15039DB MONTHLY CONSTRUCTION PROGRESS REPORT Summary Contents Key Activities Scope Development Schedule Progress Photos 1 2 3 4 5 EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG JULY 2016 OKLAHOMA STATE CAPITOL RESTORATION Eteri!" Rehabili$a%ion EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG OKLAHOMA STATE CAPITOL RESTORATION Eteri!" Rehabili$a%ion Contents Summary Safety Progress Photos Attachments 1 2 3 15039DB MONTHLY CONSTRUCTION PROGRESS REPORT 4 APRIL 2019 OMA STATE CAPITOL RESTORATIO

Upload: others

Post on 10-Dec-2021

19 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Summary

Contents

Key Activities

Scope Development

Schedule

Progress Photos

1

2

3

4

5

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG

JULY 2016

OKLAHOMA STATE CAPITOL RESTORATION

E teri!" Rehabili$a%ion

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG

OKLAHOMA STATE CAPITOL RESTORATION

E teri!" Rehabili$a%ion

ContentsSummary

Safety

Progress Photos

Attachments

1

2

3

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4

APRIL 2019

OMA STATE CAPITOL RESTORATIO

Page 2: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

APRIL 2019

Su& ary: During the month of April on the Oklahoma Capitol Exterior Restoration Project, interior tunnel work

continued, including slab preparation for new waterproofi ng followed by the placement of new waterproofi ng

on the fl oor of the tunnel. The interior fi nal fi nishes in the tunnel will start in October 2019. However, the

tunnel will remain closed until the new Visitor’s Center is complete.

The West Wing North Elevation (Lima) was completed and the scaffolding has been dismantled and

removed from the jobsite. This marks the completion of the fi nal exterior restoration of the windows, stone,

and built-in gutters.

The site work has continued around the Capitol. The new North Plaza concrete slab was completed in

April. The concrete wall repairs in the lightwells around the Capitol began in March and have continued in

April. Once the concrete repairs are complete, the lightwell walls will be coated with an elastomeric coating.

Also, in the lightwells, the work for the new sump pump pits has been on-going. This work will wrap up

in late May. Replacement of the old concrete retaining walls was completed on in the SW quadrant of the

building. Lighted handrail installation on the North Stairs was done in April and the guardrails around the

generator areaway were also installed.

The roofi ng replacement has progressed with the South Wing copper fl at lock panels continuing to

be installed and soldered in place. Skylight framing on the South Wing, along with the new Creteplank

installation, will wrap up on the skylights in early May. On the North Wing, new wood substrate and sleeper

repairs were completed in April. The removal and relocation of existing vent lines was also done in April. The

copper fl at lock panel installation in the gutterways will begin in May. The East Wing existing copper was

removed in April. A temporary roofi ng membrane was installed to keep the building water tight. Demo and

replacement of the existing substrate will begin in May.

Page 3: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

KeyActivities:

- Lightwell excavation/concrete work for new sump pumps in progress

- West Wing North Elevation (Lima) exterior work and punchlist complete

- New North Plaza Concrete is complete

- The retaining wall work in the South West quadrant is complete

- Generator and areaway guardrail installation is complete

- South wing gutterway fl at-lock copper installation in progress

- South wing skylight replacement in progress

- East wing copper demolition complete

- North wing substrate replacement and repairs in progress

E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

APRIL 2019

Page 4: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

Safety:

The safety of our workforce and the general public during the course of construction is the most import-

ant task that we must deliver. To that end, every craftsmen involved with the project receives a detailed

project orientation, and prior to performing any task, the teams develop detailed task specifi c work

plans. These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing

different hazards associated with each work activity prior to beginning work.

E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

APRIL 2019

Safety Data and Metrics

Orientations Performed through 04.30.19 690

First Aid Incidents for the month of April 1*

Recordable Incidents for the month of April 0

Trade Partner Incidents for the month of April 1**

Total Man-Hours for the month of April (hrs.) 4,436

Total Project Man-Hours (hrs.) 191,750

*While carrying material on the low roof, a Trade Partner sprained their ankle. The worker was treated at the clinic with ice packs and returned to work.

**Following a rain storm, a live extension cord was discovered submerged in water on the roof. GFCI did not trip. No injuries or damage occured. The cord was unplugged and removed from teh water. A safety meeting was held to review this near miss.

Page 5: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

APRIL 2019E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

Safety Spotlight

We recently completely another round of rigging training for our exterior restoration trade partners and our roofi ng

crews. This rigging training included using virtual videos to learn proper hand signals as well as actual training

on-site using the tower crane. Proper rigging training is important to ensure all materials that are being hoisted

are secured properly before being lifted into the air.

Page 6: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

Co' er Re-roofi ng Update

APRIL 2019E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

Plywood installation on the North Wing

East Wing Copper Demo South Wing Flat Lock Installation

Skylight 1

Page 7: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

APRIL 2019 E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

Progre) Photos & Field Reports

The photos and fi eld reports attached in the subsequent pages represent progress photos taken during the month of

April for the Oklahoma State Capitol Exterior Restoration project.

