Volume 27, Number 45 December 4, 2015 Construction Weekly Annual Toy Drive Help us make Christmas special for the many children of the San Joaquin Child Abuse Prevention Council by donatinga a new, un-wrapped toy! Toys can be dropped off at the Exchange, located at 7500 West Lane, Stockton, CA 95210, Monday - Friday until December 19th. If you are attending the Crab Feed, you can bring your new, un-wrapped toy and receive a FREE drink ticket. Thank You for your Support!

Upload: the-builders-exchange-of-stockton

Post on 24-Jul-2016

227 views

Category:

Documents


3 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Construction weekly december 4, 2015

Volume 27, Number 45 • December 4, 2015

Construction Weekly

Annual Toy Drive Help us make Christmas special for the many

children of the San Joaquin Child Abuse Prevention Council by donatinga a new,

un-wrapped toy! Toys can be dropped off at the Exchange, located at 7500 West Lane,

Stockton, CA 95210, Monday - Friday until December 19th. If you are attending the

Crab Feed, you can bring your new, un-wrapped toy and receive a

FREE drink ticket.

Thank You for your Support!

Page 2: Construction weekly december 4, 2015

2 • Construction Weekly

The Builders’ Exchange of Stockton

2015 Crab FeedScholarship Fundraiser

Friday, December 11, 2015Lodi Grape Festival Pavilion Building • 413 E. Lockeford Street

• 6pm Social Hour • 7pm Dinner & Raffle • 9pm Music & Dancing

$50 Donation Per PersonTickets and table reservations can be purchased at the Builders’

Exchange of Stockton, 7500 West Lane or by Phone: 209-478-1000 or Fax: 209-478-6507 or by mail with payment enclosed.

Bring an unwrapped toy to Crab Feed for the Builders’ Exchange of Stockton Toy Drive

& receive a FREE Drink Ticket.

Toy Drive Donations

Dance the night away with...

Page 3: Construction weekly december 4, 2015

construction weeklyThe official publication of the

Builders’ Exchange of Stockton

7500 West Lane • Stockton, CA 95210Phone (209) 478-1000

Fax (209) 478-6507Plan Room (209) 478-1005

www.besonline.com

OFFICE HOURSMonday - Thursday 8-5

Friday 8-4

DIRECTORSTONY ARCEO, Grayson EngineeringDUSTIN SACCONE, Comfort Air, Inc.

RYAN HAGGERTY, Haggerty ConstructionJASON HJELMSTAD, Holt of California

J.J. JONES, United Rentals A&A Tool RentalsSCOTT LOVOTTI, Lovotti Air

TOM MAYO, Tom Mayo ConstructionTOM PATTI, Delta Cranes

AL TOCCOLI, Al Toccoli ConstructionNICK WOODY, Bockmon and Woody Electric Co.

OFFICERSAL TOCCOLI, President

JASON HJELMSTAD, Vice PresidentTONY ARCEO, Treasurer

TOM MAYO, Member at LargeNICK WOODY, Past President

STAFFMICHAEL SELF, Executive Director

[email protected] PUIG-HINK, Director of Events • Editor

[email protected] LARA, Bookkeeper

[email protected] ROBINSON, Administrative Assistant

[email protected]

• Crab Feed Flyer Page 2

• Welcome New Members Page 4

• Contractor Connection Page 5

• Membership Anniversaries Page 6

• Economic Update Page 7

• Classified Page 8

• Projects Out to Bid Pages 12-35

• Legal Notices Pages 36-37

• Tail Gate Topic Page 38

Contents

Construction Weekly • 3

Page 4: Construction weekly december 4, 2015

4 • Construction Weekly

Mainline Plumbing, Inc.

Valley Distributors, Inc.

RJR Plumbing

Alejo Electric

Envision 4 Integrated Technology Inc.

J & R Warehouse Equipment

R.L. Davis Construction Company, Inc.

West Star Industries

HCS Engineering, Inc

Mike Smith Engineering, Inc.

WELCOME

Welcome new members of the Builders’ Exchange of Stockton. For information about these Members please visit our online directory.

Page 5: Construction weekly december 4, 2015

As a reminder from the CSLB:

SACRAMENTO — California law (Business and Professions Code Section 7071.6) requires all contractors to have either a contractor’s bond or cash deposit filed with the Contractors State License Board (CSLB). The bond or cash deposit is filed for the benefit of consumers who may be damaged as a result of defective construction or other license law violations, and for the benefit of employees who have not been paid wages that are due to them.

On January 1, 2016, the amount of the bond is increas-ing from $12,500 to $15,000. CSLB urges all contractors to make sure they’ve got their new bond or cash deposit in-place by that date.

Contractors who don’t meet the deadline risk having their license suspended.

If you haven’t been informed about the new $15,000 limit by your bond company, it’s important that you contact them immediately, so you can comply with the new law.

Construction Weekly • 5

Contractor Connection

2120 28th Street • Sacramento, California 95818 • 916-451-1114 direct • 916-451-1118 fax • [email protected]

Remember, CLC is ready to answer ALL of your licensing questions and/

or to assist you with ALL of your licensing, incorporation and

other business needs.

Contractors Urged to Make Sure They Increase Bond Coverage to $15,000 Before End of Year;

Applies to All Licensees

Note that the bond of qualifying individuals will remain at $12,500.

Recently passed legislation (Senate Bill 467) raised the contractor bond required of all licensees from $12,500 to $15,000 at the start of the new year. The legislation also eliminated the requirement that contractor applicants prove they have $2,500 in working capital as a condition of obtaining a CSLB license.

Your resource for ALL of your California Contractor’s License and business needsOver 33 years of legislative and regulatory advocacy on behalf of the construction industry.

• Fastrenewalofyourexistingcontractor’s license. We submit at CSLB’s front counter sameday(whichmeansimmediate activation or re-activation and proof through CSLB date stamp). • Contractor licensing, application preparation and test assistance. Expeditesavailable(must provide substantiation). • Assistancewithcomplaintsfiledagainst your license. • Incorporationsandotherfilingswith California Secretary of State. • Assistancewithincorporationsand licensing in other states.

Contractors Licensing Center

SERVICES WE PROVIDE

Contact Us For Free Status Check of Your License

PO Box 191341, Sacramento, CA 95819 | [email protected] | (916) 542-2162

•ObtainingyourEmployerIdentificationNumber(EIN)throughtheFederalGovernment•RegisteringwiththeFranchiseTaxBoardandBoardofEqualization•RegisteringwiththeEmploymentDevelopmentDepartment(EDD)•AssistingwiththefilingofMinorityBusiness,DisabledVeteranBusinessorasaCertifiedSmallBusinesswiththeStateofCalifornia

Filings and assistance for other contractor business needs

2120 28th Street Sacramento CA 95818 + Phone: (916) 451-1114 + Fax: (916) 451-1118

Page 6: Construction weekly december 4, 2015

6 • Construction Weekly

CONGRATS!CongratsCongratulations

These companies have their anniversaries with the Exchange this week. They have been Members for:

Harold W Thompson, Inc. 70 Years

Valley Landscaping & Maintenance 33 Years

Kelso’s Painting, Inc. 17 Years

Valued Engineering 14 Years

Advance Data Communications, Inc. 12 Years

Big Valley Ford Lincoln 6 Years

Thanks for your support!

Page 7: Construction weekly december 4, 2015

Weekly Economic Update provided by Dennis Goldstrand

For disclosure information contact Dennis Goldstrand at (209) 472-7000. 2800 West March Lane, Suite 326 • Stockton, CA 95219

www.goldstrand.com • [email protected]

Construction Weekly • 7

MC-11302015

Dennis J. Goldstrand Presents:

WEEKLY ECONOMIC UPDATE

WEEKLY QUOTE“First say to yourself what you would be; and then do what you have to do.” - Epictetus WEEKLY TIP Taking money out of your retirement account with the goal of using it to pay for your child’s college expenses is a bad idea. Student loans do burden a young adult, but you could end up delaying your retirement because of this move.

WEEKLY RIDDLE In what year did Christmas and New Year’s Day happen in the same year?

Last week’s riddle:You cannot see me. I am inside everyone. I only emerge in anger. The shorter I am, the hotter I am. What am I? Last week’s answer:A temper.

November 30, 2015 CONSUMER CONFIDENCE TRENDS DOWN November saw the Conference Board consumer confidence index plummet. It dropped 8.7 points from its revised October mark of 99.1 to 90.4; economists polled by Briefing.com assumed it would rise slightly to 99.6. The CB attributed November’s poor reading (the lowest since September 2014) to declining expectations of job and wage growth in the next few months. November’s final University of Michigan consumer sentiment index also declined to 91.3 from its preliminary reading of 93.1.1,2

CONSUMER SPENDING NUDGES UP Personal spending improved just 0.1% in October, but the Commerce Department’s latest report also revealed that personal incomes rose by 0.4% last month. In news related to consumer spending, October saw a 3.0% gain in capital goods orders (0.5% minus transportation orders), and the Bureau of Economic Analysis put Q3 GDP at 2.1% in its second estimate, 0.6% higher than in its first.1

A LEAP FOR NEW HOME SALES IN OCTOBER New home buying increased 10.7% last month according to the Census Bureau, resulting in a 4.9% annualized gain. Resales declined 3.4% in October, the National Association of Realtors noted, citing declining inventory as a major factor.3

AN ADVANCE FOR THE BIG THREE The Nasdaq led the way among the major U.S. equity indices last week, rising 1.06% to a November 27 close of 5,127.53. Next was the Dow, gaining 0.37% in the shortened trading week to settle at 17,798.49 Friday. The S&P 500 eked out an 0.04% advance from Monday through Friday to close the week at 2,090.11.4

THIS WEEK: NAR’s October pending home sales index appears Monday. Tuesday sees the release of the November ISM manufacturing PMI and Q3 earnings from Bob Evans. Wednesday, Federal Reserve chair Janet Yellen speaks on the outlook for the economy in Washington, D.C.; the Fed releases a new Beige Book, a new ADP employment change report comes out, and Wall Street also considers earnings from Aeropostale and American Eagle Outfitters. Thursday, Janet Yellen testifies on the economic outlook in the Senate; October’s Challenger job-cut report, November’s ISM services PMI, a new initial claims report and earnings from Barnes & Noble, Dollar General, Express, Five Below, Kroger, Land’s End, Sears Holdings and Toro also arrive. The Labor Department’s November jobs report arrives Friday, plus earnings from Big Lots! and Hovnanian.

% CHANGE Y-T-D 1-YR CHG 5-YR AVG 10-YR AVG

DJIA -0.14 -0.17 +12.09 +6.34 NASDAQ +8.27 +7.01 +20.46 +12.90 S&P 500 +1.52 +1.09 +15.15 +6.62

REAL YIELD 11/27 RATE 1 YR AGO 5 YRS AGO 10 YRS AGO

10 YR TIPS 0.62% 0.39% 0.75% 2.04%Sources: wsj.com, bigcharts.com, treasury.gov - 11/27/155,6,7,8,9

Indices are unmanaged, do not incur fees or expenses, and cannot be invested into directly. These returns do not include dividends. 10-year TIPS real yield = projected return at maturity given expected inflation.

Please feel free to forward this article to family, friends or colleagues. If you would like us to add them to our distribution list, please reply with their address.

We will contact them first and request their permission to add them to our list.

Page 8: Construction weekly december 4, 2015

8 • Construction Weekly

Employment Opportunities

Classified

Account ManagerThe Account Manager position manages Service Providers from various angles including but not limited to: scheduling, workman-ship, cost, scope compliance and overall customer satisfaction. Additionally, they assist with Service Provider selection and ongoing management. 25-30 Hours per week. Please email resumes to Jaclyn Frenzel at [email protected] or to see a full job position description.

SEEKING Employment

Project ManagerProactive, competitive construction professional Project Manager / Construction Estimator experienced in all levels of residential, com-mercial, light commercial and industrial projects including heating, ven-tilation & air conditioning, sheet metal, electrical, plumbing, foundation, carpentry, landscaping, solar, civil, architectural and structural design per all related code requirements. Contact Mark at 209-474-3894.

Requesting subbids from all Qualified DBE, Subcontractors and Materials Suppliers for the following project:

Vehicle Maintenance Shop & Administration BuildingModesto, CA

Bids December 16, 2015 @ 2:00 PM

ACME CONSTRUCTION COMPANY, INC. P.O. Box 4710

Modesto, CA 95352 (209) 523-2674 and (209) 523-0213 (Fax)

Contact Mike Mastagni – ext. 106 [email protected]

All Subcontractors may be required to furnish sub-bond

We are an Equal Opportunity Employer

Page 9: Construction weekly december 4, 2015

Construction Weekly • 9

Local insurance solutions for the construction industryWells Fargo Insurance delivers an outstanding combination of resources with excellent local service and support. And, as part of Wells Fargo & Company, we can provide access to financial solutions to help ensure your success.

Bonds | Insurance | Construction risk management

Wells Fargo Insurance Services USA, Inc. Dave Weise10940 White Rock RoadRancho Cordova, CA 95670916-589-8035 | [email protected]

Products and services are offered through Wells Fargo Insurance Services USA, Inc., and Wells Fargo Insurance Services of West Virginia, Inc., non-bank insurance agency affiliates of Wells Fargo & Company.

Products and services are underwritten by unaffiliated insurance companies except crop and flood insurance, which may be underwritten by an affiliate, Rural Community Insurance Company. Some services require additional fees and may be offered directly through third-party providers. Banking and insurance decisions are made independently and do not influence each other.

© 2013 Wells Fargo Insurance Services USA, Inc. All rights reserved.

040113AMb_Builders_Exch_ad color.indd 1 4/3/2013 12:50:58 PM

Commercial Doors, Builder’s Hardware,

Toilet Partitions, General Hardware & More

924 E. Church Street, Stockton, CA 95203 WWW.CVHARDWARE.COM

Phone (209) 464-7305 * Fax (209) 464-1737

Commercial Residential Design/Build

Al Toccoli • General [email protected]

(209) 639-7608 • Fax (209) 931-3513License #522916

Page 10: Construction weekly december 4, 2015

10 • Construction Weekly

We Offer:Medical, Dental, Vision and MORE!

For a complete list of products go to www.cbxbenefits.com

For More Information:Denise Haycock - Benefits Consultant

800-595-1339 or [email protected]&A Insurance Marketing, CA License #0B17048

Membership has its Benefits...

800-UR-RENTSunitedrentals.com

Rentals • Sales • Service • Supplies Consider it done.tm

• Widest selection of construction equipment• In-stock availability of over 9,000 contractor supply

items• Helpful, expert staff to assist with your project• On site maintenance, equipment and safety training• Delivery to your job site• Nearly 700 locations

Working with You from Start to Finish

Visit us today:Stockton #1 Rental Store2911 East Fremont StreetStockton, CA 95205209-948-9500

Branch hours: Weekdays 7:00am - 5:00pm

GSA #: GS-06F-0068R

Page 11: Construction weekly december 4, 2015

Construction Weekly • 11

Business Ads

Ohio National Cooperative Advertising Fund GuidelinesFormat ads may be altered in size and style, but not in content. The typestyle (Adobe Garamond) of the Ohio National Financial Services logo, as well as the logo itself, may not be altered.

Agent imprint: Agents may use their names, life insurance professional designations, and address and telephone numbers in this area. Designations such as JD and CPA may not be used (since agents are not representing the company in those capacities), as well as other titles containing terms such as insur-ance or financial consultant; financial, insurance or estate planner; financial or insurance counselor; insurance, financial or investment adviser; or other words implying an independent or non-representative capacity. For co-op reimbursement, general agents should submit: 1. a copy of the paid invoice. 2. tear sheet/photo of the ad. 3. completed Form 1914 (Request for Reimbursement), including approval number for the ad.

No payment will be made for advertising that does not comply with these guidelines.

Approval Number: A-0078-BU-002 Rev. 2-13

What You Don’t Know Can Hurt Your Business

What You Don’t Know Can Hurt Your Business

The Ohio National Life Insurance CompanyOhio National Life Assurance Corporation

You know your day-to-day business better than anyone. But, do you know the best ways to protect your key assets? Provide important employee benefits? Minimize your taxes? Reward yourself and reach your financial goals?

Help your business succeed by bolstering its long-term health. From individual life and disability income insurance, to 401(k) and simplified employee pension plans, we can help you make the right moves.

Call today for Free information and consultation.

Product, product features and rider availability vary by state. Issuers not licensed to conduct business and products not distributed in AK, HI and NY. Disability income insurance not available in AK, CA, HI, ME and NY.

You know your day-to-day business better than anyone. But, do you know the best ways to protect your key assets? Provide important employee benefits? Minimize your taxes? Reward yourself and reach your financial goals?Help your business succeed by bolstering its long-term health. From individual life and disability income insurance, to 401(k) and simplified employee pension plans, we can help you make the right moves.

Call today for Free information and consultation.

The Ohio National Life Insurance CompanyOhio National Life Assurance Corporation

Product, product features and rider availability vary by state. Issuers not licensed to conduct business and products not distributed in AK, HI and NY. Disability income insurance not available in AK, CA, HI, ME and NY.

