consultancy services as independent …nhai.org.in/spw/iereport/monthly progress report for the...
TRANSCRIPT
ConCessionaires
CONSULTANCY SERVICES AS INDEPENDENT CONSULTANT DURING OPERATION AND MAINTENANCE OF 4- PANAGARH-PALSIT-DANKUNI SECTION FROM LANE DIVIDED CARRIAGEWAY FACILITY CONSTRUCTED ON BOT (ANNUITY) OF KM 517.000 TO KM 645.600 (NEW CH/KM 520.103 TO CH/KM
649.072) OF NH-2 IN THE STATE OF WEST BENGAL
SSSuuubbbmmmiiitttttteeeddd bbbyyy
SSSuuubbbmmmiiitttttteeeddd tttooo
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
Sr. No. Title Page
1 PROJECT DESCRIPTION ....................................................................................................................1
1.1 Project Background ..............................................................................................................................1 1.2 Concessionaire .....................................................................................................................................1 1.3 Project Features ....................................................................................................................................1 1.4 Appointment of Independent Engineer............................................................................................... 6
2. TERMS OF REFERENCE OF INDEPENDENT ENGINEER.............................................................7 2.1 Objective................................................................................................................................................7 2.2 Scope of Services...................................................................................................................................7
3. OPERATION & MAINTENANCE REQUIREMENT .........................................................................9
3.1 General .................................................................................................................................................9 3.2 O & M Manual and Plans ...................................................................................................................10 3.3 Maintenance Requirements .................................................................................................................10 3.4 Safety and Traffic Management Operations .......................................................................................12 3.5 Inspection ............................................................................................................................................12 3.6 Reporting Requirements......................................................................................................................13 3.7 Operational and Maintenance Manual ................................................................................................13 3.8 Miscellaneous ......................................................................................................................................13 4. INDEPENDENT ENGINEER`S ORGANIZATION .........................................................................14 4.1 Line of Communication between Entities ...........................................................................................14 4.2 Consultant`s Team ..............................................................................................................................14 4.3 Team Mobilization .............................................................................................................................15
CCC OOO NNN TTT EEE NNN TTT SSS
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM KKMM.. 551177..000000 TTOO 664455..660000 ((NNEEWW
CCHH//KKMM 552200..110033 TTOO CCHH//KKMM 664499..007722)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
5. MAINTENANCE ACTIVITIES ........................................................................................................17
5.1 Routine & Other Maintenance ............................................................................................................17 5.2 Periodic Maintenance .........................................................................................................................17 5.3 Safety & Traffic Management Operations .........................................................................................17 5.4 Inspection ...........................................................................................................................................17 5.5 Operatiional and Maintenance Manual ...............................................................................................17 5.6 Financial Progress ...............................................................................................................................17 5.7 Cost Variation .....................................................................................................................................18 5.8 Permit and Clearances .......................................................................................................................18 5.9 Lane Availability .................................................................................................................................18 5.10 Tests ........................................................................................................................... ....................18 5.11 Miscellaneous........................................................................................................................... .........19
6. HIGHWAY MANAGEMENT ............................................................................................................19
6.1 Highway Asset Management ............................................................................................................19 6.2 Details of Proposal Sent to NHAI .....................................................................................................20 6.3 Details of NCRs Issued .....................................................................................................................20 6.4 Review of Accidents and Remedial Measures ..................................................................................20 6.5 Review of Encroachment Details ......................................................................................................20 6.6 Review of Unauthorized Access .......................................................................................................20 6.7 Breach of Obligations .......................................................................................................................20
7. SUMMARY FINDINGS ......................................................................................................................20 7.1 Standard of Services ..........................................................................................................................20 7.2 Details of Slippages and Remedial Measures ...................................................................................20
8. ANNEXURES
9. MAINTENANCE PHOTOGRAPHS
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM KKMM.. 552200..110033 TTOO 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Monthly Progress Report - Page -1
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
1 PROJECT DESCRIPTION
1.1 Project Background Ministry of Shipping, Road Transport and Highways through National Highway Authority of India (NHAI) has upgraded the stretch Panagarh–Palsit - Dankuni from Km 517+00 to Km 645+600 (New Chaiange/Km 520.103 to 649.072) of National Highway No.2 in West Bengal to 4 lanes divided carriageway facility through Concessionaires on BOT (Annuity) basis. The Project is a part of Golden Quadrilateral (G.Q.) connecting high-density metro corridors of Delhi, Mumbai, Chennai and Kolkata. NH-2 is the link between Delhi and Kolkata, amongst other linkages, it traverses through five states namely Delhi, Haryana, Utter Pradesh, Bihar, Jharkhand and West Bengal. The NH-2 connects number of major urban conglomerates on its way like Delhi, Agra, Kanpur, Allahabad, Varanasi, Dhanbad, Durgapur and Howrah. The Concessionaires have completed the construction work and the project facility is open to traffic. The Concessionaires have the responsibility to maintain the project highway during the concession period to comply with standards and specifications spelled out in the concession agreement
1.2 Concessionaire
The project stretch under the Annuity Approach on BOT basis has been split in two sections. The details of stretch and Concessionaires are as given in Table 1.1 below. The Concessionaires site office address for Operation and Maintenance is: M/s Mapex Infrastructure Pvt. Ltd & M/s Emas Expressway Pvt. Ltd, Mosagram, Ajhapur (Highway), Burdwan, West Bengal, PIN-713 401.
1.3 Project Features
1.3.1 Topography
The Project Road is passing through the area of Ganges Plateau through plain terrain. The road is crisscrossed by a number of cross drainage works. The temperature in the project area varies from 10o C to 40o C. The average annual rainfall in Burdwan District is 1470mm and in Hooghly District is 1621mm. The range of relative humidity varies from a minimum of 8 % to a maximum of 23 %.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM KKMM.. 552200..110033 TTOO 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Monthly Progress Report - Page -2
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
The project location map is given in Fig. 1.1
Table 1.1 Project Stretch Details
S. No.
Project Stretch
Length (Km)
Name of Concessionaire
Date of Commercial Operation
Annuity Payments
Concession period
1 Panagarh (Km
517.000) to Palsit
(Km. 581.457)
New chain ages Km.
520.103 to 584.929
64.826 M/s Mapex
Infrastructure Pvt. Ltd.
09.06.2005
30 Annuity
payments of Rs 555 million each on 21st June and 21st Dec. of
each year from 2005
to 2019
17 years and 6
months (ending on Dec. 20,2019)
2 Palsit (Km.
581.457) to
Dankuni (Km.
645.60 (Durgapu
r Expressw
ay) New chain ages Km.
584.929 to 649.072
64.143 M/s Emas
Expressway Pvt. Ltd.
20.06.2005
30 Annuity
payments of Rs
399.98 million each on
27th August and 27th Feb of
each year from 2005
to 2020
17 years and 4
months (ending on Feb.
26, 2020)
Total 128.969
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Monthly Progress Report - Page -3
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
Figure 1.1 – Project Location Map
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -4
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
1.3.2 Salient Features The salient features of project road are given in Table 1.2 below
Table 1.2 Salient Details
Description Panagarh to Palsit Km
517+000 to 581+ 457 New Chainage/Km 520.103 to 584.929
Palsit to Dankuni Km 581+457 to 645+600 New Chainage/Km 584.929 to 649.072
Road Length 64.457 km (New chainages 64.826 km)
64.143 km (New chainages 64.143)
Right of Way (ROW) Generally 45m to 60m Generally 90m
Carriageway Duel Duel
Terrain Plain Plain
Road Width Main carriageway
- Median width - Median side edge strip - Paved Shoulder - Unpaved Both side
7.0 m 4.5m
0.25 m 1.5m
2.0 m (Earthen shoulder)
7.0 m 8.5 m 0.25 m 1.5m
2.0 m (Hard shoulder)
Service Road Bituminous pavement 7.0 mtr. and 1.5mtr wide
shoulder on both sides.
Bituminous pavement 3.75 mtr. and 1.5m wide shoulder on both sides
Pavement Composition a. New Construction at
Left side Carriageway
BC
DBM
WMM
GSB
50 mm
130 mm
250 mm
250 mm
50 mm
130 mm
250 mm
250 mm
b. In Over Lay Portion Right side carriage way
BC 50 mm 50 mm
DBM 100 mm 100 mm
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -5
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
Description Panagarh to Palsit Km 517+000 to 581+ 457
New Chainage/Km 520.103 to 584.929
Palsit to Dankuni Km 581+457 to 645+600 New Chainage/Km 584.929 to 649.072
Graded Inter section
Two i. Km 576+346 ii Km 582+576
Six i. Km 585+370 ii. Km.589.411 iii. Km,615.476 iv. Km.634.400 v. Km.646.962 vi. Km.648.527
Toll Plazas One (Palsit Toll Plaza at Km 586.076)
One (Dankuni Toll Plaza at Km 646.376)
Over Pass - Km.632.066
ROB One at Km 581+718 Km 632+960
Fly Over One Km 584.633
Five i. Km.591.910 ii. Km.598.3770 iii. Km.606.005 iv. Km.617.500 v. Km.638.350
Underpass
13 No. i) Km 527.330, ii) Km 543.031, iii) Km 543.871, iv) Km 551.061, v) Km 552.558, vi) Km 556.004, vii) Km562.592 viii) Km563.329,
ix) Km 564.200, x) Km 573.071, xi) Km 578.424, xii) Km 579.188, xiii) Km 579.655
10 No. i) Km 595.235, ii) Km 597.604, iii) Km 601.146, iv) Km 603.778,
v) Km 611.610, vi) Km 620.036, vii) Km 624.908, viii) Km 630.045,
ix) Km 630.893, x) Km 636.830
Cattle Crossing Km 637.413 Km 639.551
Minor Bridges Five Seventeen
Culverts 69
Canal Minor Bridge - Km 623+509
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -6
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
Description Panagarh to Palsit Km 517+000 to 581+ 457
New Chainage/Km 520.103 to 584.929
Palsit to Dankuni Km 581+457 to 645+600 New Chainage/Km 584.929 to 649.072
Ancillary Facilities
(i) Integrated way side amenities complex
One at Km 528.300 One at Km 621.025 RHS
(ii) Truck Lay Byes Two at Km 558.096 and Km 577.871
Two at Km 595.695 & Km 640.140
(iii) Bus bay (19 No.)
11 No. Left side:
Km 532+953, Km 534+396, Km 536+421, Km 539+746, Km 546+750, Km 548+266, Km 552+936, Km 555+296, Km 570+561, Km 576+696,
Km 582+624
8 No. Right side:
Km 523+703, Km 533+996, Km 540+201, Km 546+206, Km 547+641, Km 555+546, Km 570+200, Km 576+546
1.4 Appointment of Independent Engineer (IE) As per terms of the Concession Agreement, an Independent Engineer has to be appointed for supervision during operation and maintenance period. Unihorn India Pvt. Ltd. has been appointed as Independent Consultant on the basis of National Competitive Bidding. The letter of award was issued by NHAI on 03-09-2013 vide their letter no. NHAI/15019/1/2004/CGM (Tech)/VOL-II/173/43204 dated 03-09-2013. The agreement was signed on 30-09-2013. The contract was initially for 2 Years with the Date of Commencement as 19-10-2013. Extension of Time (EOT) has been proposed vide IE’s letter no. UNI/HO/C-17/08-15/398, dated 19.08.2015 to NHAI for 6 months ending on 18.04.2016. EOT is under process in NHAI, of which approval is expected soon.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -7
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
The Consultant has commenced the services. The address for communication is:
Registered Office : Site Office :
UNIHORN INDIA PVT. LTD. IRIS Tech Park, Unit No. 404, 4th Floor, Sector-48, Sohna Road, Gurgaon-122018, Haryana Tel.: 124-4518800-49 Fax: 124-4518832 Email: [email protected] Web Site: www.unihornindia.com
UNIHORN INDIA PVT. LTD. C/o Bankim Timber Works (Amar Sapna) Opposite Jaguar Shop, Near Purvasha Bus Terminal, Alisha, G. T. Road, Post-Joteram, Burdwan-713101, West Bengal Tel.: 0342-2646388, Fax: 0342-2646384 Email: [email protected]
2 TERMS OF REFERENCE OF INDEPENDENT ENGINEER
2.1 Objective
The main objective of the assignment is comprehensive supervision of the operation and maintenance activities carried out by the Concessionaire to ensure complete compliance with respect to technical specifications and various stipulations contained in the Concession agreement with high standard of quality assurance in supervision of O & M works. The Independent Engineer is expected to play a positive and independent role in discharging its functions, thereby facilitating the smooth operation and maintenance of the project. The objective of this consultancy is: • Independently review, monitor and where required by the Agreement to
approve activities associated with Operation and Maintenance of the Project Facilities to ensure compliance by the Concessionaire with the O&M requirements set out in schedule ‘I’ of concessionaire agreement.
• Report to the Parties on the various Physical, Technical and Financial aspects of the Project based on inspections, site visits and tests.
• Assist the Parties in arriving at an amicable settlement of disputes, should the need arise, and.
• Review matters related to safety and traffic management measures adopted by the concessionaire for the project.
2.2 Scope of Services The detailed scope of IE is set out in Schedule ` L’ of Concession Agreement. The services of Consultant with respect to Project Highway shall include but not be limited to the operation & maintenance of the following project facilities:
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -8
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
• Toll plazas, Maintenance yard, Way side amenities and related structures • Traffic management • Hardware and software • Communication systems • Administration and maintenance depots • Rest area and fuel and service facilities • Illumination, Highway signs, Road markings, Road furniture • Interchanges • Bridges including ROB, Overpasses and Pedestrian and Animal crossings,
Grade separators • Service roads • Lay byes, bus bays • Traffic safety, Landscaping, Arboriculture and other Project facilities • Corridor control • Safety barrier and Pedestrian guard rail • Asset management • Project deliverables and tolerance
The IE shall be responsible for reviewing and monitoring the operation and maintenance activities undertaken by the Concessionaire, Affirmation of all certifications done by the Concessionaires so as to ensure compliance with the O&M requirements. The responsibilities of the IE shall also include the following: • To monitor, in accordance with Good Industry Practice, the operations and
maintenance activities undertaken by the Concessionaires so as to ensure compliance with the O&M requirements.
• To review the O&M plans and schedules submitted by the Concessionaires from time to time and assist the Concessionaires in finalizing the same.
• Monitor operation & maintenance activities (including maintenance of equipment, standards of service, traffic management, safety and environmental issues) and the overall quality of O&M activities so as to ensure compliance by the Concessionaire with the O&M Requirements, O&M Plan and O&M Manual.
• Periodically review the O&M Manual for adequacy. • Inspect the Project Facilities at least once a month and as and when
exigencies require ascertaining conformity with Project Requirements. • Review and ascertain the cost variation arising as a result of Change in Law
and / or Change in Scope and determine the Additional Cost. • Undertake a quarterly review of the various records and registers to be
maintained by the Concessionaires (including the records relating to complaints and accidents) and suggest suitable remedial measures / procedures, where necessary.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -9
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
• Review the accident record on the project highway and suggest remedial measures.
• To mediate and assist in resolving disputes, if any, between NHAI and Concessionaire during O&M stage.
• Initiate necessary action to undertake maintenance obligation of risk and cost of the Concessionaires in the case of their failure to carryout O&M.
In the event of Emergency, the Independent Engineer shall assist the Concessionaires in dealing with the same and if necessary require or permit, as the case may be, the Concessionaire to take such appropriate steps or measures including where necessary decommissioning of any project Facilities.
3 OPERATION AND MAINTENANCE REQUIREMENTS
3.1 General The O & M requirements are set out in ‘Schedule I’ of Concession Agreement. Concessionaire shall ensure that during concession period, the project facilities are maintained to the standards and specifications set out therein. The concessionaire shall further ensure that: • The project facilities are kept free from undue deterioration and undue wear. • Applicable and adequate safety measures are taken. • Minimum delay is caused to users of the project facilities. • Adverse effects on the environment and to the owners and occupiers of the
property and /or land in the vicinity of the project facilities, due to any of its actions are minimized.
• Any situation which has been arisen or likely to arise on account of any accident or other emergency is responded to as quickly as possible and its adverse effects controlled/minimized.
• Disturbance or damage or destruction to property of third party by operations of the project facility is controlled/minimized.
• Members of the public times are treated with due courtesy and consideration by its employees/agents.
• Users are provided with adequate information and forewarned of any event or any other matter affecting the Project Facilities to enable them to control/minimize any adverse consequences by such event or matter.
• A complaint register to record grievances of any member of the public in relation to the operations and maintenance of the Project/ Project Facilities is duly maintained.
• Traffic data and data relating to the O & M of the Project Facilities are collected.
• All materials used in the maintenance, repair and replacement of any kind of the Project Facilities shall meet the Design Requirements/standards prescribed in the DPR.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -10
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
• The personnel assigned by the Concessionaires have the requisite qualifications and experience and are given the training necessary to enable the concessionaires meet the O & M Requirements.
3.2 Operation & Maintenance Manual and O&M Plans
The Concessionaire shall finalize the O & M Manual and O & M Plans. The O & M plan is required to be submitted six weeks prior to the anniversary of COD each year.
3.3 Maintenance Requirements
All the road work and pavement contained in the Project Facilities (including those in the ancillary facilities) during operation period shall be maintained in traffic worthy condition as per intervention levels 1 and 2 provided in the Table I-2 of Concession Agreement for various maintenance activities set out.
Maintenance Activities shall comprise of:
• Routine Maintenance • Periodic Maintenance • Emergency Maintenance • Other Maintenance Works
3.3.1 Routine Maintenance
(a) In order to ensure smooth and uninterrupted flow of traffic during normal operating conditions for all 24 hours of a day, routine maintenance of the Project Facilities shall include but not be limited to:
• Prompt repairs of potholes, electrical items, concrete joints, drains, lane marking, lighting and signage, patching, re-grading of granular shoulders to designed standard, making good the deficiency of material on the shoulder, drain cleaning, repairing of signs, road marking, carrying out repairs to pavement crack by sealing;
• Replacement of equipment/consumables, horticultural maintenance and repairs to equipment, pavements, bridges, structures and other civil works which are part of the Project/Project Facilities;
• Maintenance of the approach roads to and underpasses, overpasses and drainages within the Project Site in accordance with Good Industry Practice;
• Keeping the Project Site/Project Facilities in a clean, tidy and orderly condition free of litter and debris and taking all practical measures to pavement damage to the Project Facilities or any other property on or near the Project Site. Removing and disposing of in accordance with all Applicable Laws and Applicable Permits. All rubbish, debris, etc. including any and all equipment, supplies, materials and wastes brought or produced by the Concessionaire/Contractor on the Project Site;
• Undertaking maintenance works in accordance with the O & M Plan and O & M Manual;
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -11
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
• Preventing, with the assistance of concerned law enforcement agencies where necessary, any unauthorized entry to and exit from and any encroachments including any encroachments on the ROW/Project site;
• Taking all reasonable measures for the safety of all the workmen, material, supplies and equipment brought to the project site.
