 2 hp zeinth italy brand with No-return valveع اب عدم رج نت 2 حصان مع ص ع س ب مضخة فرامة ن د و ترك تزو

NB 1

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube with allconnection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 350

66

Supply and install an electrical Lebanese cable 3 mm+ protected tubewith all connection and accessories

لات مع ش عازل ع جميع ال لات لبنان) + ن ا ا 3 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا جميع التوص

l.m 50

67 Supply and install an Manual voltage regulator 50 AMP with contactor

. and steel standة د ا 50 امب مع فاصل اتومات و قاعدة حد دوي كه ب منظم د و ترك تزو

PC 1

68 Supply and install a lamp 30 Wة 30 وات ب لم د و ترك تزو

NB 31

69 Supply and install a water proof switch and lamp holderة مع دو ب فقسة مط د و ترك تزو

Nb 31

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 40

73 . Marbleك رخام m3 20

74 Supply and place Hollow Block 15 cm as cat walkد و وضع حجر خفان 15 سم تزو

m2 20

75 Excavation of the land in m3اعمال الحفر م3

m3 10

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 85

83 Supply and install an arabic seat with vent elbow + concrete around to

fix the seatر ت ال ب اطون لت حة + ع ر ب كر عر مع ك د و ترك تزو

NB 10

90 .Construction of (High flood) full package Pits+2x1000 L Drainage tanksف الص املة + 2×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 5

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 5

المواصلات

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 8: connect the tank to water points ], rehabilitation of 1 NB 13

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 3

Page 9: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description Unit Assessment Quantity

Unit Price Total Price

Kfar Melki 039

1

+ Supply and install a full latrine with Concrete Slab (inside and in front) + tap+ paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 5

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل 1.50×1.5×0.15 م +حسب الخرا

NB 5

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 5

15supply and spread gravel in m3

حص 1م3 د و فرش تزوm3 4

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 7

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 5

23 Supply and screed 1m3 of concrete without reinforcement (7 bags of

(cement for eachل م ) اس من الاسمنت ل اطون الغ مسلح (7 ا د وصب 1م3 من ال تزو

m3 4

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 120

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brand

طا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزوNB 4

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 4

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 140

د اطون والحد ال

ة اعمال الصح

Page 10: connect the tank to water points ], rehabilitation of 1 NB 13

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 50

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube withall connection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 50

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessoriesك لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة ا

سسوارات اە المطبخ مع جميع التوصلات والا ف م لت

NB 7

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessoriesك لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة ا

سسوارات اە المطبخ مع جميع التوصلات والا ف م لت

NB 3

73 . Marbleك رخام m3 4

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 7

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanks

ف املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح االص

NB 4

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 5

المواصلات

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 11: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Kfar melki 053

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 2

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 1

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 2

15 supply and spread gravel in m3حص 1م3 د و فرش تزو

m3 5

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 3

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 4

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 50

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 3

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 2

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 50

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 30

ة د الصح اعمال الحفر وتمد

د اطون والحد ال

ة اعمال الصح

Page 12: connect the tank to water points ], rehabilitation of 1 NB 13

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 3

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

73 . Marbleك رخام m3 2

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 3

84 Supply and install western seat with all accessories + fixation on the

concreteاطون ال ت ب سسوارات و الت ل الا ب كر فرن + مع د وترك تزو

NB 1

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 1

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

المواصلات

Page 13: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Assessment Price

Mqaiteaa 026

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 3

2

Reinstallation of latrine+concrete slab (in & out)+install zink sheetpaint + tap+(lamp+switch) +threshold+perforated steel 3mm+foam+ان نكو +د ب الواح ز ة ( داخله و خارجه)+اترك لاطة الاسمن ب حمام + اعادة ترك