Agent Name/Agency Name Street Address City, State ZIP 000.000.0000

Licensed in (List all states that apply)

Agent Name/Agency Name Street Address City, State ZIP 000.000.0000

Licensed in (List all states that apply)

Dennis J. Goldstrand, CLU, ChFC, AEPGoldstrand Planning Group

[email protected] W. March Lane, Suite 326 • Stockton, CA 95219-8202

Office: (209) 472-7000 • Toll Free: (800) 507-9911 • Fax: (209) 472-1551www.goldstrand.com

Page 12: Construction weekly december 4, 2015

12 • Construction Weekly

CSI SPECIFICATION

LEGEND-DIVISIONS

1 General Requirements 2 Sitework 3 Concrete 4 Masonry 5 Metals 6 Wood/Plastic 7 Thermal/Moisture Protection 8 Doors/Windows 9 Finishes10 Specialties11 Equipment12 Furnishings13 Special Construction14 Conveying system15 Mechanical16 Electrical

Projects out to bid

December 07FREMONT BOULEVARD ADAPTIVE SIGNAL CONTROL TECHNOLOGY PROJECTFremont Plan OnlineOnlyProject #: 8870, 16-004Bid Date: 12/7/2015 2:00 PM City of Fremont (510) 494-4741Addenda: 2Description: Work consists of imple-menting an adaptive signal control technology (ASCT) system for the Fremont Boulevard Adaptive Signal Control Technology project (here-inafter “Project”), and will receive proposals in the office of the City’s Purchasing Division at 3300 Capitol Avenue,Building B, Fremont, CA 94538, up to the hour of 2:00 p.m., on December 3, 2015.

SOLAR POWER PURCHASE KERMAN UNIFIED SCHOOL DISTRICTKerman Plan OnlineOnlyBid Date: 12/7/2015 5:00 PM TerraVerde Renewable Partners 888-316-2597Prebid: MAND 11/6/15 at 9:00 amAddenda: 1Description: The District is seek-ing proposals from qualified solar contractors (“Respondents”) to design, engineer, procure, con-struct, interconnect, commission, maintain, operate and own solar photovoltaic systems at one or more of the sites listed in the Ex-ecutive Summary (“Project Sites”). The Project may be split into two or more stages or phases if the District determines, after review-ing responses to this Request for Proposals (“RFP”), that staging is advisable.

PHOTOVOLTAIC INSTALLATION @ FIVE CITY PROPERTIES PROJECTWest Sacramento Plan Onli-neOnlyProject #: 52047Bid Date: 12/7/2015 1:30 PM City of West Sacramento - Public Works 916-617-4850Prebid: MAND 11/6/15 at 9:00 amAddenda: 5Description: Design, engineer, procure, install, interconnect, commission, operate and perform maintenance for solar photovoltaic system for five City properties.

PARK AVENUE SENIOR APART-MENTS AND LAURELGROVE FAMILY APARTMENTSSan Jose Plan OnlineOnlyProject #: 1511-005Bid Date: 12/7/2015 5:00 PM Housing Authority of the County of Santa Clara 408-275-8770Prebid: 11/19/15 at 11:00amAddenda: 3Description: The Housing Author-ity of the County of Santa Clara (HACSC ) is the current owner and developer of a 2.19 acre property located at 777 Park Av-enue, San Jose. It has developed the property into two separate projects. The Park Avenue Senior Apartments (Park Avenue ) and Laurel Grove Family Apartments (Laurel Grove ) (the Projects ) are two new construction, affordable housing projects. Gelfand Partner Architects is the architect for both projects.

KOTTINGER DR. AND FIRST ST. WATER MAIN IMPROVEMENT PROJECTPlesanton Plan OnlineOnlyBid Date: 12/7/2015 5:00 PM L & D Construction 408-2920128Addenda: 1Description: This project will start in December 2015 or January 2016, depending on weather. Note that this is in advance of the 131-unit Kottinger Gardens apart-ment project. If you are bidding both projects, assume a separate mobilization for the offsite water line work.

LARCH ROAD RECONSTRUC-TION AND HANSEN ROAD WW COLLECTION SYSTEM UP-GRADETracy Plan OnlineOnlyProject #: 73125, 74097, 74106, 74113Bid Date: 12/7/2015 2:00 PM City of Tracy - Development & En-gineering Services 209-831-6400Prebid: 11/4/15 at 10:00amAddenda: 2Description: Work consists of the reconstruct 3700 lf 2 lane minor arterial road, including cement treated base, roller compacted (RCC) or asphalt concrete paving, install 3700 lf 24” sewer force main, 4250 lf fiber optic system, modify sewage lift station includ-ing pumps, piping, concrete repair and resurfacing, electrical, bypass pumping. Goodfellow Top Grade Construc-tion, Inc., Livermore PH: (925) 449-5764 FAX: (925) 449-5875 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209

December 081080 EMELINE INTEGRATED BEHAVIORAL HEALTH REMOD-EL PROJECTSanta Cruz Plan OnlineOnlyProject #: 15C1-002Bid Date: 12/8/2015 2:30 PM Santa Cruz County 831-454-2160Estimated Cost: $0 to $131,000Prebid: MAND 11/24/15 at 10:00amAddenda: 0Description: See specs for details.

Page 13: Construction weekly december 4, 2015

Construction Weekly • 13

Projects out to bidFIRE RISER/WET SPRINKLER INSPECTION AND CONDITION ASSESSMENT SERVICES-DE ANZA COLLEGECupertino Plan OnlineOnlyProject #: 1744Bid Date: 12/8/2015 4:00 PM De Anza Community College (650) 949-6165Addenda: 0Description: The Foothill-De Anza Community College District teeks to enter into an agreement with a vendor that will (1) perform a condition assessment by conduct-ing an inspection of all fire risers/wet sprinklers on the De Anza College campus to complete the certification process, (2) provide a five-year certification that is compliant with NFPA 25/Title 19 requirements, and (3) provide a deficiency report of recommended repairs.

COMMERCIAL WAYFINDING SIGN PROGRAMLos Altos Plan OnlineOnlyProject #: CD-01002Bid Date: 12/8/2015 12:00 PM City of Los Altos 650-947-2780Addenda: 0Description: The project includes, but is not limited to, fabricating and installing citywide wayfinding signs, downtown parking signs, and downtown gateway signs ac-cording to the plans and specifi-cations. Signs will be installed at various locations throughout the City of Los Altos.

OHLONE DOG PARK RENOVA-TIONBerkeley Plan OnlineOnlyProject #: 15-10962-CBid Date: 12/8/2015 2:00 PM City of Berkeley - Public Works 510-981-6400Estimated Cost: $0 to $300,000Addenda: 0Description: Work of Contract comprises all work on drawings listed in Document 00004, List of Drawings, and the Specifications, including but not limited to the following: renovation of existing Dog Park, addition of a small dog park, installation of new site pav-ing, ADA access improvements, grading and drainage improve-ments, fencing, landscaping and irrigation, and other site amenities for the City of Berkeley (“City”) Ohlone Dog Park, located at 1801 Hearst Avenue in Berkeley, California and ancillary work in accordance with the terms and conditions of the Contract Docu-ments Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

3808 ABILENE COURTModesto Plan OnlineOnlyProject #: 15-08Bid Date: 12/8/2015 4:30 PM City of Modesto 209-571-5526Prebid: MAND 12/1/15 at 3:00pmAddenda: 0Description: Work consists of re-roof, replacing doors, exte-rior painting, and remodel both bathrooms. Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

LOPES COURT UTILITY RELO-CATION PROJECTFremont Plan OnlineOnlyProject #: 8804Bid Date: 12/8/2015 2:00 PM City of Fremont (510) 494-4741Estimated Cost: $0 to $900000Prebid: MAND 11/23/15 at 10:00amAddenda: 0Description: Work consists of maintaining traffic control and pavement delineation throughout the period of construction; saw cutting, demolishing and dispos-ing of existing improvements, including existing 10 inch sanitary sewer in 30 inch steel casing and installation of new 20 inch water main in 30 inch steel casing and all associated connections. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601

TUOLUMNE RIVER REGIONAL PARK (TRRP) GATEWAY PAR-CEL – PHASE 2 Modesto Plan OnlineOnlyBid Date: 12/8/2015 11:00 AM City of Modesto 209-571-5526Addenda: 0Description: The project will include grading, trails, pedestrian bridge, river overlook and planting and irrigation forhabitat restoration adjacent to the north bank of the Tuolumne River between Highway 99 and 7th Street. Burdick Excavating, CARSON CITY PH: 775-297-4566 FAX: 775-297-0974 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 Diede Construction, Inc., Lodi PH: 209-369-8255 FAX: 209-368-0600 Harris Builders, Inc., Hilmar PH: (209) 664-9486 FAX: (209) 667-0738

MODESTO JUNIOR COLLEGE WEST CAMPUS WESTERLY ROADS PROJECT AREAS 3 & 4Modesto Plan OnlineOnlyProject #: 16-1742Bid Date: 12/8/2015 4:00 PM Yosemite Community College District 209-575-6521Estimated Cost: $0 to $1,893,372Prebid: 9/2/15 at 10:00 amAddenda: 4Description: Scope of work includes but is not limited to site demolition; site grading and pav-ing; site utilities; landscaping and irrigation; concrete work; electrical supply and lighting systems. This project, being the Modesto Junior College West Campus Westerly Roads Areas 3 and 4, scope of work will be the addition of the first phase of the campus wide circulation road ways, up-grading existing roads and the rehabilita-tion of the northerly parking lot. The project also includes added pedestrian access way facili-ties to the existing softball field, site lighting along roads and the added pedestrian path, along with the associated site landscaping installations. Other construction consists of site improvements and accessible parking stalls Acme Construction, Modesto PH: 209-523-2674 FAX: 209-523-0213 McFadden Construction, Inc., Stockton PH: 209-478-7407 FAX: 209-478-1516

Page 14: Construction weekly december 4, 2015

14 • Construction Weekly

Projects out to bidBRENTWOOD UNION SCHOOL DISTRICT (CUPCC)Brentwood Plan OnlineOnlyBid Date: 12/8/2015 2:00 PM Brentwood Union School District 925-513-6300Prebid: MAND 11/20/15 at 9:00 am Addenda: 0Description: The Brentwood Union School District is updating its list of contractors who may be inter-ested in performing public works for the year 2016.

DEL NORTE HIGH SCHOOL EX-TERIOR RENOVATION & HVAC REPLACEMENTCrescent City Plan OnlineOnlyBid Date: 12/8/2015 1:00 PM Danco Builders 707-822-9000Estimated Cost: $0 to $5,400,000Prebid: MAND 10/23/15 at 1:00pm Addenda: 2Description: Work consists of HVAC System Replacement: Classrooms, offices, and Multi-Use Rooms / Kitchen. Gymna-siums and Locker Rooms. Shop buildings. Modular classrooms are not being considered. 2. Replace exterior windows with scheduled window units with high efficiency glazing. 3. Replace glazing and infill at exterior glazing walls and doors sidelights and transom units. 4. Roofing replacement- Re-place the existing built-up roofing with new single ply PVC mem-brane with new 4” foam insulation, including a new metal perimeter fascia, gutters and downspouts. 5. New electrical service and feeder upgrade to support new mechani-cal load. 6. New campus wide automatic fire alarm system. 7. New soffit at front of school.

MCLAUGHLIN RESERVE IM-PROVEMENTS FIELD STATION – REBIDLower Lake Plan OnlineOnlyProject #: 9518300, WC-1114CFBid Date: 12/8/2015 3:00 PM University of California, Davis Health System 916-734-7024Estimated Cost: $800000Prebid: MAND 11/12/15 at 11:00am Addenda: 0Description: Work consists of providing all labor, materials, equipment, tools, transportation, insurance, and services for the interior renovation of a residence facility including demolition and construction of restroom facili-ties, kitchen improvements, fire sprinkler system, fire alarm system, HVAC modifications and addition of doors and new glass to the storefront systems; drainage, flatwork and parking improve-ments; site fire water system and Pump Building. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156 Helmer & Sons, Inc., Angwin PH: (707) 965-2425 FAX: (707) 965-2982 Koch & Koch, Inc., Penn Valley PH: 530-432-4000 FAX: 530-432-4099

ISLAND ENERGY ELECTRIC MANHOLE REPLACEMENT ON MARE ISLAND BRIDGEMare Island Plan OnlineOnlyProject #: 2015-IE.MRPBid Date: 12/8/2015 2:00 PM Pittsburg Power Company dba Island Energy 925-252-4860Prebid: MAND 11/24/15 at 9:30amAddenda: 0Description: Work consists of the replacement of an elevated elec-tric manhole on the western end of the Mare Island Bridge.

NORTH BAY REGIONAL WATER TREATMENT PLANT FILTERS #2, #3, & #6 MEDIA REPLACE-MENTFairfield Plan OnlineOnlyBid Date: 12/8/2015 2:00 PM City of Fairfield - Department of Public Works 707-428-7486Estimated Cost: $0 to $850,000Addenda: 0Description: Work consists of Removal and replacement of the sand and granular activated carbon media in three (3) two-bay filters at the North Bay Regional Water Treatment Plant, 5110 Water Works Lane, Fairfield, Cali-fornia. CONTRACTOR is respon-sible to dispose of the existing media at CONTRACTOR’S cost. CONTRACTOR is to replace any damaged nozzles, replacement nozzles installed by the CON-TRACTOR are provided by the CITY. The CITY will determine which nozzles are damaged for the CONTRACTOR to replace. Disposal of any damaged existing nozzles is at the CONTRAC-TOR’S cost.

CONSTRUCTION OF VISALIA EMERGENCY COMMUNICA-TIONS CENTER (VECC)Visalia Plan OnlineOnlyProject #: RFB-15-16-32Bid Date: 12/8/2015 12:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $11,000,000Prebid: 11/6/15 at 10:00AMAddenda: 1Description: The Visalia Emer-gency Communications Center Project (VECC) consists of an approximately18,700 square foot, two-story building, located on a site area of approximately 4.2 acres. The VECC building will include the City’s 911/Dispatch Center, Fire Department Admin-istration, Emergency Operations Center, Traffic Management Center, and Information Services Center. The site is located SE of the intersection of Goshen Av-enue and Burke Street in the east downtown area of Visalia. The site address is 420 N. BurkeStreet. The site is currently unde-veloped. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Colombo Construction, Bakers-field PH: (661) 316-0100 FAX: (661) 316-0101 Cooper Chase Construction, Fresno PH: (559) 255-7009 FAX: (559) 255-7012 Lewis C. Nelson & Sons, Inc., Selma PH: 559-896-1443 FAX: 559-896-8609 S. C. Anderson, Bakersfield PH: (661) 392-7000 FAX: (661) 391-9999 S.C. Anderson Construction, Bakersfield PH: (661) 392-7000 FAX: (661) 391-9999

Page 15: Construction weekly december 4, 2015

Construction Weekly • 15

Projects out to bidSeals/Biehle General Contractors, Visalia PH: (559) 641-4040 FAX: (559) 651-4145 Simile Construction Service, Inc., Modesto PH: (209) 545-6111 FAX: (209) 545-6113

1437 OAKWOOD DRIVEModesto Plan OnlineOnlyProject #: 15-07Bid Date: 12/8/2015 4:30 PM City of Modesto - Dept of Parks, Recreation & Neighborhoods 209-577-5392Prebid: MAND 12/1/15 at 1:30pmAddenda: 0Description: Work consists of a small addition, re-roof, replacing doors, replace windows, exterior painting, new flooring, and bath-rooms remolding.

December 09SIERRA VISTA GYMNASIUM RENOVATION DESIGN-BIDStockton Plan OnlineOnlyProject #: 1516-002Bid Date: 12/9/2015 11:00 AM Diede Construction, Inc. 209-369-8255Estimated Cost: $0 to $770,000Prebid: 11/19/15 at 10:00amAddenda: 0Description: Work consists of de-sign, fabrication, delivery, instal-lation, construction, and any site work. The Contractor shall provide to the Authority Contracting Of-ficer (CO) all design drawings, shop drawings, calculations, as well as submittals for all permits and permissions. Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 DOORS, WINDOWS, GLASS AND GLAZ-INGBakersfield Plan OnlineOnlyProject #: 3025Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $132,110Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide doors, windows, glass and glazing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 LATH, PLASTER, DRYWALL AND METAL STUDS Bakersfield Plan OnlineOnlyProject #: 3026Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,777,587Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide lath, plas-ter, drywall and metal studs for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 GEN-ERAL CONSTRUCTIONBakersfield Plan OnlineOnlyProject #: 3018Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $169,603Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide general construction for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 CERAM-IC TILEBakersfield Plan OnlineOnlyProject #: 3027Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $168,710Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide ceramic tile for completion of North High School Modernization Phase 2.

RFP - ENVIRONMENTAL (CEQA) SERVICES FOR CAREER AND TECHNICAL EDUCATION REGIONAL TRAINING CENTER (CTERTC) - 2015Bakersfield Plan OnlineOnlyProject #: 3344Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Addenda: 0Description: Provide Preliminary Environmental Assessment Services (PEA) for Career and Technical Education Regional Training Center (CTERTC) - 2015.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 OVER-HEAD COILING COUNTER DOORSBakersfield Plan OnlineOnlyProject #: 3024Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $26,610Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide overhead coiling counter doors for comple-tion of North High School Modern-ization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 PAINT-INGBakersfield Plan OnlineOnlyProject #: 3031Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $159,416Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide painting for completion of North High School Modernization Phase 2.

