Page | 1 Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning, 132 kV receiving cum 25 kV AC Traction cum 33 kV Auxiliary Main Sub Stations and EHV cabling for Noida-Greater Noida Corridors of Delhi Mass Rapid Transport System Project Phase-3 NE-02 PRE BID CLARIFICATIONS AND REPLY TO QUERIES Attached with Addendum No.-03 Sl No Volume, Section Clause, Page No. As per Tender Query/Clarification DMRC’s Reply/Clarification 1 Vol 1 clause 1.1.4.2 A Financial data for latest last five audited financial years has to be submitted by the tenderer in APPENDIX 13 OF FOT along with audited balance sheets. The financial data in the prescribed format shall be certified by Chartered Accountant with his stamp and signature. We understand it is a minimum requirement that the participating company should be in operation and should have audited balance sheet for atleast five years. Tender Condition are self explanatory. No Change in Tender Condition.

Upload: others

Post on 08-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 1

Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning, 132 kV receiving cum 25 kV AC Traction cum33 kV Auxiliary Main Sub Stations and EHV cabling for Noida-Greater Noida Corridors of Delhi Mass Rapid Transport System Project

Phase-3

NE-02 PRE BID CLARIFICATIONS AND REPLY TO QUERIESAttached with Addendum No.-03

SlNo

Volume,Section

Clause, PageNo. As per Tender Query/Clarification DMRC’s

Reply/Clarification

1 Vol 1 clause 1.1.4.2 A

Financial data for latest last five auditedfinancial years has to be submitted by thetenderer in APPENDIX 13 OF FOT along withaudited balance sheets. The financial data inthe prescribed format shall be certified byChartered Accountant with his stamp andsignature.

We understand it is a minimumrequirement that the participatingcompany should be in operation andshould have audited balance sheet foratleast five years.

Tender Condition are selfexplanatory. No Change inTender Condition.

Page 2: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 2

In case audited balance sheet of the lastfinancial year is not made available by thebidder, he has to submit an affidavit certifyingthat ‘the balance sheet has actually not beenaudited so far’. In such a case the financial dataof previous ‘4’ audited financial years will betaken into consideration for evaluation.

A newly formed company that does nothave balance sheet for last five Financialyears shall be considered as non-responsive.

If audited balance sheet of any other year thanthe last year is not submitted, the tender will beconsidered as non-responsive.

Please confirm

2 Vol-1 1.1.4.2The exchange rate of foreign currency shall beapplicable 28 days before the submission dateof tender.

We are considering the exchange ratesfor 09.06.2015 (28 days before bidsubmission).

No Change in TenderConditionsPlease confirm that in case bid

submission date is extended, we need notto revise the exchange rate since CAcertification of financial data is a timeconsuming process, specially for foreignpartners.

Page 3: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 3

3 Vol-1 1.1.9

Tender submissions will be made online afteruploading the mandatory scanned documentstowards cost of tender documents such asDemand Draft or Pay Order or Banker’s Chequefrom a Scheduled commercial bank based inIndia and towards Tender Security such as BankGuarantee or Demand Draft or Pay Order orBanker’s Cheque from a Scheduled commercial

Please confirm that no other documentexcept “RFP document cost” and “BidSecurity” has to be submitted in physicalform.

The Tender Document is tobe submitted online exceptcost of tender document andtender security to besubmitted in physical formas per tender documentbefore deadline ofsubmission of tender.

bank based in India and other documents asstated in the tender document.

4 Vol 1, clause 1.1.4.2 A

In case the work is executed for private client,copy of work order, bill of quantities, billwise details of payment received certified byC.A., T.D.S certificates for all payments receivedand copy of final/last bill paid by client shall alsobe submitted

Since the contracts are governed byconfidentiality agreement, it is notpossible to share all these information.We request you to allow submission ofcustomer certificate for the works asqualifying document.

No Change in TenderConditions

5

Vol-1NIT

Date & time of Submission of Tender07.07.2015 @ 15:00 Hrs.

Submission timeline is too early toprepare for a good quality offer.

No Change in TenderConditions

We Request for a time extension of 4weeks in Bid Submission Date.

6 Vol 1 ITT Page 35

Check Sheet For Technical SubmissionIn the Check Sheet For TechnicalSubmission, Annexure-8 is given as Bankproviding the PBG. But, in Annexure-8,the format for PERFORMANCE SECURITY(GUARANTEE) BY BANK is given insteadof the format for Bank providing the

Kindly refer to AddendumNo.-3.