ة + برطاش ة)+فوم+حنف سة و لم ل 10 م +ك ا د مخرم 3 مم+ ( ل+حد اله

NB 4

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 4

5 Supply and Install of steel rope for water tank from two sidesت الخزان من الجهت ب ل فولاذ لت ت ح ب د ت تزو

NB 6

6 Supply and install zinc " 5 doz" door reinforced with hollow steel tube 5x2.5

cmد الفارغ 5×2.5 سم . الحد م مقوى نكو 5 دوز اب ز ب د و ترك تزو

NB 3

7 Supply and install a zinc sheet 85x250 cmنكو 85×250 سم ح ز ب ل د و ترك تزو

NB 30

8

Dismantle of the latrine, by removing the concrete slab and move it away fromthe site.Keep the latrine in the site

جب ترك الحمام اطون خارج الموقع . ة و نقل ال لاطة الاسمن ق ازالة ال ازالة الحمام ,عن طالارض

NB 4

13 Construction of plastic manhole 60x60x60 cm / with cover

اس60x60x60سم مع غطاء ق ك لاس غار من شاء ر اNB 10

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 4

19 .… ,Make welding for hinges, Steel sheetد م المفاصل, صفائح الحد تلح

NB 10

20 . Supply and install a door tongue which prevent the sway of the doorمنعه من التارجح اب الحمام الذي ب لسان ل د و ترك تزو

NB 12

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 10

24

Paint the steel structure, the flat plate using Epoxy paint by aircompressor. The color of the epoxy must be gray

كون جب ان ق فرد الرش . استخدام مادة الابوك عن ط ل والصاجه ان اله دان لون رمادي الد

kilo 6

29Supply and install 2..5x2.5 cm with thickness 2mm

ه 2مم د فارغ 2.5*2.5 سم , سما ت حد ب د وت تزوl.m 8

د اطون والحد ال

ة اعمال الصح

Page 14: connect the tank to water points ], rehabilitation of 1 NB 13

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 80

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 4

39 Supply and install a Cover for water tankب غطاء خزان د و ترك تزو

NB 5

46 Supply and install a tap Nuss Brand(made in turky) or Riz Brand (made in

tailand) in the toiletلندي) الحمام ع رايز (تا ع نص (تر ) او ن ة ن ب حنف د و ترك تزو

NB 10

47 Supply and install a short- galvanized-pipe mounted with butterfly valve

(italy brand)طا ع ا بق مع سكر فراشة ن ة من القسطل الم ة قص ب حنف د و ترك تزو

NB 5

48 Supply and install a butterfly valve 1/2 inchش ب سكر فراشة 1/2 ا د و ترك تزو

NB 5

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 5

50Supply and install a flexible pipe 1.5" + all accessories

سسوارات ش + مع الا يج راصور 1.5 ا ب ن د و ترك تزوNB 10

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 120

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 80

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube with allconnection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 120

68 Supply and install a lamp 30 Wة 30 وات ب لم د و ترك تزو

NB 12

69 Supply and install a water proof switch and lamp holderة مع دو ب فقسة مط د و ترك تزو

Nb 12

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 4

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 3

73 . Marbleك رخام m3 3

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 15: connect the tank to water points ], rehabilitation of 1 NB 13

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 10

85Supply and install valve Italy Brand 3/4 inch

ش طا 3/4 ا ع ا اە ن ب سكر للم د و ترك تزوNB 5

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 2

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 3

المواصلات

Page 16: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Mqaiteaa 065

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 2

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 2

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 3

15 supply and spread gravel in m3حص 1م3 د و فرش تزو

m3 5

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 2

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 3

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 50

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 1

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 2

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 50

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 30

د اطون والحد ال

ة اعمال الصح

Page 17: connect the tank to water points ], rehabilitation of 1 NB 13

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

73 . Marbleك رخام m3 2

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 2

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 2

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

ة د الصح اعمال الحفر وتمد

المواصلات

Page 18: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Qaabrine 006

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 2

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 1

6 Supply and install zinc " 5 doz" door reinforced with hollow steel tube 5x2.5

cmد الفارغ 5×2.5 سم . الحد م مقوى نكو 5 دوز اب ز ب د و ترك تزو

NB 1

7 Supply and install a zinc sheet 85x250 cmنكو 85×250 سم ح ز ب ل د و ترك تزو

NB 8

8

Dismantle of the latrine, by removing the concrete slab and move it away fromthe site.Keep the latrine in the site