ARCHITECTURAL SERVICES FOR CAREER AND TECHNICAL EDUCATION REGIONAL TRAIN-ING CENTER Bakersfield Plan OnlineOnlyProject #: 3342Bid Date: 12/9/2015 2:00 PM City of Bakersfield 661-326-3746Addenda: 0Description: Work consists of providing appropriate services for Career and Technical Educa-tion Regional Training Center (CTERTC) – 2015

ARCHITECTURAL SERVICES FOR REGIONAL OCCUPA-TIONAL CENTER BUILDING ADDITIONSBakersfield Plan OnlineOnlyProject #: 3341Bid Date: 12/9/2015 2:00 PM City of Bakersfield 661-326-3746Prebid: 12/1/15 at 9:00amAddenda: 0Description: Work consists of providing appropriate services for Regional Occupational Center Building Additions - 2015.

Page 16: Construction weekly december 4, 2015

16 • Construction Weekly

Projects out to bidINSTALLATION OF REPLACE-MENT WELL 4 AND NEW WELL 9Ukiah Plan OnlineOnlyProject #: 14-05Bid Date: 12/9/2015 2:00 PM City of Ukiah 707-463-6200Estimated Cost: $0 to $1,158,000Prebid: MAND 11/19/15 at 1:00pmAddenda: 3Description: The work includes the installation of 2 new monitor-ing wells and the installation of one new municipal potable water production well and one replace-ment municipal potable water production well at two separate locations.

RFP - PRELIMINARY ENVIRON-MENTAL ASSESSMENT (PEA) SERVICES FOR CAREER AND TECHNICAL EDUCATION RE-GIONAL TRAINING CENTER (CTERTC) - 2015 Bakersfield Plan OnlineOnlyProject #: 3343Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Addenda: 0Description: Provide Preliminary Environmental Assessment Services (PEA) for Career and Technical Education Regional Training Center (CTERTC) - 2015NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 STRUC-TURAL CONCRETEBakersfield Plan OnlineOnlyProject #: 3014Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321 Estimated Cost: $0 to $1,185,172 Prebid: 11/10/15 at 3:00 pm Addenda: 0Description: Provide structural concrete for completion of North High School Modernization Phase 2.

BROKAW SUBSTATION FEED-ERS 101 AND 102 INSTALLA-TION PROJECTSanta Clara Plan OnlineOnlyProject #: 2419ABid Date: 12/9/2015 3:00 PM City of Santa Clara - Public Works 408-615-3000Prebid: 11/18/15 at 10:00amAddenda: 1Description: Work consists of the installation of feeders 101 and 102 at Brokaw Substation in Santa Clara, CA.

SHELL PAD BUILDINGLos Banos Plan OnlineOnlyBid Date: 12/9/2015 2:00 PM SD Deacon 916-969-0900Addenda: 0Description: Shell Pad Building (4,000 s.f.). Trades to include: site demolition, grading, AC paving, striping & signage, landscape/irrigation,underground utilities, erosion control, concrete, masonry, structural steel, rough carpentry, insulation, roofing (TPO & Standing Seam Metal), sheet-metal/flashing, roof accessories, caulking, doors/frames/hardware, storefront/glazing, plaster/EIFS, painting, awnings, fire sprinklers, plumbing, HVAC and electrical. Moorefield Construction, Sacra-mento PH: 916-614-7888 FAX: 916-419-8870

ARCHITECTURAL, ENGINEER-ING, AND/OR CONSULTANT SERVICES FOR DISTRICT-WIDE MISCELLANEOUS PROJECTS Bakersfield Plan OnlineOnlyProject #: 3340Bid Date: 12/9/2015 2:00 PM City of Bakersfield 661-326-3746Addenda: 0Description: Work consists of providing appropriate services for various District Office Projects.

SOLANO AVENUE DRAINAGE DITCH REPAIRNapa Plan OnlineOnlyProject #: 15-27Bid Date: 12/9/2015 3:30 PM Napa County - Public Works 707-253-4351Estimated Cost: $0 to $50,000Prebid: MAND 11/18/15 & 11/24/15 at 10:00 amAddenda: 0Description: The engineer's estimate for construction of this project which includes but is not limited to the demolition and repair of an existing damaged concrete segmental retaining wall and fencing is $50,000.

YOLO COUNTY JUVENILE HALL MULTI-PURPOSE BUILDING PACKAGE PROJECTWoodland Plan OnlineOnlyProject #: CAOIFBSL1501Bid Date: 12/9/2015 2:00 PM County of Yolo - Central Services Division 530-666-8322Prebid: 11/12/15 at 10:00 amAddenda: 4Description: The project will con-struct a facility that includes; Multi-purpose Recreation use spaces, Program rooms and Visitor Center that will share scheduled time between “in-custody” youth and youth who are being supervised in the community after their release from Juvenile Hall. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 BROWARD BUILDERS INC., WOODLAND PH: (530) 666-5635 FAX: (530) 666-5723 S W ALLEN CONSTRUCTION, SACRAMENTO PH: (916) 344-2098 FAX: (916) 344-0307

STORM DRAIN RELINE PROJ-ECTStockton Plan OnlineOnlyProject #: 712Bid Date: 12/9/2015 2:00 PM San Joaquin Delta Community College 209-954-5065Estimated Cost: $0 to $33,000Prebid: MAND 11/30/15 at 11:00 amAddenda: 0Description: The Project has been reviewed and approved by the Division of State Architect and it generally consists of: Reline exist-ing sections of storm drain piping near Locke and Budd buildings, approximately 100’ of 8” pipe and approximately 60’ of 6” – 8” pipe respectively, as shown on Exhibit ‘A’ drawings. The existing storm drain pipe is to be relined utiliz-ing the cure-in-place pipe (CIPP) lining procedure by inversion and curing of resin-impregnated flex-ible tube. Contractor to perform CCTV pre-inspection and post-inspection.

PROPOSITION 39 CLEAN ENERGY JOBS ACT HVAC REPLACEMENT MARK TWAIN ELEMENTARYAngels Camp Plan OnlineOnlyBid Date: 12/9/2015 3:00 PM Mark Twain Union Elementary School District 209-736-1855Estimated Cost: $0 to $175,000Prebid: MAND 12/2/15 at 3:00pmAddenda: 0Description: Work consists of re-placing fifteen roof top 5-ton pack-aged HVAC units to new SEER 13 units at Mark Twain Elementary.

Page 17: Construction weekly december 4, 2015

Construction Weekly •17

Projects out to bidNORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 CHAIN LINK FENCINGBakersfield Plan OnlineOnlyProject #: 3012Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $151,555Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide chain link fencing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 PLUMB-INGBakersfield Plan OnlineOnlyProject #: 3040Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $585,850Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide plumbing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 METAL LOCKERSBakersfield Plan OnlineOnlyProject #: 3034Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $267,370Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide metal lock-ers for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SITE UTILITIESBakersfield Plan OnlineOnlyProject #: 3011Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $611,060Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide site utili-ties for completion of North High School Modernization Phase 2.

RFP - CIVIL ENGINEERING SERVICES FOR CAREER AND TECHNICAL EDUCATION REGIONAL TRAINING CENTER (CTERTC) - 2015Bakersfield Plan OnlineOnlyProject #: 3345Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Addenda: 0Description: Provide Preliminary Environmental Assessment Services (PEA) for Career and Technical Education Regional Training Center (CTERTC) - 2015.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ARCHI-TECTURAL SPECIALTIESBakersfield Plan OnlineOnlyProject #: 3033Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $135,050Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide architectural specialties for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 STRUC-TURAL STEEL AND MISC. IRONBakersfield Plan OnlineOnlyProject #: 3016Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $2,017,963Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide structural steel and misc. iron for completion of North High School Moderniza-tion Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SITE CONCRETEBakersfield Plan OnlineOnlyProject #: 3013Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,642,510Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide site concrete for completion of North High School Modernization Phase 2. NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ATHLET-IC EQUIPMENTBakersfield Plan OnlineOnlyProject #: 3036Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $80,710Prebid: 11/10/15 at 3:00pmAddenda: 0Description: Provide athletic equipment for completion of North High School Modernization Phase 2

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FOOD SERVICE EQUIPMENTBakersfield Plan OnlineOnlyProject #: 3035Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $49,700Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide food service equipment for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FIRE ALARM SYSTEMBakersfield Plan OnlineOnlyProject #: 3043Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $112,000Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide fire alarm system for completion of North High School Modernization Phase 2

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SELEC-TIVE DEMOLITIONBakersfield Plan OnlineOnlyProject #: 3009Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $160,000Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide selective demolition for completion of North High School Modernization Phase 2.

Page 18: Construction weekly december 4, 2015

18 • Construction Weekly

Projects out to bidNORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 SITE DEMOLITION & EARTHWORKBakersfield Plan OnlineOnlyProject #: 3008Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $900,000Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide site demoli-tion and earthwork for completion of North High School Moderniza-tion Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ELEC-TRICALBakersfield Plan OnlineOnlyProject #: 3042Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $2,391,743Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide electrical for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 AS-PHALT CONCRETE PAVINGBakersfield Plan OnlineOnlyProject #: 3010Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $588,278Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide asphalt concrete paving for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 INSULA-TIONBakersfield Plan OnlineOnlyProject #: 3020Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $52,863Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide insulation for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 DOORS, FRAMES & HARDWAREBakersfield Plan OnlineOnlyProject #: 3023Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $361,230Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide doors, frames and hardware for comple-tion of North High School Modern-ization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 MA-SONRYBakersfield Plan OnlineOnlyProject #: 3015Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,128,711Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide masonry for completion of North High School Modernization Phase 2

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FLOOR-ING AND CARPETBakersfield Plan OnlineOnlyProject #: 3030Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $63,920Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide flooring and carpet for completion of North High School Modernization Phase 2.

FAMOUS DAVE’S ALAMEDAAlameda Plan OnlineOnlyBid Date: 12/9/2015 12:00 PM RC Pacific Construction Inc 916-782-5682Addenda: 0Description: See specifications for details.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 TOILET PARTITIONS AND ACCESSO-RIESBakersfield Plan OnlineOnlyProject #: 3032Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $78,070Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide toilet parti-tions and accessories for comple-tion of North High School Modern-ization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 RESIL-IENT WOOD FLOORINGBakersfield Plan OnlineOnlyProject #: 3029Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $211,725Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide resilient wood flooring for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ROOF-INGBakersfield Plan OnlineOnlyProject #: 3021Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $550,000Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide roofing for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 METAL ROOFINGBakersfield Plan OnlineOnlyProject #: 3022Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $425,000Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide metal roof-ing for completion of North High School Modernization Phase 2.

Page 19: Construction weekly december 4, 2015

Construction Weekly •19

Projects out to bidNORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 TELE-SCOPING BLEACHERSBakersfield Plan OnlineOnlyProject #: 3037Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $271,181Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide telescoping bleachers for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ARCHI-TECTURAL WOODWORKBakersfield Plan OnlineOnlyProject #: 3019Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $123,070Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide architectural woodwork for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 HVAC AND SHEET METALBakersfield Plan OnlineOnlyProject #: 3041Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $1,069,948Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide HVAC and sheet metal for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ACOUS-TICAL CEILING AND TECTUM Bakersfield Plan OnlineOnlyProject #: 3028Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $238,943Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide acoustical ceiling and tectum for completion of North High School Moderniza-tion Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 FIRE SPRINKLER SYSTEMBakersfield Plan OnlineOnlyProject #: 3039Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $163,663Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide fire sprinkler system for completion of North High School Modernization Phase 2

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 ORNA-MENTAL METALBakersfield Plan OnlineOnlyProject #: 3017Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $141,780Prebid: 11/10/15 at 3:00 pmAddenda: 0Description: Provide ornamental metal for completion of North High School Modernization Phase 2.

NORTH HIGH SCHOOL MOD-ERNIZATION PHASE 2 VERTI-CAL PLATFORM LIFTBakersfield Plan OnlineOnlyProject #: 3038Bid Date: 12/9/2015 2:00 PM Kern High School District 661-827-3321Estimated Cost: $0 to $40,000Prebid: 11/10/15 AT 3:00PMAddenda: 0Description: Provide vertical platform lift for completion of North High School Modernization Phase 2.

EXTERIOR DOOR REPLACE-MENT AT THE DMV HANFORD FIELD OFFICEHanford Plan OnlineOnlyProject #: 15-274Bid Date: 12/9/2015 2:00 PM Department of Motor Vehicles 916-651-2556Estimated Cost: $0 to $40,000Prebid: MAND 10/14/15 at 1:00 pm AND 11/18/15 at 12:30pmAddenda: 1Description: The Contractor, agrees to provide the Depart-ment of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to replace two (2) exterior doors, glass, store fronts, locking devices and assorted hardware at the DMV Hanford Field Office.

December 10SAN JOSE CITY COLLEGE PHYSICAL EDUCATION BUILD-ING #122San Jose Plan OnlineOnlyProject #: 0119-16GCBid Date: 12/10/2015 3:00 PM San Jose/Evergreen Community College District 408-270-6431Estimated Cost: $0 to $22,000,000Addenda: 0Description: Work consists of the new construction and repurposing of existing facilities as determined to be feasible. At approximately 45,000 gross square feet the facilities will be located in the northeast part of the campus and include a spectator gymnasium, a fitness center, locker and dressing rooms, training rooms, offices and labs. UNIVERSITY PARKING LOT RESTRIPINGSan Francisco Plan OnlineOnlyBid Date: 12/10/2015 2:00 PM San Francisco State University 415-338-2547Estimated Cost: $0 to $60,000Prebid: 12/1/15 at 2:00pmAddenda: 0Description: Work consists of re-striping several parking areas at San Francisco State University. Work includes, but is not limited to surface preparation, re-con-figuring stall spaces, re-striping approximately 2,500 stall spaces, removing & installing concrete wheel stops -and- painting stall signs, letters & crosshatching.

Page 20: Construction weekly december 4, 2015

20 • Construction Weekly

Projects out to bidFISH PASSAGE FACILITIES WITHIN THE ALAMEDA CREEK WATERSHEDAlameda Plan OnlineOnlyProject #: WD-2729Bid Date: 12/10/2015 2:00 PM San Francisco Water Power Sewer 415-5514603Estimated Cost: $30,000,000 Prebid: 10/29/15 at 10:00amAddenda: 3Description: The objective of the project is to construct the follow-ing items: a fish ladder, diversion structure including an intake mani-fold, training walls, pipes, founda-tion and drilled piers; sluiceway #3; fish screens; debris boom; de-bris racks; soldier pile and tieback wall; water control gates; power system; SCADA system, VSAT Tower and duct bank, camera system, control buildings; modify sluiceway #2 and existing intake structure in the left bank of Alam-eda Creek Diversion Tunnel; and install wildlife exclusion fences.. The work is to be performed in Alameda County, California.

JOCs 125 126Sacramento Plan OnlineOnlyBid Date: 12/10/2015 2:00 PM County of Sacramento 916-874-6851Estimated Cost: $20,000 to $950,000Prebid: MAND 11/18/15 at 1:30 pmAddenda: 0Description: The work to be performed under this contract includes the furnishing of all labor, materials and equipment for a JOB ORDER CONTRACT.

CABLING & ELECTRICAL SERVICES FOR SPECIFIC DMV FIELD OFFICES IN THE NORTH-ERN CALIFORNIA REGION 2 Northern California Region 2 Plan OnlineOnlyProject #: 15-347Bid Date: 12/10/2015 2:30 PM Department of Motor Vehicles 916-657-0997Addenda: 1Description: Provide cabling and electrical services for Closed Circuit Televisions (CCTV), self-service terminals (SST's), docu-ment and authentication devices (DAD's), Automated Knowledge Touch Equipment (AKTE's) and queing systems for specific DMV field office which will include Alturas, Chico, Colusa, Crescent City, Eureka, Fall River Mills, Fort Bragg, Garberville, Grass Valley, Lakeport, Oroville, Paradise, Quincy, Red Bluff, Redding, Su-sanville, Truckee, Tulelake, Ukiah, Weaverville, Willows, Yreka and Yuba City. REPLACE DOORS CAMPUS-WIDE (RE-BID)San Francisco Plan OnlineOnlyProject #: D000906Bid Date: 12/10/2015 2:00 PM San Francisco State University 415-338-2547Estimated Cost: $0 to $100,000Prebid: MAND 12/1/15 at 11:00 amAddenda: 1Description: This is a rebid of Contract D000906. Work in-cludes, but not limited to, demoli-tion, modification of storefront systems, new aluminum and hollow metal doors, door hard-ware, automatic door operators, patching and painting.

WELL 34 SITE IMPROVEMENTS, CIP NO. 8174 AND CONVER-SION OF WELLS 31 AND 33 TO VARIABLE FREQUENCY DRIVE PUMPS, PROGRAM NO. 7522Davis Plan OnlineOnlyProject #: 66.458Bid Date: 12/10/2015 2:00 PM City of Davis, Public Works De-partment 530-757-5686Estimated Cost: $0 to $1,830,000Addenda: 6Description: Work consists of con-struction of improvements to an existing well site including instal-lation of a vertical turbine pump and motor, a sodium hypochlorite feed system, a pre-engineered building and well enclosure, an above ground diesel fuel tank and standby generator, an electri-cal main service panel, a motor control center, a SCADA system, instrumentation, site improve-ments including extension of existing fence system, site grad-ing, paving, drainage, upgraded utility service for electrical, offsite storm drain and water pipelines, and associated appurtenances. Work also includes installation of variable frequency drives and well enclosures for existing Well Nos. 31 and 33. BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 J J M ENGINEERING CON-STRUCTORS, INC., SACRA-MENTO PH: (916) 992-2840 FAX: (916) 992-1000 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209

RFP - ARCH-AIRPORT ROAD AND B STREET INTERSECTION INSTALL TRAFFIC SIGNAL AND SAFETY LIGHTING Stockton Plan OnlineOnlyProject #: PW1417_HSIPL-5008-135Bid Date: 12/10/2015 3:00 PM City of Stockton 209-937-8818Addenda: 0Description: Consultant services to design the traffic signal at the intersection of B Street/Arch-Airport Road.