Page 8: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

ZFI Engineering Co.

8411 S. Walker Ave.

OKC, OK 73139

Ph: 405.634.3393

Fx: 405.634.6414

www.zfiengr.com

ENGINEER’SFIELDREPORT Project: Oklahoma State Capitol Exterior Renovation Project#: 15071-01 Date/Time: February 13, 2018 Temperature: ~60° F Weather: Scattered Clouds, Windy

WorkinProgress: Demolition of existing roof materials (North Wing), specifically

the removal of copper standing seam roof panels ( ReasonforVisit: Observer existing conditions and unforeseen conditions at the North

Wing Roof Personnel: Mark Maska – JE Dunn (General Contractor) Jon Whaley – JE Dunn (General Contractor) Lynnsee Boyse – JE Dunn (General Contractor) Mike Thompson – ZFI Engineering (Structural EOR)

Mike Thompson (MDT) of ZFI was on-site to observe the early stages of roofing material demolition on the North Wing roof. An unforeseen condition was encountered at the north end of the roof

Observations:

1. The existing copper standing seam panels had been removed over a large portion of the roof area. Temporary roofing material was being installed to protect the roof. Both aspects of this work were on-going.

Page 9: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Engineer’s Field Report Oklahoma State Capitol Exterior Renovation ZFI Project # 15071-01 February 13, 2019 Page 2 of 5

2. ZFI observed an unforeseen condition at the end of the north roof where a large gap existed between the north veneer stone and the concrete structure.

South Face of Stone Veneer

North Face of Concrete Roof Beam

Page 10: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Engineer’s Field Report Oklahoma State Capitol Exterior Renovation ZFI Project # 15071-01 February 13, 2019 Page 3 of 5

3. The gap measured approximately six inches at the location observed (east end of the roof, in the gutterway). The top of the stone was approximately 3 ¼” above the top of the adjacent beam.

4. Several ferrous rod anchors

crossing the joint were also observed at this location anchoring the top of the stone segments back into the top of the concrete beams. Further demolition up the slope was necessary to determine the extent of the anchorage to the roof beams.

5. JE Dunn was planning on installing a cover board over the gap to avoid a trip hazard until such time a permanent solution can be devised to address the condition.

Page 11: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Engineer’s Field Report Oklahoma State Capitol Exterior Renovation ZFI Project # 15071-01 February 13, 2019 Page 4 of 5

6. Original steel cable/wire rope was also observed below the original roofing of the east gutterway. It is not believed that this is part of the lightning protection system, but rather an abandoned erection cable from the building’s original construction.

7. The removal of the copper standing seam roof revealed that the underlayment system below differed from that encountered at the south roof to date. In lieu of the ice/water barrier-plywood-1x6 plank layup seen on the south, the ice/water barrier was directly adhered to 1x6 plank layer and no plywood was present. The barrier appeared to be securely adhered to the 1x6. This will prevent direct observation of the condition of the 1x6 layer.

Page 12: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Engineer’s Field Report Oklahoma State Capitol Exterior Renovation ZFI Project # 15071-01 February 13, 2019 Page 5 of 5

8. Wood sleeper and cement fill condition in the east gutterway appeared to be largely consistent similar areas seen on the South Wing. There were isolated areas of sleeper deterioration, but no widespread issues in the areas uncovered so far.

ReportedBy: Mike Thompson, PE ZFI Engineering Co.

-END-

Page 13: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 1 of 11

FIELD OBSERVATION REPORT REPORT NO: 126 DATE: 3/26/2019

TIME: 10:45 - 11:30 AM DAY OF WEEK: Tuesday

OWNER: OMES TEMP. RANGE: Mid 60s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Brandon Marriott, Jon Whaley, Lindsey Ross, Lynnsee Boyse, Mark Maska - JE

Dunn

Lukasz Lesniak - Mark 1

WORK OBSERVED:

Balustrade repair progressing on west elevation of north wing (Alpha).

Roof work progressing on west slope of north wing (Alpha).

Door 106 installation progressing on north elevation of north wing (Bravo).

Sidewalk installation progressing at North Plaza.

Roof work progressing on east slope of north wing (Charlie).

Sump pit work progressing on east elevation of north wing (Charlie).

Sidewalk installation progressing at tunnel entry building.

Roof work progressing on east slope of south wing (Golf).

Roof work progressing on west slope of south wing (India).

Retaining wall work progressing at southwest portion of site.

Sump pit work progressing on south elevation of west wing (Juliette).

Sealant installation progressing at West Plaza.

Punch list progressing on north elevation of west wing (Lima).

Copper gutter installation progressing at backside of parapet on north elevation of west wing (Lima).

Page 14: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 2 of 11

ITEMS DISCUSSED:

None

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

OAC Meeting occurred prior to the site visit in the jobsite trailers.

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Brandon Marriott (JE Dunn), Jon Whaley (JE Dunn), Lindsey

Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), Victor Mendoza (JE

Dunn), JC Witcher (ADG), Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia

Manglitz (TreanorHL), Kelsey Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley

(TreanorHL), Mike Thompson (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam

Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Pointing mortar installation in progress at balustrade on west elevation of north wing (Alpha). The north

portion of the balustrade fell over when the adjacent concrete sidewalk was removed.