جب ترك الحمام اطون خارج الموقع . ة و نقل ال لاطة الاسمن ق ازالة ال ازالة الحمام ,عن طالارض

NB 1

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 3

15 supply and spread gravel in m3حص 1م3 د و فرش تزو

m3 5

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 2

19 .… ,Make welding for hinges, Steel sheetد م المفاصل, صفائح الحد تلح

NB 20

20 . Supply and install a door tongue which prevent the sway of the doorمنعه من التارجح اب الحمام الذي ب لسان ل د و ترك تزو

NB 2

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 4

24

Paint the steel structure, the flat plate using Epoxy paint by aircompressor. The color of the epoxy must be gray

كون جب ان ق فرد الرش . استخدام مادة الابوك عن ط ل والصاجه ان اله دان لون رمادي الد

kilo 3

29Supply and install 2..5x2.5 cm with thickness 2mm

ه 2مم د فارغ 2.5*2.5 سم , سما ت حد ب د وت تزوl.m 10

30Supply and install 5x2.5 cm with thickness 2mm

ه 2مم د فارغ 5*2.5 سم , سما ت حد ب د وت تزوl.m 10

31 Door hingesاب مفصلات

NB 10

32

& Supply and install a steel cover 180x180 cm with thickness 1.95 mm reinforced with steel 2.5x2.5 cm with an opening 20x20 cm for

. dislodgingد 2.5×2.5 الحد ة 1.95 مم مقوى دي 180×180 سم سما ب غطاء حد د و ترك تزو

اس 20×20 سم للشفط ا الغطاء ق سم مع فتحة

NB 2

د اطون والحد ال

ة اعمال الصح

Page 19: connect the tank to water points ], rehabilitation of 1 NB 13

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 50

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 1

46 Supply and install a tap Nuss Brand(made in turky) or Riz Brand (made in

tailand) in the toiletلندي) الحمام ع رايز (تا ع نص (تر ) او ن ة ن ب حنف د و ترك تزو

NB 2

47 Supply and install a short- galvanized-pipe mounted with butterfly valve

(italy brand)طا ع ا بق مع سكر فراشة ن ة من القسطل الم ة قص ب حنف د و ترك تزو

NB 2

48 Supply and install a butterfly valve 1/2 inchش ب سكر فراشة 1/2 ا د و ترك تزو

NB 2

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 2

50Supply and install a flexible pipe 1.5" + all accessories

سسوارات ش + مع الا يج راصور 1.5 ا ب ن د و ترك تزوNB 2

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 30

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 50

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube with allconnection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 50

68 Supply and install a lamp 30 Wة 30 وات ب لم د و ترك تزو

NB 2

69 Supply and install a water proof switch and lamp holderة مع دو ب فقسة مط د و ترك تزو

Nb 2

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

73 . Marbleك رخام m3 2

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 20: connect the tank to water points ], rehabilitation of 1 NB 13

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 3

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 2

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

المواصلات

Page 21: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Assessment Price

Qaabrine 007

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 3

2

Reinstallation of latrine+concrete slab (in & out)+install zink sheetpaint + tap+(lamp+switch) +threshold+perforated steel 3mm+foam+ان نكو +د ب الواح ز ة ( داخله و خارجه)+اترك لاطة الاسمن ب حمام + اعادة ترك

ة + برطاش ة)+فوم+حنف سة و لم ل 10 م +ك ا د مخرم 3 مم+ ( ل+حد اله

NB 2

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 5

7 Supply and install a zinc sheet 85x250 cmنكو 85×250 سم ح ز ب ل د و ترك تزو

NB 30

8

Dismantle of the latrine, by removing the concrete slab and move it away fromthe site.Keep the latrine in the site

جب ترك الحمام اطون خارج الموقع . ة و نقل ال لاطة الاسمن ق ازالة ال ازالة الحمام ,عن طالارض

NB 2

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 10

13 Construction of plastic manhole 60x60x60 cm / with cover

اس60x60x60سم مع غطاء ق ك لاس غار من شاء ر اNB 4

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 10

19 .… ,Make welding for hinges, Steel sheetد م المفاصل, صفائح الحد تلح

NB 20

20 . Supply and install a door tongue which prevent the sway of the doorمنعه من التارجح اب الحمام الذي ب لسان ل د و ترك تزو