ARCH ROAD OPTIC CONDUIT AND CABLING PROJECT Stockton Plan OnlineOnlyProject #: PW7239Bid Date: 12/10/2015 2:00 PM City of Stockton 209-937-8818Addenda: 0Description: Work consists of installing and terminate of fiber optic cables, conduits, and acces-sories along Arch Road between Kingsley Road and Fite Court Bockmon & Woody Electric, Stockton PH: (209) 464-4878 FAX: (209) 464-2615

D120/D140 CHILLER REPLACE-MENT FOOTHILL COLLEGELos Altos Plan OnlineOnlyProject #: 1741–405Bid Date: 12/10/2015 2:00 PM Foothill - De Anza Community College District 4018-864-5554Estimated Cost: $0 to $70,000Prebid: 11/18/15 AT 10:00AMAddenda: 0Description: See specs for details

Page 21: Construction weekly december 4, 2015

Construction Weekly •21

Projects out to bidORCHARD DRIVE SEWER EXTENSION PROJECTSanta Cruz Plan OnlineOnlyBid Date: 12/10/2015 2:00 PM Santa Cruz County 831-454-2160Estimated Cost: $0 to $588,775Addenda: 0Description: This project involves the construction of approximately 1,003 linear feet of 8-inch public sanitary sewer main in Orchard Drive, 320 linear feet of 10-inch public sanitary sewer main in Sims Road, and six (6) sanitary sewer manholes. Twenty-seven (27) 4-inch service laterals will be extended to the property line for the parcels to be served. A new manhole will be constructed in Graham Hill Road for connection of the new 10-inch sewer main in Sims Road to the existing sewer main located in Graham Hill Road. The entire roadways within the area of work shall be slurry sealed and striping replaced after con-struction of the sewer main and laterals are completed.

OAK MANOR PARKUkiah Plan OnlineOnlyProject #: 15-18Bid Date: 12/10/2015 2:00 PM City of Ukiah 707-463-6200Estimated Cost: $81,179 to $91,979Addenda: 2Description: Work consists of building picnic area in Oak Manor Park. Existing turf would be removed and replaced with new paving. Equipment including shade structures and picnic tables shall be installed. FRC Inc, Petaluma PH: (707) 782-9143 FAX: (707) 782-9141

ACCESSIBILITY IMPROVE-MENTS - SIGNALIZED INTER-SECTIONS - 2016 & HURLEY WAY SIDEWALK IMPROVE-MENTS - JONAS TO MORSESacramento County Plan Onli-neOnlyProject #: 4298Bid Date: 12/10/2015 2:00 PM Estimated Cost: $0 to $1,070,000Prebid: 11/18/15 at 1:30 pmAddenda: 1Description: Includes clearing and grubbing, pavement grinding and removal, tree removal, roadway excavation, installation of curb gutter and sidewalk, installation of drainage pipes, manholes and inlets, aggregate base and asphalt pavement, traffic striping, traffic signal modifications, street lighting, median construction, placement of landscaping and other incidental work. Teichert Construction, Pleasanton PH: 925-621-5700

CENTRAL DIVISION AST IN-STALLATION Fresno Plan OnlineOnlyProject #: 139749Bid Date: 12/10/2015 2:00 PM Department of General Services 916-375-4292Estimated Cost: $630,000Prebid: MAND 11/17/15 at 11:00amAddenda: 2Description: Work consist of the purchase and installation of a new 12,000 gallon fuel tank and asso-ciated fueling system dispensers, above ground fuel piping, canopy, fuel management system, bollards and monitoring systems.

WOODBRIDGE STREETS IM-PROVEMENTS, PHASE IIIWoodbridge Plan OnlineOnlyProject #: 14.218Bid Date: 12/10/2015 1:30 PM San Joaquin County 209-468-3982Prebid: 12/1/15 at 1:30pmAddenda: 0Description: Work consists of reconstructing-existing road-way, construct curb, gutter and sidewalks, install water and storm drain main lines, and install drain-age features according to plans. McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209

GRANT UNION HIGH SCHOOL AQUATIC COMPLEXSacramento Plan OnlineOnlyBid Date: 12/10/2015 10:00 AM Twin River Unified School District 916-566-1600Prebid: MAND 11/19/15 AT 10:00amAddenda: 0Description: Work consists of constructing an aquatics complex pool and bathhouse with related decking, landscaping, irrigation and parking lot repairs; includes demolition, installation of new construction and concrete work for decks and walkways, pool recirculation, filtration, automation, sanitation / oxidation systems and continuous gutter and surge tanks with accompanying bathhouse. AMG & Associates, Inc., Santa Clarita PH: 661-251-7401 FAX: 661-251-7405 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Diede Construction, Inc., Lodi PH: 209-369-8255 FAX: 209-368-0600

STATE ROUTE 32 WIDENING PROJECTChico Plan OnlineOnlyProject #: 15010Bid Date: 12/10/2015 4:00 PM City of Chico 530-879-6959Addenda: 0Description: Work consists of roadway widening, pavement re-habilitation and overlay of existing roadway, drainage improvements, signal modifications and traffic signal installation, overhead sign installation, landscaping, and all necessary appurtenances PRE-PILOT PROGRAM FOR PROTECTIVE COATING SYS-TEM INSTALLATIONS ON TRANSMISSION LINE STEEL POLE STRUCTURESSacramento Plan OnlineOnlyProject #: 150388.KNBid Date: 12/10/2015 2:00 PM Estimated Cost: $40 to $60,000Prebid: 12/3/15 at 9:30amAddenda: 0Description: Work consists of Surface preparation and new protective coating system instal-lation on SMUD transmission line painted steel pole structures.

LAKE CUNNINGHAM BIKE PARKSan Jose Plan OnlineOnlyProject #: 7187Bid Date: 12/10/2015 3:00 PM City of San Jose 408-277-3671Estimated Cost: $0 to $2,200,000Addenda: 1Description: See specifications for details. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601

Page 22: Construction weekly december 4, 2015

22 • Construction Weekly

Projects out to bidCITY HALL RELOCATION 3RD & 4TH FLOORS TENANT IM-PROVEMENTS FOR THE CITY OF STOCKTONStockton Plan OnlineOnlyProject #: PUR 15-021Bid Date: 12/10/2015 2:00 PM City of Stockton 209-937-8818Prebid: MAND 11/24/15 at 10:00 am Addenda: 0Description: The City of Stockton has begun the process of relocat-ing City offices to 400 E. Main St., Stockton, CA. In preparation for this move, the City is inviting bids for the construction of an interior office remodel on the third and fourth floors in accordance with the plans and specifications provided for this project BMY Construction Group, Inc., Fresno PH: (559) 243-4200 FAX: (559) 222-2380 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 BZ Construction, Ceres PH: (209) 531-1252 FAX: (209) 531-1254 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 Hometown, Rio Linda PH: (916) 991-2486 FAX: (916) 991-2881 Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

30 INCH OLD BAYSHORE SANI-TARY SEWER SUPPLEMENTSan Jose Plan OnlineOnlyProject #: 5512Bid Date: 12/10/2015 3:00 PM City of San Jose 408-993-4600Estimated Cost: $0 to $2,519,445Addenda: 0Description: See specs for details Con-Quest Contractors, Inc, San Francisco PH: (415) 206-0524 FAX: (415) 206-0528

RITE AID #6768 RELOCATIONMc Farland Plan OnlineOnlyBid Date: 12/10/2015 2:00 PM Moorefield Construction 916-614-7888 Addenda: 0Description: Work consists of new construction. Construction Developers, Inc., Fresno PH: 559-277-4700 FAX: 559-277-1410 Moorefield Construction, Sacra-mento PH: 916-614-7888 FAX: 916-419-8870

FURNISH AND INSTALL NEW PUMPING EQUIPMENT AT PUMP STATION 36 Fresno Plan OnlineOnlyProject #: 42121Bid Date: 12/10/2015 2:00 PM City of Fresno - Public Works 559-621-1165Estimated Cost: $0 to $65,000Addenda: 0Description: Work consists of furnishing and installing new pump and assembly with City sup-plied 50 Horsepower motor. The contractor will ensure an operable assembly once the City connects motor and checks rotation. Pump Station 36 is located at 3591 East Church Avenue, (NW Corner Church and Orange) Fresno, California.

CASTLE AIRPORT BUILDING #1340 RE-ROOFAtwater Plan OnlineOnlyBid Date: 12/10/2015 3:00 PM Merced County - Public Works 209-385-7601Estimated Cost: $0 to $215,000Prebid: MAND 10/3/15 at 10:00 am Addenda: 0Description: In general, this project comprises the removal of approximately 14,000 SF existing built-up roofing with gravel ballast, repairs to water damage structure, installing new single-ply roofing system. Also demolition of two roof-only canopies.

December 11ENGINE CONTROLS SYSTEM UPGRADESan Jose Plan OnlineOnlyProject #: 15-16-26Bid Date: 12/11/2015 2:00 PM City of San Jose 408-277-3671Estimated Cost: $0 to $400,000Addenda: 0Description: 1) Must have a current California Contractor’s License C10 - Electrical. Con-tractor shall maintain a current license in good standing until the project is completed. 2) Provide three (3) customer references demonstrating at least five (5) years of experience in engine controls system upgrade using the Customer Reference Worksheet Form (Attachment 7) attached to the bid. It is preferred that one reference is from a Public Agency. The five (5) years of experience must also be certified in the Bid Certification Form.

WHITNEY HIGH SCHOOL ELEC-TRICAL LOAD REDISTRIBUTIONRocklin Plan OnlineOnlyBid Date: 12/11/2015 2:00 PM Rocklin Unifed School District (916) 630-3188Prebid: MAND 11/30/15 at 10:00amAddenda: 0Description: See specs for details.

RFP ENGINEERING SERVICES NEED ASSESSMENT FOR DO-MESTIC WATER AND WASTE-WATER FACILITIES AT HARNEY LANE MIGRANT CENTERLodi Plan OnlineOnlyBid Date: 12/11/2015 3:00 PM MK Housing Compliance Solu-tions 209-423-5574Prebid: 11/18/15 at 10:00 amAddenda: 1Description: All bids must include the work, services equipment and materials for both phases. The RFD, through Phase I of this RFP, seeks a qualified company to provide professional services for the Engineering Services related to the “Development of a Needs Assessment for Wastewater Facil-ities at various Migrant Centers lo-cated throughout Central Califor-nia Sewer Rehabilitation Project” (Wastewater Needs Assessment). The Wastewater Needs Assess-ment seeks to comprehensively assess the needed improvements to bring current facilities to a safe and sanitary condition to meet requirements as defined by State or local requirements for each of the facilities. Phase II of the RFP requires the selected FIRM to provide engineering services for Project Management, for project improvements selected by RFD. Please see Section 4, below, for a full description of the services required.

Page 23: Construction weekly december 4, 2015

Construction Weekly •23

Projects out to bidTOIYABE INDIAN HEALTH PROJECT COMPREHENSIVE HEALTHBishop Plan OnlineOnlyBid Date: 12/11/2015 2:00 PM Flint Builders, Inc. (916) 757-1000Addenda: 1Description: Work consists of the design and construction of a 55,000 SF Medical Office Building in Bishop, CA. The project in-cludes one Administration Building and one Clinical Building that are connected by a custom Corridor Building Connector.

December 14CONSTRUCTION MANAGER AT RISK FOR THE UPGRADES TOTHE INTERNATIONAL AR-RIVALS BUILDING PROJECT AT THE OAKLAND INTERNATIONAL AIRPORTOak-land Plan OnlineOnlyProject #: X2015-10-A1Bid Date: 12/14/2015 2:00 PM Port of Oakland 510-272-9329Prebid: MAND 11/16/15 at 2:00 pmAddenda: 0Description: See specifications for details.

LANDFILL GAS TO ELECTRIC-ITY OPERATION AND MAINTE-NANCEYolo County Plan OnlineOnlyProject #: 9198Bid Date: 12/14/2015 3:00 PM Yolo County Planning, Public Works Services (530) 666-8775Addenda: 0Description: Yolo County is seek-ing a qualified and experienced contractor to operate and main-tain the landfill gas to electricity facility at the Yolo County Central Landfill.

GENERAL CONTRACTOR / CONSTRUCTION MANAGER FOR SHOCKLEY TERRACESelma Plan OnlineOnlyProject #: P15011Bid Date: 12/14/2015 4:00 PM Fresno Housing Authority 559-445-8965 Prebid: 12/2/15 at 11:00 am Addenda: 0Description: The Fresno Hous-ing Authority (FH) is requesting proposals from licensed general contractors/construction manag-ers for pre-construction services and construction phase services associated with the new construc-tion of 48 multifamily housing units at 1445 Peach Street, Selma, California. Work shall in-clude all professional fees, profit, overhead and general require-ments, insurance and bonding, as set forth in the General Scope of Work, and in a condition accept-able to the FH.

ON-CALL GENERAL CON-TRACTING SERVICESSacramento Plan OnlineOnlyProject #: P16014541005Bid Date: 12/14/2015 2:00 PM Estimated Cost: $0 to $250,000Prebid: 12/2/15 at 10:00amAddenda: 2 Description: This Request for PROPOSALS (RFP) solicits qualification statements from local professional con-struction firms for the purpose of establishing an on-call list to assist our facilities staff on future commercial facilities projects designated as small projects. For the purposes of this RFP, a small project is defined as a project not exceeding $250,000 in total proj-ect cost, and may include, but is not limited to, public buildings and facilities, public safety facilities, community centers, libraries, park facilities, pools, corporation yards, and offsite improvements.

ROOF REPLACEMENT SER-VICESRoseville Plan OnlineOnlyProject #: 01-3063Bid Date: 12/14/2015 3:00 PM City of Roseville - Purchasing 916-774-5720Estimated Cost: $0 to $32,000Prebid: MAND 12/7/15 at 8:30 amAddenda: 0Description: Replace +/- 1,500 SF of roofing on an electrical control house building.

December 15INDUSTRIAL AVENUE BRIDGE REPLACEMENT PROJECTRoseville Plan OnlineOnlyProject #: BRLS-5182(056)Bid Date: 12/15/2015 3:00 PM City of Roseville 916-774-5251Estimated Cost: $0 to $3,700,000Addenda: 0Description: Work replacement of the existing bridge over Pleas-ant Grove Creek and roadway improvements including: roadway widening and realignment, profile adjustment, utilities (including storm drain, sanitary sewer, water, irrigation and street lighting), con-crete curb, gutter, and sidewalk, and other minor improvements. Teichert Construction - Lincoln District, Roseville PH: 916-645-4800 FAX: 916-645-4801

PARK MAINTENANCE MCKIN-LEY PARK POND MAINTE-NANCE AND TESTINGSacramento Plan OnlineOnlyProject #: B16191311003Bid Date: 12/15/2015 2:00 PM City of Sacramento 916-808-1458Addenda: 0Description: The City of Sac-ramento is requesting bids to provide pond maintenance and water quality monitoring.

DELTA ISLAND ELEMENTARY SCHOOL DEMOLITION AND SITE GRADINGStockton Plan OnlineOnlyBid Date: 12/15/2015 2:00 PM Tracy Unified School District 209-830-3200Prebid: MAND 12/3/15 at 10:00 am Addenda: 0Description: Abatement and de-molition of all structures and site work including, but not limited to, allunderground plumbing, electri-cal, irrigation, landscape, septic system and well as well as site grading and erosion control.

NEW SIDEWALKS FY16 - DON-ALD AVENUE & HAYWARD BOULEVARDHayward Plan OnlineOnlyProject #: 05268Bid Date: 12/15/2015 2:00 PM City of Hayward 510-583-4738Estimated Cost: $0 to $596,440Prebid: 12/2/15 at 2:30 pmAddenda: 0Description: The work consists, in general, of demolition of existing improvements, saw cutting, road-way excavation, hot mix asphalt deep lift, construction of concrete sidewalk, curb & gutter, driveway approaches, curb ramps, retaining curbs and performing other items or details, not mentioned above, that are required by the plans, Standard Specifications or these Special Provisions. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601

Page 24: Construction weekly december 4, 2015

24 • Construction Weekly

Projects out to bidLAKESHORE ELEMENTARY SCHOOL WINDOW REPLACE-MENTSan Francisco Plan OnlineOnlyProject #: 11058Bid Date: 12/15/2015 3:00 PM San Francisco Unified School District (415) 241-6158Prebid: MAND 11/24/15 or 12/1/15 at 3:30pmAddenda: 0Description: Exterior Window Replacement, including but not limited to interior and exterior patching and painting at affected areas, demolition and hazardous material remediation and other misc. renovation work, replace-ment of fencing, and addition of new overflow drains on roof. Arntz Builders, Inc., Novato PH: (415) 382-1188 FAX: (415) 883-7529 CLW Builders, Inc., San Fran-cisco PH: 415-333-9788 FAX: 415-333-9787 CWS Construction Group Inc, Novato PH: (415) 59-95585 FAX: (415) 20-90228 Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

BACKHOE AND BORING THROUGH 2018Sacramento County Plan Onli-neOnlyProject #: 150349.CABBid Date: 12/15/2015 5:00 PM SMUD 916-732-5607Estimated Cost: $0 to $4,900,000Prebid: 12/1/15 at 10:00am - ONLINE Addenda: 0Description: See specification for details.