Page 15: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 3 of 11

Decking removal in progress on west slope of north wing (Alpha)

Door 106 installation in progress on north elevation of north wing (Bravo)

Page 16: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 4 of 11

Compacted subgrade work in progress for concrete sidewalk at upper level of North Plaza

Concrete curing at lower level of North Plaza

Page 17: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 5 of 11

Plywood overdeck installation in progress on east slope of north wing (Charlie)

Light well access window on north elevation of east wing (Delta)

Page 18: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 6 of 11

Concrete curing at base of light pole at east parking lot

Concrete sidewalk curing around tunnel entry building

Page 19: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 7 of 11

Flat lock copper installation in progress at gutterway on east slope of south wing (Golf)

Reglet cut in progress at south elevation dome base on west slope of south wing (India)

Page 20: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 8 of 11

Plywood overdeck installation in progress at skylight on west slope of south wing (India)

Grading in progress adjacent to retaining wall at southwest portion of site

Page 21: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 9 of 11

Concrete cutting in progress for sump pit at light well on south elevation of west wing (Juliette)

Sealant installation adjacent to granite base at southwest corner of West Plaza

Page 22: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 10 of 11

Sealant installation adjacent to granite treads at south stair at West Plaza

Sealant installation adjacent to granite treads at north stair at West Plaza

Page 23: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 126 - 2019_03-26.docx

Page 11 of 11

Punch list in progress with tape marks on items to be corrected on north elevation of west wing (Lima)

Copper installation in progress at gutter on backside of parapet on north elevation of west wing (Lima)

Page 24: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO: 127 DATE: 4/2/2019

TIME: 10:20 - 11:00 AM DAY OF WEEK: Tuesday

OWNER: OMES TEMP. RANGE: Lower 70s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Brandon Marriott, Jon Whaley, Lindsey Ross, Lynnsee Boyse, Mark Maska - JE

Dunn

WORK OBSERVED:

Roof work progressing on west slope of north wing (Alpha).

Sidewalk installation progressing at North Plaza.

Roof work progressing on east slope of north wing (Charlie).

Sump pit work progressing on east elevation of north wing (Charlie).

Concrete repairs progressing in light well on north elevation of east wing (Delta).

Scaffold erection progressing on north slope of east wing (Delta).

Scaffold erection progressing on south slope of east wing (Foxtrot).

Roof work progressing on east slope of south wing (Golf).

Roof work progressing on west slope of south wing (India).

Retaining wall work progressing at southwest portion of site.

Sump pit work progressing on south elevation of west wing (Juliette).

Scaffold removal progressing on north elevation of west wing (Lima).

Copper gutter installation progressing at backside of parapet on north elevation of west wing (Lima).

ITEMS DISCUSSED:

Page 25: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 2 of 8

Difference in height between upper level of concrete sidewalk and retaining wall at North Plaza

discussed with Mark. Height extension of new retaining wall to be provided adjacent to concrete

sidewalk on west and east sides of sidewalk.

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

OAC Meeting occurred prior to the site visit in the jobsite trailers.

Interior/Exterior Coordination Meeting occurred prior to the site visit in room G4.

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Brandon Marriott (JE Dunn), Jon Whaley (JE Dunn), Lindsey

Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), Victor Mendoza (JE

Dunn), JC Witcher (ADG), Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia

Manglitz (TreanorHL), Kelsey Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley

(TreanorHL), Mike Thompson (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam

Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Concrete repairs in progress on west slope of north wing (Alpha)

Page 26: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 3 of 8

Concrete pour progress on west portion of North Plaza

Concrete repairs in progress on east slope of north wing (Charlie)

Page 27: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 4 of 8

Sump pit work in progress in light well on east elevation of north wing (Charlie)

Concrete repairs in progress at light well wall on north elevation of east wing (Delta)

Page 28: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 5 of 8

Scaffold erection progress on north slope of east wing (Delta)

Scaffold erection progress on south slope of east wing (Foxtrot)

Page 29: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 6 of 8

Flat lock copper installation in progress at gutterway on east slope of south wing (Golf)

Framing progress at large skylight on ridge of south wing

Page 30: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 7 of 8

Scaffold removal progressing on north elevation of west wing (Lima)

Copper installation in progress at gutter on backside of parapet on north elevation of west wing (Lima)

Page 31: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 127 - 2019_04-02.docx

Page 8 of 8

Existing retaining wall height shown adjacent to new concrete sidewalk and battlement wall. New

retaining wall to be provided with height extension to match height of new concrete sidewalk.

Page 32: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO: 128 DATE: 4/11/2019

TIME: 1:45 - 2:30 PM DAY OF WEEK: Thursday

OWNER: OMES TEMP. RANGE: Lower 50s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Brandon Marriott, Lindsey Ross, Mark Maska - JE Dunn

WORK OBSERVED:

Roof work progressing on west slope of north wing (Alpha).

Door 106 installation progressing on north elevation of north wing (Bravo).

Concrete installation progressing at North Plaza.

