Module III Tracking, Wind Erosion, and Construction Site Management BMPs Modul e Topic 0 Overview I Introduction II Soil Stabilization (SS) and Sediment Control (SC) BMPs III Tracking, Wind Erosion, and Construction Site Management BMPs IV Incorporation of Construction Site BMPs into the Design Process V Final Wrap-Up

Upload: hoangngoc

Post on 03-Jan-2017

229 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Construction Site Management Issues

Module IIITracking, Wind

Erosion, and Construction Site

Management BMPs

Module Topic

0 Overview

I Introduction

II Soil Stabilization (SS) and Sediment Control (SC) BMPs

IIITracking, Wind Erosion, and Construction Site Management BMPs

IVIncorporation of Construction Site BMPs into the Design Process

V Final Wrap-Up

Page 2: Construction Site Management Issues

Module III ObjectivesUpon completion, the student will be able to

• Understand potential tracking, wind erosion, and construction site management issues on construction sites

• Understand water pollution control strategies behind for these types of BMPs

• Select Tracking Control, Wind Erosion Control, and Construction Site Management BMPs

• Identify Standard Special Provisions (SSPs)

2

Page 3: Construction Site Management Issues

Construction Activities

and Storm WaterConstruction projects tend to• Disrupt the existing area by

exposing soils and changing drainage patterns

• Store and use materials that contain or are themselves pollutants

• Require ancillary activities that are potential sources of pollutants

3

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 4: Construction Site Management Issues

Tracking Control Issue

4

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 5: Construction Site Management Issues

No wind erosion controls used

Wind Erosion Control Issue

5

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 6: Construction Site Management Issues

6

Construction Site

Management Issues

Vehicle Cleaning

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 7: Construction Site Management Issues

7

Construction Site

Management Issues

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 8: Construction Site Management Issues

No solid waste management

8

Construction Site

Management Issues

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 9: Construction Site Management Issues

9

Construction Site

Management Issues

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 10: Construction Site Management Issues

Water Pollution Control Strategies during

Construction• Prevent storm water contact with disturbed

soil areas (DSAs)• Protect DSAs from erosion• Minimize sediment in storm water

before discharge• Control discharges of sediment from

other sources• Prevent non–storm water discharges• Prevent storm water contact with

other potential construction site pollutants

10

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 11: Construction Site Management Issues

Control Sediment Discharge

From Other Sources Tracking Controls• Stabilized

Construction Exits• Street Sweeping and

Vacuuming

11

Wind Erosion Control

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 12: Construction Site Management Issues

Prevent Non-Storm Water Discharges • Manage concrete waste• Employ proper dewatering

operations• Fuel vehicles and equipment

off-site or in designated areas• Use covers or platforms to

catch debris over water• Manage sandblasting

operations

12

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 13: Construction Site Management Issues

Prevent Storm Water Contact

With Other Pollutants • Minimize storage and

non-essential activities• Store materials/wastes

in watertight containers• Cover stored

materials/wastes• Prevent run-on• Clean up spills of

materials/wastes

13

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 14: Construction Site Management Issues

Example ProjectRoadway WideningCentral Expressway

• Widen from two to four lanes

• Elevate roadway• Construct wall and

bridge structures• Grade embankments

Purpose• Assess impacts and

problem conditions• Select and deploy

BMPs• Identify SSPs for

separate bid line items

14

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

PS&E Phase

Page 15: Construction Site Management Issues

Access Point

Adobe CreekBridge Structure

Stockpile AreaNew Roadway

15

Page 16: Construction Site Management Issues

Project Information

Construction Activities• Dewatering• Stream crossing• Vehicle and

equipment• Material storage• Stockpiles• Demolition• Concrete placementWhere to begin?

16

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 17: Construction Site Management Issues

Construction Site BMP

Consideration Form 17

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

See Reference Material Tab Page 1

Page 18: Construction Site Management Issues

Checklist CS-1, Part 3

18

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

See Ref TabPage 7

Page 19: Construction Site Management Issues

19

Checklist CS-1, Part 3

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 20: Construction Site Management Issues

Tracking Controls

•Street sweeping and Street sweeping and vacuumingvacuuming•Stabilized construction Stabilized construction entranceentrance 20

Page 21: Construction Site Management Issues

Tracking Control BMPs

•07-480 Temporary Construction Entrance

•07-481 Temporary Construction Roadway

•07-360 Street Sweeping

21

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 22: Construction Site Management Issues

What If?

Our project encountered the following conditions:

• Some 800,000 cubic yards of dirt had to be transported through a publicly used street.

• The soil type on the construction site was a combination of clays and silt.

• A sediment-impaired water body was located within 100 feet of the construction exit that would be used by the hauling equipment.

• The head of the RWQCB lived just up the street.

Are the standard BMPs for tracking control adequate?