21. Annexure-8 Bank providing the PBG

Page 4: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 4

PBG. Please clarify.

7

Vol 1

Page 35

Annexure-8 Form of Performance Security(Guarantee) By Bank

As per clause C12.3 and F5 of ITT, thePerformance Security and AdditionalBank Guarantee are to be submitted afterthe award of contract. However, thesedocuments are a part of Check Sheet fortechnical submission. Please clarify

Kindly refer to AddendumNo.-3.Annexure-9 Form of additional Bank

Guarantee

ITT

8 Vol-7 Price Schedule (BOQ)

The BOQ is to be uploaded in excelformat on the e-tendering portalwww.tenderwizard.com/DMRC.

Kindly refer to AddendumNo.-3.

However, there is no mention about theprovision to upload any additionaldocument, like Discount Letter , alongwith the Price Schedule.Please clarify.

9 Vol--1

Clause: A1.5 Only road restoration charges paid by thecontractor to the civic agencies will bereimbursed by DMRC on submission ofdocumentary evidence of payment.

All charges paid by the contractor tothe civic agencies will be reimbursed byDMRC on submission of documentaryevidence of payment. Please confirm.

Tender Condition are selfexplanatory. No Change inTender Condition.Page-19

10

Vol-1

Clause 1.1.3 of This is a NON-JICA funded Contract andproject shall be financed accordingly

l confirm the source of funding of theproject and name of the funding agency.

On behalf of NMRC, DMRC shall behandling the contract and shall be releasingthe payment as per contract.NIT

11 Vol-2 GCC Sub-Clause11.1.1 , Taxes & Duties

Since as per The Constitution (122ndAmendment) Bill, 2014 GST will beapplicable w.e.f April 2016 and

No Change in TenderConditions

Page 5: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 5

SCC 24

afterwards all taxes & duties will besubsumed in GST. Pl confirm that GSTshall be paid if applicable after bidsubmission.

12 Vol-2 Sub-Clause11.1.1

The contract price shall not be adjusted totake into account any change in taxes, duties,levies or introduction of any new tax, duty orlevy till the completion date including the dateof extended period of contract.

We request you to please allow StatutoryVariations as vide The Constitution(122nd Amendment) Bill, 2014 GST willbe applicable w.e.f April 2016 GST and itwill effect the Contract Price.

No Change in TenderConditions

13 Vol-2 SCC 46

The contractor shall submit a IndemnityBond in the format given in Schedule 8against payments made for Plant andEquipment delivered to Delhi.

We understand that payment for allequipment delivered at NOIDA - GREATERNOIDA will made against the submissionof indemnity bond to DMRC.

Confirmed.

14 Vol-2 GCC 4.2.4 Guarantees and Warranties

We understand that the requirement ofParent company undertaking & Parentcompany guarantee is applicable forwholly owned subsidiaries.

No Change in TenderConditions

If a company is an established entity andregistered as Public Limited Company inIndia under Company Act 1956 andqualifies under its own credentials, itdoes not have to provide any Parentcompany undertaking & Parent companyguarantee.Please confirm.

Page 6: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 6

15

Vol-2 GCC Sub-Clause11.1.1 &

The Noida Metro Rail Corporation is in theprocess of getting registration with concernedauthorities to avail the benefits of concessionaltaxes and duties. During the course of executionof work if the exemption is received by theNoida Metro Rail Corporation, the benefit onaccount of the taxes and duties shall betransferred to DMRC on submission ofdocumentary proof by the Contractor.

Please confirm whether contractor willget the benefit of concessional customduty or not. No Change in Tender

Conditions

SCC 24 (B)If yes, Pl confirm the Custom NotificationNo. under which this Project is listed.

16

Vol-2 GCC 2.2For any such delay in handing over of site,Contractors will be entitled to only reasonableextension of time and no monetary claimswhatsoever shall be paid or entertained on thisaccount.

We request DMRC to consider costcompensation for additional overheadexpenditure incurred by the contractordue to the delay in project for thereasons not attributed to Contractor.

No Change in TenderConditions

Access to andPossession

of the Site

17

It shall be Contractor’s exclusive responsibilityto get approvals, permits or license required forthe Contract. However, the Employer may(where he is in a position to do so) providereasonable assistance to Contractor at therequest and cost of the Contractor in gettingPermits, License or Approvals required duringthe Contract.