(b) For routine maintenance works, the Concessionaire shall generally follow the operational and performance criteria specified in the respective IRC/MORT&H standards and specifications for each of the performance indicators covered under pavement condition survey, roughness and BBD deflections. Where such criteria are not specified in the standards, the Concessionaires, for the purpose of routine maintenance shall set forth such criteria as to conform to Good International Standards and Good Industry Practice for sound pavement maintenance practices in consultation with the Independent Engineer.
(c) The Concessionaire shall regularly carry out the necessary preventive maintenance activities for the Project Facilities to ensure adherence to the Design Requirements/specification set out in the DPR throughout the Concession Period.
(d) The Concessionaires shall strictly follow and adhere Asset Management Project Deliverables and Tolerance Criteria as given in Appendix 1.1 of Concession Agreement.
3.3.2 Periodic Maintenance
To be carried out during the end of 5th year, 10th and 15th year from COD in respect of Panagarh-Palsit section and 5th, 10th and 15th Year from the COD in respect of Palsit-Dankuni Section as per Concession Agreement.
3.3.3 Emergency Response Protocol (ERP)
Emergency Response Protocol (ERP) shall be developed by Concessionaires in consultation with the local police, hospital/ ambulance services, fire department and other authority/support personnel and the Independent Engineer. The ERP shall set out steps to be taken and measures to be adopted by the Concessionaires in responding to dealing with emergency including those situations related to vehicle accidents involving personal injuries or fatalities, property damage and force majeure etc. as detailed in the Concession Agreement
3.3.4 Other Maintenance Works
It involves maintaining the following facilities as per Concession Agreement: (a) Illumination (b) Highway Sign & Road Markings (c) Landscaping (d) Safety Barriers and Pedestrians Guard Rail
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -12
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
(e) PIU Complex, Maintenance Yard and wayside amenities-Service Area (f) Truck Lay byes and Bus Bays (g) Road Furniture
3.4 Safety & Traffic Management Operations
“Safety Week” has been celebrated from 10th January to 16th January 2016 with Concessionaires, Independent Engineer and District Administration Burdwan. 27th National Safety Week was inaugurated on 10th January 2016. Slogans of “Road Safety – Time for Action” have been displaced at PIU and other Places from Panagarh to Dankuni. Messages of Safety were addressed to road users, and divers, shop keepers, villagers, pedestrians through public addressing system at different vulnerable places during safety week. Pamphlets were also distributed to improve awareness among people. A meeting was held on 18.02.2015 in the chamber of District Magistrate, Hooghly in presence of Project Director, PIU Durgapur, IE & the Concessionaire regarding the fixing sign boards of the highway chainage from 603 KM to 649 KM. Till date, concessionaire has not complied the observation, needed to be complied at earliest. ADG traffic visited both the sections with Concessionaires, Independent Engineer, and NHAI on 23.03.2015. His observation is yet to be complied.
3.4.1 Traffic Management
Traffic management shall be under taken during maintenance activities in consultation with IE as per the site conditions. A traffic management plan for planned scheduled O&M activities shall be prepared in consultation with IE with all the requirements spelled in CA.
The Corridor Control Plan shall envisage regular 24 hours patrol/surveillance of the ROW in the Project/Project Facilities shall be required to monitor, report and take actions against activities, such as, encroachments, unauthorized construction on road or entrance connections, structures, interference with drainage system etc, within 150 m of the highway corridor. Surveillance also includes traffic operation and management of the accidents and other incidents. This plan shall be developed in consultation with local administration and IE and shall form part of O & M Manual.
For safety among others a Traffic Safety Officer is to be nominated by the Concessionaire.
3.5. Inspection Inspections of various items of Project Highway and other facilities have been classified as below and related relative frequencies have been spelt out in Concession Agreement.
a) Visual inspections b) Close inspection c) Through inspection
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -13
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
The frequency of inspection can be suitably revised in consultation with IE if the situation so warrants.
3.6 Reporting Requirements
The concessionaire shall make available to the IE/NHAI, a monthly report containing the following minimum information within 5 days of the end of each calendar month:
Inspections undertaken by the Concessionaire during the month and action taken/proposed thereafter (i) Details of all reports submitted to IE during the month (ii) O & M inspection compliance report (iii) Maintenance activities undertaken during the month ended (iv) Details of any emergency and action taken.
3.7 Operational and Maintenance Manual
The O & M Manual prepared by the Concessionaires in consultation with IE shall set out the operations and maintenance standards and details of O & M activities to be undertaken during Concession Period, so that the Project Facilities shall at all times conform to the Design Requirements/specifications set out in the DPR. The Manual shall include without limitation the following aspects:
Organization structure with responsibilities of key personnel Traffic management plan including the corridor control plan Safety management programme including the emergency response protocol Inspection procedures Maintenance invention levels Asset management project deliverables and tolerance criteria Environment management plan Maintenance programme Management information system Report formats.
3.8 Miscellaneous The Concessionaire shall:
• Maintain an inventory of all items comprised in the project facilities (The Inventory), in a format to be developed in consultation with IE. This shall be updated throughout the concession period
• Take all reasonable steps to facilitate the transit of Abnormal Indivisible Loads along the Project Facilities
• Responsible for the installation, operation, maintenance and removal of any equipment belonging to third parties.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -14
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
4 INDEPENDENT ENGINEER’S ORGANIZATION
4.1 Line of Communication between Entities.
4.2 Consultant’s Team:
The contract envisages deployment of following personnel for the services: Key Personnel of Consultant:
Sl. No. Position Man Months
1 Team Leader cum Senior Highway Engineer 24+6.0= 30
2 Highway Engineer 24+6.0= 30 3 Senior Pavement Specialist 2+0.5= 2.5 4 Senior Bridge Design Engineer 2+0.5= 2.5 5 Bridge/Structural Engineer 8+2.0= 10 6 Road Safety Expert 4+0.5= 4.5 7 Senior Quality cum Material Expert 8+2.0= 10 8 Legal Expert 2+0.5= 2.5
Sub Total 74+18=92
Concessionaire Section Panagarh-Palsit of NH-2
M/s MAPEX Infrastructure Pvt. Ltd.
Independent Engineer Unihorn India Pvt. Ltd.
Client National Highways Authority of India
Concessionaire Section Palsit-Dankuni of NH-2
M/s EMAS Expressway Pvt. Ltd.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -15
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
Sub Professional:
Sl. No. Position Man Months 1 Assistant Highway Engineer 24+6.0= 30 2 Assistant Bridge Engineer 12+3.0=15 3 Asst. Quality cum Material Engineer 12+3.0=15
Sub Total 48+12= 60 GRAND TOTAL 92+60=152
Sub Support Staff:
Sl. No. Position Man Months 1 Secretary cum Computer Operator 24+6.0= 30 2 Manager cum Accountant 24+6.0= 30 3 Photocopy Machine Operator 24+6.0= 30 4 Office Boy 24+6.0= 30 5 Watchman 24+6.0= 30
TOTAL 120+30= 150
NOTE: Proposed man month of EOT has been added in the man month of initial man month as per agreement to reflect man month up to the 1st extension period.
4.3 Team Mobilization The key professionals and other support staff for the construction are
being deployed as per the actual requirement in consultation with client. The following personnel have been mobilized:
A. Key Personnel of Consultant: Team Leader : Mr. V.K.Shrivastava from
19.10.2013 to 15.07.2015 Mobile No. : 09415229633
Acting Team Leader & Highway Engineer : Mr. Durgesh Kumar from 09.04.2014 Mobile No. : 08337830095 / 09431378392
A. Key Personnel for Intermittent Inputs: Senior Pavement Specialist : Mr. N.Dharmarajan from
01.09.2014 to 10.09.2014 Mobile No. : 09611120749
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -16
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
Road Safety Expert : Mr. Prof. M.N. Sreehari from 02.09.2014 to 09.09.2014
Mobile No. : 09845049505
Senior Quality cum Material Expert : Mr. Ashit Kr. Sarkar from 30.04.2015 to 10.05.2015 & 20.08.2015 to 03.09.2015 Mobile No. : 07686891334
B. Sub Professional: Assistant Highway Engineer : Mr. H. S. Chowdhury from
10.12.2013 Mobile No. : 09434156185
Assistant Quality cum Material Engineer : Mr. Manoj Kr. Sinha from 07.12.2013 to 06.12.2014
Assistant Bridge Engineer : Mr. Mritunjay Kumar Singh from 15.11.2014
Mobile No. : 08348829334 C. Sub Support Staff: Secretary cum Computer Operator : Mr. Vishal Kumar Sinha/
Mrs. Saraswati Let from 16.07.2015
Mobile No. 09851404480
Manager cum Accountant : Mr. Sudip Das from 19.10.2013 Mobile No. 7797652126/8158908443
Photocopy Operator : Mr. Pawan Kumar Sinha/ Mr. Sandip Das from
01.04.2014. Mobile No. 09800131962
Office Boy : Mr. Sanjay Shaw/ Ms. Namita Sarkar from
16.07.2015 Mobile No. 09002771003
Watchman : Mr. Mohan/Mr. Chiranjit Das/ Mr. Monoj Bauri from 16.07.2015
Mobile No. 09647650196
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -17
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
5. Maintenance Activities
5.1 Routine and Other Maintenance
The Concessionaire has been found lacking in maintaining certain routine maintenance items like rectification of ruts, cracks, potholes, damaged shoulder, drainage road cleanness, inadequate plantation in median and ROW, deficient road marking, missing hectometer stones, encroachments, unauthorized parking, unauthorized access, unauthorized dumping, inadequate informatory and caution signs, poor illumination, broken cattle mesh guard, damaged crash barrier etc. All these shortcomings have been pointed to the Concessionaire in the startup meeting held on 18.11.2013. Deficiencies held are pointed out time to time to the Concessionaires through letters for rectification. Before passing the annuity, non-compliance list / rectification notice with attached list are being issued for rectification.
5.2 Periodic Maintenance
10th Year periodic renewal was completed of both the sections Panagarh-Palsit & Palsit-Dankuni in the month of MAY 2015.
5.3 Safety & Traffic Management Operations The Concessionaire has submitted a Safety Management Programme on 17.02.2010 which is being followed. Unauthorized access and encroachments is quite a regular feature and Concessionaire has shown interest in getting them vacated. For safety among others, a Traffic Safety Officer has not been nominated by the Concessionaire. CGM NHAI called on a meeting on 9th July with IE & concessionaire at Kolkata. TL submitted a proposal to reduce the rate of accident.
5.4 Inspection Visual, close and through inspections are to be undertaken by the Concessionaires as per the approved programme. In the monthly report submitted by the Concessionaires for the Month of February’2016 and all Maintenance Activities undertaken and details of any emergency and action taken.
5.5 Operational and Maintenance Manual A copy of the O&M Manual has been received from the Concessionaire. This is being scrutinized and necessary report shall be follow.
5.6 Financial Progress
For Mapex Infrastructure Pvt. Ltd. 18th Annuity along with O&M Cost COS recommended for release vide NHAI/ RO/KOL/001/2013/11/47/2210, dated 16.12.2013
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -18
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
19th Annuity along with O&M Cost COS recommended for release vide NHAI/ RO/KOL/001/2013/11/47/1050, dated 17.06.2014. 20th Annuity along with O&M Cost COS recommended for release vide NHAI/RO-KOL/001/2013/11/47/2346, dated 18.12.2014. 21st Annuity along with O&M Cost COS recommended for release vide 12017/3/2005/PIU (DUP)/, dated 23.06.2015. 22nd Annuity along with O&M Cost COS recommended for release vide NHAI/RO-KOL/001/2013/11/47/2018, dated 15.12.2015
For Emas Expressway Pvt. Ltd. 18th Annuity along with O&M Cost COS recommended for release vide NHAI/ RO/KOL/001/2014/11/47/315, dated 22.02.2014
19th Annuity along with O&M Cost COS recommended for release vide NHAI/ RO/KOL/001/2014/11/47/1492, dated 14.08.2014
20th Annuity along with O&M Cost COS Recommended for release on NHAI/RO-KOL/001/2013/11/47/359, dated 24.02.2015. 21st Annuity along with O&M Cost COS Recommended for release on NHAI/RO-KOL/001/2015/11/47/1391, dated 24.08.2015. 22nd Annuity along with O&M Cost COS Recommended for release on NHAI/RO-KOL/001/2016/11/47/272, dated 22.02.2016.
5.7 Cost Variation No claim either for any extra item or variation except speed limit sign board has been received from the Concessionaire.
5.8 Permit and Clearances
Necessary permits for quarries and clearances are yet to be submitted by the Concessionaire.
5.9 Lane Availability
No lane closure has been observed during month of March’2016 except to permissible under Cl. 5.5 of C.A.
5.10 Tests
The Concessionaire has been carried out traffic count and axle load test for Panagarh-Palsit and Palsit-Dankuni Section. Report has been submitted. Slide Presentation Conducted regarding pavement evaluation on 07.03.2014 at Palsit PIU.BC mix test result from outside laboratory (NTH, Kolkata) for Panagarh-Palsit section & Palsit-Dankuni section submitted & found in order.
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -19
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
5.11 Miscellaneous The Concessionaire has been asked to submit a copy of inventory of all project facility items, organization chart including list of man power deployed in different activities and plant and machinery mobilized for the O&M activities section wise.
6. HIGHWAY MANAGEMENT
6.1 Highway Asset Management
6.1.1 Highway Description The details of project highway under operation and maintenance are as follows
1. Panagarh (Km 517.000) to Palsit (Km. 581.457) New changes Km. 520.103 to 584.929
Name Number Total Length under Maintenance (Km.) New Chainage
National Highway NH-2 64.826 Km 520.103
to Km 584.929
2. Palsit (Km. 581.457) to Dankuni (Km. 645.600) (Durgapur Expressway) New chainages Km. 584.929 to 649.072
Name Number Total Length under Maintenance (Km.) New Chainage
National Highway NH-2 64.143 Km 584.929
to Km 649.072
6.1.2 Right of Way The ROW generally varies from 45 m to 60 m in respect of Panagarh-Palsit Section and about 90 m in respect of Palsit-Dankuni Section. Exact details are awaited from the Concessionaire.
6.1.3 Other Features The details of other features like pavement width, median width, pavement surface type, shoulder type and width, junctions, intersections, , service roads, way side amenities etc are the same as given in Para 1.3 bridges, culverts, ROB/RUB, underpasses, road side drain.
6.1.4 Plantation The road side plantation as well as median plantation is considered adequate. The Concessionaire has been carrying out with plantation at damage/missing spots for both the sections. Avenue Plants are numbered within ROW in both the sections. IE has prepared the plantation report of both the sections and submitted to Project Director Office with a copy to the Concessionaire vide letter
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -20
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
No. Unihorn/ NHAI/ NH-2/ O&M/ IC-1/ 2014/ 115, dated 14.02.2014. The concessionaires have done plantation in ROW during monsoon season.
6.2 Details of Proposal Sent to NHAI As directed by ADG Traffic, Speed limit sign board for both the sections have been sent to NHAI (PIU) DGP for necessary approval.
6.3 Details of NCRs Issued No NCR has been issued so far.
6.4 Review of Accidents and Remedial Measures The Concessionaire has included a list of monthly accidents in his Monthly Report of March’2016. No suggestion for any kind of remedial measures has so far been projected.
6.5 Review of Encroachment Details The Concessionaire has included a list of monthly encroachments in his Monthly Report of March’2016. This list is being further examined and the matter shall be brought out in the next report.
6.6 Review of Unauthorized Access The Concessionaire has included a list of unauthorized access cases in his Monthly Report of March’2016.
6.7 Breach of Obligations No such instance of breach of obligation has so far come to our notice.
7 SUMMARY OF FINDINGS
7.1 Standard of Services
The standard of services of operation and maintenance is generally satisfactory.
7.2 Details of Slippages and Remedial Measures There are certain persistent slippages, for which the Concessionaires have been asked to attend from time to time.
It had been observed that some signages are missing or damaged in the project corridor. The detailed list of signage are prepared and forwarded to Concessionaire with instruction to comply the list, different location of both the section pavement is damaged after overlaid, necessary repairs are required. The BC overlaid is damaged on different locations in both the sections for which the Concessionaires have been instructed and they are doing the repair. At different locations of the stretch metal beam crash barrier is damaged and needs to be repaired/replaced immediately to avoid accidents. RHS of Singur ROB
CCOONNSSUULLTTAANNCCYY SSEERRVVIICCEESS FFOORR OOPPEERRAATTIIOONN && MMAAIINNTTEENNAANNCCEE OOFF 44--LLAANNEE DDIIVVIIDDEEDD CCAARRRRIIAAGGEEWWAAYY OOFF PPAANNAAGGAARRHH--PPAALLSSIITT--DDAANNKKUUNNII SSEECCTTIIOONN FFRROOMM CCHH// KKMM.. 552200..110033 TTOO CCHH//KKMM 664499..007722 ((NNEEWW CCHH..)) OOFF NNHH--22 IINN WWEESSTT BBAANNGGAALL
Page -21
UUNNIIHHOORRNN IINNDDIIAA PPVVTT.. LLTTDD..
expansion joint not functioning properly. Repainting of structure with suitable paint is required.
Road Safety Expert Prof. M. N. Shreehari visited the site and has pointed out deficiencies related to safety and has suggested for improvement of safety in the project. Road Safety report has been submitted to the NHAI vide out letter no. Unihorn/ NHAI/ NH-2/ O&M/ IC-1/ 2014/ 367, dated 19.09.2014. His observations are yet to be complied.