JOB ORDER CONTRACTING (JOC) FOR MISCELLANEOUS STREET MAINTENANCE WORKSalinas Plan OnlineOnlyBid Date: 12/15/2015 2:00 PM City of Salinas 831-758-7972Estimated Cost: $50,000 to $1,000,000Prebid: MAND 12/3/15 at 1:30 pmAddenda: 0Description: A Job Order Contract is an indefinite quantity contract pursuant to which the Contractor may perform an ongoing series of individual Projects at differ-ent locations within the city. The Contract Documents include a Construction Task Catalog® containing construction tasks with preset Unit Prices. All Unit Prices are based on local labor, material and equipment prices and are for the direct cost of construction.

SUTRO ELEMENTARY SCHOOL WINDOW REPLACEMENTSan Francisco Plan OnlineOnlyProject #: 11037Bid Date: 12/15/2015 2:00 PM San Francisco Unified School District (415) 241-6158Estimated Cost: $0 to $480,000Prebid: MAND 11/23/15 or 11/30/15 at 3:30pmAddenda: 0Description: Window and window covering removal and replace-ment with associated flashing, finishes (cutting/patching and repair) and hazardous material abatement. Arntz Builders, Inc., Novato PH: (415) 382-1188 FAX: (415) 883-7529 CLW Builders, Inc., San Fran-ciscoPH: 415-333-9788 FAX: 415-333-9787 Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

PLEASANT HILL REGENCY BUILDING PADPleasant Hill Plan OnlineOnlyBid Date: 12/15/2015 5:00 PM Woodland Construction 209-545-1987Addenda: 0Description: All Site and Building Shell Related ConstructionCONTRACT FOR HUD-FUNDED FIRE STATION 1 BREEZEWAY IMPROVEMENTSBakersfield Plan OnlineOnlyProject #: 15-16-29Bid Date: 12/15/2015 11:00 AM City of Bakersfield 661-326-3746Estimated Cost: $0 to $70,000Prebid: 12/1/15 at 11:00amAddenda: 1Description: The City of Bakers-field is requesting bids from expe-rienced and reputable contractors for providing a Contract for HUD-Funded Fire Station 1 Breezeway Improvements.

TRAFFIC SIGNAL IN AT THE INTERSECTION OF BARSTOW AND BRAWLEY AVENUESFresno Plan OnlineOnlyProject #: 3436 - 11352Bid Date: 12/15/2015 3:00 PM City of Fresno 559-621-1332Estimated Cost: $0 to $408,600Prebid: 12/7/15 at 11:00 amAddenda: 0Description: The Scope of work includes, but is not limited to: Traffic signal and detector loop installation, crosswalks, signage and pavement markings, ADA compliant wheelchair ramp and minor concrete improvements and modifications to the streetlight system.

December 16JAMES DENMAN MIDDLE SCHOOL WINDOW REPLACE-MENTSan Francisco Plan OnlineOnlyProject #: 11770Bid Date: 12/16/2015 2:00 PM SFJUSD - Simon Reyes 415-241-4311Estimated Cost: $0 to $1,130,000Prebid: MAND 11/24/15 at 1:00pmAddenda: 0Description: Selective demolition, cutting & patching, metal fabri-cations, rough carpentry, sheet metal flashing & trim, glazed aluminum curtain walls, aluminum windows & panning, glazing, fixes louvers, tiling repair, window shades, cleaning. CLW Builders, Inc., San Fran-cisco PH: 415-333-9788 FAX: 415-333-9787 CWS Construction Group Inc, Novato PH: (415)599-5585 FAX: (415) 209-0228

ALAMO SQUARE RESTROOM AND IRRIGATION UPGRADESan Francisco Plan OnlineOnlyProject #: 3202V-R, FCP15104Bid Date: 12/16/2015 2:30 PM City of San Francisco 415-551-4603Estimated Cost: $0 to $1,900,000Prebid: 11/18/15 AT 10:00AMAddenda: 0Description: See specs for details. Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

Page 25: Construction weekly december 4, 2015

Construction Weekly •25

Projects out to bidACALANES HIGH SCHOOL SCI-ENCE CLASSROOM & REST-ROOM PROJECTLafayette Plan OnlineOnlyProject #: PTN 61630-50Bid Date: 12/16/2015 11:00 AM Acalanes Union High School District 925-376-6200Estimated Cost: $0 to $900,000Prebid: MAND 11/18/15 at 3:45amAddenda: 0Description: Increment 1 includes but not limited to renovation of storage room to science class-room with new roofing & windows. Increment 2 includes but not limited to the renovation of exist-ing restroom in Room 511 & the addition of a restroom in Room 510. GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156 Integra Construction Services, Inc., Pleasanton PH: (925) 596-5032 FAX: (925) 398-8245 S W ALLEN CONSTRUCTION, SACRAMENTO PH: (916) 344-2098 FAX: (916) 344-0307 Sausal Corporation, San Leandro PH: 510-568-6600 FAX: 510-632-9769

PANERA BREAD # 4488San Jose Plan OnlineOnlyBid Date: 12/16/2015 10:00 PM Tilton Pacific Construction (916) 630-7200 Addenda: 0Description: Concrete slab demo-lition, concrete, rough carpentry, finish carpentry, FPR, insulation, store front, metal stud drywall, ceramic tile, painting, roofing, restroom accessories, plumbing, HVAC, electrical, fire alarm.

RECONSTRUCTION OF SUMPS 40 & 146Sacramento Plan OnlineOnlyProject #: B16141321013Bid Date: 12/16/2015 2:00 PM City of Sacramento 916-808-1458Estimated Cost: $0 to $925,000Prebid: 12/4/15 at 9:00 amAddenda: 0Description: The City of Sacra-mento is soliciting sealed propos-als for Reconstruction of Sumps 40 & 146. Sealed proposals will be received by the City Clerk of the City of Sacramento at the Office of the City Clerk, City Hall, located at 915 I Street, 5th Floor, Public Counter, up to the hour of 2:00 p.m. on December 16, 2015. Proposals will then be opened and read as soon thereafter as business allows, in the Hear-ing Room, 2nd Floor Room, in Historic City Hall.

AMBROSE AQUATIC CENTER RENOVATION PROJECTPittsburg Plan OnlineOnlyProject #: 2013·25Bid Date: 12/16/2015 2:00 PM City of Pittsburg 925-252-4930Estimated Cost: $0 to $1,212,000Prebid: 12/2/15 at 10:00amAddenda: 1Description: Work consists in general of the rehabilitation of the existing pool and pool facilities. The scope includes but is not limited to demolition of the exist-ing bath house, pool deck and mechanical building, restoration of the existing pool, replacement of the deck area, and a new pad for a Romtec building (by others); new fencing; accessible parking stalls; chemical storage building; and landscaping. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681

MAE FONG PARK LANDSCAPE IMPROVEMENTSSacramento Plan OnlineOnlyProject #: B16190021009Bid Date: 12/16/2015 12:00 PM City of Sacramento 916-808-1458Estimated Cost: $97,500 to $107,200 Addenda: 0Description: The work to be per-formed consists of developing the landscape improvements at Mae Fong Park in Sacramento at 3004 Redding Avenue. The improve-ments will consist of 0.75 acres, (clearing and grubbing, individual picnic area, concrete flatwork and mow curbs, site furnishings, disc golf baskets, irrigation and landscaping. Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

PUBLIC WORKS VEHICLE MAINTENANCE SHOP AND ADMINISTRATION BUILDINGModesto Plan OnlineOnlyBid Date: 12/16/2015 2:00 PM Stanislaus County Public Works 209-575-5235Estimated Cost: $0 to$15,000,000Prebid: MAND 12/2/15 at 2:00pmAddenda: 0Description: Work consists of con-struction of vehicle maintenance and administration buildings and associated site and street improvements at County Center No. 4. Acme Construction, Modesto PH: 209-523-2674 FAX: 209-523-0213 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 F&H Construction, Stockton PH: 209-931-3738 FAX: 209-931-4427

SEISMIC RETROFIT OF PWTP CONTROL BUILDING (IRP2) AND PWTP CLEANWELL RE-COAT AND REPAIR PROJECTS (SECURED JOB)San Jose Plan OnlineOnlyProject #: 93764003 and 93234043Bid Date: 12/16/2015 2:00 PM Santa Clara Valley Water District 408-265-2600Prebid: MAND 11/30/15 at 2:00 pmAddenda: 0Description: See Specifications for details.

TEMPORARY ROCK BARRIERS - 2016, 2017 & 2018Solano / San Joaquin Counties Plan OnlineOnlyProject #: 15-15 / C51517Bid Date: 12/16/2015 2:00 PM Prebid: 12/1/15 at 10:00 amAddenda: 2Description: Construct / remove temporary rock barriers and appurtenances at Middle River, Old River and Grant Line Canal including placement and removal of Department furnished rock ma-terials, culverts, docks, articulating concrete mats and other accesso-ries; maintenance, refurbishment and/or replacement of appurte-nances; dredging; debris removal; slope protection; etc.

Page 26: Construction weekly december 4, 2015

26 • Construction Weekly

Projects out to bidDecember 17

SOUTHEAST WATER POLLU-TION CONTROL PLANT 521/522 & DISINFECTION UPGRADES SECURED PROJECTSan Francisco Plan OnlineOnlyProject #: WW-613Bid Date: 12/17/2015 2:00 PM City of San Francisco 415-551-4603 Estimated Cost: $0 to $22,000,000 Prebid: 11/5/15 at 10:00 am Addenda: 1Description: SECURED DOCS WILL NOT BE POSTED The objective of the project is to up-grade the controls and chemical sampling station in Building 521 and relocate most of the electrical equipment into a new building. In addition, improvements to the No. 3 water system and replacement of valves/actuator will occur. Western Water Constructors, Santa Rosa PH: 707-540-9640 FAX: 707-540-9641

PROFESSIONAL SERVICES FOR THE INTELLIGENT TRANS-PORTATION SYSTEMS STRATE-GIC PLANVisalia Plan OnlineOnlyProject #: 15-16-35Bid Date: 12/17/2015 2:00 PM Estimated Cost: $0 to $150,000Prebid: 12/2/15 at 11:00amAddenda: 0Description: The City of Visalia is requesting proposals from quali-fied consulting firms experienced in professional services for the development of an Intelligent Transportation System (ITS) Stra-tegic Plan to provide for future ITS needs based on an assessment of both current and forecasted conditions of the City of Visalia.

FACILITIES BUILDING RE-PLACEMENT-INCREMENT 2 WEST VALLEY COLLEGESaratoga Plan OnlineOnlyProject #: 01-1516Bid Date: 12/17/2015 2:00 PM West Valley- Mission Community College District 408-741-2187Estimated Cost: $0 to $12,590,000Prebid: MAND 11/9/15 at 11:00amAddenda: 2Description: See specifications for details. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 F&H Construction, Stockton PH: 209-931-3738 FAX: 209-931-4427 GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156 Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

MCLAUGHLIN PARK IMPROVE-MENTSan Jose Plan OnlineOnlyProject #: 7441Bid Date: 12/17/2015 3:00 PM City of San Jose 408-993-4600Estimated Cost: $0 to $336,000Addenda: 0Description: Demolition, concrete reinforcing, metal fabrications, painting, playground equipment, site clearing, grading, base courses, rigid paving, playground protective surfacing, planting irrigation.

WATT AVENUE PEDESTRIAN ENHANCEMENTSSacramento Plan OnlineOnlyProject #: 4295Bid Date: 12/17/2015 2:00 PM County of Sacramento - Municipal Services Agency 916-874-6544Estimated Cost: $0 to $520,000Addenda: 2Description: The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for installation of curb, gutter and sidewalk, ADA ramp improve-ments, installation of street lighting, installation of drainage facilities, installation of retaining wall, application of slurry seal and thermoplastic striping and other incidental work. Biondi Paving & Engineering, Sacramento PH: 916-383-5982 FAX: 916-383-3077 CE GREEN INC, Orangevale PH: (916) 365-4925 FAX: (916) 583-7504 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209

CHASE BANK TI OAKLANDOakland Plan OnlineOnlyBid Date: 12/17/2015 2:00 PM Moorefield Construction 916-614-7888Addenda: 0Description: Work consists of 9,566 sf of Interior Tenant Improvement for Chase Bank of Newly Constructed 2 Story Shell Building.

STREET IMPROVEMENTS,

NORTH OF BRUNDAGE LANE AND WEST OF UNION A VENUE, PHASES 3, 4, & 5Bakersfield Plan OnlineOnlyProject #: T6K220Bid Date: 12/17/2015 11:00 AM City of Bakersfield 661-326-3746Estimated Cost: $0 to $344,140Prebid: MAND 11/30/15 at 10:00am Addenda: 1Description: The work to be performed consists, in general, of repairing and augmenting existing street improvements north of Brundage Lane and west of Union Avenue. The work includes but is not limited to the removal and replacement of various reaches of curb, gutter, sidewalk and associ-ated drive approaches; construc-tion of new sidewalk in absence of existing; construction of ADA complaint wheelchair (handicap) ramps; and saw cut, removal, and replacement of existing pavement; all in conformance with these contract documents. This project has a base bid (Phases 3&4) and an additive alternate (Phase 5). Central Valley Asphalt, Lindsay PH: (559) 562-7802 FAX: (559) 562-7902 Dalian Construction, Bakersfield PH: (661) 303-5977 FAX: (661) 282-5699

STILLWATER WASTWATER TREATMENT PLANT FILTER UNDERDRAIN REPLACEMENT PROJECTRedding Plan OnlineOnlyProject #: 4738 / 2465Bid Date: 12/17/2015 3:00 PM City of Redding 530-225-4170Estimated Cost: $0 to $470,000Addenda: 0Description: Rehabilitate two 16’ wide x 65’ long automatic back-wash filter mechanisms, traveling bridges control panel and filter sand media.

Page 27: Construction weekly december 4, 2015

Construction Weekly •27

Projects out to bidKIEFER LANDFILL EXTRAC-TION WELLl 15 (REBID)Sloughhouse Plan OnlineOnlyProject #: 4290Bid Date: 12/17/2015 2:00 PM County of Sacramento 916-876-6300Estimated Cost: $0 to $600,000Prebid: 11/12/15 or 12/9/15 at 9:00 amAddenda: 1Description: Work consists of 1) Drilling a test hole* to an approxi-mate depth of 235 feet using the dual wall reverse circulation meth-od 2) Constructing and develop-ing a 10-inch-diameter extraction well* to a depth of about 230 feel 3) Equipping the extraction well with a 25 HP submersible pump and motor, concrete pad, above ground piping and valves, buried pipeline, and connection lo the ex-isting buried pipeline 4) Providing and installing all electrical control, structural and pump discharge equipment lo connect to an exist-ing pipeline 5) Rehabilitating five (5) existing extraction wells.

NORTH 12TH COMPLETE STREET PROJECTSacramento Plan OnlineOnlyProject #: T15165000Bid Date: 12/17/2015 4:00 PM City of Sacramento 916-808-5515Prebid: 11/30/15 at 2:00pmAddenda: 1Description: This Request for Pro-posals (RFP) solicits a proposal for consultant services to provide engineering and environmental services for the North 12th Com-plete Street Project.

CORPORATION YARD PARKING LOT AND K-9 TRAINING AREA IMPROVEMENTS PROJECTElk Grove Plan OnlineOnlyProject #: WCY005Bid Date: 12/17/2015 4:00 PM City of Elk Grove 916-478-2212Estimated Cost: $635,500 to $676,500Addenda: 0Description: Work consists of the construction of a parking lot on the empty parcel adjacent to the City’s Corporation Yard. Improve-ments include paving, striping, lighting installation, landscaping, and installation of artificial turf in the Police Department’s K-9 train-ing area (Work). Biondi Paving & Engineering, Sacramento PH: 916-383-5982 FAX: 916-383-3077 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 McFadden Construction, Inc., Stockton PH: 209-478-7407 FAX: 209-478-1516 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209 Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

CHP ACADEMY HIGH SPEED TRACKWest Sacramento Plan Onli-neOnlyProject #: 141035Bid Date: 12/17/2015 2:00 PM Department of General Services (916) 376-1673Estimated Cost: $0 to $1,391,000Prebid: MAND 12/1/15 at 9:30 amAddenda: 1Description: Grind and resurface the existing high speed track with an asphalt overlay. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209 Teichert Construction, Pleasanton PH: 925-621-5700

December 18

MAJOR STREET REHABILITA-TION – GIDDINGS STREETVisalia Plan OnlineOnlyProject #: 2370-72000/CP0144-999, 15-16-40Bid Date: 12/18/2015 3:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $1,500,000Prebid: 12/1/15 at 10:00 amAddenda: 0Description: See specifications for details.