NB 11

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 10

23 Supply and screed 1m3 of concrete without reinforcement (7 bags of

(cement for eachل م ) اس من الاسمنت ل اطون الغ مسلح (7 ا د وصب 1م3 من ال تزو

m3 4

29Supply and install 2..5x2.5 cm with thickness 2mm

ه 2مم د فارغ 2.5*2.5 سم , سما ت حد ب د وت تزوl.m 20

30Supply and install 5x2.5 cm with thickness 2mm

ه 2مم د فارغ 5*2.5 سم , سما ت حد ب د وت تزوl.m 20

31 Door hingesاب مفصلات

NB 20

د اطون والحد ال

ة اعمال الصح

Page 22: connect the tank to water points ], rehabilitation of 1 NB 13

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 80

36

Supply and install a HDPE pipe 1 inch specifically for portable water use have several properties that make them well suited for, and easy to use in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or

, steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light weight and also chemical resistanance and connect .to latrine/washbasin/water

tank/tent- from water sourceا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 1 ا ب ن د و ترك تزو

ع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 120

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 5

46 Supply and install a tap Nuss Brand(made in turky) or Riz Brand (made in

tailand) in the toiletلندي) الحمام ع رايز (تا ع نص (تر ) او ن ة ن ب حنف د و ترك تزو

NB 11

47 Supply and install a short- galvanized-pipe mounted with butterfly valve

(italy brand)طا ع ا بق مع سكر فراشة ن ة من القسطل الم ة قص ب حنف د و ترك تزو

NB 8

48 Supply and install a butterfly valve 1/2 inchش ب سكر فراشة 1/2 ا د و ترك تزو

NB 8

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 4

50Supply and install a flexible pipe 1.5" + all accessories

سسوارات ش + مع الا يج راصور 1.5 ا ب ن د و ترك تزوNB 8

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 80

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 50

55 Supply and install a PVC pipe 8" + excavation 40 cm depth along the quantity

requiredع مع حفر 40 سم عمق وحسب الم الطو ش ن ب قسطل 8 ا د و ترك تزو

l.m 10

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube with allconnection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 150

68 Supply and install a lamp 30 Wة 30 وات ب لم د و ترك تزو

NB 9

69 Supply and install a water proof switch and lamp holderة مع دو ب فقسة مط د و ترك تزو

Nb 9

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 23: connect the tank to water points ], rehabilitation of 1 NB 13

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 10

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 4

73 . Marbleك رخام m3 6

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 12

84 Supply and install western seat with all accessories + fixation on the

concreteاطون ال ت ب سسوارات و الت ل الا ب كر فرن + مع د وترك تزو

NB 2

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 5

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 3

المواصلات

Page 24: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Qaabrine 011

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 1

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 1

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 2

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 3

19 .… ,Make welding for hinges, Steel sheetد م المفاصل, صفائح الحد تلح

NB 12

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 4

23 Supply and screed 1m3 of concrete without reinforcement (7 bags of

(cement for eachل م ) اس من الاسمنت ل اطون الغ مسلح (7 ا د وصب 1م3 من ال تزو

m3 2

24

Paint the steel structure, the flat plate using Epoxy paint by aircompressor. The color of the epoxy must be gray

كون جب ان ق فرد الرش . استخدام مادة الابوك عن ط ل والصاجه ان اله دان لون رمادي الد

kilo 4

31 Door hingesاب مفصلات

NB 12

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 70

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 2

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 3

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 50

د اطون والحد ال

ة اعمال الصح

Page 25: connect the tank to water points ], rehabilitation of 1 NB 13

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 20

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 3

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 3

73 . Marbleك رخام m3 4

75 Excavation of the land in m3اعمال الحفر م3

m3 20

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 3

84 Supply and install western seat with all accessories + fixation on the

concreteاطون ال ت ب سسوارات و الت ل الا ب كر فرن + مع د وترك تزو

NB 2

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 1

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

المواصلات

ة د الصح اعمال الحفر وتمد

Page 26: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Qaabrine 049

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 1

2

Reinstallation of latrine+concrete slab (in & out)+install zink sheetpaint + tap+(lamp+switch) +threshold+perforated steel 3mm+foam+ان نكو +د ب الواح ز ة ( داخله و خارجه)+اترك لاطة الاسمن ب حمام + اعادة ترك