ANNEXURE-H
1
ANNEXURE-H
Comments on Monthly Progress Report March’2016 of Mapex Infrastructure Pvt. Ltd. for Panagarh to Palsit Section
1. Monthly O&M Report: The report does not contain the following: • Details of all report submitted to the IE/NHAI during the month • Complete details of all maintenance activities undertaken during the month ended • Details of any Emergency and action taken
2. O&M Plan: The Concessionaire is required to undertake the maintenance work in accordance
with the O&M Plan (refer CA Sch-I, Cl. B1 a v). The annual O&M plan for the current year has been submitted by the Concessionaire is not in details. However, the Concessionaire submits his weekly O&M working plan which is satisfactory.
3. Maintenance Requirements
A. Maintenance Standards: The various activities to the performed by the Concessionaire for ensuring traffic worthiness of the of the project road as per the intervention levels 1 and 2 are given in Table I-2 of CA. The progress report on the activities undertaken neither specifies the serviceable level nor the date of carrying out the activity like roughness; structural condition of pavement, bridge and other structures etc. Further some other activates like landscaping, safety barriers, PIU complex, maintenance yard, wayside amenities, truck lay-byes etc have not been reported upon. However the general performance of the Main Carriage Way and Service roads is generally satisfactory.
B. Maintenance Activates
(i) Routine Maintenance: a) The routine maintenance activities reported generally comprised of maintenance of
illumination, km/hect. Stone, drains, signage’s road marking, crash barrier etc. The defects/damages noticed in respect of such activities are required to be attended to promptly within 24 hours to 7 days of its occurrence in order to ensure smooth and uninterrupted flow of traffic during normal operating conditions for all the 24 hours of a day (refer CA Sch-I, Cl.B1a). A review of the routine inspection report indicates that the damages/defects noticed have generally been attending as per schedule. It is again stressed that prompt action is taken in attending to the damaged/defects as noticed. Further, a linear chart showing the date of occurrence of such defects/damages Vis-a Vis the date of their rectification is required to be reported to monitor the activity. A report on the Asset Management Project deliverables vis-a-vis the Tolerance criteria (as per Appendix-I-1 of CA) is not given in the report.
b) Watering of plants in the ROW/Median is termed as a rectification work which is incorrect. As a matter of fact this activity is to be performed on regular basis as per the watering requirement from time to time. Watering of plant is required throughout the year except that to monsoon season.
2
Though road side avenue trees are numbered but their record is not maintained in the register.
c) The encroachment details reported till date are as follow.
Total Cases - 504 Encroachments removed - 503 Encroachments existing - 1 The action taken in getting the remaining encroachment vacated is not reported.
d) As per CA Sch-I, Cl.B1 c, the Concessionaire is required to carry out necessary preventative maintenance activities to ensure adherence to design requirements/specifications but nothing is reported.
e) As per CA Sch-I, Cl.B1 d, the Concessionaire is required to follow and adhere to the Asset Management Project Deliverables and Tolerance Criteria as given in Appendix-I-1. Nothing is reported in this connection.
(ii) Periodic Maintenance The periodic renewal wearing coat was required to be carried out during the 10th year from COD i.e. during July 2014-June 2015. The renewal wearing coat has been completed during the 10th year and its performance is found satisfactory.
(iii) Emergency Maintenance The details of Staff, plant, equipment and materials available for this activity are not specified. Even the name of the Duty Officer for responding to emergency is not reported. This format does not conform to that given in the O&M Manual submitted by the Concessionaire. (iv) Other Maintenance Nothing is reported on some other activities like:
• Landscaping • Safety Barriers • PIU Complex • Maintenance yard • Wayside Amenities • Truck Lay-Byes and Bus Bays • Repair to Bridges, Culverts and other Structures
4. Safety and Traffic Management Operation:
Nothing has been reported about the implementation of traffic and safety management programme. Even the person nominated as traffic safety and control officer is not given. As per CA Sch-I, Cl.B1 a (vii), the Concessionaire is required to take reasonable measures for the safety of workmen, material, equipment etc. as brought to the site, but no such reporting is made. 5. Corridor Control Plan:
As per CA Sch-I Cl. 4.2-C, the Concessionaire is required to carry out 24 hours patrol/surveillance of the ROW to monitor, report and take action against activates such as encroachment, unauthorized construction of road or entrance connections, structures, interference with drainage system etc. Nothing in this connection is reported except for the encroachments which have been commented in pare 2c above.
3
As per CA Sch-I, cl.B1 a (vi), the Concessionaire is required to prevent any kind of unauthorized construction or entry/exit on the ROW, but no such information is reported. 6. Inspections and Frequency
As per Sch-I paragraph 5, the Concessionaire is required to carry out inspections (visual, close and through) of the project facilities for its smooth operations as per the frequency mentioned in Table I-3 of Sch. I. But no such reporting is made. 7. Miscellaneous
In the report, there is no mention of following:
• Updated inventory of all project facility related items. A copy of which is to be supplied to IE • Abnormal Indivisible Load Routing • Complete organization structure including names of personnel deployed and responsibilities
of key personnel • Environmental Management plan
The Concessionaire is being reminded to take action on the observation in the monthly progress report.
1
ANNEXURE-H
Comments on Monthly Progress Report March’2016 Of EMAS Expressway Pvt. Ltd. for Palsit-Dankuni Section
1. Monthly O&M Report: The report does not contain the following: • Details of all report submitted to the IE/NHAI during the month • Complete details of all maintenance activities undertaken during the month ended • Details of any Emergency and action taken
2. O&M Plan: The Concessionaire is required to undertake the maintenance work in accordance
with the O&M Plan (refer CA Sch-I, Cl.B1 a v). The annual O&M plan for the current year has been submitted by the Concessionaire is not in details. However, the Concessionaire submits his weekly O&M working plan which is satisfactory.
3. Maintenance Requirements
A. Maintenance Standards: The various activities to the performed by the Concessionaire for ensuring traffic worthiness of the of the project road as per the intervention levels 1 and 2 are given in Table I-2 of CA. The progress report on the activities undertaken neither specifies the serviceable level nor the date of carrying out the activity like roughness; structural condition of pavement, bridge and other structures etc. Further some other activates like landscaping, safety barriers, PIU complex, maintenance yard, wayside amenities, truck lay-byes etc have not been reported upon. However the general performance of the Main Carriage Way and Service roads is generally satisfactory.
B. Maintenance Activates
(i) Routine Maintenance: a) The routine maintenance activities reported generally comprised of maintenance of
illumination, km/hect. Stone, drains, signage’s road marking, crash barrier etc. The defects/damages noticed in respect of such activities are required to be attended to promptly within 24 hours to 7 days of its occurrence in order to ensure smooth and uninterrupted flow of traffic during normal operating conditions for all the 24 hours of a day (refer CA Sch-I, Cl.B1a). A review of the routine inspection report indicates that the damages/defects noticed have generally been attending as per schedule. It is again stressed that prompt action is taken in attending to the damaged/defects as noticed. Further, a linear chart showing the date of occurrence of such defects/damages Vis-a Vis the date of their rectification is required to be reported to monitor the activity. A report on the Asset Management Project deliverables vis-a-vis the Tolerance criteria (as per Appendix-I-1 of CA) is not given in the report.
b) Watering of plants in the ROW/Median is termed as a rectification work which is incorrect. As a matter of fact this activity is to be performed on regular basis as per the watering requirement from time to time. Watering of plant is required throughout the year except that to monsoon season.
2
c) The encroachment details reported till date are as follow. Total Cases - 141 Encroachments removed - 131 Encroachments existing - 10 The action taken in getting the remaining encroachment vacated is not reported.
d) As per CA Sch-I, Cl.B1 c, the Concessionaire is required to carry out necessary preventative maintenance activities to ensure adherence to design requirements/specifications but nothing is reported.
e) As per CA Sch-I, Cl.B1 d, the Concessionaire is required to follow and adhere to the Asset Management Project Deliverables and Tolerance Criteria as given in Appendix-I-1. Nothing is reported in this connection.
(ii) Periodic Maintenance The periodic renewal wearing coat was required to be carried out during the 10th year from COD i.e. during July 2014-June 2015. The renewal wearing coat has been completed during the 10th year and its performance is found satisfactory.
(iii) Emergency Maintenance The details of Staff, plant, equipment and materials available for this activity are not specified. Even the name of the Duty Officer for responding to emergency is not reported. This format does not conform to that given in the O&M Manual submitted by the Concessionaire. (iv) Other Maintenance Nothing is reported on some other activities like:
• Landscaping • Safety Barriers • PIU Complex • Maintenance yard • Wayside Amenities • Truck Lay-Byes and Bus Bays • Repair to Bridges, Culverts and other Structures
4. Safety and Traffic Management Operation: Nothing has been reported about the implementation of traffic and safety management programme. Even the person nominated as traffic safety and control officer is not given. As per CA Sch-I, Cl.B1 a (vii), the Concessionaire is required to take reasonable measures for the safety of workmen, material, equipment etc. as brought to the site, but no such reporting is made. 5. Corridor Control Plan: As per CA Sch-I Cl. 4.2-C, the Concessionaire is required to carry out 24 hours patrol/surveillance of the ROW to monitor, report and take action against activates such as encroachment, unauthorized construction of road or entrance connections, structures, interference with drainage system etc. Nothing in this connection is reported except for the encroachments which have been commented in pare 2c above. As per CA Sch-I, Cl.B1 a (vi), the Concessionaire is required to prevent any kind of unauthorized construction or entry/exit on the ROW, but no such information is reported.
3
6. Inspections and Frequency As per Sch-I paragraph 5, the Concessionaire is required to carry out inspections (visual, close and through) of the project facilities for its smooth operations as per the frequency mentioned in Table I-3 of Sch. I. But no such reporting is made. 7. Miscellaneous In the report, there is no mention of following:
• Updated inventory of all project facility related items. A copy of which is to be supplied to IE • Abnormal Indivisible Load Routing • Complete organization structure including names of personnel deployed and responsibilities
of key personnel • Environmental Management plan
The Concessionaire is being reminded to take action on the observation in the monthly progress report.
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection
Status at Junctions
Status at Interchange
Status at Builtup Areas
Status at Toll-Plaza
Status at Bridge/Under
pass Approaches
Status at Truck-Bays
Status at Administratio
n building
Status at Bus Bays
Status at Rest Areas Remarks
9/Mar/16 Acceptable Acceptable Acceptable Nil Acceptable Not acceptable
Acceptable Acceptable N.A.
13/Mar/16 Acceptable Acceptable Acceptable Nil Acceptable Not acceptable
Acceptable Acceptable N.A.
18/Mar/16 Acceptable Acceptable Acceptable Nil Acceptable Acceptable Acceptable Not acceptable
N.A.
22/Mar/16 Acceptable Acceptable Acceptable Nil Acceptable Acceptable Acceptable Not acceptable
N.A.
27/Mar/16 Not acceptable
Acceptable Acceptable Nil Acceptable Acceptable Acceptable Acceptable N.A.
29/Mar/16 Acceptable Acceptable Acceptable Nil Acceptable Acceptable Acceptable Not acceptable
N.A.
29/Mar/16 Not acceptable
Acceptable Acceptable Nil Acceptable Acceptable Acceptable Acceptable N.A.
For the Month of: March'2016STATUS of STREET LIGHTING
UNIHORN INDIA PVT. LTD.
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection
Status of Over head signages
Status of Sign board
Alignment
Status of Signage at Junctions
Status of Signage at Truck bays
Status of Signage at
Bridge Approaches
Status of Signage
Pedestrians crossing
Status of Signage at Toll plazas
Status of Signage at Bus bays
UNIHORN INDIA PVT. LTD.STATUS SIGNAGE
For the Month of: March'2016
Remarks
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection Location Status of
inletStatus of
outletStatus of co-barrel
Drainage spouts pipe
line
Cleanliness inside barrel
Evidence of cracks
Status of joints
Any dip road way
Status of side slopes
Evidence of
flooding
Evidence of
siltationRemarks
527.330 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
543.061 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
543.871 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
551.061 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
552.558 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
556.004 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
562.592 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
563.330 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
566.221 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
573.071 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil -
578.424 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
579.118 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
STATUS Vehicular Underpass (VUP)For the Month of: March'2016
UNIHORN INDIA PVT. LTD.
8/Mar/16
29/Mar/16
11/Mar/16
23/Mar/16
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection Location Status of
buildingsStatus of toilets
Status of water supply
Status of draining facilities
Status of Pavement
Status of lighting
Waste disposal
General cleanliness Remarks
12/Mar/16 577.796 Nil Nil Nil Acceptable Acceptable Not Acceptable Acceptable Still to be improved
20/Mar/16 558.001 Acceptable Acceptable Acceptable Acceptable Acceptable Not Acceptable Acceptable Still to be improved
At KM 558+001, LHS, 04 nos. 250W HPSV Lights were not glowing due to Cable Fault
29/Mar/16 558.001 Acceptable Acceptable Acceptable Acceptable Acceptable Not Acceptable Acceptable Still to be improved
At KM 558+001, LHS, 04 nos. 250W HPSV Lights were not glowing due to Cable Fault
UNIHORN INDIA PVT. LTD.Status of Truck Lay Bye
For the Month of: March'2016
For Panagarh-Palsit Section of NH-2Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection Village Chainage Sides Status of
structureStatus of seating
Status of pedestrian guard rail
Status of water kiosks
Status of litter bin
Status of paint work General cleanliness Remarks
TN Gate 523.953 LHS Acceptable NiL Nil Nil Nil Acceptable AcceptableTN Gate 523.703 RHS Acceptable NiL Nil Nil Nil Acceptable Acceptable
Paraj 533.996 RHS Acceptable NiL Nil Nil Nil Acceptable AcceptableParaj 534.396 LHS Acceptable NiL Nil Nil Nil Acceptable AcceptablePursa 536.421 LHS Acceptable NiL Nil Nil Nil Acceptable Still to be improved
Galigram 539.746 LHS Acceptable NiL Nil Nil Nil Acceptable Still to be improvedGaligram 540.201 RHS Acceptable NiL Nil Nil Nil Acceptable Still to be improved
Sarul 546.206 RHS Acceptable NiL Nil Nil Nil Acceptable AcceptableSarul 546.750 LHS Acceptable NiL Nil Nil Nil Acceptable Acceptable
Khana 547.641 LHS Acceptable NiL Nil Nil Nil Acceptable Acceptable
Khana 547.641 RHS Acceptable NiL Nil Nil Nil Acceptable Acceptable
Khana 548.266 RHS Acceptable NiL Nil Nil Nil Acceptable AcceptableBorodighi 552.936 LHS Acceptable NiL Nil Nil Nil Acceptable AcceptableKurmun 555.296 LHS Acceptable NiL Nil Nil Nil Acceptable AcceptableKurmun 555.546 RHS Acceptable NiL Nil Nil Nil Acceptable Acceptable
AlisaMore 570.209 RHS Acceptable NiL Nil Nil Nil Acceptable AcceptableAlisaMore 570.561 LHS Acceptable NiL Nil Nil Nil Acceptable Still to be improved
AMRA 576.546 RHS Acceptable NiL Nil Nil Nil Acceptable Still to be improvedAMRA 576.696 LHS Acceptable NiL Nil Nil Nil Acceptable Acceptable
29-M
ar-1
6
PALSIT 582.624 LHS Acceptable NiL Nil Nil Nil Acceptable Still to be improved
21-M
ar-1
628
-Mar
-16
UNIHORN INDIA PVT. LTD.Status Bus Bays
For the Month of: March'2016
14-M
ar-1
65-
Mar
-16
10-M
ar-1
6
For Panagarh-Palsit Section of NH-2Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection Location Status of
inletStatus of
outletStatus of co-barrel
Drainage spouts pipe
line
Cleanliness inside barrel
Evidence of cracks
Status of joints
Any dip road way
Status of side slopes
Evidence of flooding
Evidence of siltation Remarks
579.655 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
1.165(RampB) Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil -
579.655 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil -
1.165(RampB) Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be
maintain Inside & Outside
For the Month of: March'2016Status of Cattle CrossingUNIHORN INDIA PVT. LTD.
9/Mar/16
29/Mar/16
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
For the
ToCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintainedCamber should be maintained
571.400 to 571.600 LHS Camber should be maintainedCamber should be maintained
28/Mar/16 580.000 584.929 Acceptable Acceptable Camber should be maintained
27/Mar/16 570.000 580.000 Acceptable Acceptable
23/Mar/16 560.000 570.000 Acceptable Acceptable
17/Mar/16 550.000 560.000 Acceptable Acceptable
10/Mar/16 540.000 550.000 Acceptable Acceptable
6/Mar/16 532.000 540.000 Acceptable Acceptable
UNIHORN INDIA PVT. LTD.Status Unpaved Shoulder
For the Month of: March'2016
1/Mar/16 520.103 532.0000 Acceptable Acceptable
RemarksStatus of Unpaved
shoulder RHS
Status of Unpaved
shoulder LHS
Location /chainageDate of Inspection
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Date of Inspection Location Status of
BuildingDrainage Facility
Status of Pavement
Status of Lighting
No. of Lanes Open
Status of paint work
Status of air condition
Status of emergency generator
Status of Road Markings Remarks
8/Mar/16 Not in our Scope
Not in our Scope
Not in our Scope
Not in our Scope
Not in our Scope
Not in our
Scope
Not in our Scope
Not in our Scope
Not in our Scope
Not in our Scope
UNIHORN INDIA PVT. LTD.Status Toll plaza
For the Month of: March'2016
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
From To
4/Mar/16 572.100 572.125 Acceptable Acceptable Nil NotAcceptable Acceptable Acceptable Acceptable No 572.100 to 572.125 MEDIAN MCB damagedue to accident
5/Mar/16 569.239 Acceptable Acceptable Nil Acceptable Acceptable Acceptable Acceptable No 569.239 MEDIAN 2.5m kerb Damage
9/Mar/16 579.708 579.722 Acceptable Acceptable Nil NotAcceptable Acceptable Acceptable Acceptable No 578.708 to 579.722 MEDIAN MCB damagedue to accident
11/Mar/16 570.000 Acceptable Acceptable Nil Acceptable Acceptable NotAcceptable Acceptable No 570.000 MEDIAN 7.5 m Kerb Damage
18/Mar/16 563.329 Acceptable Acceptable Nil Acceptable Acceptable Acceptable Acceptable No 563.329 MEDIAN Under Pass Sky Light Damage
UNIHORN INDIA PVT. LTD.