ELECTRIC VEHICLE SUPPLY EQUIPMENT INSTALLATIONSan Francisco/Alameda Counties Plan OnlineOnlyProject #: 138353Bid Date: 12/18/2015 2:00 PM Department of General Services 916-376-1622 Estimated Cost: $0 to $243,000 Prebid: MAND 12/2/15 at 9:00 am Addenda: 1Description: Install two City furnished Electric Vehicle Char-gers (Charge Point Model CT 4000) per the attached Plans and Specifications. The Contractor's bid proposal shall include, but not be limited to: all labor, materials, testing, taxes, and bonds neces-sary to install and get operational two EV chargers, including but not limited too; trenching, backfill-ing, conduits, conductors, pull boxes, transformer and mounting hardware, testing, mounting EV chargers, signage, mobilization, water pollution control, cleanup, and traffic and pedestrian control. Class C-10 License required.

RECYCLED WATER RELIABIL-ITY UPGRADE PROJECTRichmond Plan OnlineOnlyBid Date: 12/18/2015 2:00 PM GSE Construction 925-447-0292Estimated Cost: $0 to $23,700,000 Addenda: 0Description: Work consists of the construction of Aeration basin No.3, improvements to Aeration Basins No.1 & No.2, improve-ments to aeration piping and controls, improvements to the WAS pumps and WAS piping, construction of a new aeration ba-sin splitter box, improvements to all feed systems, improvements to Secondary Sedimentation Basins No.3 and No.4, and demolition of the Roughing Filter and Roughing Filter Pump Station.

Page 28: Construction weekly december 4, 2015

28 • Construction Weekly

Projects out to bidARCHITECTURAL AND ENGI-NEERING (A-E) SERVICES FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES, NEW JAIL FACILITYSanta Clara County Plan OnlineOnlyProject #: RFS-FAF-FY16-0086Bid Date: 12/18/2015 2:00 PM County of Santa Clara 408-993-4600Prebid: 12/3/15 at 10:00amAddenda: 0Description: The County pro-poses to design and construct a new seven (7) story, 203,000 square foot building comprised of 465 cells (105 beds in single occupancy cells and 710 beds in double occupancy cells), inclu-sive of medium and high-medium security housing, mental health housing, and accessible cells, with a maximum rated capacity of 815 beds plus multi-purpose/programs space, visitation and recreation space, mental health treatment and program space, custody administration space, security operations, staff support, institutional support space, and related mechanical, electrical, and plumbing space.

HOME 2 SUITES BY HILTONHanford Plan OnlineOnlyBid Date: 12/18/2015 2:00 PM Construction Developers, Inc. 559-277-4700Addenda: 0Description: Work consists of a ground up 4 story hotel.

ADMINISTRATION BUILDING EMERGENCY BACKUP GEN-ERATORSacramento Plan OnlineOnlyBid Date: 12/18/2015 2:00 PM Sacramento Regional Transit District 916-321-3845Prebid: 12/1/15 at 2:00pmAddenda: 0Description: Work consists of Contractor providing and install-ing all necessary materials, labor and equipment for an emer-gency power generator for RT’s Administration Building located at 1400 291h Street in accordance with the Technical Specifications and Plans. The work includes, but is not limited to, trenching, backfilling, concrete removal and replacement, concrete pad, fenc-ing, generator, automatic transfer switch, and diesel fuel.

December 21WOLFE ROAD RECYCLED WA-TER FACILITIES PROJECTSunnyvale Plan OnlineOnlyProject #: C0607, 91244001Bid Date: 12/21/2015 2:00 PM Santa Clara Valley Water District 408-265-2600Estimated Cost: $10,000,000 to $13,000,000Prebid: MAND 11/30/15 at 10:30amAddenda: 2Description: See specs for details. Ghilotti Construction Co Inc, Santa Rosa PH: (707) 585-1221 FAX: (707) 585-1601 R.J. Gordon Construction, Pleas-ant Hill PH: (925) 680-8660 FAX: (925) 680-8670

BEST BUY #685Mountain View Plan OnlineOnlyBid Date: 12/21/2015 2:00 PM SD Deacon 916-969-0900Addenda: 0Description: Work consists of the tenant improvement for a new 49,038 SF Best Buy Store located in Mountain View, CA. Subcontractor Trades include: surveying, demolition, earth-work, asphalt paving, pavement marking, concrete, masonry, structural steel, carpentry, finish carpentry, solid surface counters, FRP, building insulation, metal roofing, roofing, sheet metal, joint sealer, doors & hardware, overhead doors, entrances and storefront, plaster, drywall/metal framing, tile, acoustical ceiling, painting, toilet partitions & acces-sories, loading dock equipment, fire sprinklers, plumbing, HVAC, electrical, fire alarm system, com-munication cabling, telephone & intercommunication equipment, fixturing.

December 22BRIDGE ENGINEER, ENVIRON-MENTAL SERVICES & SURVEY SERVICESYolo County Plan OnlineOnlyProject #: PPWSRFPCS1508Bid Date: 12/22/2015 3:00 PM Yolo County Planning, Public Works Services (530) 666-8775Estimated Cost: $0 to $600,000Addenda: 0Description: Request for Pro-posal Notice – Bridge Engineer, Environmental Services & Survey Services: Preliminary Engineer-ing, Surveying & Mapping, Engi-neering Studies, Bridge Replace-ment on County Road (CR) 29, and Bride Replacement on CR 95 in Yolo County, California.

DIGESTERS NO 10 AND 11 REHABILITATIONElk Grove Plan OnlineOnlyProject #: 8195Bid Date: 12/22/2015 3:00 PM Sacramento Regional County Sanitation District 916-875-9070Prebid: MAND 12/8/15 at 9:00 amAddenda: 0Description: This project consists of rehabilitation to Digesters No. 10 and 11. BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 NMI Industrial Holdings, Inc, Sacramento PH: (916) 635-7030 FAX: (916) 852-1635

NAPA COUNTY HALL OF JUSTICE THIRD FLOOR CELL REPAIRSNapa Plan OnlineOnlyProject #: 15-15BBid Date: 12/22/2015 3:00 PM Napa County - Public Works 707-253-4351Estimated Cost: $0 to $565,385Prebid: MAND 12/3/15 at 10:00amAddenda: 1Description: Work consists of the demolition and replacement of grout between precast panels, demolition and replacement of VCT floor tiles, floor crack epoxy sealing, painting and plumbing testing listed in the Plans and Technical Specifications for the Napa County Hall of Justice Third Floor Cell Repairs. GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156

Page 29: Construction weekly december 4, 2015

Construction Weekly •29

Projects out to bidDIGESTER GAS PRODUCTION, POWER GENERATION AND CREDIT OPTMIZATION ANALY-SIS FOR THE CITY OF FRESNO REGIONAL WASTEWATER RECLAMATION FACILITYFresno Plan OnlineOnlyProject #: 101915KNBid Date: 12/22/2015 4:00 PM City of Fresno 559-621-8713Addenda: 0Description: The City of Fresno (City) is requesting Statements of Qualifications (SOQ) from quali-fied engineering firms to conduct an optimization assessment for the City’s anaerobic digestion facilities and power generation facilities located at the City’s Fresno-Clovis Regional Water Reclamation Facility.

FACILITY UPGRADES TO AIR-PORT T-52 BUILDINGSalinas Plan OnlineOnlyProject #: 9151Bid Date: 12/22/2015 2:00 PM City of Salinas 831-758-7972Estimated Cost: $0 to $96000Prebid: 11/24/15 at 1:30pmAddenda: 2Description: In general, the work shall include, but is not limited to the remodeling of the two non-compliant restrooms and a break room, replacing them with two new ADA-compliant restrooms, and a break area; including all related mechanical, plumbing, and electrical work, and other work associated with the remod-eling including all incidental and appurtenant improvements and restorations specified on the Plans and Specifications.

AMADOR PLAZA ROAD BI-CYCLE AND PEDESTRIAN IMPROVEMENTS PROJECTDublin Plan OnlineOnlyProject #: ST0815Bid Date: 12/22/2015 12:00 PM City of Dublin 925-833-6630Addenda: 0Description: The Project is more specifically defined in the Con-tract Documents, but generally includes: furnishing all labor, ma-terials, tools, equipment, trans-portation, and services necessary to perform the construction and installation of the following: removal of curb, gutter, and sidewalk, removal of trees, modi-fications to storm drain system, removal of pavement markings and striping, installation of new pavement markings and striping, installation of median islands, curb extensions, and decora-tive crosswalks, installation of rectangular rapid flashing beacon systems, traffic control, and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Direc-tor, to which reference is hereby made for further particulars.

KOTTINGER GARDENSPleasanton Plan OnlineOnlyBid Date: 12/22/2015 5:00 PM L & D Construction 408-2920128Addenda: 0Description: Work consists of the new construction of 131 apartment units across nine (9) one-story wood-framed apart-ment buildings, one (1) two-and three-story wood-framed apart-ment building, and related onsite and offsite improvements.

PUBLIC HEALTH OFFICE REMODEL Oroville Plan OnlineOnlyProject #: 53-16Bid Date: 12/22/2015 3:00 PM County of Butte 530-538-4353Prebid: 12/8/15 at 10:00amAddenda: 0Description: Work consists of a single story, concrete tilt up building. The remodel area is approximately 4,295 square feet, and construction work will be phased into two separate phases to allow ongoing operations within the Public Health Clinic, which will remain operational throughout construction. Project includes selective demolition, tie-in to existing systems, exterior civil accessibility modifications, framing and drywall modifica-tions, the design, approval and field modification of Fire Sprin-kler system by a Licensed Fire Sprinkler contractor, an additional accessible restroom and fin-ishes, an additional sink, custom millwork, storefront framing and safety glass, suspended ceiling system and ceiling tile with insu-lation to match existing, HVAC, light fixtures, insulation, signage, electrical, tie-in of additional fire alarm strobes, and plumbing as indicated by the Public Health Office Remodel Rev 2 drawings dated 06/11/15.

OLD MUNICIPAL SWIMMING POOL BUILDING RETROFIT PHASE 1Salinas Plan OnlineOnlyProject #: 9535Bid Date: 12/22/2015 2:00 PM City of Salinas 831-758-7972Estimated Cost: $287,700Prebid: 11/17/15 at 1:30pmAddenda: 2Description: Work consists the demolition/removal of the existing swimming pool deck and the top 18” of vertical pool wall; fracturing of the existing pool bottom; struc-tural backfill of the existing pool; construction of new, reinforced concrete slab/surfacing; minor ADA upgrades in the restroom areas, installation of new emer-gency exit door mechanisms, and compliance with Water Pollution Control requirements as required by the City’s National Pollutant Discharge Elimination System (NPDES) program.

PROFESSIONAL ENGINEER-ING SERVICES FOR BRIDGE REPLACEMENT/REHABILITA-TION PROJECTSChico Plan OnlineOnlyProject #: 2015-001Bid Date: 12/22/2015 2:00 PM City of Chico 530-879-6959Prebid: 12/16/15 at 2:00pmAddenda: 0Description: See specification for details.

300 W. Pine StreetLodi, California 95240

p 209.333.1116f 209.333.8597

Rich PiomboAdministrative Manager

[email protected]

Page 30: Construction weekly december 4, 2015

30 • Construction Weekly

Projects out to bidDecember 23

CITY CLERK/HUMAN RE-SOURCES OFFICE REMODELMountain View Plan OnlineOnlyProject #: 15-46Bid Date: 12/23/2015 2:00 PM City of Mountain View 650-903-6527Estimated Cost: $200,000 to $250,000Prebid: 12/10/15 at 2:00pmAddenda: 0Description: Work consists of the remodel of two office areas and include modifications to existing millwork, new partitions, bullet-re-sistant glazing, carpet, card read security doors, shelving, kitch-enette, power and data outlets, electrical, and plumbing.

December 28RFQ-FOR ASBESTOS ABATE-MENT - HELLYER COUNTY PARKSan Jose Plan OnlineOnlyProject #: RFQ-FAF-FY16-0090Bid Date: 12/28/2015 3:00 PM City of Santa Clara - Public Works 408-615-3000Prebid: MAND 12/17/15 at 10:00 amAddenda: 0Description: Contractor shall be responsible for all necessary equipment, tools, materials, labor, and supplies required to perform the asbestos abatement at the Hellyer County Park – Flooring removal from Ranger Office and Visitor Center located at Hellyer County Park.

December 29NTERSECTION IMPROVE-MENTS AT THE INTERSECTION OF BEN MADDOX WAY AND DOUGLAS AVENUEVisalia Plan OnlineOnlyProject #: 15-16-26Bid Date: 12/29/2015 2:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $610,000Prebid: 12/9/15 at 10:00 amAddenda: 0Description: Intersection Im-provements at the Intersection of Ben Maddox Way and Douglas Avenue

FIRE STATION NO. 5 EXPAN-SIONSalinas Plan OnlineOnlyProject #: 9235Bid Date: 12/29/2015 2:00 PM City of Salinas 831-758-7972Prebid: MAND 11/17/15 at 2:00pm Addenda: 0Description: In general, the work shall include, but is not limited to expanding existing apparatus room to accommodate additional vehicles including a new ladder truck; regrading and paving for a new concrete driveways; Expand existing interior restrooms to add additional toilet to both men’s and women’s restrooms; Reconfigur-ing plumbing fixtures to meet cur-rent ADA requirements; Add parti-tion wall to subdivide sleeping quarters for privacy; Reconfigure existing countertop and cabinets in kitchen for additional storage; Addition of exterior fuel station to also serve vehicles from other Fire Stations; and Adjust exist-ing ADA parking stalls to meet current ADA requirements, and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.

December 30SNELL PIPELINE (SANTA TERESA WATER TREATMENT PLANT TO COYOTE CREEK LINE VALVE) REHABILITATION PROJECTSan Jose Plan OnlineOnlyProject #: 95084001 , C0608 Bid Date: 12/30/2015 2:00 PM Santa Clara Valley Water District 408-265-2600 Estimated Cost: $3,000,000 to $4,000,000 Pre-bid: MAND 12/1/15 at 9:00am Addenda: 0 Description: See specs for details.

SHAFTER HIGH SCHOOL: CTE-FP MODERNIZATION PHASE THREE FOR AGRICULTURAL MECHANICSShafter Plan OnlineOnlyProject #: 3337Bid Date: 12/30/2015 2:00 PM Kern High School District 661-827-3122Estimated Cost: $0 to $1,258,000Prebid: 12/8/15 at 3:00 pmAddenda: 0Description: Contractor shall provide all labor, materials, and equipment as shown or implied, per the plans and specifications, for the AG Mechanics Building (900), along with the associated site work. The work shall include, but not be limited to demolition, hazardous material removal, ac-cessibility requirements, plumb-ing, HVAC, electrical, fire, and data requirements. Klassen Corporation, Bakersfield PH: (661) 324-3000 FAX: (661) 324-3900 Superior Construction, Bakers-field PH: (661) 588-0552 FAX: (661) 588-0264

December 31STANISLAUS UNION DISTRICT OF STANISLAUS COUNTY (CUPCC)Stanislaus County Plan Onli-neOnlyBid Date: 12/31/2015 5:00 PM Stanislaus Union School District 209-529-9546Addenda: 0Description: Contractors are asked to submit which construc-tion work they are interested in (for example: earthwork, pipe-lines, electrical, painting, general building, etc.) together with the class of contractor's license(s) held and contractor license number(s) CITY OF PITTSBURG (CUPPC)Pittsburg Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM City of Pittsburg 925-252-4930Addenda: 0Description: The City of Pittsburg is seeking to update its "list of qualified bidders" as specified under the Uniform Construction Cost Accounting Act. See specifi-cations for details.

NAPA COUNTY PUBLIC WORKS (CUPPC)Napa Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM County of Napa - Public Works 707-253-4351Addenda: 0Description: The Napa County Public Works Department is seeking to update its "list of quali-fied bidders" as specified under the Uniform Construction Cost Accounting Act. See specifica-tions for details.

Page 31: Construction weekly december 4, 2015

Construction Weekly •31

Projects out to bidCITY OF ALAMEDA (CUPPC)Alemeda Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM City of Alameda 510-747-7900Addenda: 0Description: The City of Alameda is seeking to update its "list of qualified bidders" as specified under the Uniform Construction Cost Accounting Act. See specifi-cations for details.

ANTIOCH UNIFIED SCHOOL DISTRICT (CUPPC)Antioch Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Antioch Unified School District 925-706-5241 Addenda: 0Description: The Antioch Unified School District is seeking to up-date its "list of qualified bidders" as specified under the Uniform Construction Cost Accounting Act. See specifications for details.

STANISLAUS COUNTY OFFICE OF EDUCATION (CUPPC)Stanislaus County Plan Onli-neOnlyBid Date: 12/31/2015 5:00 PM Stanislaus County Office of Edu-cation 209-238-1900Addenda: 0Description: Stanislaus County Office of Education is inviting licensed contractors, under the provision of PCC Section 22036 of the Uniform Public Construc-tion Code Accounting Act, to be included on the agency's list of qualified bidders for the entire 2016 calendar year.Qualified Bidder form is available on our website.

SYLVAN UNION SCHOOL DIS-TRICT (CUPPC)Modesto Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Addenda: 0Description: The Sylvan Union School District is seeking to up-date its "list of qualified bidders" as specified under the Uniform Construction Cost Accounting Act. See specifications for details.