Roof work progressing on east slope of north wing (Charlie).

Sump pit work progressing on east elevation of north wing (Charlie).

Concrete repairs progressing in light well on north elevation of east wing (Delta).

Roof work progressing on north slope of east wing (Delta).

Roof work progressing on south slope of east wing (Foxtrot).

Roof work progressing on east slope of south wing (Golf).

Roof work progressing on west slope of south wing (India).

Sump pit work progressing on south elevation of west wing (Juliette).

Concrete repairs progressing in light well on south elevation of west wing (Juliette).

Scaffold removal progressing on north elevation of west wing (Lima).

Metal panel installation progressing at backside of parapet on north elevation of west wing (Lima).

ITEMS DISCUSSED:

Page 33: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 2 of 9

None

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

None

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Brandon Marriott (JE Dunn), Jon Whaley (JE Dunn), Lindsey

Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG),

Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey

Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson

(ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine

(Alvine), Gary Noland (Smith Roberts Baldischwiler)

Marine grade plywood installation in progress at gutterway on west slope of north wing (Alpha)

Page 34: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 3 of 9

Door 106 installation progress on north elevation of north wing (Bravo)

Concrete slab progress at North Plaza with historic light fixtures in place

Page 35: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 4 of 9

Reglet cut in limestone on east slope of north wing (Charlie)

Concrete repair progress at light well wall on north elevation of east wing (Delta)

Page 36: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 5 of 9

Copper panel removal progress at monitor on north slope of east wing (Delta)

Copper panel removal progress at monitor on south slope of east wing (Foxtrot)

Page 37: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 6 of 9

Flat lock copper installation in progress at gutterway on east slope of south wing (Golf)

Marine grade plywood installation in progress at large skylight on ridge of south wing

Page 38: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 7 of 9

Flat lock copper installation progress at gutterway on west slope of south wing (India)

Sump pit progress at light well on south elevation of west wing (Juliette)

Page 39: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 8 of 9

Concrete repair progress at light well wall on south elevation of west wing (Juliette)

Linear drain grates painted at West Plaza

Page 40: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 128 - 2019_04-11.docx

Page 9 of 9

Scaffold removal progress down to second floor on north elevation of west wing (Juliette)

Metal panel and furring channel installation in progress at backside of parapet on north elevation of west

wing (Juliette)

Page 41: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO: 129 DATE: 4/18/2019

TIME: 3:00 - 3:45 PM DAY OF WEEK: Thursday

OWNER: OMES TEMP. RANGE: Mid 50s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Jon Whaley, Mark Maska - JE Dunn

Ed Kongs - Alvine

WORK OBSERVED:

Railing installation progressing at North Plaza.

Sealant installation progressing at North Plaza.

Sump pit work progressing in light well on east elevation of north wing (Charlie).

Sump pit work progressing in light well on north elevation of east wing (Delta).

Concrete repairs progressing in light well on north elevation of east wing (Delta).

Sump pit work progressing on south elevation of west wing (Juliette).

Concrete repairs progressing in light well on south elevation of west wing (Juliette).

Sealant installation progressing at mow strip on south elevation of west wing (Juliette).

Railing installation progressing at West Plaza.

Scaffold removal progressing on north elevation of west wing (Lima).

ITEMS DISCUSSED:

Reviewed water coming through existing pipes at sump pits in light wells on east elevation of north

wing (Charlie) and north elevation of east wing (Delta). Outlets, that will connect to the existing

pipes, will be provided through the sump pit walls to allow groundwater to drain to the sump pit.

Page 42: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 2 of 9

Reviewed space between areaway railing and wall at south stair at West Plaza. Railing to be provided

between the railing and stair wall.

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

Roof work suspended earlier in the day due to wind speed.

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Brandon Marriott (JE Dunn), Jon Whaley (JE Dunn), Lindsey

Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG),

Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey

Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson

(ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine

(Alvine), Gary Noland (Smith Roberts Baldischwiler)

Railing installation progress at stair at North Plaza

Page 43: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 3 of 9

Sealant installation progress adjacent to granite water table at North Plaza

Sealant installation progress adjacent to granite treads at bottom of stair at North Plaza

Page 44: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 4 of 9

Sealant installation progress adjacent to granite treads at top of stair at North Plaza

Sump pit work progress at light well on east elevation of north wing (Charlie). Outlets, that will be

connected to the existing pipes, will be provided through the sump pit walls to allow groundwater to

drain to the sump pit.

Page 45: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 5 of 9

Sump pit work progress at light well on north elevation of east wing (Delta). Outlets, that will be

connected to the existing pipes, will be provided through the sump pit walls to allow groundwater to

drain to the sump pit.

Concrete repair progress at walls of light well on north elevation of east wing (Delta)

Page 46: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 6 of 9

Sump pit work progress at light well on south elevation of west wing (Juliette)

Extension provided to match manhole elevation to mow strip elevation on south elevation of west wing

(Juliette)

Page 47: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 7 of 9

Concrete repair progress at walls of light well on south elevation of west wing (Juliette). Sump pit work

progress can be seen in the background.