RemarksLocationDate of
Inspection
Status of Kilometre
stones
Status of Hectometre
stones
Wire Mesh Fencing
Metal Crash Barrier
Embankment slopes
Slopes pitching
Any evidence of blockade
Status Road FurnitureFor the Month of: March' 2016
Kerb
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
From To
Acceptable Acceptable AcceptableAcceptable Nil Nil Nil Nil Nil Acceptable Acceptable
AcceptableNil Acceptable AcceptableNil Nil Nil NilAcceptable Acceptable Acceptable
Acceptable
7/Mar/16 Acceptable Acceptable Acceptable
15/Mar/16 530.000 540.000 Acceptable Acceptable Acceptable
520.103 530.000
Remarks
UNIHORN INDIA PVT. LTD.Status Pavement
For the Month of: March'2016
LocationDate of Inspection
Embankment slopes LHS
Status of paved
shoulder LHS
Status of pavement at
junctions
Status of pavement at
bridge approaches
Any evidence of
shoving
Any evidence of
ruts
Any edge deformati
on
Any sign of cracks
Embankment slopes RHS
Paved lines/LHS
Paved lines/RHS
Status of paved
shoulder RHS
Any evidence of
potholes
Signs of bleeding
570.000 584.929
Acceptable Acceptable
26/Mar/16 Acceptable Acceptable Acceptable Acceptable
540.000 550.000
550.000 570.000 Acceptable Acceptable
20/Mar/16
26/Mar/16
Acceptable
AcceptableNil
AcceptableAcceptable
Acceptable
AcceptableAcceptable
NilAcceptable
AcceptableNilNilNil
NilNilAcceptableAcceptable
NilAcceptable Acceptable Nil
Acceptable
Acceptable
AcceptableAcceptableNilNilNil
Nil NilNil Acceptable
From To
7/Mar/16 520.103 530.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
15/Mar/16 530.000 540.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
20/Mar/16 540.000 550.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
26/Mar/16 550.000 570.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
26/Mar/16 570.000 584.929 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
UNIHORN INDIA PVT. LTD.Status Pavement
For the Month of March'2016
Any evidence
of shoving
Any evidence of ruts
Any sign of cracks
Status of pavement
at junctions
Status of pavement at bridge
approaches
RemarksEmbankment slopes
LHS
Status of paved
shoulder LHS
Status of paved
shoulder RHS
Signs of bleeding
Any evidence
of potholes
Any edge deforma-
tion
For Panagarh-Palsit Section of NH-2
Date of Inspection
Location
Paved lines/LHS
Paved lines/RHS
Embankment slopes
RHS
From To
7/Mar/16 520.103 530.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
15/Mar/16 530.000 540.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
20/Mar/16 540.000 550.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
26/Mar/16 550.000 570.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
26/Mar/16 570.000 584.929 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable Acceptable Acceptable
Status of pavement at bridge
approaches
Any evidence of ruts
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Mapex Infrastructure Pvt. Ltd.
Any sign of cracks
Status of pavement
at junctions
UNIHORN INDIA PVT. LTD.Status Pavement
For the Month of: March'2016
Date of Inspection
Location
Paved lines/LHS
Paved lines/RHS
Embankment slopes
RHS
Embankment slopes
LHS
Status of paved
shoulder LHS
RemarksStatus of
paved shoulder
RHS
Signs of bleeding
Any evidence of
potholes
Any edge deformati
on
Any evidence
of shoving
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection
Status at Junctions
Status at Interchange
Status at Builtup Areas
Status at Toll-Plaza
Status at Bridge/Under
pass Approaches
Status at Truck-Bays
Status at Administratio
n building
Status at Bus Bays
Status at Rest Areas Remarks
6/Mar/16 Acceptable Not acceptable
Acceptable Acceptable Acceptable Acceptable Acceptable Nil N.A. At KM 638+344, BOTH SIDE, S/R,6 nos. 150W & 2 nos. HPSV Lights were not glowing.
Acceptable Not acceptable
Acceptable Acceptable Acceptable Acceptable Acceptable Nil N.A. At KM 646+972, RHS 01 nos. 9 mtr. S/A illumination pole with all accessories damaged by an accident.
Acceptable Acceptable Acceptable Acceptable AcceptableNot
acceptableAcceptable Nil N.A. At KM 595+986, BOTH SIDE, 4 nos. tube lights were not glowing & 2 nos.
Exhaust Fan were not running.
10/Mar/16 Acceptable Acceptable Acceptable Acceptable Not
AcceptableNot
acceptableAcceptable Nil N.A. At KM 640+441, BOTH SIDE, 2 nos. tube lights were not glowing
11/Mar/16 Acceptable Not acceptable
Acceptable Acceptable Acceptable Acceptable Acceptable Nil N.A. At KM 585+376, BOTH SIDE, 3 nos. 400W & 2 nos. 250W HPSV Light are not glowing
13/Mar/16 Acceptable Acceptable Acceptable Not acceptable
Acceptable Acceptable Acceptable Nil N.A. At KM 586+056, LHS & Median, 4 nos. 400W HPSV Light are not glowing
17/Mar/16 Acceptable Acceptable Acceptable Acceptable AcceptableNot
acceptableAcceptable Nil N.A. At KM 640+441, BOTH SIDE, 6 nos. Security Lamp were not glowing
19/Mar/16 Acceptable Not acceptable
Acceptable Acceptable Acceptable Acceptable Acceptable Nil N.A. At KM 585+376, Median, 1 no. S/A 9 mtr. Cantilever Signal Pole with all accessories damaged by an accident.
21/Mar/16 Acceptable Acceptable Acceptable Not acceptable
Acceptable Acceptable Acceptable Nil N.A. At KM 646-376, LHS, 2 nos. 70W HPSV Lights were not glowing.
23/Mar/16 Acceptable Acceptable Acceptable Not acceptable
Acceptable Acceptable Acceptable Nil N.A. At KM 646+376, LHS, Canopy lights needs to be clean.
25/Mar/16 Acceptable Acceptable Acceptable Not acceptable
Acceptable Acceptable Acceptable Nil N.A. At KM 646+376, RHS, Canopy lights needs to be clean.
28/Mar/16 Acceptable Acceptable Acceptable Not acceptable
Acceptable Acceptable Acceptable Nil N.A. At KM 646+377, LHS, 5 nos. 400W HPSV lights were not glowing
29/Mar/16 Acceptable Acceptable Acceptable Not acceptable
Acceptable Acceptable Acceptable Nil N.A. At KM 646+377, LHS, 2 nos. 400W HPSV lights were not glowing
29/Mar/16 Acceptable Acceptable Acceptable Not Acceptable Acceptable Acceptable Nil N.A. At KM 646-376, LHS, 2 nos. 70W HPSV Lights were not glowing.
8/Mar/16
UNIHORN INDIA PVT. LTD.STATUS of STREET LIGHTINGFor the Month of: March'2016
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection
Status of Over head signages
Status of Sign board
Alignment
Status of Signage at Junctions
Status of Signage at Truck bays
Status of Signage at
Bridge Approaches
Status of Signage
Pedestrians crossing
Status of Signage at Toll plazas
Status of Signage at Bus bays
11/Mar/16 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 589.411 MEDIAN TA 1 Object Hazard MarkerSignage damage
15/Mar/16 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 610.450 MEDIANS - 9A,
TA 1
Object Hazard MarkerSignage & U turn signage damaged
19/Mar/16 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 627.288 MEDIANS - 9A,
TA 1
Object Hazard MarkerSignage & U turn signage damaged
29/Mar/16 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable 593.564 MEDIANS - 9A,
TA 1
Object Hazard MarkerSignage & U turn signage damaged
UNIHORN INDIA PVT. LTD.STATUS SIGNAGE
For the Month of: March'2016
Remarks
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection Location Status of
inletStatus of
outletStatus of co-barrel
Drainage spouts pipe
line
Cleanliness inside barrel
Evidence of cracks
Status of joints
Any dip road way
Status of side slopes
Evidence of
flooding
Evidence of
siltationRemarks
587.391 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
595.235 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
597.604 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
601.146 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
603.778 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
611.616 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
620.036 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
624.908 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
630.045 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
630.893 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
631.245 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
636.830 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil −
STATUS Vehicular Underpass (VUP)For the Month of: March'2016
UNIHORN INDIA PVT. LTD.
5/Mar/16
10/Mar/16
14/Mar/16
29/Mar/16
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection Location Status of
buildingsStatus of
toiletsStatus of
water supply
Status of draining facilities
Status of Pavement
Status of lighting
Waste disposal
General cleanliness Remarks
12/Mar/16 595.686 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Still to be improved
Water filling and Toilet cleaning to be maintained Regularly
25/Mar/16 640.141 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Still to be improved
Water filling and Toilet cleaning to be maintained Regularly
UNIHORN INDIA PVT. LTD.Status of Truck Lay Bye
For the Month of: March'2016
38
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection Village Chainage Sides Status of
structureStatus of seating
Status of pedestrian guard rail
Status of water kiosks
Status of litter bin
Status of paint work General cleanliness Remarks
Beyond our Scope
Beyond our Scope
UNIHORN INDIA PVT. LTD.Status of Bus Bays
For the Month of: March'2016
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection Location Status of
inletStatus of
outletStatus of co-barrel
Drainage spouts pipe
line
Cleanliness inside barrel
Evidence of cracks
Status of joints
Any dip road way
Status of side slopes
Evidence of
flooding
Evidence of
siltationRemarks
637.413 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
639.551 Acceptable Acceptable Acceptable Acceptable Acceptable No cracks Acceptable Nil Acceptable Nil Nil Regular Cleaning to be maintain Inside & Outside
For the Month of: March'2016Status of Cattle Crossing
UNIHORN INDIA PVT. LTD.
18/Mar/16
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
From To
Acceptable Acceptable 589.200 to 589.350 LHS Camber should be maintained
Acceptable Acceptable 589.500 to 589.600 LHS Camber should be maintained
Acceptable Acceptable 599.500 to 599.700 LHS Camber should be maintained
Acceptable Acceptable 616.300 to 616.400 LHS Camber should be maintained
Acceptable Acceptable 619.000 to 619.800 LHS Camber should be maintained
Acceptable Acceptable 620.800 to 621.050 LHS Camber should be maintained
Acceptable Acceptable 623.700 to 625.800 LHS Camber should be maintained
Acceptable Acceptable 633.700 to 633.800 LHS Camber should be maintained
Acceptable Acceptable 636.800 to 637.000 LHS Camber should be maintained
Acceptable Acceptable 640.400 to 640.700 LHS Camber should be maintained
Acceptable Acceptable 641.200 to 641.250 LHS Camber should be maintained
Acceptable Acceptable 641.950 to 642.000 LHS Camber should be maintained
Status of Unpaved
shoulder RHS
Status of Unpaved
shoulder LHS
Location /chainageDate of Inspection
18/Mar/16 584.929 642.000
UNIHORN INDIA PVT. LTD.Status of Unpaved ShoulderFor the Month of: March'2016
Remarks
For Palsit-Dankuni Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
Date of Inspection Location Status of
BuildingDrainage Facility
Status of Pavement
Status of Lighting
No. of Lanes Open
Status of paint work
Status of air condition
Status of emergency generator
Status of Road Markings Remarks
586.056PALSIT TOLL Acceptable Acceptable Acceptable Acceptable 12 Acceptable Not in our
Scope Acceptable Acceptable
646.376DANKUNI TOLL Acceptable Acceptable Acceptable Acceptable 12 Acceptable Not in our
Scope Acceptable Acceptable
586.056PALSIT TOLL Acceptable Acceptable Acceptable Acceptable 12 Acceptable Not in our
Scope Acceptable Acceptable
646.376DANKUNI TOLL Acceptable Acceptable Acceptable Acceptable 12 Acceptable Not in our
Scope Acceptable Acceptable
UNIHORN INDIA PVT. LTD.Status of Toll Plaza
For the Month of: March'2016
5/Mar/16
29/Mar/16
For Panagarh-Palsit Section of NH-2
Concessionaire Name: Emas Expressway Pvt. Ltd.
From To
14/Mar/16 632.000Not
Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable No 632.000 RHS Km Stone Missing
27/Mar/16 646.000 -Not
Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable No 646.000 RHS Km Stone Missing
UNIHORN INDIA PVT. LTD.Status Road Furniture
For the Month of: March'2016
Date of Inspection
Location Status of Kilometre
stones
Status of Hectometre
stones
Wire Mesh Fencing
Metal Crash Barrier
Embankment slopes
Slopes pitching
Any evidence of blockade Remarks
Concessionaire Name: Emas Expressway Pvt. Ltd.
From To
2/Mar/16 646.000 647.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil AcceptableAcceptable Acceptable 646+200 646+600 RHS
Road marking fainted/faded
Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable584+929 LHS Crack sealing done
Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil Nil Acceptable585+532 LHS Crack sealing done
25/Mar/16 590.000 591.500 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil NilAcceptable
Acceptable Acceptable 590+800 591+250 LHS Crack sealing done
Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil NilAcceptable
Acceptable Acceptable 591+800 591+975 LHS Crack sealing done
Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil NilAcceptable
Acceptable Acceptable 591+975 592+140 LHS Crack sealing done
29/Mar/16 593.000 600.000 Acceptable Acceptable Acceptable Acceptable Acceptable Acceptable Nil Nil Nil Nil NilAcceptable
Acceptable Acceptable 591+800 591+975 LHS Crack sealing done
584.929 590.000
UNIHORN INDIA PVT. LTD.Status of Pavement
For the Month of: March'2016
10/Mar/16
Paved lines/LHS
Paved lines/RHS
Status of paved
shoulder RHS
Any evidence of
potholes
Signs of bleeding
Acceptable Acceptable
591.000 593.00027/Mar/16
RemarksLocationDate of
InspectionEmbankment slopes LHS
Status of paved
shoulder LHS
Status of pavement at
junctions
Status of pavement at
bridge approaches
Any evidence of
shoving
Any evidence of
ruts
Any edge
deformation
Any sign of cracks
Embankment slopes RHS
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
01-Mar-16 01-Mar-16 529.600 529.700 MEDIAN MCW Median Plant base curing done
01-Mar-16 01-Mar-16 537.550 537.650 MEDIAN MCW Median Plant base curing done
01-Mar-16 01-Mar-16 537.000 538.000 MEDIAN MCW Median Plant necessary trimming done
01-Mar-16 01-Mar-16 534.000 534.300 LHS MCW Unlined Drain Cleaned
01-Mar-16 01-Mar-16 534.000 534.100 RHS MCW Unlined Drain Cleaned
01-Mar-16 01-Mar-16 558.000 - LHS MCW KM Stone Repaired, painting and lettering done