NOTICE FOR INCLUSION ON YUBA COMMUNITY COLLEGE DISTRICT (YCCD) BIDDERS LIST 2016Yuba Plan OnlineOnlyBid Date: 12/31/2015 12:00 PM Yuba Community College District 530-741-6801Addenda: 0Description: If you would like to be included on the YCCD’s list of qualified bidders for Calendar Year 2016, you must fill out and submit the Bidders List Infor-mation Form with all required information.

SAN JOAQUIN COUNTY (UPC-CAA)San Joaquin County Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Addenda: 0Description: Names will be added to the Contractors List through our on-line registration only.

LODI UNIFIED SCHOOL DIS-TRICT (CUPCCAA)Lodi Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Lodi Unified School District 209-331-7228Addenda: 0Description: The Lodi Unified School District is updating its list of contractors who may be inter-ested in performing public works for the year 2016.

ELK GROVE USD QUALIFICA-TION LISTElk Grove Plan OnlineOnlyBid Date: 12/31/2015 12:00 PM Elk Grove Unified School District 916-686-7711 Addenda: 0Description: Notice is hereby given that all contractors required to pre-qualify for Elk Grove Uni-fied School District (“District”) projects must adhere to the following procedures, submit the following documentation and information at least annually, with quarterly certifications or updates, and must be found by the District on a quarterly basis to pre-qualify, as a condition of bidding the District project during any quarterly period. The District is required to have a pre-qualification process pursu-ant to applicable California law (in particular Public Contracts Code sections 20111.5 and 20111.6) for any projects projected to cost $1,000,000 or more. Any General Contractors, Electrical, Mechanical, and Plumbing Sub-contractors bidding on projects projected to cost $1,000,000 or more are required to participate in the District’s pre-qualification process. Pre-qualification ap-plication packages are available by contacting the Facilities and Planning Department located at the address shown below, via telephone at (916) 686-7711, or via email at [email protected].

SAN RAMON VALLEY UNIFIED SCHOOL DISTRICT ANNUAL RENEWAL OF CONTRACTORS LISTSSan Ramon Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM San Ramon Valley Unified School District 925-552-2960Addenda: 0 Description: The San Ramon Valley Unified School District is updating its lists of contractors which may be inter-ested in performing public works projects for the year 2016. Inter-ested contractors must submit the following: Name and Address: The name and address to which notices of Public Projects should be mailed. Phone Number and Email Address: Phone number and email address at which the contractor may be reached. Type of Work: The type of work and currently licensed to perform. License Classification & Number: The class of contractor license(s) held and the contractor’s license number(s).

SOLANO COUNTY PRE-QUALI-FICATION LISTSolano County Plan OnlineOnlyBid Date: 12/31/2015 12:00 PM Solano Community College District 707-864-7416Addenda: 0 Description: Solano County’s Notice to Contractors (attached) invites all interested licensed contractors to submit their company for inclusion on Solano County’s Informal Bid-ders’ List for calendar year 2016 in accordance with the Califor-nia Uniform Construction Cost Accounting Act (UCCAA). The attached Notice to Contractors includes instructions. For further information, email [email protected], or phone/fax (707) 784-6320.

Page 32: Construction weekly december 4, 2015

32 • Construction Weekly

Projects out to bidFRESNO COUNTY OFFICE OF EDUCATION (CUPPC)Fresno Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Fresno County Office of Educa-tion (559) 497-3705Addenda: 0Description: The Fresno County Office of Education may create a new contractors list effective January 1 of each year and may include any contractor’s name it desires on the contractors list, but must include, at a minimum, all contractors who have properly provide d the District with the required information, either dur-ing the calendar year in which the list is valid or during November and December of the prior year. A contractor may have their firm added to the school district’s con-tractors list at any time by provid-ing the required information.

JEFFERSON SCHOOL DIS-TRICT (CUPCC)Tracy Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Jefferson Elementary School District 209-836-3388Addenda: 0Description: The Jefferson School District is updating its list of con-tractors who may be interested in performing public works for the year 2016. Interested contractors must submit the following: Name & Address, Phone Number, Type of Work, License Classification & Number.

NOTICE FOR INCLUSION MER-CED COMMUNITY COLLEGE DISTRICTMerced Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Merced Community College District 209-384-6300Addenda: 0Description: Pursuant to Section 22034 of the California Public contract Code, the Merced Com-munity College District (herein-after MCCD) hereby invites all licensed contractors to submit the following information for inclusion in our, 2016 calendar year, list of bidders. To be included in our list of Bidders, you must provide the MCCD the following information: 1. Name of your Company 2. Contact person's name, phone, email and fax number at you company. 3. The address to which all Notices to Contractors and/or Proposals shall be mailed. 4. The general phone number of your company (if different from item #2 above). 5. The type of work in which your company is interested in performing and is currently licensed to do (earth-work, pipelines, electrical, paint-ing, general building, etc.) 6. The class of contractor's license(s) held, your contractor license number and DIR number. The information should be submitted in the order above and mailed to the MCCD on a single sheet of paper, any advertisements, literature, and/or cut sheets should be enclosed in a separate envelope. All information must be submitted to the MCCD no later than 2:00 pm on Friday Decem-ber 18, 2015. The information should be mailed to the address below and to the attention of: Mr. Chuck Hergenraeder, Purchasing Manager.

MERCED UNION HIGH SCHOOL DISTRICT (CUPCC)Merced Plan OnlineOnlyBid Date: 12/31/2015 5:00 PM Merced Union High School Dis-trict 209-385-6400 Addenda: 0Description: The Merced Union School District is updating its list of contractors who may be inter-ested in performing public works for the year 2016. Interested con-tractors must submit all required information by mail or email.

January 04NAPA COUNTY SHERIFF'S BUILDING REPAIRSNapa Plan OnlineOnlyProject #: PW 15-300Bid Date: 1/4/2016 3:30 PM County of Napa - Public Works 707-253-4351 Estimated Cost: $0 to $1,200,000 Prebid: MAND 12/8/15 at 10:00 am Addenda: 1 Description: Div_02-selective Building demolition; Div_03-concrete; Div_04-repair mortar, stone veneer repair; Div_05-cold formed metal framing, metal fabrications; Div_07-acoustic batt insulation, exterior insulation fin-ish system repair, bldg.. envelope underlayment, standing seam metal roof repaors, metal roofing underlayment, flashing & sheet metal, precast concrete pavers & open joint pedestal system, joint sealants; Div_08-aluminim store-fronts; Div_09-gypsum board assemblies, painting & coating; Div_10-signage, fire extinguisher cabinets; Div_22-plumbing; Div_23-HVAC; Div_26-electrical system. NOTE: Non-Mandatory Pre-Bid Site Visit for subcontrac-tors 12/17 @ 10AM at 1535 Airport Blvd, Napa. GCCI, Inc., Santa Rosa PH: 707-545-2134 FAX: 707-545-2156

January 05REROOF CONCORD SHOP LOWER ROOF, CONCORD STA-TION PLATFORM CANOPY AND SUPERVISOR'S BUILDINGConcord Plan OnlineOnlyProject #: 15QJ-170Bid Date: 1/5/2016 2:00 PM BART - S.F. Bay Area Rapid Transit District 510-464-6540Estimated Cost: $420,000 to $500,000Prebid: 12/3/15 at 2:00pmAddenda: 0Description: Work consists of the performance of all operations to completely remove existing roof-ing system to the roof deck, and install a new roof as indicated in the Specifications and Contract Drawings for Concord Shop Lower Roof and Concord Station Platform Canopy and Supervi-sor's Building.

ADMINISTRATION BUILDING REMODEL PHASE 2 - HUMAN RESOURCES & RESTROOM PROJECTStockton Plan OnlineOnlyProject #: 713Bid Date: 1/5/2016 2:00 PM San Joaquin Delta Community College 209-954-5065Estimated Cost: $0 to $486,000Prebid: MAND 12/3/15 at 9:00amAddenda: 0Description: Work consists of demolition of interior walls, new Work Room, new finishes, electrical and telecommunica-tions upgrades, and second floor restroom modernization to be ADA compliant with new finishes, plumbing and electrical work. Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600

Page 33: Construction weekly december 4, 2015

Construction Weekly •33

Projects out to bidMODIFICATIONS OF FIVE EX-ISTING TRAFFIC SIGNALSVisalia Plan OnlineOnlyProject #: 15-16-39, 3010-72000/CP8407-999Bid Date: 1/5/2016 2:00 PM City of Visalia 559-713-4334Estimated Cost: $0 to $1,180,000Addenda: 0 Description: Work consists of modifying 5 existing traffic signals.

January 06LANDSCAPE MAINTENANCE FOR MEADOWVIEW CITY SER-VICE COMPLEXSacramento Plan OnlineOnlyProject #: B16155711002Bid Date: 1/6/2016 2:00 PM City of Sacramento 916-808-1437Prebid: MAND 12/9/15 at 9:00amAddenda: 1Description: Work to be per-formed comprises general horti-cultural maintenance, related IPM services, the operation of manual and automatic irrigation, cleanup of landscape areas as designated in the attached list of locations and, when necessary, repairs of irrigation systems and replace-ment of plant materials. Require-ments vary by location depending upon the landscaping present.

SOUTH YOSEMITE PEDESTRI-AN IMPROVEMENT PROJECTOakdale Plan OnlineOnlyProject #: 5153(036)Bid Date: 1/6/2016 3:00 PM City of Oakdale 209-845-3600Estimated Cost: $0 to $568,893Addenda: 0Description: Work consists of frontage improvements (curb & gutter, sidewalk, fencing, etc.), pavement widening, median installation, and striping improve-ments.

BUTTE REGIONAL TRANSIT OPERATIONS CENTER TEN-ANT IMPROVEMENT REMODEL PROJECTChico Plan OnlineOnlyBid Date: 1/6/2016 2:00 PM Kitchell 916-648-9700Estimated Cost: $0 to $2,000,000Prebid: MAND 12/15/15 at 9:00amAddenda: 0Description: Work consists of the construction remodel of an existing office and maintenance shop building. The existing of-fices, electrical room, and shop improvements will require soft demo to a cold shell structure. The improvements will include storefront aluminum window wall infill, the BCAG boardroom and associated casework, finishes and Audio Video improvements, approximately 14 offices with conference rooms, reception, restrooms and break room areas. S W ALLEN CONSTRUCTION, SACRAMENTO PH: (916) 344-2098 FAX: (916) 344-0307

FLUORIDATION AT WATER TREATMENT PLANTSSan Jose Plan OnlineOnlyProject #: 93084011 C0610Bid Date: 1/6/2016 2:00 PM Santa Clara Valley Water District 408-265-2600Prebid: MAND 12/2/15 at 10:00 amAddenda: 0Description: See Specifications for details.

NINOS PARKWAY COMMUNITY GARDENSacramento Plan OnlineOnlyProject #: B16190021010Bid Date: 1/6/2016 2:00 PM City of Sacramento 916-808-1458Estimated Cost: $164,260 to $202,690Addenda: 0Description: The work to be performed consists of Ninos Parkway Community Garden, in Sacramento. The improvements will consist of demolition, grading, irrigation system, landscaping, concrete flatwork and curbs, special pavement, decomposed granite paving, chain link fencing and gates, irrigation, and picnic tables. Sierra Valley Construction, Inc., Loomis PH: (916) 772-0800 FAX: (916) 772-0825

REPLACE 5KV MEDIUM VOLT-AGE CABLES AND SWITCH-GEAR Norwalk Plan OnlineOnlyProject #: 137634Bid Date: 1/6/2016 2:00 PM Department of General Services 916-375-4292Prebid: MAND 12/15/15 at 10:00amAddenda: 0Description: Work consists of the replacement of underground 5kv cables with new replacement of 5kv sectionalizing SF6 switch-gear, OFC’s, dry and oil filled transformers, 5kv pull box covers and manhole sump pumps with new, as well as conducting primary distribution load study. Removal and disposal of 5kv lead cables, mineral oil and recycling SF6 gas.

SIERRA AVENUE AND D STREET SEWER PUMP STA-TION REPLACEMENT PROJ-ECTOakdale Plan OnlineOnlyBid Date: 1/6/2016 2:00 PM City of Oakdale 209-845-3600Estimated Cost: $0 to $1,077,438Addenda: 0 Description: Work consists of construction of new wet well, controls, piping, bypass pumping, and demolition of exist-ing pump station.

January 07HOLDEN RANCH GYMNASIUM HVAC UPGRADEMorgan Hill Plan OnlineOnlyProject #: 263-CP15006Bid Date: 1/7/2016 2:00 PM County of Santa Clara 408-993-4600 Estimated Cost: $0 to $350,000 Prebid: 12/3/15 at 10:00am Addenda: 0Description: Work consists of providing a new package air conditioning unit, housekeeping pad, and associated duct work to serve the existing exercise room and hallway space of the Holden Ranch Gymnasium.

JOB ORDER CONTRACTS: JOC-001, JOC-002 And JOC-003Merced County Plan OnlineOn-ly Bid Date: 1/7/2016 3:00 PM Merced County - Public Works 209-385-7601Prebid: MAND 12/15/15 at 10:00 am Addenda: 0Description: This Advertise-ment for bids is for the award of three separate JOC and the work includes repair, alterations, modernizations, maintenance, re-habilitations, and demolition work performed on buildings, offices, facilities, infrastructure, and and other real property.

Page 34: Construction weekly december 4, 2015

34 • Construction Weekly

Projects out to bidFLORIN CREEK MULTI-USE BASIN PROJECTSacramento Plan OnlineOnlyProject #: 4297Bid Date: 1/7/2016 2:00 PM County of Sacramento 916-876-6300Estimated Cost: $2,650,000 to $3,150,000Prebid: 12/15/15 at 10:00 amAddenda: 0Description: Includes the excava-tion of +/- 65,000 CY of soil for the construction of a multi-use detention basin and the con-struction of park enhancements including a pond, drainage and roadway construction, pedestrian bridge relocation, wetland habitat construction and the modifica-tion, installation or relocation of utilities. **Include "Contract No. 4297" in subject line of email cor-respondence. Anderson Dragline, Inc., Gridley PH: (530) 695-1352 FAX: (530) 695-3131 Westcon Construction Corp, Rocklin PH: (916) 663-2425 FAX: (916) 663-2448

VARIOUS IMPROVEMENTS IN THE ELIHU HARRIS BUILDINGOakland Plan OnlineOnlyProject #: 131130Bid Date: 1/7/2016 2:00 PM Department of General Services (916) 376-1673Prebid: 12/9/15 at 10:00 amAddenda: 0Description: Major components of Project Work consist of: Demoli-tion, Tenant improvements on the Third Floor; Construction of a se-cure evidence storage room and an employee break room, HVAC, fire sprinkler modifications, elec-trical and Title 24 upgrades. Rodan Builders , Belmont PH: 650-508-1700 FAX: 650-508-1705

January 08AIRPORT SECURITY INFRA-STRUCTURE PROGRAMSan Francisco Plan OnlineOnlyProject #: 10511.66Bid Date: 1/8/2016 2:00 PM Estimated Cost: $0 to $90,000,000Prebid: 11/23/15 at 9:00amAddenda: 3Description: Work consists of upgrading security infrastructure. The work is campus-wide and will encompass the Airport’s waterside and landside perimeter, Airfield operations, and Terminal buildings.

January 12COUNTRY HILLS DRIVE AND VISTA GRANDE DRIVE WATER MAIN REPLACEMENTAntioch Plan OnlineOnlyProject #: 503-16Bid Date: 1/12/2016 2:00 PM City of Antioch - Capital Improve-ments 925-779-7050Estimated Cost: $0 to $1,250,000Addenda: 0Description: Work consists of installing domestic water facilities and cathodic protection in the areas shown on the plans. Ad-ditional work shall include, but not be limited to, surface restoration, traffic control, water pollution control and all other work shown on the plans, specified in the Standard Specifications, Special Provisions and as directed by the Engineer.