Sealant installation progress at mow strip adjacent to balustrade on south elevation of west wing

(Juliette)

Page 48: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 8 of 9

Railing installation progress at areaway at West Plaza

Space between areaway railing and wall at south stair at West Plaza. Railing to be provided between

railing and stair wall.

Page 49: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 129 - 2019_04-18.docx

Page 9 of 9

Scaffold removal progress down to first floor on north elevation of west wing (Lima)

Page 50: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 130 - 2019_04-23.docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO: 130 DATE: 4/23/2019

TIME: 2:00 - 2:45 PM DAY OF WEEK: Tuesday

OWNER: OMES TEMP. RANGE: Mid 50s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Jon Whaley, Mark Maska - JE Dunn

WORK OBSERVED:

Sump pit work progressing in light well on east elevation of north wing (Charlie).

Sump pit work progressing in light well on north elevation of east wing (Delta).

Roof work progressing on north slope of east wing (Delta).

Roof work progressing on south slope of east wing (Foxtrot).

Roof work progressing on east slope of south wing (Golf).

Roof work progressing on west slope of south wing (India).

Metal panel installation progressing at backside of parapet on north elevation of west wing (Lima).

ITEMS DISCUSSED:

None

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

Page 51: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 130 - 2019_04-23.docx

Page 2 of 6

REMARKS:

Majority of work on-site suspended due to rain earlier in the day.

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Brandon Marriott (JE Dunn), Jon Whaley (JE Dunn), Lindsey

Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG),

Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey

Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson

(ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine

(Alvine), Gary Noland (Smith Roberts Baldischwiler)

Temporary roof membrane protection placed over skylight on east slope of north wing (Charlie)

Page 52: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 130 - 2019_04-23.docx

Page 3 of 6

Sump pit walls poured in light well on east elevation of north wing (Charlie)

Sump pit walls poured in light well on north elevation of east wing (Delta)

Page 53: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 130 - 2019_04-23.docx

Page 4 of 6

Copper panel removal progress on north slope of east wing (Delta)

Copper panel removal progress on south slope of east wing (Foxtrot)

Page 54: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 130 - 2019_04-23.docx

Page 5 of 6

Roof work progress on east slope of south wing (Golf)

Roof work progress on west slope of south wing (India)

Page 55: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 130 - 2019_04-23.docx

Page 6 of 6

Metal panel and furring channel installation progress at backside of parapet on north elevation of west

wing (Lima)

Page 56: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.149 - 2019_03_25.docx Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO: 149 DATE: 03/25/2019 TIME: noon – 4:30 pm DAY OF WEEK: Monday OWNER: OMES TEMP. RANGE: Mid 50s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other ___ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Lindsey Ross, Mark Maska, Jon Whaley, Brandon Marriott (JE Dunn) Brandon Thompson (ReView Windows) Eddie Pait, Shannon Cheek (Baker Roofing)

WORK OBSERVED:

Installation of ballistic window system mockup in progress.

South wing roofing, skylights: replacement of decking over lower skylights on the west slope is in progress. Setting Crete-plank on the third of four is underway. Cricket built on the upslope side of the southern-most was reviewed. See discussion below.

South wing roofing, flat lock: flat lock installation is ongoing at the east gutterway, central section. Damage noted to the bottom of the coping stones on the west gutterway. Damage appears to be caused by expansion anchors driven through the upturned leg of the through wall flashing. Use of expansion anchors for low slope roofing terminations was not indicated nor was it approved. Severe instances of damage may need to be repaired.

North wing roofing, substrate repairs: removal of existing wood decking has revealed gap between northern-most concrete framed beam and the stone cornice (see discussion below), and a few cracks parallel to the slope in the Hy-Rib concrete deck, review with structural scheduled for 3/26. Replacement of deteriorated sleeper is in progress.

Page 57: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.149 - 2019_03_25.docx Page 2 of 6

ITEMS DISCUSSED:

South wing lower skylight carpentry and copper: Construction is acceptable overall, however the vertical dimension from the ridge of the cricket and the overall height were compared to the mockup executed on the ground to determine whether adjustments to copper or framing need to be made. The ground-based mock-up box is approximately ½” shorter than the actual condition. However, the closure between the cricket ridge and the upslope edge of the skylight would be better if the top of the skylight was a bit higher. Additional framing to increase the height will add weight (needs to be discussed with structural) and depending on how much could alter the way the lower skylights are perceived relative to the upper skylights (historic appearance).

Back of parapet gutterway termination detail: Sequence of construction on this detail was discussed as were alternatives. Threaded rod anchors on the north wing are reported to be damaged and/or cut off during demolition work.

North wing roofing, substrate: reviewed proposed detail for infilling the gap found between the concrete beam and stone cornice at the east slope which was more recently uncovered. The vertical offset dimensional variances across the gap noted on the west slope are different on the east. Discussed alternatives to simplify framing and copper work where the slope meets the gutterway. Discussed alternative methods to make up the height difference of the base substrate across the gap in a way that is more tolerant, including providing a layer of cementitious fill over the existing deck.