01-Mar-16 01-Mar-16 575.156 575.499 MEDIAN MCW Damage kerb re-casted and necessary repairing done At selected spot
01-Mar-16 01-Mar-16 562.600 563.400 MEDIAN MCW Median Plant necessary trimming done
01-Mar-16 01-Mar-16 581.400 582.000 RHS SERVICE ROAD Underpass Cleaning done
01-Mar-16 01-Mar-16 575.000 575.500 MEDIAN MCW Median Watering
01-Mar-16 01-Mar-16 550.000 551.000 MEDIAN MCW Median Bush Cutting
01-Mar-16 01-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
01-Mar-16 01-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
02-Mar-16 02-Mar-16 523.000 524.000 MEDIAN MCW Median Plant necessary trimming done
02-Mar-16 02-Mar-16 539.200 539.300 MEDIAN MCW Median Plant base curing done
02-Mar-16 02-Mar-16 546.000 547.000 MEDIAN MCW Median Plant necessary trimming done
02-Mar-16 02-Mar-16 534.200 534.600 LHS MCW Unlined Drain Cleaned
02-Mar-16 02-Mar-16 533.800 534.200 RHS MCW Unlined Drain Cleaned
02-Mar-16 02-Mar-16 563.400 565.000 MEDIAN MCW Median Plant necessary trimming done
02-Mar-16 02-Mar-16 544.500 545.500 LHS MCW ROW Bush Cutting
02-Mar-16 02-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
02-Mar-16 02-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
03-Mar-16 03-Mar-16 520.103 521.000 MEDIAN MCW Median plant watering
03-Mar-16 03-Mar-16 524.000 525.000 MEDIAN MCW Median Plant necessary trimming done
03-Mar-16 03-Mar-16 547.000 547.500 MEDIAN MCW Median Plant necessary trimming done
03-Mar-16 03-Mar-16 539.400 539.500 MEDIAN MCW Median Plant base curing done
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
03-Mar-16 03-Mar-16 534.400 534.800 LHS MCW Unlined Drain Cleaned
03-Mar-16 03-Mar-16 533.400 533.800 LHS MCW Unlined Drain Cleaned
03-Mar-16 03-Mar-16 546.000 553.000 RHS MCW Damage kerb re-casted and necessary repairing done At selected spot
03-Mar-16 03-Mar-16 581.400 582.000 LHS MCW Row Bush cutting under ROB
03-Mar-16 03-Mar-16 575.000 584.929 BOTH SIDE MCW ROW Plant Nurturing and Watering
03-Mar-16 03-Mar-16 558.000 560.400 MEDIAN MCW Median Plant necessary trimming done
03-Mar-16 03-Mar-16 545.500 546.300 LHS MCW ROW Bush Cutting
03-Mar-16 03-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
03-Mar-16 03-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
04-Mar-16 04-Mar-16 525.000 525.700 MEDIAN MCW Median Plant necessary trimming done
04-Mar-16 04-Mar-16 531.000 531.200 MEDIAN MCW Median Plant necessary trimming done
04-Mar-16 04-Mar-16 539.500 539.600 MEDIAN MCW Median Plant base curing done
04-Mar-16 04-Mar-16 547.500 548.100 MEDIAN MCW Median Plant necessary trimming done
04-Mar-16 04-Mar-16 520.103 569.000 LHS MCW Pothole repair At selected spot
04-Mar-16 04-Mar-16 555.000 555.400 BOTH SIDE MCW ROW Bush Cutting
04-Mar-16 04-Mar-16 581.400 582.400 LHS MCW Row Bush Cutting Under ROB
04-Mar-16 04-Mar-16 545.200 546.000 RHS MCW ROW Bush Cutting
04-Mar-16 04-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
04-Mar-16 04-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
05-Mar-16 05-Mar-16 525.700 526.400 MEDIAN MCW Median Plant necessary trimming done
05-Mar-16 05-Mar-16 539.600 539.700 MEDIAN MCW Median Plant base curing done
05-Mar-16 05-Mar-16 548.100 548.600 MEDIAN MCW Median Plant necessary trimming done
05-Mar-16 05-Mar-16 533.700 534.000 LHS MCW Unlined Drain Cleaned
05-Mar-16 05-Mar-16 542.000 546.366 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
05-Mar-16 05-Mar-16 530.000 531.000 MEDIAN MCW Median Bush Cutting
05-Mar-16 05-Mar-16 546.000 547.000 RHS MCW ROW Bush Cutting
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
05-Mar-16 05-Mar-16 568.500 568.600 MEDIAN MCW Median Bush Cutting
05-Mar-16 05-Mar-16 558.200 558.900 MEDIAN MCW Median Bush Cutting
05-Mar-16 05-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
05-Mar-16 05-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
07-Mar-16 07-Mar-16 523.000 524.000 MEDIAN MCW Median plant watering
07-Mar-16 07-Mar-16 526.400 527.100 MEDIAN MCW Median Plant necessary trimming done
07-Mar-16 07-Mar-16 540.000 541.650 MEDIAN MCW Median plant watering
07-Mar-16 07-Mar-16 548.000 549.000 MEDIAN MCW Median plant watering
07-Mar-16 07-Mar-16 554.600 555.000 MEDIAN MCW Median Plant necessary trimming done
07-Mar-16 07-Mar-16 538.800 539.000 LHS MCW Unlined Drain Cleaned
07-Mar-16 07-Mar-16 571.518 579.190 LHS MCW Pothole repair At selected spot
07-Mar-16 07-Mar-16 575.000 576.400 MEDIAN MCW Median plant watering
07-Mar-16 07-Mar-16 584.826 PIU RHS PIU Routine Maintenance Work of PIU Complex
07-Mar-16 07-Mar-16 556.200 558.100 MEDIAN MCW Median Plant necessary trimming done
07-Mar-16 07-Mar-16 561.000 562.300 MEDIAN MCW Median plant watering
07-Mar-16 07-Mar-16 529.500 530.000 MEDIAN MCW Median Bush Cutting
07-Mar-16 07-Mar-16 546.300 547.000 LHS MCW ROW Bush Cutting
07-Mar-16 07-Mar-16 558.900 559.400 MEDIAN MCW Median Bush Cutting
07-Mar-16 07-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
07-Mar-16 07-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
08-Mar-16 08-Mar-16 522.000 523.000 MEDIAN MCW Median plant watering
08-Mar-16 08-Mar-16 528.000 529.000 MEDIAN MCW Median Plant necessary trimming done
08-Mar-16 08-Mar-16 527.500 528.100 MEDIAN MCW Median Bush Cutting
08-Mar-16 08-Mar-16 539.000 540.000 MEDIAN MCW Median plant watering
08-Mar-16 08-Mar-16 546.000 547.000 MEDIAN MCW Median plant watering
08-Mar-16 08-Mar-16 554.000 554.600 MEDIAN MCW Median Plant necessary trimming done
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
08-Mar-16 08-Mar-16 531.000 556.000 BOTH SIDE MCW Pothole repair At selected spot
08-Mar-16 08-Mar-16 520.908 541.438 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
08-Mar-16 08-Mar-16 558.100 560.000 MEDIAN MCW Median Plant necessary trimming done
08-Mar-16 08-Mar-16 560.000 565.000 RHS MCW ROW Bush Cutting
08-Mar-16 08-Mar-16 567.500 568.000 LHS MCW ROW Bush Cutting
08-Mar-16 08-Mar-16 567.300 568.400 MEDIAN MCW Median plant watering
08-Mar-16 08-Mar-16 570.000 575.000 MEDIAN MCW Median Plant necessary trimming done
08-Mar-16 08-Mar-16 577.400 579.500 MEDIAN MCW Median Plant necessary trimming done
08-Mar-16 08-Mar-16 576.400 578.800 MEDIAN MCW Median plant watering
08-Mar-16 08-Mar-16 584.870 PIU RHS PIU Routine Maintenance Work of PIU Complex
08-Mar-16 08-Mar-16 529.000 529.500 MEDIAN MCW Median Bush Cutting
08-Mar-16 08-Mar-16 548.300 549.000 RHS MCW ROW Bush Cutting
08-Mar-16 08-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
08-Mar-16 08-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
09-Mar-16 09-Mar-16 523.000 524.000 MEDIAN MCW Median plant watering
09-Mar-16 09-Mar-16 530.000 532.000 MEDIAN MCW Median Plant necessary trimming done
09-Mar-16 09-Mar-16 529.000 530.000 MEDIAN MCW Median Bush Cutting
09-Mar-16 09-Mar-16 536.000 537.000 MEDIAN MCW Median plant watering
09-Mar-16 09-Mar-16 540.000 541.000 MEDIAN MCW Median plant watering
09-Mar-16 09-Mar-16 547.500 548.000 MEDIAN MCW Median Plant necessary trimming done
09-Mar-16 09-Mar-16 532.800 533.200 RHS MCW Unlined Drain Cleaned
09-Mar-16 09-Mar-16 528.000 529.000 MEDIAN MCW Median Bush Cutting
09-Mar-16 09-Mar-16 553.500 555.000 RHS MCW ROW Bush Cutting
09-Mar-16 09-Mar-16 566.000 566.700 LHS MCW ROW Bush Cutting
09-Mar-16 09-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
09-Mar-16 09-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
10-Mar-16 10-Mar-16 524.000 525.000 MEDIAN MCW Median plant watering
10-Mar-16 10-Mar-16 532.600 532.800 MEDIAN MCW Median Plant necessary trimming done
10-Mar-16 10-Mar-16 548.000 549.000 MEDIAN MCW Median plant watering
10-Mar-16 10-Mar-16 548.000 549.000 MEDIAN MCW Median plant watering
10-Mar-16 10-Mar-16 548.000 548.600 MEDIAN MCW Median Plant necessary trimming done
10-Mar-16 10-Mar-16 548.075 548.250 LHS MCW Unlined Drain Cleaned
10-Mar-16 10-Mar-16 531.824 550.000 RHS SERVICE ROAD Damage kerb re-casted and necessary repairing done At selected spot
10-Mar-16 10-Mar-16 576.500 576.900 MEDIAN MCW Median Plant necessary trimming done
10-Mar-16 10-Mar-16 578.900 580.500 MEDIAN MCW Median plant watering
10-Mar-16 10-Mar-16 527.000 528.000 MEDIAN MCW Median Bush Cutting
10-Mar-16 10-Mar-16 553.500 555.000 LHS MCW ROW Bush Cutting
10-Mar-16 10-Mar-16 555.900 556.300 MEDIAN MCW Median Bush Cutting
10-Mar-16 10-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
10-Mar-16 10-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
11-Mar-16 11-Mar-16 524.000 525.000 MEDIAN MCW Median plant watering
11-Mar-16 11-Mar-16 531.800 532.600 MEDIAN MCW Median Plant necessary trimming done
11-Mar-16 11-Mar-16 536.000 537.000 MEDIAN MCW Median plant watering
11-Mar-16 11-Mar-16 554.000 555.000 MEDIAN MCW Median plant watering
11-Mar-16 11-Mar-16 531.000 560.000 BOTH SIDE MCW ROW Plant Nurturing and Watering
11-Mar-16 11-Mar-16 531.000 560.000 BOTH SIDE MCW ROW Plant Nurturing and Watering
11-Mar-16 11-Mar-16 560.350 560.417 MEDIAN MCW Median Drain Cleaned
11-Mar-16 11-Mar-16 562.600 565.000 MEDIAN MCW Median plant watering
11-Mar-16 11-Mar-16 575.000 576.000 MEDIAN MCW Median Plant necessary trimming done
11-Mar-16 11-Mar-16 579.900 582.500 MEDIAN MCW Median Plant necessary trimming done
11-Mar-16 11-Mar-16 578.650 578.678 LHS MCW Shoulder Repair and necessary dressing done
11-Mar-16 11-Mar-16 526.500 527.200 MEDIAN MCW Median Bush Cutting
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
11-Mar-16 11-Mar-16 538.000 538.700 MEDIAN MCW Median Bush Cutting
11-Mar-16 11-Mar-16 579.000 579.400 MEDIAN MCW Median Bush Cutting
11-Mar-16 11-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
11-Mar-16 11-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
12-Mar-16 12-Mar-16 525.000 526.000 MEDIAN MCW Median plant watering
12-Mar-16 12-Mar-16 533.600 533.800 MEDIAN MCW Median Plant necessary trimming done
12-Mar-16 12-Mar-16 534.000 535.000 MEDIAN MCW Median plant watering
12-Mar-16 12-Mar-16 546.000 547.000 MEDIAN MCW Median plant watering
12-Mar-16 12-Mar-16 535.000 535.500 MEDIAN MCW Median Plant necessary trimming done
12-Mar-16 12-Mar-16 548.125 548.350 LHS MCW Unlined Drain Cleaned
12-Mar-16 12-Mar-16 547.000 541.000 RHS MCW ROW Plant Nurturing and Watering
12-Mar-16 12-Mar-16 556.600 557.500 MEDIAN MCW Median Plant necessary trimming done
12-Mar-16 12-Mar-16 576.000 576.550 MEDIAN MCW Median Plant necessary trimming done
12-Mar-16 12-Mar-16 578.800 579.900 MEDIAN MCW Median Plant necessary trimming done
12-Mar-16 12-Mar-16 526.500 527.200 MEDIAN MCW Median Bush Cutting
12-Mar-16 12-Mar-16 538.000 539.000 MEDIAN MCW Median Bush Cutting
12-Mar-16 12-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
12-Mar-16 12-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
14-Mar-16 14-Mar-16 526.000 527.000 MEDIAN MCW Median plant watering
14-Mar-16 14-Mar-16 533.000 534.000 MEDIAN MCW Median plant watering
14-Mar-16 14-Mar-16 533.800 534.000 MEDIAN MCW Median Plant necessary trimming done
14-Mar-16 14-Mar-16 551.600 553.000 MEDIAN MCW Median plant watering
14-Mar-16 14-Mar-16 545.000 545.400 MEDIAN MCW Median Plant necessary trimming done
14-Mar-16 14-Mar-16 535.000 541.000 RHS MCW ROW Plant Nurturing and Watering
14-Mar-16 14-Mar-16 547.000 547.375 LHS MCW Unlined Drain Cleaned
14-Mar-16 14-Mar-16 535.000 541.000 RHS MCW ROW Plant Nurturing and Watering
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
14-Mar-16 14-Mar-16 578.800 579.100 MEDIAN MCW Median Plant necessary trimming done
14-Mar-16 14-Mar-16 576.975 577.075 MEDIAN MCW Median Drain Cleaned
14-Mar-16 14-Mar-16 580.200 582.100 MEDIAN MCW Median plant watering
14-Mar-16 14-Mar-16 557.500 558.400 MEDIAN MCW Median plant watering
14-Mar-16 14-Mar-16 560.260 560.300 MEDIAN MCW Median Drain Cleaned
14-Mar-16 14-Mar-16 548.000 548.600 MEDIAN MCW Median Bush Cutting
14-Mar-16 14-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
14-Mar-16 14-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
15-Mar-16 15-Mar-16 529.000 530.000 MEDIAN MCW Median plant watering
15-Mar-16 15-Mar-16 531.000 532.000 MEDIAN MCW Median plant watering
15-Mar-16 15-Mar-16 534.000 534.300 MEDIAN MCW Median Plant necessary trimming done
15-Mar-16 15-Mar-16 546.000 547.000 MEDIAN MCW Median plant watering
15-Mar-16 15-Mar-16 541.300 541.600 MEDIAN MCW Median Plant necessary trimming done
15-Mar-16 15-Mar-16 550.000 553.000 BOTH SIDE MCW Pothole repair At selected spot
15-Mar-16 15-Mar-16 538.050 538.450 RHS MCW Unlined Drain Cleaned
15-Mar-16 15-Mar-16 547.400 547.775 LHS MCW Unlined Drain Cleaned
15-Mar-16 15-Mar-16 545.646 545.649 MEDIAN MCW Damage kerb re-casted and necessary repairing done At selected spot
15-Mar-16 15-Mar-16 546.438 546.440 MEDIAN MCW Damage kerb re-casted and necessary repairing done At selected spot
15-Mar-16 15-Mar-16 573.950 574.170 MEDIAN MCW Median Drain Cleaned
15-Mar-16 15-Mar-16 577.075 577.175 MEDIAN MCW Median Drain Cleaned
15-Mar-16 15-Mar-16 582.100 584.929 MEDIAN MCW Median plant watering
15-Mar-16 15-Mar-16 560.100 560.260 MEDIAN MCW Median Drain Cleaned
15-Mar-16 15-Mar-16 567.350 568.400 MEDIAN MCW Median plant watering
15-Mar-16 18-Mar-16 562.426 562.475 RHS MCW Guard Post Mounted/Installed
15-Mar-16 15-Mar-16 525.000 528.800 MEDIAN MCW Median Bush Cutting
15-Mar-16 15-Mar-16 540.000 541.000 MEDIAN MCW Median Bush Cutting
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
15-Mar-16 15-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
15-Mar-16 15-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
16-Mar-16 16-Mar-16 520.103 521.000 MEDIAN MCW Median plant watering
16-Mar-16 16-Mar-16 524.000 525.000 MEDIAN MCW Median plant watering
16-Mar-16 16-Mar-16 534.300 534.600 MEDIAN MCW Median Plant necessary trimming done
16-Mar-16 16-Mar-16 545.000 546.000 MEDIAN MCW Median plant watering
16-Mar-16 16-Mar-16 541.000 541.500 MEDIAN MCW Median Plant necessary trimming done
16-Mar-16 16-Mar-16 550.000 551.200 BOTH SIDE MCW Pothole repair At selected spot
16-Mar-16 16-Mar-16 547.775 548.100 LHS MCW Unlined Drain Cleaned
16-Mar-16 16-Mar-16 577.175 577.300 MEDIAN MCW Median Drain Cleaned
16-Mar-16 16-Mar-16 575.000 576.000 MEDIAN MCW Median plant watering
16-Mar-16 16-Mar-16 584.500 584.929 MEDIAN MCW Median plant watering
16-Mar-16 16-Mar-16 573.448 573.615 MEDIAN MCW Median Drain Cleaned
16-Mar-16 16-Mar-16 560.500 560.650 MEDIAN MCW Median Drain Cleaned
16-Mar-16 16-Mar-16 568.400 570.000 MEDIAN MCW Median plant watering