January 13WATER TREATMENT PLANT CAPITAL IMPROVEMENTS PROJECT, PHASE 1BPittsburg Plan OnlineOnlyProject #: 2012-16BBid Date: 1/13/2016 2:00 PM City of Pittsburg - Redevelopment Agency 925-252-4044Prebid: MAND 12/2/15 & 12/16/15 at 2:00 pm Addenda: 0Description: Work consists of constructing facilities to improve operability and reliability of the treatment plant (Type A) improve-ments and facilities to remove and process water treatment plant sludge (Type B improve-ments). See specifications for further details. C. Overaa and Co., Richmond PH: (510) 234-0926 FAX: (510) 237-2435 Taber Construction, Martinez PH: (925) 682-6133 FAX: (925) 682-6122 Western Water Constructors, Santa Rosa PH: 707-540-9640 FAX: 707-540-9641

January 14EBBETTS PASS WATER SYSTEM REACH 3A PIPELINE REPLACEMENT PROJECTCalaveras County Plan Onli-neOnly Project #: 11078Bid Date: 1/14/2016 2:00 PM Calaveras County Water District 209-754-3181Prebid: 11/3/15 at 10:00 amAddenda: 2DescriptionSee Specifications for details. Herback General Engineering, Minden PH: (775) 267-6800 FAX: (775) 786-7595 K.W. Emerson, Inc., San An-dreas PH: (209) 754-3839 FAX: (209) 754-3830

DELTA SERVICE DISTRICT CENTER RELOCATION/CON-STRUCTIONStockton Plan OnlineOnlyProject #: 107756Bid Date: 1/14/2016 2:00 PM Department of General Services 916-376-1622Estimated Cost: $0 -$19,500,000Prebid: MAND 11/19/15 at 10:00 am Addenda: 3Description: Project comprises labor, material and services necessary for: Construction of a California Conservation Corps District Center, which includes, site improvements, excavation, concrete, steel, plaster, skylights, coiling doors, cold storage room, Kitchen and equipment, HVAC, fire protection, security, lighting electrical, data and communica-tions, transformers, switchgear, and related work AMG & Associates, Inc., Santa Clarita PH: 661-251-7401 FAX: 661-251-7405 Arntz Builders, Inc., Novato PH: (415) 382-1188 FAX: (415) 883-7529 Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 D.L. Falk Construction Inc., Hay-ward PH: (510) 887-6500 FAX: (510) 887-6501 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600 F & H Construction, Lodi PH: (209) 931-3738 FAX: (209) 931-4427 Flint Builders, Inc., ROSEVILLE PH: (916) 757-1000 FAX: (916) 797-7400 Roebbelen Contracting, Inc., EL DORADO HILLS PH: (916) 939-1110 FAX: (916) 939-4027 Zovich Construction, Hayward PH: 510-784-1273 FAX: 510-784-0173

Page 35: Construction weekly december 4, 2015

Construction Weekly •35

Projects out to bidWINDOW REPLACEMENT - X01 UNIT LMNG ROOMS UNIVER-SITY PARK NORTH - REBIDSan Francisco Plan OnlineOnlyProject #: D000814Bid Date: 1/14/2016 2:00 PM San Francisco State University 415-338-7242Estimated Cost: $0 to $750,000Prebid: 152/16/15 AT 10:00AMAddenda: 0Description: Work consists of fur-nishing labor and material neces-sary to replace the X01 unit living room windows in Buildings 6, 7, 8 and 9 at University Park North on the campus of San Francisco State University.

CITYWIDE CURB RAMP IM-PROVEMENTSConcord Plan OnlineOnlyProject #: 2325Bid Date: 1/14/2016 2:00 PM City of Concord 925-671-3361Estimated Cost: $250,000 to $300,000Addenda: 0Description: The scope of work is generally for constructing curb ramps at various locations throughout the City of Concord. Work shall include adjusting utility covers, asphalt concrete, traffic control, pedestrian detours, stag-ing of the work, water pollution control program ; and such other items or details that are required by the Plans, Standard Specifica-tions, the Special Provisions and as directed by the Engineer. CALIFORNIA CORRECTIONAL CENTER (CCC) HEALTH CARE FACILITY IMPROVEMENT PRO-GRAM (HCFIP) & HIGH DESERT STATE PRISON HCFIPSusanville Plan OnlineOnlyProject #: 6000001904Bid Date: 1/14/2016 2:00 PM

Department of Corrections and Rehabilitation 209-274-4911Estimated Cost: $0 to $23,457,000Prebid: MAND 12/10/15 at 9:00am - Clearance Requests must be submitted by 12/2 @ 4 PM Addenda: 1Description: See Specifications for details. Bobo Construction, Inc., Sacra-mento PH: (916) 383-7777 FAX: (916) 383-1681 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600

BIG TREES SOUTH ZONERED-WOOD POTABLE WATER STORAGE TANKSWILDFIRE HAZARD MITIGATION PROJ-ECTCalaveras County Plan Onli-neOnly Project #: 11073Bid Date: 1/14/2016 2:00 PM Calaveras County Water District 209-754-3181Prebid: 12/1/15 at 10:00amAddenda: 1 Description: See specifications for details. BRCO Constructors, Inc., Loomis PH: 916-652-3868 FAX: 916-652-3922 Diede Construction, Woodbridge PH: (209) 369-8255 FAX: (209) 368-0600

January 20 BIOLOGICAL NUTRIENT RE-MOVAL (BNR) PROJECTElk Grove Plan OnlineOnlyProject #: 4208Bid Date: 1/20/2016 2:00 PM Sacramento Regional County Sanitation District 916-875-9015Estimated Cost: $0 to $503,933,780Prebid: 11/18/15 at 9:00 amAddenda: 1 Description: See specifications for details.

January 28JAIL SECURITY SYSTEM MAIN-TENANCE AND UPGRADES PHASE IINapa Plan OnlineOnlyProject #: PW 11-04BBid Date: 1/28/2016 3:30 PM County of Napa - Public Works 707-253-4351Estimated Cost: $0 to $1,400,000Prebid: MAND 1/7/15 at 10:00 am Addenda: 0Description: Electronic safety & security, conductors & cables, raceways & boxes, system signal grounding, cabinets, enclosures & racks, electronic components, intercom systems, video surveil-lance systems, fire alarm system, integrated sequence of op-erations, PLC integrated control systems

ELMWOOD M1 SUNDECK/MEDICAL HOUSING UNITSMilpitas Plan OnlineOnlyProject #: RFP-FAF-FY16-0049Bid Date: 1/28/2016 5:00 PM County of Santa Clara 408-993-4600Prebid: 12/14/15 at 10:00 amAddenda: 1Description: This project includes the reprogramming, realignment of interior spaces of the upper level of building M1 Elmwood correctional facility and also necessary accessibility upgrades to interior facilities used by staff and inmates. Work also includes structural work, mechanical, plumbing, fire protection, and electrical upgrades.

CDE-1,OOOKVA CP TRANS-FORMER REPLACEMENTFremont Plan OnlineOnlyProject #: 138052Bid Date: 1/28/2016 2:00 PM Department of General Services (916) 376-1673Prebid: MAND 8/6/15 at 10:30amAddenda: 3Description: Work consists of the replacement of the exist-ing 1,OOOKVA, 12KV-480/277 volt transformer within the Unit Substation NO.1 line up. New 1,OOOKVA transformer on Pre-Fabricated pad located outside of the Central Plant building. Coordination Arc Flash study, relay settings per study and related work.

February 04EAST "C" STREET REPAVE-MANT AND WATERLINE PROJ-ECT - PHASE 1Oakdale Plan OnlineOnlyBid Date: 2/4/2016 2:00 PM City of Oakdale 209-845-3600Addenda: 2Description: See specifications for details. Central Valley Asphalt, Lindsay PH: (559) 562-7802 FAX: (559) 562-7902 McGuire & Hester, Oakland PH: (510) 632-7676 FAX: (510) 562-5209 Ridgeline Engineering, Stockton PH: (209) 955-0110 FAX: (209) 955-0220

Page 36: Construction weekly december 4, 2015

36 • Construction Weekly

NOTICE OF COMPLETION Recordation Completion Date Owner Name Date Contractor Name Property Address 11/16/15 Bright Dev 11/16/15 1566 Monte Stella Pl, Mtca Bright Dev 11/09/15 751 Monte Casa St, Mtca City of Ripon 11/10/15 OC Jones & Sons Inc Concession Stand & Restroom Facility at Mistlin Sports Park Lincoln Unified School District 11/04/15 Clark & Sullivan Paloma Preschool Panda Express Inc 10/27/15 Cutting Edge Bldrs Inc 1572 E Fremont St, Stkn Pulte Home Corp 11/13/15 1365 Chestnut Hill Dr, Mtca11/17/15 Caresco Bldrs Corp 11/09/15 10105 Kaycee Ln, Stkn Pulte Home Corp 11/13/15 1364 Chestnut Hill Dr, Mtca TRI Pointe Homes Inc 11/16/15 504 Derone Ln, Trcy11/18/15 CPG River Island Communities 11/16/15 DeNova Homes Inc 1264 Darrow Dr, Lthrp LLC CPG River Island Communities 11/13/15 DeNova Homes Inc 18427 Pilot Ct, Lthrp LLC MSG Investors LLC 11/12/15 1002 S Walcott Ave, Mtn Hse Oakwood LT Ventures LLC 11/10/15 Casner Communities Inc 1481 Riva Trigoso Pl, Mtca Pulte Home Corp 11/16/15 1334 Arbor Brook Dr, Mtca Richmond American Homes of 11/17/15 130 W Bonner Dr, Mtn Hse Maryland Inc Shea Homes LP 11/09/15 562 N Castellina Terr, Mtn Hse William Lyon Homes Inc 11/17/15 2642 Daniel Hansen Wy, Trcy11/19/15 Brookfield Windrift LLC 11/16/15 940 Evergreen Ave, Lthrp Brookfield Windrift LLC 11/19/15 980 Evergreen Ave, Lthrp Central Valley Executive Bldrs Inc 11/04/15 322 Diamond Wy, Rpn Meritage Homes of Calif Inc 11/18/15 868 Emigrant St, Mtca MSG Investors LLC 11/04/15 1026 S Walcott Ave, Mtn Hse MSG Investors LLC 11/04/15 1038 S Walcott Ave, Mtn Hse MSG Investors LLC 10/27/15 966 S Walcott Ave, Mtn Hse Pulte Home Corp 11/17/15 1340 Arbor Brook Dr, Mtca Woodside 05N LP 11/16/15 Woodside Homes 10404 Ian Ct, Stkn

11/20/15 Brookfield Windrift LLC 11/13/15 978 Riverbend Dr, Lthrp CalAtlantic Group Inc 11/19/15 Standard Pacific Corp 1697 Kyle Dayton Dr, Trcy Christian E Koenig; Carrie L 11/13/15 Shannon Cabebe 19323 Tami Ln, Wdbrdg Koenig

LEGALNoticesP (209) 599-8895 F (209) 599-6530 • PO Box 554 Ripon CA 95366

Page 37: Construction weekly december 4, 2015

Construction Weekly •37

LEGALNoticesP (209) 599-8895 F (209) 599-6530 • PO Box 554 Ripon CA 95366

CPG River Island Communities 11/13/15 DeNova Homes Inc 18280 Spence Ave, Lthrp LLC CPG River Island Communities 11/19/15 DeNova Homes Inc 18409 Pilot Ct, Lthrp LLC DR Horton Bay Inc 11/16/15 1810 Ettles St, Mtca DR Horton Bay Inc 11/18/15 1813 Ettles St, Mtca DR Horton Bay Inc 11/19/15 1822 Ettles St, Mtca Pulte Home Corp 11/18/15 1346 Arbor Brook Dr, Mtca Woodside 05N LP 11/09/15 Woodside Homes 10422 Ian Ct, Stkn

MECHANICS LIENS Date Lien Recorded Owner Name Amount Contractor Name Property Address 11/16/15 Geraldine King $3,789 Roofing Supply Group - California LLC 18811 N Lockewood Ln, Lckfrd11/17/15 Lauren Grasso $1,121 Huff Restoration DKI; Huff Const Co Inc 653 Agate Ave, Mtca11/20/15 Mamie Perry; Perry Williams $3,955 Domus Const & Design Inc 2107-09 Nightengale Ave, Stkn

LIEN RELEASES Date Recorded Owner Name Contractor Name Property Address 11/19/15 Excel Manteca LLC Storm Const Inc 2168 Daniels St, Mtca N & D Speno Ventures III LLC Storm Const Inc 1220 W Lathrop Rd, Mtca11/20/15 Raghbir S Sohal; Sukhbir Kaur TMW & Assoc Inc 2454 Teepee Dr, Stkn

Pre-Lien Research & ProcessingMechanics Lien Law Training

www.thelienlady.comP (209) 599-8895 F (209) 599-6530

PO Box 554 Ripon CA 95366

Page 38: Construction weekly december 4, 2015

38 • Construction Weekly

by State Compensation Insurance Fund

builders’ safety services!

Site Safety Inspections

Meeting Attended By

Employee Recommendations

Reviewed MSDS# Subject

Supervisor’s Signature

This information does not supercede local, State, or Federal regulations.

Dec

embe

r 7

, 201

5

Regular site safety inspections using site-specific checklists keep the work-place safe by identifying and correcting hazards in the workplace. Inspection frequency depends on the hazard level of the workplace; sites may need checks at every shift, daily, quarterly or annually. Document the inspection observations, identified hazards, and the corrective actions taken.

Focus on the administrative records and postings at the workplace. Safety Data Sheet (SDS) binders, safety programs, procedures, trainings, and records need to be up to date and accurate. Critical procedures (e.g. spill cleanup, evacuation) should be posted in prominent locations. Required employer postings (e.g. Cal/OSHA, Workers Compensation, and labor law) must be “likely to be seen” by employees. Floor surfaces should be clean and free of slip hazards such as dirt, granular substances, equipment parts, water, or oil. Wet surfaces should be covered with non-slip materials. Holes in the floor, sidewalk, carpet, or other walking surface should be repaired properly, covered, or made safe.

For good housekeeping, items and debris should be kept up off floors and out of walkways. Stored items need to be stacked properly on shelving units firm-ly attached to the wall; heavier items should be on the bottom, lighter items stored on top shelves. Items stored on tops shelves require 18” clearance from fire sprinkler systems. Unsecured stacks on floors should not exceed 72” in height. Ensure areas under desks and tables are accessible to allow proper ergonomic seating and access in case of an earthquake.

Electric panels should have 36” clearance in front. Power cords to equipment should be intact; repair or replace frayed cords. Check that extension cords do not cross walkways and are used only temporarily. Additional power outlets should be installed if extension cords are necessary on a permanent basis or there are “daisy chained” power strips. Ground Fault Circuit Interrupter (GFCI) outlets should be installed around wet areas.

Aisles and walkways need 36” clearance in an office and 44” in a shipping area. Clearly mark emergency exits so they can be seen from any point in the facility. Keep exits clear of stacked material and other impediments. Label doors that are not exits to avoid confusion. Fire doors should not be propped open.

Ensure equipment and tools are in good working order; place defective equip-ment out of service. Check that equipment guards and protective coverings are in place. Store chemicals within their compatible classes; flammables should be kept in a secured flammable cabinet. Personal protective equip-ment should be clean and accessible with available areas and materials for decontamination and storage.

Test fire alarms and sprinkler systems annually. Fire extinguishers should be checked for charge monthly and recharged annually. Inspect first aid kits periodically and replenish or replace supplies when needed.

Site safety inspections keep the workplace safe; a hazard left uncorrected can lead to accidents and injuries.

Page 39: Construction weekly december 4, 2015

Construction Weekly •39

builders’ safety services!

Site Safety Inspections

builders’ safety services!

Be prepared for El Niño with these

great pump specials!

www.multiquip.com

Multiquip Submersible PumpsST2037 2 " Discharge, 115V 1Ø, 1.0 HP, 73 GPM, 37' Total HeadList $405 • Sale $294

ST20472 " Discharge, 115V 1Ø, 1.0 HP, 87 GPM, 47' Total Head List $630 • Sale $450

ST2040T Submersible Trash Pump2 " Discharge, 115V 1Ø, 1.0 HP, 79 GPM, 40' Total HeadList $415 • Sale $300

SST3020BCUL 3 " Discharge, 230V 1Ø, 2.0 HP, 170 GPM, 72' Total HeadList $1,790 • Sale $1,232

Submersible Pumps w/mechanical floatST2037F 2 " Discharge, 115V 1Ø, 1.0 HP, 73 GPM, 37’ Total HeadList $510 • Sale $394

ST2040TF Submersible Trash Pump2 " Discharge, 115V 1Ø, 1.0 HP, 87 GPM, 47’ Total HeadList $489 • Sale $388

Multiquip Engine Driven Trash PumpsQP2TH 2" Suction, Trash Pump, 211 GPM, 98 ft. Head; Honda GX160List $1,470 • Sale $1,013

QP3TH3" Suction, Trash Pump, 396 GPM, 95 ft. Head; Honda GX-240List $1,805.00 • Sale $1,244

QP4TH4" Suction, Trash Pump, 555 GPM, 92 ft. Head; Honda GX340List $3,245 • Sale $2,320

Multiquip 500G Water Trailer also available

© C

OP

YR

IGH

T 2

015,

MU

LTIQ

UIP

INC

. (0

9151

5)

This special promotion ends on December 31, 2015.

3223 N. Deer Run Dr. Carson City, CA 89701 775-884-4745

2855 Fair St. Chico, CA 95928 530-894-7799

3132 Jacobs Ave. Eureka, CA 95501 707-442-9378

5741 S. Toyota Ave. Fresno, CA 559-834-6207

750 Madera Ave. Madera, CA 559-673-2343

5616 Lindhurst Ave. Marysville, CA 95901 530-743-8989

1346 W. 16th St. Merced, CA 209-383-2984

1331 Coldwell Ave. Modesto, CA 209-521-6250

3040 Crossroads Dr. Redding, CA 96003 530-221-8851

4700 Pacific St. Rocklin, CA 95677 916-624-0641

625 Display Way Sacramento, CA 95838 916-922-9895

790 Glendale Ave. Sparks, NV 89431 775-359-6600

2911 E. Fremont St. Stockton, CA 209-948-9500

925 N. Ben Maddox Visalia, CA 559-627-5112

Your local United Rentals locations...

Page 40: Construction weekly december 4, 2015

BUILDERS’ EXCHANGEOF STOCKTON

7500 West Lane • Stockton, CA 95210

RETURN SERVICE REQUESTED

Call Steve for a Informational Webinar Presentation at 209.331.3216http://www.raymorgan.com/welcome_builders_exchange

Ray Morgan CompanyDOCUMENT TECHNOLOGY SOLUTIONS

Do you need Document Management?

Build Better Business Processes From the Job Site to the Corporate O�ce and Access All Your Information from Wherever You Are