North wing roofing, attic conditions: JE Dunn reports that no changes have been detected in the cementitious plaster covering on the bottom of the Hy-Rib deck.

ACTION REQUIRED:

Discuss adding framing to increase height of lower south skylight. (TreanorHL)

Revisions to roof deck infill and coordination with structural. (TreanorHL)

Discuss backing out of epoxy set anchors with Mark1. (JE Dunn) ITEMS TO VERIFY:

REMARKS:

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Jon Whaley (JE Dunn), Brandon Marriott (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Page 58: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.149 - 2019_03_25.docx Page 3 of 6

South wing, west slope (India) – roofed over skylight decking replacement in progress.

South wing, west slope (India) – section of crete-plank being hoisted to the work area for placement.

Page 59: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.149 - 2019_03_25.docx Page 4 of 6

South wing, west slope – skylight with decking replaced and plywood installed to form cricket. The vertical dimensions of the actual condition were compared to the mock-up executed on the ground to determine what ajustments, if any, need to be made. Additional height on the roofed over sklyight deck would help

the sheet metal detailing.

Page 60: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.149 - 2019_03_25.docx Page 5 of 6

South wing, east slope (Golf) – flat lock copper installation ongoing at the central section of the

gutterway.

North wing, east slope (Charlie) – near the gutterway, gap to the left is void in deck between the concrete

roof structure and the stone cornice. Void was uncovered after demolition, proposed detail discussed and altered based on differences between west and east slopes and to simplify construction.

Page 61: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.149 - 2019_03_25.docx Page 6 of 6

North wing, east slope (Charlie) – substrate marked for review by structural engineer. Concrete deck is

cracked parallel to the sleeper.

Page 62: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.150 - 2019_03_26.docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO: 150 DATE: 03/26/2019 TIME: 8:00 am – 4:00 pm DAY OF WEEK: Tuesday OWNER: OMES TEMP. RANGE: Lo 60s to Mid 60s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other ___ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Lindsey Ross, Mark Maska, Jon Whaley, Brandon Marriott, Geoffrey Johnson (JE Dunn) Brandon Thompson (ReView Windows) Eddie Pait, Shannon Cheek (Baker Roofing) Lukasz Lesniak (Mark 1) Jason Cady (Mass Architects) David Mihm, Trait Thompson, Doug Kellogg (OMES/State of Oklahoma) Mike Thompson (ZFI)

WORK OBSERVED:

Repairs to lightwell balustrade on A206 (Alpha) are nearly complete, stones are repaired and reset, pointing is in progress.

North wing roof: Removal of existing board sheathing and repairs continue. Reviewed concrete roof deck and sleeper conditions with JE Dunn, ZFI and Mass.

ITEMS DISCUSSED:

North wing roof concrete substrate, cracking is consistent with locations of roof trusses and transition between formed poured concrete system and the Hy-rib lath slab/metal truss system. Cracking in Hy-rib slab likely caused by negative moment over the truss. Discussed whether crack should be filled and if so with what material (epoxy or sealant). (ZFI, JE Dunn, Mass)

Cam lock layout and installation for windows. (ReView)

Page 63: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.150 - 2019_03_26.docx Page 2 of 4

ACTION REQUIRED:

Recommended treatment for cracking parallel to the slope on north wing. (ZFI, TreanorHL) ITEMS TO VERIFY:

REMARKS:

Punchlist review of A205 (Lima) – last façade! – all morning and into the afternoon.

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Jon Whaley (JE Dunn), Brandon Marriott (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Built-in gutter on A205 (Lima) where it meets the first section of gutter on A206 (Alpha) at the upper left

(copper is brighter in the recently completed section).

Page 64: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.150 - 2019_03_26.docx Page 3 of 4

Dutchman repair on A205 (Lima).

Eagle on A205 (Lima).

Page 65: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.150 - 2019_03_26.docx Page 4 of 4

North wing, east slope – appears to be abandoned ties near the transition between the two structural

systems in the roof, possibly stays for the derrick used during construction. Such items uncovered during the work are to be prepared and painted to the extent they are exposed, just as when such items are

found imbedded in stone.

1916 construction photo, north wing is the wing on the right, the derrick is visible protruding from the

roof.

Page 66: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

APRIL 2019E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing & Schedule A+ achments: The following documents are included in the subsequent pages:

- Site Phasing Plan

- Site Utilization Plan

- Six (6) Week Look Ahead Schedule

Page 67: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

15

03

9D

B

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTS

CLICK HERE

APRIL 2019E teri!" Rehabili$a%ionJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan:

The site phasing plan is a broad representation of the work fl ow for the Capitol exterior rehabilitation.

Beginning with Alpha (west elevation of the north wing), scaffolding was constructed continuing

on to Bravo, Charlie, Delta and Echo. We construct a phase of scaffolding at a time, which is followed by

hazardous material removal, window restoration, and stone and lighting repair. As each phase is complet-

ed, the scaffolding will be disassembled and reassembled on similar elevations. With the recent completion

of the Lima elevation, the fi nal remaining scaffolding will be dismantled and removed from the jobsite.