16-Mar-16 16-Mar-16 520.225 520.700 MEDIAN MCW Median Bush Cutting
16-Mar-16 16-Mar-16 541.000 542.000 MEDIAN MCW Median Bush Cutting
16-Mar-16 16-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
16-Mar-16 16-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
17-Mar-16 17-Mar-16 521.000 522.000 MEDIAN MCW Median plant watering
17-Mar-16 17-Mar-16 525.000 526.000 MEDIAN MCW Median plant watering
17-Mar-16 17-Mar-16 534.600 534.900 MEDIAN MCW Median Plant necessary trimming done
17-Mar-16 17-Mar-16 546.000 547.000 MEDIAN MCW Median plant watering
17-Mar-16 17-Mar-16 541.500 541.800 MEDIAN MCW Median Plant necessary trimming done
17-Mar-16 17-Mar-16 550.000 552.000 LHS MCW Pothole repair At selected spot
17-Mar-16 17-Mar-16 575.000 584.850 BOTH SIDE MCW ROW Plant Watering
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
17-Mar-16 17-Mar-16 577.400 577.600 MEDIAN MCW Median Drain Cleaned
17-Mar-16 17-Mar-16 572.837 572.975 MEDIAN MCW Median Drain Cleaned
17-Mar-16 17-Mar-16 560.500 560.675 MEDIAN MCW Median Drain Cleaned
17-Mar-16 17-Mar-16 559.000 561.300 MEDIAN MCW Median plant watering
17-Mar-16 17-Mar-16 563.000 563.800 MEDIAN MCW Median Plant necessary trimming done
17-Mar-16 17-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
17-Mar-16 17-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
18-Mar-16 18-Mar-16 521.000 522.000 MEDIAN MCW Median plant watering
18-Mar-16 18-Mar-16 526.000 527.000 MEDIAN MCW Median plant watering
18-Mar-16 18-Mar-16 534.900 535.000 MEDIAN MCW Median Plant necessary trimming done
18-Mar-16 18-Mar-16 554.000 555.000 MEDIAN MCW Median plant watering
18-Mar-16 18-Mar-16 541.600 541.800 MEDIAN MCW Median Plant necessary trimming done
18-Mar-16 18-Mar-16 548.000 549.000 BOTH SIDE MCW Pothole repair At selected spot
18-Mar-16 18-Mar-16 547.400 547.475 RHS MCW Unlined Drain Cleaned
18-Mar-16 18-Mar-16 538.700 537.875 LHS MCW Unlined Drain Cleaned
18-Mar-16 18-Mar-16 523.282 541.478 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
18-Mar-16 18-Mar-16 542.980 542.997 MEDIAN MCW Damage kerb re-casted and necessary repairing done At selected spot
18-Mar-16 18-Mar-16 560.650 560.710 MEDIAN MCW Median Drain Cleaned
18-Mar-16 18-Mar-16 561.300 562.800 MEDIAN MCW Median plant watering
18-Mar-16 18-Mar-16 570.000 571.000 MEDIAN MCW Median plant watering
18-Mar-16 18-Mar-16 577.175 577.300 MEDIAN MCW Median Drain Cleaned
18-Mar-16 18-Mar-16 572.050 572.110 MEDIAN MCW Median Drain Cleaned
18-Mar-16 18-Mar-16 533.300 534.200 MEDIAN MCW Median Bush Cutting
18-Mar-16 18-Mar-16 541.000 542.300 LHS MCW ROW Bush Cutting
18-Mar-16 18-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
18-Mar-16 18-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
19-Mar-16 19-Mar-16 523.000 524.000 MEDIAN MCW Median plant watering
19-Mar-16 19-Mar-16 530.500 530.900 MEDIAN MCW Median Plant necessary trimming done
19-Mar-16 19-Mar-16 548.000 549.000 MEDIAN MCW Median plant watering
19-Mar-16 19-Mar-16 541.000 541.500 MEDIAN MCW Median Plant necessary trimming done
19-Mar-16 19-Mar-16 547.000 548.000 BOTH SIDE MCW Pothole repair At selected spot
19-Mar-16 19-Mar-16 538.875 539.025 LHS MCW Unlined Drain Cleaned
19-Mar-16 19-Mar-16 547.775 548.000 RHS MCW Unlined Drain Cleaned
19-Mar-16 19-Mar-16 523.858 534.248 RHS MCW Damage kerb re-casted and necessary repairing done At selected spot
19-Mar-16 19-Mar-16 524.225 524.238 MEDIAN MCW Damage kerb re-casted and necessary repairing done At selected spot
19-Mar-16 19-Mar-16 560.710 560.740 MEDIAN MCW Median Drain Cleaned
19-Mar-16 19-Mar-16 562.000 564.600 MEDIAN MCW Median plant watering
19-Mar-16 19-Mar-16 571.000 574.500 MEDIAN MCW Median plant watering
19-Mar-16 19-Mar-16 577.440 577.573 MEDIAN MCW Median Drain Cleaned
19-Mar-16 19-Mar-16 570.972 571.129 MEDIAN MCW Median Drain Cleaned
19-Mar-16 19-Mar-16 534.200 535.000 MEDIAN MCW Median Bush Cutting
19-Mar-16 19-Mar-16 540.000 541.000 LHS MCW ROW Bush Cutting
19-Mar-16 19-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
19-Mar-16 19-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
21-Mar-16 21-Mar-16 526.000 527.000 MEDIAN MCW Median plant watering
21-Mar-16 21-Mar-16 530.200 530.500 MEDIAN MCW Median Plant necessary trimming done
21-Mar-16 21-Mar-16 545.000 546.000 MEDIAN MCW Median plant watering
21-Mar-16 21-Mar-16 539.000 541.000 MEDIAN MCW Median Plant necessary trimming done
21-Mar-16 21-Mar-16 539.025 539.400 LHS MCW Unlined Drain Cleaned
21-Mar-16 21-Mar-16 524.000 575.200 BOTH SIDE MCW KM Stone Repaired, painting and lettering done
21-Mar-16 21-Mar-16 524.000 575.200 BOTH SIDE MCW Hectometer Stone replaced, painting and lettering
21-Mar-16 21-Mar-16 548.115 548.117 MEDIAN MCW Damage kerb re-casted and necessary repairing done At selected spot
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
21-Mar-16 21-Mar-16 560.740 560.760 MEDIAN MCW Median Drain Cleaned
21-Mar-16 21-Mar-16 564.400 565.150 MEDIAN MCW Median plant watering
21-Mar-16 21-Mar-16 569.388 569.540 MEDIAN MCW Median Drain Cleaned
21-Mar-16 21-Mar-16 575.300 576.500 MEDIAN MCW Median plant watering
21-Mar-16 21-Mar-16 578.660 578.780 MEDIAN MCW Median Drain Cleaned
21-Mar-16 21-Mar-16 532.000 533.200 MEDIAN MCW Median Bush Cutting
21-Mar-16 21-Mar-16 537.500 538.500 RHS MCW ROW Bush Cutting
21-Mar-16 21-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
21-Mar-16 21-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
22-Mar-16 22-Mar-16 527.000 528.000 MEDIAN MCW Median plant watering
22-Mar-16 22-Mar-16 534.000 535.000 MEDIAN MCW Median plant watering
22-Mar-16 22-Mar-16 521.000 521.400 MEDIAN MCW Median Plant necessary trimming done
22-Mar-16 22-Mar-16 546.000 547.000 MEDIAN MCW Median plant watering
22-Mar-16 22-Mar-16 539.500 540.000 MEDIAN MCW Median Plant necessary trimming done
22-Mar-16 22-Mar-16 540.000 542.000 BOTH SIDE MCW Pothole repair At selected spot
22-Mar-16 22-Mar-16 539.400 539.800 LHS MCW Unlined Drain Cleaned
22-Mar-16 22-Mar-16 563.100 575.500 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
22-Mar-16 22-Mar-16 560.760 560.850 MEDIAN MCW Median Drain Cleaned
22-Mar-16 22-Mar-16 578.780 578.840 MEDIAN MCW Median Drain Cleaned
22-Mar-16 22-Mar-16 576.500 578.100 MEDIAN MCW Median plant watering
22-Mar-16 22-Mar-16 534.000 535.000 LHS MCW ROW Bush Cutting
22-Mar-16 22-Mar-16 538.500 539.400 RHS MCW ROW Bush Cutting
22-Mar-16 22-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
22-Mar-16 22-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
24-Mar-16 24-Mar-16 528.000 529.000 MEDIAN MCW Median plant watering
24-Mar-16 24-Mar-16 528.000 529.000 MEDIAN MCW Median Plant necessary trimming done
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
24-Mar-16 24-Mar-16 548.000 549.000 MEDIAN MCW Median plant watering
24-Mar-16 24-Mar-16 553.000 554.000 MEDIAN MCW Median plant watering
24-Mar-16 24-Mar-16 542.000 545.000 BOTH SIDE MCW Pothole repair At selected spot
24-Mar-16 24-Mar-16 539.800 540.000 LHS MCW Unlined Drain Cleaned
24-Mar-16 24-Mar-16 563.100 575.500 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
24-Mar-16 24-Mar-16 578.100 579.500 MEDIAN MCW Median plant watering
24-Mar-16 24-Mar-16 555.000 556.000 MEDIAN MCW Median plant watering
24-Mar-16 24-Mar-16 560.850 560.900 MEDIAN MCW Median Drain Cleaned
24-Mar-16 24-Mar-16 565.900 566.200 MEDIAN MCW Median Drain Cleaned
24-Mar-16 24-Mar-16 533.000 534.000 LHS MCW ROW Bush Cutting
24-Mar-16 24-Mar-16 537.000 537.700 MEDIAN MCW Median Bush Cutting
24-Mar-16 24-Mar-16 583.200 583.800 MEDIAN MCW Median Bush Cutting
24-Mar-16 24-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
24-Mar-16 24-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
25-Mar-16 25-Mar-16 522.000 523.000 MEDIAN MCW Median plant watering
25-Mar-16 25-Mar-16 532.000 533.000 MEDIAN MCW Median plant watering
25-Mar-16 25-Mar-16 539.500 540.200 MEDIAN MCW Median Plant necessary trimming done
25-Mar-16 25-Mar-16 540.000 542.000 BOTH SIDE MCW Pothole repair At selected spot
25-Mar-16 25-Mar-16 534.600 534.800 LHS MCW Unlined Drain Cleaned
25-Mar-16 25-Mar-16 534.025 534.200 LHS MCW Unlined Drain Cleaned
25-Mar-16 25-Mar-16 520.103 535.000 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
25-Mar-16 25-Mar-16 577.000 578.200 MEDIAN MCW Median plant watering
25-Mar-16 25-Mar-16 560.544 560.600 MEDIAN MCW Median Drain Cleaned
25-Mar-16 25-Mar-16 575.000 584.900 BOTH SIDE MCW ROW Plant Watering
25-Mar-16 25-Mar-16 578.850 578.900 MEDIAN MCW Median Drain Cleaned
25-Mar-16 25-Mar-16 565.750 565.900 MEDIAN MCW Median Drain Cleaned
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
25-Mar-16 25-Mar-16 583.138 583.140 RHS MCW Damage kerb re-casted and necessary repairing done At selected spot
25-Mar-16 25-Mar-16 532.000 533.000 LHS MCW ROW Bush Cutting
25-Mar-16 25-Mar-16 550.000 551.000 MEDIAN MCW Median Bush Cutting
25-Mar-16 25-Mar-16 571.600 572.000 MEDIAN MCW Median Bush Cutting
25-Mar-16 25-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
25-Mar-16 25-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
26-Mar-16 26-Mar-16 521.000 522.000 MEDIAN MCW Median plant watering
26-Mar-16 26-Mar-16 531.000 532.000 MEDIAN MCW Median plant watering
26-Mar-16 26-Mar-16 530.000 531.400 MEDIAN MCW Median Plant necessary trimming done
26-Mar-16 26-Mar-16 554.000 555.000 MEDIAN MCW Median plant watering
26-Mar-16 26-Mar-16 540.000 540.600 MEDIAN MCW Median Plant necessary trimming done
26-Mar-16 26-Mar-16 542.000 545.000 BOTH SIDE MCW Pothole repair At selected spot
26-Mar-16 26-Mar-16 533.050 533.200 LHS MCW Unlined Drain Cleaned
26-Mar-16 26-Mar-16 535.000 545.000 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
26-Mar-16 26-Mar-16 558.400 559.400 MEDIAN MCW Median plant watering
26-Mar-16 26-Mar-16 560.550 560.620 MEDIAN MCW Median Drain Cleaned
26-Mar-16 26-Mar-16 570.000 571.400 MEDIAN MCW Median plant watering
26-Mar-16 26-Mar-16 578.900 579.100 MEDIAN MCW Median Drain Cleaned
26-Mar-16 26-Mar-16 521.600 522.300 LHS MCW ROW Bush Cutting
26-Mar-16 26-Mar-16 553.600 555.000 MEDIAN MCW Median Bush Cutting
26-Mar-16 26-Mar-16 572.000 573.000 MEDIAN MCW Median Bush Cutting
26-Mar-16 26-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
26-Mar-16 26-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
28-Mar-16 28-Mar-16 523.000 524.000 MEDIAN MCW Median plant watering
28-Mar-16 28-Mar-16 529.000 530.000 MEDIAN MCW Median plant watering
28-Mar-16 28-Mar-16 530.200 530.600 MEDIAN MCW Median Plant necessary trimming done
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
28-Mar-16 28-Mar-16 522.200 522.600 LHS MCW ROW Bush Cutting
28-Mar-16 28-Mar-16 553.000 554.000 MEDIAN MCW Median plant watering
28-Mar-16 28-Mar-16 539.000 539.300 MEDIAN MCW Median Plant necessary trimming done
28-Mar-16 28-Mar-16 532.300 532.600 LHS MCW Unlined Drain Cleaned
28-Mar-16 28-Mar-16 545.000 555.000 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
28-Mar-16 28-Mar-16 578.840 578.920 MEDIAN MCW Median Drain Cleaned
28-Mar-16 28-Mar-16 579.500 581.000 MEDIAN MCW Median plant watering
28-Mar-16 28-Mar-16 561.300 563.000 MEDIAN MCW Median plant watering
28-Mar-16 28-Mar-16 522.300 523.300 MEDIAN MCW Median Bush Cutting
28-Mar-16 28-Mar-16 551.400 552.600 MEDIAN MCW Median Bush Cutting
28-Mar-16 28-Mar-16 574.000 575.000 MEDIAN MCW Median Bush Cutting
28-Mar-16 28-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
28-Mar-16 28-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
29-Mar-16 29-Mar-16 523.000 524.000 MEDIAN MCW Median plant watering
29-Mar-16 29-Mar-16 529.800 530.600 MEDIAN MCW Median Plant necessary trimming done
29-Mar-16 29-Mar-16 522.600 523.100 RHS MCW ROW Bush Cutting
29-Mar-16 29-Mar-16 540.000 541.000 MEDIAN MCW Median plant watering
29-Mar-16 29-Mar-16 546.000 547.000 MEDIAN MCW Median plant watering
29-Mar-16 29-Mar-16 538.900 539.000 MEDIAN MCW Median Plant necessary trimming done
29-Mar-16 29-Mar-16 529.800 530.200 LHS MCW Unlined Drain Cleaned
29-Mar-16 29-Mar-16 555.000 560.000 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
29-Mar-16 29-Mar-16 578.920 579.050 MEDIAN MCW Median Drain Cleaned
29-Mar-16 29-Mar-16 581.000 582.500 MEDIAN MCW Median plant watering
29-Mar-16 29-Mar-16 557.000 557.200 MEDIAN MCW Median Plant necessary trimming done
29-Mar-16 29-Mar-16 567.350 568.600 MEDIAN MCW Median plant watering
29-Mar-16 29-Mar-16 523.300 524.300 MEDIAN MCW Median Bush Cutting
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
29-Mar-16 29-Mar-16 520.103 520.300 Both side MCW ROW Bush Cutting
29-Mar-16 29-Mar-16 573.000 574.000 MEDIAN MCW Median Bush Cutting
29-Mar-16 29-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
29-Mar-16 29-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
30-Mar-16 30-Mar-16 524.000 525.000 MEDIAN MCW Median plant watering
30-Mar-16 30-Mar-16 529.600 529.800 MEDIAN MCW Median Plant necessary trimming done
30-Mar-16 30-Mar-16 523.100 523.800 LHS MCW ROW Bush Cutting
30-Mar-16 30-Mar-16 538.000 539.000 MEDIAN MCW Median plant watering
30-Mar-16 30-Mar-16 548.000 549.000 MEDIAN MCW Median plant watering
30-Mar-16 30-Mar-16 529.900 530.200 RHS MCW Unlined Drain Cleaned
30-Mar-16 30-Mar-16 565.000 570.000 BOTH SIDE MCW Damage kerb re-casted and necessary repairing done At selected spot
30-Mar-16 30-Mar-16 582.500 584.500 MEDIAN MCW Median plant watering
30-Mar-16 30-Mar-16 557.200 557.600 MEDIAN MCW Median Plant necessary trimming done
30-Mar-16 30-Mar-16 561.475 561.550 MEDIAN MCW Median Drain Cleaned
30-Mar-16 30-Mar-16 530.000 531.000 MEDIAN MCW Median Bush Cutting
30-Mar-16 30-Mar-16 543.500 544.500 MEDIAN MCW Median Bush Cutting
30-Mar-16 30-Mar-16 565.000 566.000 MEDIAN MCW Median Bush Cutting
30-Mar-16 30-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
30-Mar-16 30-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
31-Mar-16 31-Mar-16 525.000 526.000 MEDIAN MCW Median plant watering
31-Mar-16 31-Mar-16 529.000 529.600 MEDIAN MCW Median Plant necessary trimming done
31-Mar-16 31-Mar-16 523.800 524.300 LHS MCW ROW Bush Cutting
31-Mar-16 31-Mar-16 536.000 537.000 MEDIAN MCW Median plant watering
31-Mar-16 31-Mar-16 540.000 541.000 MEDIAN MCW Median plant watering
31-Mar-16 31-Mar-16 537.000 538.000 BOTH SIDE MCW Pothole repair At selected spot
31-Mar-16 31-Mar-16 537.050 537.350 LHS MCW Unlined Drain Cleaned
PANAGARH-PALSIT SECTION, NH-2
UNIHORN INDIA PVT. LTD.