22

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 23: Construction Site Management Issues

23

Checklist CS-1, Part 3

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 24: Construction Site Management Issues

24

Tire WashPotential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 25: Construction Site Management Issues

Develop a Non-Standard Special Provision

25

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

TC-3 Tire Wash

Page 26: Construction Site Management Issues

Construction Site BMP

Consideration Form

26

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 27: Construction Site Management Issues

27

Checklist CS-1, Part 4Example

Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

See Ref TabPage 8

Page 28: Construction Site Management Issues

Standard Dust Control vs. More

Rule of thumb• Additional measures are probably

necessary if a “Dust Control Plan” is specified in the contract documents.

• Otherwise, standard dust control practices are most likely sufficient for the project’s wind erosion control.

Appropriate uses would be in air quality management districts and high wind areas.

28

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 29: Construction Site Management Issues

• Wind erosion control• Protect DSAs from wind by applying

soil stabilization BMPs

Wind Erosion Controls

29

Page 30: Construction Site Management Issues

07-354 Temporary Tacked Straw

07-371 Temporary Soil Binder07-380 Temporary Mulch07-381 Temporary Hydraulic

Mulch (Bonded Fiber Matrix)

07-382 Temporary Hydraulic Mulch

(Polymer Stabilized Fiber

Matrix)07-390 Temporary Erosion

Control Blanket07-395 Temporary Cover

Wind Erosion Control BMPs

30

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

See Reference Material TabPage 18

Page 31: Construction Site Management Issues

Construction Site BMP

Consideration Form

31

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 32: Construction Site Management Issues

32

Checklist CS-1, Part 5Example

Project

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

See Ref TabPage 9

Page 33: Construction Site Management Issues

Project–Specific Permits• Discharges of Dredged or Fill Material into

Navigable Waters• Section 404 Permit – U.S. Army Corps of

Engineers• Section 401 Water Quality Certification –

RWQCB• Section 1601 - California Department of Fish

and Game Streambed Alteration Agreement– Avoidance or mitigation of adverse impacts

to fish and wildlife resources– Applicable to projects in/around lakes,

rivers, and streams

Construction Phase

Permits and Concerns

33

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 34: Construction Site Management Issues

Dewatering operations for water removal

– Water from coffer dams– Groundwater in

excavations– Accumulated Rainwater

Requirements vary by district

Non–Storm Water Discharges Allowed by a Separate NPDES

Permit

34

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 35: Construction Site Management Issues

Construction Site BMP

Consideration Form

35

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 36: Construction Site Management Issues

36

Checklist CS-1, Part 6

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

See Reference Material TabPage 10

Page 37: Construction Site Management Issues

•Stockpile covers•Linear barriers

Waste Management and MaterialsPollution Control

37

Page 38: Construction Site Management Issues

07-346 Construction Site Management

07-371 Temporary Soil Binder07-380 Temporary Mulch07-381 Temporary Hydraulic

Mulch(Bonded Fiber Matrix)

07-382 Temporary Hydraulic Mulch

(Polymer Stabilized Fiber Matrix)

07-390 Temporary Erosion Control Blanket

07-395 Temporary Cover

Temporary Stockpile BMPs

38

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 39: Construction Site Management Issues

39

Linear Sediment Barrier• 07-420 Temporary Fiber Roll • 07-430 Temporary Silt Fence• 07-460 Temporary Straw Bale

Barrier• 07-470 Temporary Gravel Bag

Berm • 07-XXX Temporary Sand Bag

Barrier

Temporary Stockpile BMPs

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Example Project

Page 40: Construction Site Management Issues

Construction Site BMP

Consideration Form

40

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 41: Construction Site Management Issues

41

Checklist CS-1, Part 6Example

Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 42: Construction Site Management Issues

• 07-405 Temporary Concrete Washout Facility

• 07-406 Temporary Concrete Washout Facility (Portable)

• 07-407 Temporary Concrete Washout Bin

Above-grade washout42

Concrete Washout BMPs

Example Project

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 43: Construction Site Management Issues

• Spill prevention and control

• Material management• Material storage• Stockpile management• Solid waste management

07-346 Construction Site Management

43

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Construction Site Housekeeping BMPs

Page 44: Construction Site Management Issues

• Hazardous waste• Contaminated soil• Concrete waste• Sanitary/septic waste• Liquid waste

07-346 Construction Site Management

44

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Provides for management of

Page 45: Construction Site Management Issues

• Water control and conservation• Illegal connection and discharge

detection and reporting• Vehicle and equipment cleaning• Vehicle and equipment fueling

and maintenance• Material and equipment over

water

07-346 Construction Site Management

45

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 46: Construction Site Management Issues

• Structural removal over or adjacent to water

• Paving, sealing, sawcutting, and grinding operations

• Thermoplastic striping and pavement striping

• Pile driving• Concrete curing• Concrete finishing

07-346 Construction Site

Management

46

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 47: Construction Site Management Issues