Page 68: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVOCOMPLETED

CO

MPLETED

CO

MPLE

TED

COMPLETED

CO

MPLETED

CO

MPLETED

ACTIVE ELEVATIONS

COMPLETED

CO

MPLE

TED

COMPLETED

CO

MPLE

TED

COMPLETED

Page 69: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

JED

JED

Page 70: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Activity ID Activity Name RemDur

Start Finish

Oklahoma Legislative SessionsOklahoma Legislative Sessions 10 04-Feb-19 A 24-May-19

.. 10 04-Feb-19 A 24-May-19

.. 10 04-Feb-19 A 24-May-19

CON-30300 2019 Session 10 04-Feb-19 A 24-May-19

ElevationsElevations 13 30-Nov-18 A 30-May-19

Lima- West Wing North FaceLima- West Wing North Face 13 30-Nov-18 A 30-May-19

Gutter/ParapetGutter/Parapet 13 30-Nov-18 A 30-May-19

CON-30140 Lima-Install Metal Wall Panels 1 30-Nov-18 A 13-May-19

CON-30120 Lima-Install Hanging Gutter 2 13-May-19 14-May-19

CON-30150 Lima-Install Stainless Steel Caps 13 13-May-19 30-May-19

SiteSite 224 06-May-19 A 27-Mar-20

TunnelTunnel 171 13-May-19 14-Jan-20

Tunnel FinishesTunnel Finishes 171 13-May-19 14-Jan-20

CON-32750 Frame Walls 15 13-May-19* 03-Jun-19

CON-32770 OH Rough-In 10 13-May-19 24-May-19

CON-33860 Inject Control Joints with Waterproofing 9 20-May-19* 31-May-19

CON-32790 Frame Ceilings 15 04-Jun-19 24-Jun-19

CON-32800 Light Fixtures 10 25-Jun-19 09-Jul-19

CON-32760 In-Wall Rough-In/Wood Bloc king 10 01-Oct-19* 14-Oct-19

CON-32820 Hang Walls 10 15-Oct-19 28-Oct-19

CON-32810 Hang Ceilings 5 29-Oct-19 04-Nov-19

CON-32830 Tape/Mud/Paint 15 29-Oct-19 18-Nov-19

CON-32840 Ceiling Grid 5 19-Nov-19 25-Nov-19

CON-32850 Handrails 5 19-Nov-19 25-Nov-19

CON-32860 Acoustical Panels 10 19-Nov-19 03-Dec-19

CON-32870 Millwork 20 19-Nov-19 17-Dec-19

CON-32920 Ceiling Grid Rough-In 5 26-Nov-19 03-Dec-19

CON-32930 Drop Tile 5 04-Dec-19 10-Dec-19

CON-32880 Rubber Stair Treads & Ris ers 3 11-Dec-19 13-Dec-19

CON-32890 Flooring Tile 15 11-Dec-19 02-Jan-20

CON-32900 Carpet 5 03-Jan-20 09-Jan-20

CON-32910 Final Clean 3 10-Jan-20 14-Jan-20

CON-32940 Tunnel Finishes Complete 0 14-Jan-20

Site-LightwellsSite-Lightwells 29 06-May-19 A 21-Jun-19

HardscapeHardscape 29 06-May-19 A 21-Jun-19

CON-33510 Lightwells-Ph 2 (Alpha, Lima) -Demo Lightwells 2 06-May-19 A 14-May-19

CON-33540 Lightwells-(Juliette)-Waterproofing 4 13-May-19 16-May-19

CON-33530 Lightwells-(Juliette)-Install Sump Pumps 1 15-May-19 15-May-19

CON-33770 Lightwells-(Alpha, Lima)-Form/Pour Concrete Pits 5 15-May-19* 21-May-19

CON-33550 Lightwells-(Juliette)-Topping Slab 1 17-May-19* 17-May-19

CON-33840 Lightwells-(Charlie, Delta)-Waterproofing 4 17-May-19 22-May-19

CON-33180 Lightwells-(Golf, Foxtrot) -Pit Slab 5 20-May-19* 24-May-19

CON-33780 Lightwells-(Alpha, Lima)-Install Sump Pumps 1 22-May-19 22-May-19

CON-33790 Lightwells-(Alpha, Lima)-Waterproofing 7 22-May-19 31-May-19

CON-33760 Lightwells-(Charlie, Delta) -Topping Slab 2 23-May-19 24-May-19

CON-33170 Lightwells-(Golf, Foxtrot)-Install Sump Pumps 1 28-May-19 28-May-19

CON-33480 Lightwells-(Golf, Foxtrot)-Waterproofing 2 28-May-19 29-May-19

CON-33490 Lightwells-(Golf, Foxtrot)-Topping Slab 1 30-May-19 30-May-19

M M M M J J J J J J J J J A A A A S S S S S O O O O N N N N D D D D D J J J J F F F F M M M M M A A A A M M M M M J J J J J J