START DATE
FINISH DATE ON / FROM TO
REMARKSMAIN CARRIAGE
WAY / SERVICE ROAD
RECTIFICATION WORK REPORT: PP SECTION
NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
RECTIFICATION WORK
DATE OF RECTIFICATION
REPORT FOR THE MONTH OF - MARCH 2016
31-Mar-16 31-Mar-16 520.103 541.000 BOTH SIDE MCW KM Stone Repaired, painting and lettering done
31-Mar-16 31-Mar-16 557.600 558.500 MEDIAN MCW Median Plant necessary trimming done
31-Mar-16 31-Mar-16 561.400 563.000 MEDIAN MCW Median plant watering
31-Mar-16 31-Mar-16 575.000 576.400 MEDIAN MCW Median plant watering
31-Mar-16 31-Mar-16 575.000 576.400 BOTH SIDE MCW Hectometer Stone replaced, painting and lettering At selected spot
31-Mar-16 31-Mar-16 560.400 - RHS MCW Hectometer Stone replaced, painting and lettering
31-Mar-16 31-Mar-16 520.105 520.600 LHS MCW ROW Bush Cutting
31-Mar-16 31-Mar-16 544.500 545.800 MEDIAN MCW Median Bush Cutting
31-Mar-16 31-Mar-16 566.000 566.800 MEDIAN MCW Median Bush Cutting
31-Mar-16 31-Mar-16 558.096 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
31-Mar-16 31-Mar-16 577.700 - BOTH SIDE TRUCK LAY BAY TLB Cleaning, Plant Maintenance and Bush Cutting
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
1-Mar-16 1-Mar-16 628.000 629.325 MEDIAN MCW Median Bush Cutting1-Mar-16 1-Mar-16 593.000 594.045 MEDIAN MCW Median Bush Cutting1-Mar-16 1-Mar-16 610.000 610.550 MEDIAN MCW Median Bush Cutting1-Mar-16 1-Mar-16 634.141 634.391 MEDIAN MCW Median plant necessary trimming done At selective spot1-Mar-16 1-Mar-16 610.216 610.466 MEDIAN MCW Median plant necessary trimming done At selective spot1-Mar-16 1-Mar-16 610.486 610.736 MEDIAN MCW Median plant necessary trimming done At selective spot1-Mar-16 1-Mar-16 584.929 586.225 BOTH SIDE MCW MCW Cleaning At selective spot1-Mar-16 1-Mar-16 617.500 618.520 BOTH SIDE MCW MCW Cleaning1-Mar-16 1-Mar-16 646.600 647.430 BOTH SIDE MCW MCW Cleaning1-Mar-16 1-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning1-Mar-16 1-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning1-Mar-16 1-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing1-Mar-16 1-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing1-Mar-16 1-Mar-16 589.150 589.700 MEDIAN MCW Median Plant Nurturing and Watering1-Mar-16 1-Mar-16 593.400 594.000 MEDIAN MCW Median Plant Nurturing and Watering1-Mar-16 1-Mar-16 620.050 620.300 MEDIAN MCW Median Plant Nurturing and Watering1-Mar-16 1-Mar-16 627.050 627.300 MEDIAN MCW Median Plant Nurturing and Watering2-Mar-16 2-Mar-16 628.000 628.725 RHS MCW ROW Bush Cutting2-Mar-16 2-Mar-16 629.325 630.620 MEDIAN MCW Median Bush Cutting2-Mar-16 2-Mar-16 594.045 595.020 MEDIAN MCW Median Bush Cutting2-Mar-16 2-Mar-16 610.550 611.120 MEDIAN MCW Median Bush Cutting2-Mar-16 2-Mar-16 634.411 634.525 MEDIAN MCW Median plant necessary trimming done At selective spot2-Mar-16 2-Mar-16 621.476 621.726 MEDIAN MCW Median plant necessary trimming done At selective spot2-Mar-16 2-Mar-16 621.746 621.996 MEDIAN MCW Median plant necessary trimming done At selective spot2-Mar-16 2-Mar-16 586.225 587.550 BOTH SIDE MCW MCW Cleaning2-Mar-16 2-Mar-16 618.520 619.495 BOTH SIDE MCW MCW Cleaning At selective spot2-Mar-16 2-Mar-16 647.430 648.225 BOTH SIDE MCW MCW Cleaning2-Mar-16 2-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning2-Mar-16 2-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning2-Mar-16 2-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing2-Mar-16 2-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing2-Mar-16 2-Mar-16 585.500 586.400 MEDIAN MCW Median Plant Nurturing and Watering2-Mar-16 2-Mar-16 640.000 646.000 MEDIAN MCW Median Plant Nurturing and Watering
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
2-Mar-16 2-Mar-16 625.523 625.525 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 625.546 625.550 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 625.568 625.572 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 625.816 625.820 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 625.823 625.826 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 625.975 625.977 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 625.999 626.003 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 626.002 626.003 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 626.006 626.008 LHS MCW Pavement Rectification done2-Mar-16 2-Mar-16 632.067 Singur Overpass LHS MCW Rank Vegetation Cleaned2-Mar-16 12-Mar-16 584.929 649.000 BOTH SIDE MCW Trimming of unwanted branches of trees At selective spot3-Mar-16 3-Mar-16 628.725 629.430 RHS MCW ROW Bush Cutting3-Mar-16 3-Mar-16 630.620 631.925 MEDIAN MCW Median Bush Cutting3-Mar-16 3-Mar-16 595.020 596.035 MEDIAN MCW Median Bush Cutting3-Mar-16 3-Mar-16 611.120 611.670 MEDIAN MCW Median Bush Cutting3-Mar-16 3-Mar-16 634.525 634.661 MEDIAN MCW Median plant necessary trimming done At selective spot3-Mar-16 3-Mar-16 627.016 627.175 MEDIAN MCW Median plant necessary trimming done At selective spot3-Mar-16 3-Mar-16 627.175 627.266 MEDIAN MCW Median plant necessary trimming done At selective spot3-Mar-16 3-Mar-16 646.025 - LHS MCW Wire Mesh Fencing Repaired3-Mar-16 3-Mar-16 587.550 588.865 BOTH SIDE MCW MCW Cleaning3-Mar-16 3-Mar-16 619.495 620.500 BOTH SIDE MCW MCW Cleaning3-Mar-16 3-Mar-16 648.225 649.072 BOTH SIDE MCW MCW Cleaning3-Mar-16 3-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning3-Mar-16 3-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning3-Mar-16 3-Mar-16 632.325 632.350 LHS MCW Edge Line Road Marking done3-Mar-16 3-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing3-Mar-16 3-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing3-Mar-16 3-Mar-16 593.300 593.400 MEDIAN MCW Median Plant Nurturing and Watering3-Mar-16 3-Mar-16 615.300 615.700 MEDIAN MCW Median Plant Nurturing and Watering3-Mar-16 3-Mar-16 626.017 626.025 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.061 626.063 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.069 626.073 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.081 626.091 LHS MCW Pavement Rectification done
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
3-Mar-16 3-Mar-16 626.107 626.109 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.114 626.120 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.127 626.131 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.141 626.145 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.141 626.144 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.154 626.156 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.173 626.177 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.179 626.182 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.209 626.211 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.218 626.221 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.219 626.222 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.250 626.254 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.260 626.262 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.315 626.317 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.328 626.331 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.336 626.339 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.345 626.353 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.367 626.369 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.375 626.380 LHS MCW Pavement Rectification done3-Mar-16 3-Mar-16 626.375 626.378 LHS MCW Pavement Rectification done4-Mar-16 4-Mar-16 629.430 630.125 RHS MCW ROW Bush Cutting4-Mar-16 4-Mar-16 631.925 633.210 MEDIAN MCW Median Bush Cutting4-Mar-16 4-Mar-16 596.035 597.045 MEDIAN MCW Median Bush Cutting4-Mar-16 4-Mar-16 611.670 612.225 MEDIAN MCW Median plant necessary trimming done At selective spot4-Mar-16 4-Mar-16 627.286 627.395 MEDIAN MCW Median plant necessary trimming done At selective spot4-Mar-16 4-Mar-16 627.395 627.536 MEDIAN MCW Median plant necessary trimming done At selective spot4-Mar-16 4-Mar-16 588.865 590.115 BOTH SIDE MCW MCW Cleaning4-Mar-16 4-Mar-16 646.600 - RHS MCW Wire Mesh Fencing Repaired4-Mar-16 4-Mar-16 620.500 621.510 BOTH SIDE MCW MCW Cleaning4-Mar-16 4-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning4-Mar-16 4-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning4-Mar-16 4-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing4-Mar-16 4-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
4-Mar-16 4-Mar-16 630.511 630.531 LHS MCW Pavement Rectification done4-Mar-16 4-Mar-16 630.542 630.549 LHS MCW Pavement Rectification done4-Mar-16 4-Mar-16 624.059 624.115 LHS MCW Pavement Rectification done5-Mar-16 5-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing5-Mar-16 5-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing5-Mar-16 5-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning5-Mar-16 5-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning5-Mar-16 5-Mar-16 630.125 630.845 RHS MCW ROW Bush Cutting5-Mar-16 5-Mar-16 633.210 634.525 MEDIAN MCW Median Bush Cutting5-Mar-16 5-Mar-16 597.045 598.040 MEDIAN MCW Median Bush Cutting5-Mar-16 5-Mar-16 612.225 612.770 MEDIAN MCW Median Bush Cutting5-Mar-16 5-Mar-16 636.316 636.425 MEDIAN MCW Median plant necessary trimming done At selective spot5-Mar-16 5-Mar-16 636.425 636.566 MEDIAN MCW Median plant necessary trimming done At selective spot5-Mar-16 5-Mar-16 590.115 591.425 BOTH SIDE MCW MCW Cleaning5-Mar-16 5-Mar-16 621.510 622.520 BOTH SIDE MCW MCW Cleaning5-Mar-16 5-Mar-16 585.000 586.400 MEDIAN MCW Median Plant Nurturing and Watering5-Mar-16 5-Mar-16 634.200 634.900 MEDIAN MCW Median Plant Nurturing and Watering7-Mar-16 7-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing7-Mar-16 7-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing7-Mar-16 7-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning7-Mar-16 7-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning7-Mar-16 7-Mar-16 630.845 631.530 RHS MCW ROW Bush Cutting7-Mar-16 7-Mar-16 630.100 630.150 MEDIAN MCW Median Bush Cutting7-Mar-16 7-Mar-16 598.040 599.000 MEDIAN MCW Median Bush Cutting7-Mar-16 7-Mar-16 612.770 613.335 MEDIAN MCW Median Bush Cutting7-Mar-16 7-Mar-16 591.425 592.715 BOTH SIDE MCW MCW Cleaning7-Mar-16 7-Mar-16 622.520 623.525 BOTH SIDE MCW MCW Cleaning7-Mar-16 7-Mar-16 627.350 627.400 MEDIAN MCW Median plant necessary trimming done At selective spot7-Mar-16 7-Mar-16 601.816 601.945 MEDIAN MCW Median plant necessary trimming done At selective spot7-Mar-16 7-Mar-16 589.150 589.600 MEDIAN MCW Median Plant Nurturing and Watering7-Mar-16 7-Mar-16 589.000 591.000 RHS MCW ROW Plant Watering7-Mar-16 7-Mar-16 595.200 TLB BOTH SIDE TRUCK LAY BY TLB Plant Nurturing and Watering7-Mar-16 7-Mar-16 621.500 621.950 MEDIAN MCW Median Plant Nurturing and Watering
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
7-Mar-16 7-Mar-16 636.300 636.900 MEDIAN MCW Median Plant Nurturing and Watering7-Mar-16 7-Mar-16 637.000 637.500 MEDIAN MCW Median Bush Cutting7-Mar-16 7-Mar-16 640.400 TLB RHS TRUCK LAY BY TLB Plant Nurturing and Watering8-Mar-16 8-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing8-Mar-16 8-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing8-Mar-16 8-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning8-Mar-16 8-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning8-Mar-16 8-Mar-16 631.530 632.135 RHS MCW ROW Bush Cutting8-Mar-16 8-Mar-16 635.810 637.105 MEDIAN MCW Median Bush Cutting8-Mar-16 8-Mar-16 613.335 613.880 MEDIAN MCW Median Bush Cutting8-Mar-16 8-Mar-16 592.715 594.010 BOTH SIDE MCW MCW Cleaning8-Mar-16 8-Mar-16 623.525 624.510 BOTH SIDE MCW MCW Cleaning8-Mar-16 12-Mar-16 646.376 DANKUNI T P BOTH SIDE MCW Gully grating repairing at selective toll lane At selective spot8-Mar-16 8-Mar-16 636.705 636.836 MEDIAN MCW Median plant necessary trimming done At selective spot8-Mar-16 8-Mar-16 601.945 602.066 MEDIAN MCW Median plant necessary trimming done At selective spot8-Mar-16 8-Mar-16 587.000 591.000 RHS MCW ROW Plant Watering8-Mar-16 8-Mar-16 615.500 615.700 MEDIAN MCW Median Plant Nurturing and Watering8-Mar-16 8-Mar-16 636.300 636.400 MEDIAN MCW Median Plant Nurturing and Watering8-Mar-16 8-Mar-16 635.800 636.100 MEDIAN MCW Median Bush Cutting8-Mar-16 8-Mar-16 601.400 602.800 LHS MCW ROW Plant Watering8-Mar-16 8-Mar-16 640.800 641.200 MEDIAN MCW Median Plant Nurturing and Watering8-Mar-16 8-Mar-16 624.085 624.115 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing9-Mar-16 9-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing9-Mar-16 9-Mar-16 632.135 632.620 RHS MCW ROW Bush Cutting9-Mar-16 9-Mar-16 637.105 638.410 MEDIAN MCW Median Bush Cutting9-Mar-16 9-Mar-16 613.880 614.445 MEDIAN MCW Median Bush Cutting9-Mar-16 9-Mar-16 594.010 595.325 BOTH SIDE MCW MCW Cleaning9-Mar-16 9-Mar-16 624.510 625.535 BOTH SIDE MCW MCW Cleaning9-Mar-16 9-Mar-16 602.086 602.125 MEDIAN MCW Median plant necessary trimming done At selective spot9-Mar-16 9-Mar-16 602.125 602.236 MEDIAN MCW Median plant necessary trimming done At selective spot9-Mar-16 9-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning9-Mar-16 9-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
9-Mar-16 9-Mar-16 593.000 594.000 RHS MCW ROW Plant Watering9-Mar-16 9-Mar-16 648.528 - MEDIAN MCW Median Plant Nurturing and Watering9-Mar-16 9-Mar-16 595.502 595.507 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.502 595.503 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.590 595.592 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.657 595.664 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.850 595.852 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.855 595.857 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.872 595.874 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.869 595.871 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.869 595.870 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.936 595.940 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.960 595.964 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.979 595.981 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 595.980 595.982 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 596.000 596.002 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 596.086 596.091 LHS MCW Pavement Rectification done9-Mar-16 9-Mar-16 596.475 596.479 LHS MCW Pavement Rectification done
10-Mar-16 10-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing10-Mar-16 10-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing10-Mar-16 10-Mar-16 632.620 633.000 RHS MCW ROW Bush Cutting10-Mar-16 10-Mar-16 637.000 637.265 RHS MCW ROW Bush Cutting10-Mar-16 10-Mar-16 638.410 639.715 MEDIAN MCW Median Bush Cutting10-Mar-16 10-Mar-16 614.445 615.000 MEDIAN MCW Median Bush Cutting10-Mar-16 10-Mar-16 595.325 596.620 BOTH SIDE MCW MCW Cleaning10-Mar-16 10-Mar-16 625.535 626.530 BOTH SIDE MCW MCW Cleaning10-Mar-16 10-Mar-16 640.616 640.725 MEDIAN MCW Median plant necessary trimming done At selective spot10-Mar-16 10-Mar-16 640.725 640.866 MEDIAN MCW Median plant necessary trimming done At selective spot10-Mar-16 10-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning10-Mar-16 10-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning10-Mar-16 10-Mar-16 589.150 589.650 MEDIAN MCW Median Bush Cutting10-Mar-16 10-Mar-16 590.000 591.800 RHS MCW ROW Plant Watering10-Mar-16 10-Mar-16 593.000 594.500 LHS MCW ROW Plant Watering
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
10-Mar-16 10-Mar-16 610.400 610.600 MEDIAN MCW Median Bush Cutting10-Mar-16 10-Mar-16 640.200 TLB TLB TRUCK LAY BY TLB Plant Nurturing and Watering11-Mar-16 11-Mar-16 637.265 637.520 RHS MCW ROW Bush Cutting11-Mar-16 11-Mar-16 639.715 641.010 MEDIAN MCW Median Bush Cutting11-Mar-16 11-Mar-16 615.000 616.610 MEDIAN MCW Median Bush Cutting11-Mar-16 11-Mar-16 596.620 597.915 BOTH SIDE MCW MCW Cleaning11-Mar-16 11-Mar-16 626.530 627.525 BOTH SIDE MCW MCW Cleaning11-Mar-16 11-Mar-16 640.886 640.995 MEDIAN MCW Median plant necessary trimming done At selective spot11-Mar-16 11-Mar-16 640.995 641.136 MEDIAN MCW Median plant necessary trimming done At selective spot11-Mar-16 11-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing11-Mar-16 11-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing11-Mar-16 11-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning11-Mar-16 11-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning11-Mar-16 11-Mar-16 586.400 586.700 MEDIAN MCW Median Bush Cutting11-Mar-16 11-Mar-16 610.300 610.400 MEDIAN MCW Median Plant Nurturing and Watering11-Mar-16 11-Mar-16 611.000 612.000 BOTH SIDE MCW ROW Plant Watering11-Mar-16 11-Mar-16 637.500 637.800 MEDIAN MCW Median Bush Cutting12-Mar-16 12-Mar-16 637.520 637.785 RHS MCW ROW Bush Cutting12-Mar-16 12-Mar-16 641.010 642.315 MEDIAN MCW Median Bush Cutting12-Mar-16 12-Mar-16 616.610 618.245 MEDIAN MCW Median Bush Cutting12-Mar-16 12-Mar-16 597.915 599.210 BOTH SIDE MCW MCW Cleaning12-Mar-16 12-Mar-16 627.525 628.530 BOTH SIDE MCW MCW Cleaning12-Mar-16 12-Mar-16 593.316 593.440 MEDIAN MCW Median plant necessary trimming done At selective spot12-Mar-16 12-Mar-16 593.440 593.566 MEDIAN MCW Median plant necessary trimming done At selective spot12-Mar-16 12-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing12-Mar-16 12-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing12-Mar-16 12-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning12-Mar-16 12-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning12-Mar-16 12-Mar-16 595.500 TLB RHS TRUCK LAY BY TLB Plant Nurturing and Watering12-Mar-16 12-Mar-16 627.150 627.300 MEDIAN MCW Median Plant Nurturing and Watering12-Mar-16 12-Mar-16 631.800 632.000 BOTH SIDE MCW ROW Plant Watering14-Mar-16 14-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing14-Mar-16 14-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