• Dewatering *

07-346 Construction Site Management

* SSP 07-346 should be adequate when water from dewatering can be discharged within project limits. If estimated quantities of water will be greater or the dewatering operation will be complex, use SSP 07-347 – Temporary Active Treatment System. 47

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 48: Construction Site Management Issues

Standard

Special Provisions (SSP)• SSP 07-340 Water Pollution Control (WPCP)

• SSP 07-345 Water Pollution Control (SWPPP)• SSP S5-630 Relations with RWQCB

48

Contract Conformance

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 49: Construction Site Management Issues

• Projects < 1 acre (0.40 ha)• Requires preparation of the WPCP in

accordance with the WPCP and SWPPP Preparation Manual

• Indicates WPCP submittal and review periods• Identifies the temporary BMPs that are

individually listed within the contract

WPCP Preparation and Approval

49

SSP 07-340 (WPCP)

Estimating quantities & cost of BMPsIncorporating revised & new SSPs

Completing SWDR - section 6

Page 50: Construction Site Management Issues

• Specifies rainy season dates• Defines winter shutdown periods (Lake

Tahoe, Truckee River, east and west forks of Carson River hydrologic units)

• Identifies BMP inspection frequencies• Identifies the process for report of

discharges, notices, or orders• WPCP preparation payment

WPCP Implementation

50

SSP 07-340 (WPCP)

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 51: Construction Site Management Issues

• Reference to Construction Site BMPs Manual• Retention of funds process for penalties

levied or assessed by RWQCB• Water Pollution Control Cost Break-Down• Identification of year-round sediment

control practices• Payment for Water Pollution Control

No longer includes the following:

51

Revisions to SSP 07-340 (WPCP)

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 52: Construction Site Management Issues

• Projects ≥ 0.40 ha (1 acre)• Requires preparation of the SWPPP in

accordance with the WPCP and SWPPP Preparation Manual

• Indicates SWPPP submittal and review periods

• Identifies the temporary BMPs that are individually listed within the contract

• Identifies sampling and analysis requirements

SWPPP Preparation and Approval

52

SSP 07-345 (SWPPP)

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 53: Construction Site Management Issues

• Specifies rainy season dates• Identifies a maximum DSA for the

rainy season• Defines winter shutdown periods

(Lake Tahoe, Truckee River, east and west forks of Carson River hydrologic units)

• Identifies BMP inspection frequencies• Identifies the process for report of

discharges, notices, or orders• SWPPP preparation payment

SWPPP Implementation

53

SSP 07-345 (SWPPP)

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 54: Construction Site Management Issues

• Reference to Construction Site BMPs Manual• Retention of funds process for penalties

levied or assessed by RWQCB• Water Pollution Control Cost Break-Down• Identification of year-round sediment

control practices• Payment for Water Pollution Control

No longer includes the following:

54

Revisions to SSP 07-345 (SWPPP)

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 55: Construction Site Management Issues

• Identifies the correct permit (General Permit versus Lake Tahoe Permit or other project-specific permit)

• Details requirements of Lake Tahoe Permit

55

SSP S5-630 Relations with RWQCB

Potential Tracking, Wind Erosion, and Construction Site Management IssuesWater Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 56: Construction Site Management Issues

What if you had a situation that required a specific BMP that didn’t have a standard

special provision?

Find an appropriate SSP or develop a non-standard special

provision for the situation!56

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Page 57: Construction Site Management Issues

Project Information1. $6 million upgrade handrail

and sidewalk project 2. Project disturbs > 0.25 ac of

soil (project not a short form)3. Estimated cost of all line item

BMPs equals $66,000

Class Exercise Time

Selecting Appropriate Construction Site BMPs

Determine the appropriate Construction Site BMPs for the

project 57

Potential Tracking, Wind Erosion, and Construction Site Management Issues

Water Pollution Control Strategies

Selecting Appropriate Tracking, Wind Erosion, and Construction Site Management BMPs

Exercise TabPage 4

Page 58: Construction Site Management Issues

Module III Summary

58

We have just covered the following topics:• The potential tracking, wind erosion, and

construction site management issues on construction sites

• The water pollution control strategies behind the selection of Tracking, Wind Erosion, and Construction Site Management BMPs

• The selection of appropriate Tracking Control, Wind Erosion Control, and Construction Site Management BMPs using the Caltrans-developed process

Page 59: Construction Site Management Issues

Questions

Calaveras 49, New Melones Reservoir 59

Page 60: Construction Site Management Issues

What do you know, some more questions!

Can non-storm water discharges be permitted by the Design Storm Water Coordinator?

60

When selecting Construction Site BMPs, where does the prudent Designer start?

Name a few Construction Site BMPs.