ة + برطاش ة)+فوم+حنف سة و لم ل 10 م +ك ا د مخرم 3 مم+ ( ل+حد اله

NB 1

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 2

8

Dismantle of the latrine, by removing the concrete slab and move it away fromthe site.Keep the latrine in the site

جب ترك الحمام اطون خارج الموقع . ة و نقل ال لاطة الاسمن ق ازالة ال ازالة الحمام ,عن طالارض

NB 1

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 4

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 3

20 . Supply and install a door tongue which prevent the sway of the doorمنعه من التارجح اب الحمام الذي ب لسان ل د و ترك تزو

NB 30

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 5

24

Paint the steel structure, the flat plate using Epoxy paint by aircompressor. The color of the epoxy must be gray

كون جب ان ق فرد الرش . استخدام مادة الابوك عن ط ل والصاجه ان اله دان لون رمادي الد

kilo 5

31 Door hingesاب مفصلات

NB 30

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 80

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 2

د اطون والحد ال

ة اعمال الصح

Page 27: connect the tank to water points ], rehabilitation of 1 NB 13

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 50

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 80

65

Supply and install an electrical Lebanese cable 1.5 mm+ protected tube with allconnection and accessories

لات مع جميع ش عازل ع جميع ال لات لبنان) + ن ا ا 1.5 مم ( ل كه ا ب د و ترك تزوسسوارات لات و الا التوص

l.m 50

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 3

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

73 . Marbleك رخام m3 2

84 Supply and install western seat with all accessories + fixation on the

concreteاطون ال ت ب سسوارات و الت ل الا ب كر فرن + مع د وترك تزو

NB 1

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 1

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

المواصلات

اء ه اعمال ال

ة د الصح اعمال الحفر وتمد

Page 28: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Assessment Price

Qaabrine 065

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 1

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 1

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 3

15 supply and spread gravel in m3حص 1م3 د و فرش تزو

m3 5

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 2

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 3

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 50

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 1

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 1

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 30

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 50

ة د الصح اعمال الحفر وتمد

د اطون والحد ال

ة اعمال الصح

اء ه اعمال ال

Page 29: connect the tank to water points ], rehabilitation of 1 NB 13

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 2

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 1

73 . Marbleك رخام m3 1.5

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 1

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 1

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

المواصلات

Page 30: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Qaabrine 075

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 3 $0.00

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 3 $0.00

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 5 $0.00

15 supply and spread gravel in m3حص 1م3 د و فرش تزو

m3 5 $0.00

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 5 $0.00

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 4 $0.00

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 120 $0.00

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 3 $0.00

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 3 $0.00

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 80 $0.00

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 60 $0.00

د اطون والحد ال

ة اعمال الصح

اء ه اعمال الة د الصح اعمال الحفر وتمد

Page 31: connect the tank to water points ], rehabilitation of 1 NB 13

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 5 $0.00

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 3 $0.00

73 . Marbleك رخام m3 3.5 $0.00

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 5 $0.00

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 3 $0.00

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 3 $0.00

$0.00

المواصلات

ة أعمال إضاف

Page 32: connect the tank to water points ], rehabilitation of 1 NB 13

Item Description UnitAssessment

Quantity Unit Price Total Price

Rmoul 011

1

+Supply and install a full latrine with Concrete Slab (inside and in front) + tap + paint electrical connections + threshold + arabic seat + foam + hanger

according to drawingة + ة (داخل و خارج الحمام ) + حنف لاطة الاسمن نكو + ال ب حمام من ال د و ترك تزوة ط المطل قة +حسب الخرا ا + كر عر + برطاش + فوم + تعل ه دات ال التمد