14-Mar-16 14-Mar-16 637.785 638.040 RHS MCW ROW Bush Cutting14-Mar-16 14-Mar-16 642.315 643.620 MEDIAN MCW Median Bush Cutting14-Mar-16 14-Mar-16 618.245 620.000 MEDIAN MCW Median Bush Cutting14-Mar-16 14-Mar-16 599.210 600.515 BOTH SIDE MCW MCW Cleaning14-Mar-16 14-Mar-16 628.530 629.525 BOTH SIDE MCW MCW Cleaning14-Mar-16 14-Mar-16 593.586 593.705 MEDIAN MCW Median plant necessary trimming done At selective spot14-Mar-16 14-Mar-16 591.000 - RHS MCW KM Stone Re-fixed with painting and lettering14-Mar-16 14-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning14-Mar-16 14-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning14-Mar-16 14-Mar-16 599.000 601.000 RHS MCW ROW Plant Watering14-Mar-16 14-Mar-16 589.150 589.600 MEDIAN MCW Median Plant Nurturing and Watering14-Mar-16 14-Mar-16 621.850 621.930 MEDIAN MCW Median Plant Nurturing and Watering14-Mar-16 14-Mar-16 615.000 - LHS MCW 5th KM Stone painting and lettering15-Mar-16 15-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing15-Mar-16 15-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing15-Mar-16 15-Mar-16 638.040 638.310 RHS MCW ROW Bush Cutting15-Mar-16 15-Mar-16 643.620 645.000 MEDIAN MCW Median Bush Cutting15-Mar-16 15-Mar-16 620.000 620.570 MEDIAN MCW Median Bush Cutting15-Mar-16 15-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning15-Mar-16 15-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning15-Mar-16 15-Mar-16 644.900 - LHS MCW Wire Mesh Fencing Repaired15-Mar-16 15-Mar-16 587.000 - LHS MCW KM Stone Re-fixed with painting and lettering15-Mar-16 15-Mar-16 593.705 593.836 MEDIAN MCW Median plant necessary trimming done At selective spot15-Mar-16 15-Mar-16 600.515 601.820 BOTH SIDE MCW MCW Cleaning15-Mar-16 15-Mar-16 629.525 630.530 BOTH SIDE MCW MCW Cleaning15-Mar-16 15-Mar-16 627.150 627.250 MEDIAN MCW Median Plant Nurturing and Watering15-Mar-16 15-Mar-16 620.150 620.600 MEDIAN MCW Median Plant Nurturing and Watering15-Mar-16 15-Mar-16 648.526 DANKUNI JUNCTION INTERSECTION Intersection Island Plant Nurturing and Watering15-Mar-16 15-Mar-16 585.000 586.400 MEDIAN MCW Median Plant Nurturing and Watering16-Mar-16 16-Mar-16 638.310 638.575 RHS MCW ROW Bush Cutting16-Mar-16 16-Mar-16 620.570 621.045 MEDIAN MCW Median Bush Cutting16-Mar-16 16-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing16-Mar-16 16-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
16-Mar-16 16-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning16-Mar-16 16-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning16-Mar-16 16-Mar-16 601.820 603.125 BOTH SIDE MCW MCW Cleaning16-Mar-16 16-Mar-16 630.530 631.525 BOTH SIDE MCW MCW Cleaning16-Mar-16 16-Mar-16 585.600 586.000 RHS MCW ROW Plant Watering16-Mar-16 16-Mar-16 589.600 591.600 RHS MCW ROW Plant Watering16-Mar-16 16-Mar-16 593.200 593.600 RHS MCW ROW Plant Watering16-Mar-16 16-Mar-16 646.250 - MEDIAN MCW High Mast pole reinstalled including all aspects16-Mar-16 16-Mar-16 600.400 600.550 MEDIAN MCW Median Bush Cutting16-Mar-16 16-Mar-16 615.500 619.000 RHS MCW ROW Plant Watering16-Mar-16 16-Mar-16 620.200 620.300 MEDIAN MCW Median Plant Nurturing and Watering16-Mar-16 16-Mar-16 606.800 608.000 RHS MCW ROW Plant Watering16-Mar-16 16-Mar-16 640.200 TLB RHS TRUCK LAY BY TLB Plant Nurturing and Watering16-Mar-16 16-Mar-16 646.000 648.526 MEDIAN MCW Median Plant Nurturing and Watering17-Mar-16 17-Mar-16 638.575 638.840 RHS MCW ROW Bush Cutting17-Mar-16 17-Mar-16 621.045 621.620 MEDIAN MCW Median Bush Cutting17-Mar-16 17-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning17-Mar-16 17-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning17-Mar-16 17-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing17-Mar-16 17-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing17-Mar-16 17-Mar-16 603.125 604.430 BOTH SIDE MCW MCW Cleaning17-Mar-16 17-Mar-16 631.525 632.535 BOTH SIDE MCW MCW Cleaning17-Mar-16 17-Mar-16 589.000 591.000 RHS MCW ROW Plant Watering17-Mar-16 17-Mar-16 585.800 586.300 MEDIAN MCW Median Plant Nurturing and Watering17-Mar-16 17-Mar-16 628.800 629.000 MEDIAN MCW Median Bush Cutting17-Mar-16 17-Mar-16 634.300 634.700 MEDIAN MCW Median Plant Nurturing and Watering17-Mar-16 17-Mar-16 621.500 621.700 MEDIAN MCW Median Plant Nurturing and Watering17-Mar-16 17-Mar-16 615.400 615.900 MEDIAN MCW Median Plant Nurturing and Watering17-Mar-16 17-Mar-16 602.200 602.400 MEDIAN MCW Median Plant Nurturing and Watering17-Mar-16 17-Mar-16 645.700 646.000 MEDIAN MCW Median Bush Cutting18-Mar-16 18-Mar-16 638.840 639.110 RHS MCW ROW Bush Cutting18-Mar-16 18-Mar-16 632.067 Singur Overpass BOTH SIDE OVERPASS Rank Vegetation Cleaned18-Mar-16 18-Mar-16 621.620 622.195 MEDIAN MCW Median Bush Cutting
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
18-Mar-16 18-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning18-Mar-16 18-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning18-Mar-16 18-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing18-Mar-16 18-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing18-Mar-16 18-Mar-16 604.430 605.735 BOTH SIDE MCW MCW Cleaning18-Mar-16 18-Mar-16 632.535 633.530 BOTH SIDE MCW MCW Cleaning18-Mar-16 18-Mar-16 610.000 615.000 LHS MCW ROW Plant Watering18-Mar-16 18-Mar-16 631.800 632.200 BOTH SIDE MCW ROW Plant Watering18-Mar-16 18-Mar-16 601.800 602.300 MEDIAN MCW Median Plant Watering18-Mar-16 18-Mar-16 603.000 605.000 BOTH SIDE MCW Median Plant Watering18-Mar-16 18-Mar-16 640.300 TLB RHS TRUCK LAY BY TLB Plant Nurturing and Watering18-Mar-16 22-Mar-16 606.800 - MEDIAN RHS MCW Metal Crash Barrier Reinstated19-Mar-16 19-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing19-Mar-16 19-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing19-Mar-16 19-Mar-16 632.067 Singur Overpass BOTH SIDE OVERPASS Rank Vegetation Cleaned19-Mar-16 19-Mar-16 639.110 639.375 RHS MCW ROW Bush Cutting19-Mar-16 19-Mar-16 622.195 622.765 MEDIAN MCW Median Bush Cutting19-Mar-16 19-Mar-16 605.735 607.030 BOTH SIDE MCW MCW Cleaning19-Mar-16 19-Mar-16 633.530 634.525 BOTH SIDE MCW MCW Cleaning19-Mar-16 19-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning19-Mar-16 19-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning19-Mar-16 19-Mar-16 585.000 586.400 MEDIAN MCW Median Plant Nurturing and Watering19-Mar-16 19-Mar-16 602.000 603.000 MEDIAN MCW Median Plant Watering19-Mar-16 19-Mar-16 593.250 593.750 MEDIAN MCW Median Plant Watering19-Mar-16 19-Mar-16 597.400 597.600 BOTH SIDE MCW Scupper Drain Cleaned19-Mar-16 19-Mar-16 595.400 TLB TLB TRUCK LAY BY TLB Plant Nurturing and Watering19-Mar-16 19-Mar-16 627.050 627.600 MEDIAN MCW Median Plant Watering19-Mar-16 19-Mar-16 629.200 629.400 BOTH SIDE MCW Median Plant Watering19-Mar-16 19-Mar-16 636.300 636.700 MEDIAN MCW Median Plant Nurturing and Watering19-Mar-16 19-Mar-16 640.800 640.900 MEDIAN MCW Median Plant Watering19-Mar-16 19-Mar-16 646.000 646.400 RHS MCW Median Plant Watering21-Mar-16 21-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing21-Mar-16 21-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
21-Mar-16 21-Mar-16 607.030 608.335 BOTH SIDE MCW MCW Cleaning21-Mar-16 21-Mar-16 634.525 635.530 BOTH SIDE MCW MCW Cleaning21-Mar-16 21-Mar-16 639.375 639.640 RHS MCW ROW Bush Cutting21-Mar-16 21-Mar-16 622.765 623.335 MEDIAN MCW Median Bush Cutting21-Mar-16 21-Mar-16 632.067 Singur Overpass BOTH SIDE OVERPASS Rank Vegetation Cleaned21-Mar-16 21-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning21-Mar-16 21-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning21-Mar-16 21-Mar-16 595.400 596.800 LHS MCW ROW Plant Watering21-Mar-16 21-Mar-16 610.400 611.000 LHS MCW ROW Plant Watering21-Mar-16 21-Mar-16 640.800 641.150 MEDIAN MCW Median Plant Watering21-Mar-16 21-Mar-16 640.050 646.150 MEDIAN MCW Median Plant Nurturing and Watering22-Mar-16 22-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing22-Mar-16 22-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing22-Mar-16 22-Mar-16 623.335 623.910 MEDIAN MCW Median Bush Cutting22-Mar-16 22-Mar-16 612.390 - RHS MCW Metal Crash Barrier Reinstated22-Mar-16 22-Mar-16 639.640 639.905 RHS MCW ROW Bush Cutting22-Mar-16 22-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning22-Mar-16 22-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning22-Mar-16 22-Mar-16 608.335 609.640 BOTH SIDE MCW MCW Cleaning22-Mar-16 22-Mar-16 635.530 636.525 BOTH SIDE MCW MCW Cleaning22-Mar-16 22-Mar-16 587.400 587.500 LHS MCW Scupper Drain Cleaned22-Mar-16 22-Mar-16 586.150 586.300 RHS MCW ROW Plant Watering22-Mar-16 22-Mar-16 588.400 591.600 RHS MCW ROW Plant Watering22-Mar-16 22-Mar-16 640.800 641.000 MEDIAN MCW Median Plant Nurturing and Watering22-Mar-16 22-Mar-16 640.200 TLB LHS TRUCK LAY BY TLB Plant Nurturing and Watering22-Mar-16 22-Mar-16 648.528 DANKUNI JUNCTION INTERSECTION Intersection Island Plant Nurturing and Watering24-Mar-16 24-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing24-Mar-16 24-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing24-Mar-16 24-Mar-16 639.905 640.165 RHS MCW ROW Bush Cutting24-Mar-16 24-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning24-Mar-16 24-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning24-Mar-16 24-Mar-16 609.640 610.945 BOTH SIDE MCW MCW Cleaning24-Mar-16 24-Mar-16 636.525 637.530 BOTH SIDE MCW MCW Cleaning
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
24-Mar-16 24-Mar-16 623.910 624.485 MEDIAN MCW Median Bush Cutting24-Mar-16 24-Mar-16 585.800 586.200 RHS MCW ROW Plant Watering24-Mar-16 24-Mar-16 636.250 636.700 MEDIAN MCW Median Plant Watering24-Mar-16 24-Mar-16 627.050 627.600 MEDIAN MCW Median Plant Watering24-Mar-16 24-Mar-16 625.000 625.200 RHS MCW Scupper Drain Cleaned24-Mar-16 24-Mar-16 603.700 604.000 MEDIAN MCW Scupper Drain Cleaned24-Mar-16 24-Mar-16 642.400 643.000 MEDIAN MCW Median Bush Cutting25-Mar-16 25-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing25-Mar-16 25-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing25-Mar-16 25-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning25-Mar-16 25-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning25-Mar-16 25-Mar-16 640.165 640.425 RHS MCW ROW Bush Cutting25-Mar-16 25-Mar-16 624.485 624.750 MEDIAN MCW Median Bush Cutting25-Mar-16 25-Mar-16 610.945 612.240 BOTH SIDE MCW MCW Cleaning25-Mar-16 25-Mar-16 637.530 638.525 BOTH SIDE MCW MCW Cleaning25-Mar-16 25-Mar-16 593.000 593.500 RHS MCW ROW Plant Watering25-Mar-16 25-Mar-16 620.050 620.700 MEDIAN MCW Median Plant Watering25-Mar-16 25-Mar-16 605.800 606.000 LHS MCW Scupper Drain Cleaned25-Mar-16 25-Mar-16 640.300 640.600 MEDIAN MCW Median Bush Cutting26-Mar-16 26-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing26-Mar-16 26-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing26-Mar-16 26-Mar-16 640.425 640.680 RHS MCW ROW Bush Cutting26-Mar-16 26-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning26-Mar-16 26-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning26-Mar-16 26-Mar-16 624.750 625.305 MEDIAN MCW Median Bush Cutting26-Mar-16 26-Mar-16 612.240 613.545 BOTH SIDE MCW MCW Cleaning26-Mar-16 26-Mar-16 638.525 639.530 BOTH SIDE MCW MCW Cleaning26-Mar-16 26-Mar-16 585.100 585.800 MEDIAN MCW Median Plant Watering26-Mar-16 26-Mar-16 593.400 593.500 MEDIAN MCW Median Bush Cutting26-Mar-16 26-Mar-16 630.200 631.000 MEDIAN MCW Median Bush Cutting26-Mar-16 26-Mar-16 640.800 641.100 MEDIAN MCW Median Plant Watering28-Mar-16 28-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing28-Mar-16 28-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing
PALSIT-DANKUNI SECTION, NH-2 OPERATION AND MAINTENANCE 11TH YEAR
UNIHORN INDIA PVT. LTD.
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
28-Mar-16 28-Mar-16 640.680 640.945 RHS MCW ROW Bush Cutting28-Mar-16 28-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning28-Mar-16 28-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning28-Mar-16 28-Mar-16 625.305 625.855 MEDIAN MCW Median Bush Cutting28-Mar-16 28-Mar-16 613.545 614.840 BOTH SIDE MCW MCW Cleaning28-Mar-16 28-Mar-16 639.530 640.525 BOTH SIDE MCW MCW Cleaning28-Mar-16 28-Mar-16 617.925 - RHS MCW Metal Crash Barrier Reinstated28-Mar-16 28-Mar-16 589.000 591.000 RHS MCW ROW Plant Watering28-Mar-16 28-Mar-16 596.000 596.700 LHS MCW ROW Plant Watering28-Mar-16 28-Mar-16 595.500 596.000 BOTH SIDE MCW ROW Plant Watering28-Mar-16 28-Mar-16 622.000 624.600 LHS MCW ROW Plant Watering28-Mar-16 28-Mar-16 617.350 617.450 LHS MCW Scupper Drain Cleaned28-Mar-16 28-Mar-16 633.100 633.300 LHS MCW Scupper Drain Cleaned28-Mar-16 28-Mar-16 633.400 634.000 MEDIAN MCW Median Bush Cutting29-Mar-16 29-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing29-Mar-16 29-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing29-Mar-16 29-Mar-16 640.945 641.210 RHS MCW ROW Bush Cutting29-Mar-16 29-Mar-16 625.855 626.410 MEDIAN MCW Median Bush Cutting29-Mar-16 29-Mar-16 614.840 616.135 BOTH SIDE MCW MCW Cleaning29-Mar-16 29-Mar-16 640.525 641.000 BOTH SIDE MCW MCW Cleaning29-Mar-16 29-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning29-Mar-16 29-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning29-Mar-16 29-Mar-16 624.675 - LHS MCW Metal Crash Barrier Reinstated29-Mar-16 29-Mar-16 585.000 586.200 MEDIAN MCW Median Plant Nurturing and Watering29-Mar-16 29-Mar-16 596.000 596.800 LHS MCW ROW Plant Watering29-Mar-16 29-Mar-16 610.400 610.700 MEDIAN MCW Median Plant Watering29-Mar-16 29-Mar-16 635.800 636.000 MEDIAN MCW Median Bush Cutting29-Mar-16 29-Mar-16 636.600 637.000 BOTH SIDE MCW Scupper Drain Cleaned29-Mar-16 29-Mar-16 648.528 DANKUNI JUNCTION INTERSECTION Intersection Island Plant Nurturing and Watering30-Mar-16 30-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing30-Mar-16 30-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing30-Mar-16 30-Mar-16 641.210 641.580 RHS MCW ROW Bush Cutting30-Mar-16 30-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning
START DATE FINISH DATE
ON /FROM TO
REMARKS
RECTIFICATION WORK REPORT: DE SECTION
DATE OF RECTIFICATION NEW CHAINAGE SIDE(RHS/LHS/MEDIAN)
MAIN CARRIAGE WAY / SERVICE
ROAD RECTIFICATION WORK
REPORT FOR THE MONTH OF MARCH 2016
30-Mar-16 30-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning30-Mar-16 30-Mar-16 626.41 627.255 MEDIAN MCW Median Bush Cutting30-Mar-16 30-Mar-16 616.135 616.940 BOTH SIDE MCW MCW Cleaning30-Mar-16 30-Mar-16 589.150 589.900 MEDIAN MCW Median Plant Nurturing and Watering30-Mar-16 30-Mar-16 585.250 585.600 LHS MCW ROW Plant Watering30-Mar-16 30-Mar-16 588.000 591.000 LHS MCW ROW Plant Watering30-Mar-16 30-Mar-16 593.300 594.400 BOTH SIDE MCW ROW Plant Nurturing and Watering30-Mar-16 30-Mar-16 620.050 620.600 MEDIAN MCW Median Plant Nurturing and Watering30-Mar-16 30-Mar-16 635.000 635.800 MEDIAN MCW Median Bush Cutting30-Mar-16 30-Mar-16 630.100 630.500 BOTH SIDE MCW Scupper Drain Cleaned30-Mar-16 30-Mar-16 608.000 610.000 RHS MCW ROW Plant Watering31-Mar-16 31-Mar-16 586.056 PALSIT T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing31-Mar-16 31-Mar-16 646.376 DANKUNI T P TOLL PLAZA MCW Toll Plaza Cleaning and Maintenance & Plant Nurturing31-Mar-16 31-Mar-16 641.580 642.000 RHS MCW ROW Bush Cutting31-Mar-16 31-Mar-16 627.255 628.000 MEDIAN MCW Median Bush Cutting31-Mar-16 31-Mar-16 616.940 617.500 BOTH SIDE MCW MCW Cleaning31-Mar-16 31-Mar-16 595.550 - BOTH SIDE MCW Truck lay By Cleaning31-Mar-16 31-Mar-16 640.140 - BOTH SIDE MCW Truck lay By Cleaning31-Mar-16 31-Mar-16 590.000 591.500 RHS MCW ROW Plant Watering31-Mar-16 31-Mar-16 585.000 587.000 LHS MCW ROW Plant Watering31-Mar-16 31-Mar-16 627.050 627.500 MEDIAN MCW Median Plant Nurturing and Watering31-Mar-16 31-Mar-16 630.700 631.000 BOTH SIDE MCW Scupper Drain Cleaned31-Mar-16 31-Mar-16 637.000 638.000 MEDIAN MCW Median Bush Cutting31-Mar-16 31-Mar-16 640.000 641.200 MEDIAN MCW Median Plant Nurturing and Watering
Maintenance Photographs
MEDIAN SIDE EDGE LINE ROAD MARKING AT KM 632+325, LHS
CONSULTANCY SERVICES FOR OPERATION & MAINTENANCE OF 4-LANE DIVIDED CARRIAGEWAY OF PANAGARH-PALSIT-DANKUNI SECTION FROM CH/ KM. 520.103 TO CH/KM 649.072 (NEW CH.) OF NH-2 IN WEST BANGAL
GULLY GRATING REPAIRING AT KM 646+376, DANKUNI TOLL PLAZA
TRIMMING OF UNWANTED BRANCHES OF PLANTS AT KM 541+025, RHS
PAGE‐1
Maintenance Photographs
GUARD POSTS INSTALLED AT KM 562+425, RHS
CONSULTANCY SERVICES FOR OPERATION & MAINTENANCE OF 4-LANE DIVIDED CARRIAGEWAY OF PANAGARH-PALSIT-DANKUNI SECTION FROM CH/ KM. 520.103 TO CH/KM 649.072 (NEW CH.) OF NH-2 IN WEST BANGAL
WATERING AT MEDIAN PLANTS AT KM 527+900, MEDIAN
METAL CRASH BARRIER REPAIRING AT KM 606+780, MEDIAN RHS
PAGE‐2