2019 Session

Lima-Install Metal Wall Panels

Lima-Install Hanging Gutter

Lima-Install Stainless Steel Caps

Frame Walls

OH Rough-In

Inject Control Joints with Waterproofing

Frame Ceilings

Light Fixtures

In-Wall Rough-In/Wood Bloc king

Hang Walls

Hang Ceilings

Tape/Mud/Paint

Ceiling Grid

Handrails

Acoustical Panels

Millwork

Ceiling Grid Rough-In

Drop Tile

Rubber Stair Treads & Ris ers

Flooring Tile

Carpet

Final Clean

Tunnel Finishes Complete

Lightwells-Ph 2 (Alpha, Lima) -Demo Lightwells

Lightwells-(Juliette)-Waterproofing

Lightwells-(Juliette)-Install Sump Pumps

Lightwells-(Alpha, Lima)-Form/Pour Concrete Pits

Lightwells-(Juliette)-Topping Slab

Lightwells-(Charlie, Delta)-Waterproofing

Lightwells-(Golf, Foxtrot) -Pit Slab

Lightwells-(Alpha, Lima)-Install Sump Pumps

Lightwells-(Alpha, Lima)-Waterproofing

Lightwells-(Charlie, Delta) -Topping Slab

Lightwells-(Golf, Foxtrot)-Install Sump Pumps

Lightwells-(Golf, Foxtrot)-Waterproofing

Lightwells-(Golf, Foxtrot)-Topping Slab

Remaining Construction

Data Date: 13-May-19

Run Date: 10-May-19; 14:01

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

 

Page 71: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORT

Activity ID Activity Name RemDur

Start Finish

CON-33500 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Wall Coating 15 31-May-19 20-Jun-19

CON-33850 Form and Pour Alpha Stairs 3 03-Jun-19* 05-Jun-19

CON-33800 Lightwells-(Alpha, Lima)-Topping Slab 2 06-Jun-19* 07-Jun-19

CON-33560 Lightwells-Ph 2 (Alpha, Lima, Juliette)-Wall Coating 10 10-Jun-19 21-Jun-19

Site-Northeast Ret Wall/LandscapeSite-Northeast Ret Wall/Landscape 214 28-May-19 27-Mar-20

LandscapeLandscape 214 28-May-19 27-Mar-20

CON-23250 NE Wall-Grading & Landscaping 15 28-May-19 17-Jun-19

CON-33190 NE Wall-Sump Pump Piping Daylighting 4 28-May-19 31-May-19

CON-33820 NE Wall-Grading & Landscaping (after crane demob) 5 23-Mar-20* 27-Mar-20

Site-Southeast Ret Wall/LandscapeSite-Southeast Ret Wall/Landscape 10 17-Jun-19 28-Jun-19

HardscapeHardscape 10 17-Jun-19 28-Jun-19

CON-33740 SE Wall-Form/Place Ftgs/New Retaining Wall 10 17-Jun-19* 28-Jun-19

Site-Southwest Ret Wall/LandscapeSite-Southwest Ret Wall/Landscape 5 09-May-19 A 07-Jun-19

LandscapeLandscape 5 09-May-19 A 07-Jun-19

CON-33210 SW Wall-Sump Pump Piping Daylighting 5 09-May-19 A 07-Jun-19

Site-Northwest Ret Wall/LandscapeSite-Northwest Ret Wall/Landscape 22 22-May-19 21-Jun-19

HardscapeHardscape 17 22-May-19 14-Jun-19

CON-33580 NW Wall-Form/Place New Retaining Wall & Mow Strip 17 22-May-19* 14-Jun-19

LandscapeLandscape 5 17-Jun-19 21-Jun-19

CON-33250 NW Wall-Grading & Landscaping 5 17-Jun-19 21-Jun-19

CON-33240 NW Wall-Sump Pump Piping Daylighting 3 17-Jun-19 19-Jun-19

Closeout & WarrantyCloseout & Warranty 308 31-Oct-19 15-Jan-21

.. 51 31-Oct-19 14-Jan-20

.. 51 31-Oct-19 14-Jan-20

CON-10760 Base Job Demobillization 50 31-Oct-19 14-Jan-20

JED-0600 Substantial Completion 0 14-Jan-20

Warranty Review sWarranty Review s 197 08-Apr-20 15-Jan-21

M M M M J J J J J J J J J A A A A S S S S S O O O O N N N N D D D D D J J J J F F F F M M M M M A A A A M M M M M J J J J J J

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Wall Coating

Form and Pour Alpha Stairs

Lightwells-(Alpha, Lima)-Topping Slab

Lightwells-Ph 2 (Alpha, Lima, Juliette)-Wall Coating

NE Wall-Grading & Landscaping

NE Wall-Sump Pump Piping Daylighting

NE Wall-Grading & Landscaping (after crane demob)

SE Wall-Form/Place Ftgs/New Retaining Wall

SW Wall-Sump Pump Piping Daylighting

NW Wall-Form/Place New Retaining Wall & Mow Strip

NW Wall-Grading & Landscaping

NW Wall-Sump Pump Piping Daylighting

Base Job Demobillization

Substantial Completion

Remaining Construction

Data Date: 13-May-19

Run Date: 10-May-19; 14:01

Oklahoma State Capitol Exterior Renovation

Page 2 of 2