NB 1

4

Supply and install a steel stand 1.70x1.2x1.2 m + epoxy paint + concrete slab 1.5x1.5x0.15 m + according to drawing

ة 1.50×1.5×0.15 لاطة اسمن ان + ة للخزان 1.7×1.2×1.2 م + د د ب قاعدة حد د و ترك تزوة ط المطل م +حسب الخرا

NB 1

12 Construction of plastic manhole 40x40x40 cm / with cover

اس 40×40×40 سم مع غطاء ق ك لاس غار من شاء ر اNB 2

15 supply and spread gravel in m3حص 1م3 د و فرش تزو

m3 5

17

Grease Trap 80x80x80 cm : Construction of a grease trap with size 80x80x80.cm

دة التخمة 80×80×80 سم . شاء مص اNB 1

22 Screed a reinforced concrete slab using steel rebars 10 mm with

.volume 1 m3حجم 1 م3 . د 10 مم و حد ة مسلحة لاطة اسمن صب

m3 3

35

Supply and install a HDPE pipe 3/4 inch specifically for portable water use have several properties that make them well suited for, and easy to use

in,potable water systems. (Yield strenghth of HDPE is approximately 1/50 that of DI or steel and 1/5 that of PVC ) .Ease to handling due to flexibility and light

weight , and also chemical resistanance and connect .to latrine/washbasin/water tank/tent- from water source

ا دة تجعله مناس ب له خصائص عد اە ال ش مخصص لاستخدام م يج 3/4 ا ب ن د و ترك تزوع ا HDPE حوا 1/50 من لغ مقاومة الخض ب . (ت اە ال تماما و سهل الاستخدام أنظمة مف , ب المرونة والوزن الخف س سهولة الاستخدام متاز . ( PVC أو الفولاذ و 1/5 من DI مقاومةاە. م- من مصدر الم له ا الحمام/المغسلة/الخزان/الخ ة . و توص ائ م و كذلك مقاوم للمواد ال

l.m 50

38 "Supply and install a mechanical float + steel rope + 3/4 valve "italy brandطا ع ا ل فولاذ + سكر 3/4 ن ة + ح ك ان ب فواشة م د و ترك تزو

NB 1

49

Supply and install a full package Washbasin + concrete slab

ة لاطة الاسمن املة + مع صب ال ب مغسلة د و ترك تزوNB 1

52 Supply and install a PVC pipe 3 " + excavation 30 cm depth along the quantity

requiredش مع 30حفر سم وحسب الم الطو ب قسطل 3 ا د و ترك تزو

l.m 30

53 Supply and install a PVC pipe 4" + excavation 30 cm depth along the quantity

requiredش مع حفر 30 سم عمق وحسب الم الطو ب قسطل 4 ا د و ترك تزو

l.m 20

د اطون والحد ال

ة اعمال الصح

اء ه اعمال الة د الصح اعمال الحفر وتمد

Page 33: connect the tank to water points ], rehabilitation of 1 NB 13

70

Construction of 1.9*1*1.1 a complete set of 3*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 1.9*1*1.1 متالفة من 3*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 1

72

Construction of 0.9*1*1.1 a complete set of 1*200 L plastic barrels for . draining water of kitchen with all connection and accessories

ف ك لت لاس ل اس 0.9*1*1.1 متالفة من 1*200 لي برم ق املة شاء مجموعة اسسوارات اە المطبخ مع جميع التوصلات والا م

NB 1

73 . Marbleك رخام m3 1

77 Supply and install a floor drain stainless steel with screw + plastic drain

concrete slab around to fix +تها ب اطون لت ك + مع صب لاس ب مصفاة ستانلس مع برا + غليون د و ترك تزو

NB 1

91 .Construction of (High flood) full package Pits+3x1000 L Drainage tanksف الص املة + 3×1000 لي خزان لل ة شاء (طوفان عا ) مجموعة من الحفر صح ا

NB 1

94 Transporting the water tank from LRC store to the IS and fixing it on it's

.steel standة. د ته ع قاعدته الحد ب م وت نقل الخزان من مستودع ل ار ا المخ

NB 1

المواصلات

ة أعمال إضاف