We understand that as per prevalentpractices, the permits and approvals shallbe obtained in the name of Employer i.eDMRC. Please confirm.

Tender Condition are selfexplanatory. No Change inTender Condition.

Vol-2 GCC 2.3

18 Vol-2 ,GCC 9.1

The Works shall be taken over by the Employerwhen they have been completed in accordancewith the Contract, have passed the Tests onCompletion, including Integrated Testing and

Please include that in case of delay inproviding acceptance or where DMRCputs the works in commercial operations,it will be deemed accepted by DMRC

No Change in TenderConditions

Page 7: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 7

Commissioning where ever applicable as perthe contract, and a Taking Over Certificate forthe Works shall be issued. Please confirm.

19 Vol-2 GCC 14.6 Limitation of Liability

We request for revision as below

No Change in TenderConditions

“The aggregate liability for any or allclaims Including but not limited toLiquidated damages and Indemnificationshall not exceed 100% of the totalamount received by the Contractor underthis contract.”

20 Vol-2 GCC 14.1

Indirect or We request for revision as below

No Change in TenderConditions

consequential damages

“The contractor to the maximum extentpermitted by applicable law, herebydisclaims all warranties / guaranties ,either express or implied , other thanwhat is expressly stated in this contract.

In no event shall contractor be liable toIndemnify the customer for loss ofcontracts , loss of business, loss ofdata(including but not limited to any andall costs for retrieving and restoring lostdata),

Page 8: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 8

loss of Interest , lost profits or businessInterruption or any Indirect orconsequential damages, Irrespective ofthe cause of action or the legal theoryupon which such claim is based and evenif such obligations of the Contractorappear at any place in this Agreementand / or any of its parts, portions, alliedcontracts and agreements.”

21

Vol-2

13 Termination

We request for revision as below

No Change in TenderConditions

“A party shall be entitled to terminate thiscontract by written notice,

a) If any proceeding is Instituted againstthe other party seeking to adjudicate suchparty as bankrupt or Insolvent , or if theother party makes a general assignmentfor the benefit of its creditors , or if areceiver is appointed on account of theInsolvency of the other party, and, In thecase of any such proceeding Institutedagainst the other party (but not by theother party itself), If such proceeding isnot dismissed with forty-five(45) days ofsuch filing, orb) If the other party is insolvent or itselffiles a petition seeking to take advantageof any law relating to bankruptcy ,insolvency, winding up or composition orreadjustment of debts,

Page 9: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 9

c) If a party commits a material breach ofthe terms and conditions of the Contract.”

22 Vol-2 GCC 2.4 Assignment by the Employer

The rights and obligations of each partyunder this contract may be assigned ,novated or otherwise transferred ordirectly or Indirectly after taking thewritten consent of the party whose rightsare being transferred.

No Change in TenderConditions

23 Vol-2 GCC 4.9 Site Data

Please include that in case of error in sitedata, necessary EoT with costcompensation to the Contractor will beallowed.

No Change in TenderConditions

24 Vol-2 GCC 4.4 Facilities and for coordination of othersPlease provide cost compensation alongwith EoT for delay by designatedcontractors

No Change in TenderConditions

25 Vol-2 - Change in lawsPlease include that in case of delay due tochange in laws, the contractor shall beentitled to EoT with cost compensation

No Change in TenderConditions

26 Vol-2 GCC 4.12 Rights of way Please inform what rights of way doesContractor need to procure.

No Change in TenderConditions

27 Vol-2 - General Are there any interfacing obligations thatContractor needs to do. Pl follow tender condition.

28 Vol-2 SCC Sub-Clause 2.4: Assignment by theEmployer (NOT USED)

We understand that the “Not USED”means that the relevant GCC clause isdeleted.

Relevant GCC clause is stillvalid. The “Not Used” isreferring to the SCC Clauseonly.

Please confirm.29 Vol-2 Schedule 5 “He agrees that should any modification be Please confirm that warranty for 24 Tender Condition are self

Page 10: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 10

required to any equipment or component asa consequence of failure, the period of 24months shall re-commence from the datewhen the modified part is commissioned.”

month will re-commence for modifiedproduct only and not for the completesystem.

explanatory. No Change inTender Condition.

SCC

30 Vol-2 SCC 25

Prices quoted by the tenderer shall be fixedthroughout the Tenderers performance of thecontract and not subject to variation of anyaccount except where specifically mentioned inthe contract conditions along with the pricevariations formula to be made applicable.

Price variation formula is applicable onlyfor Power transformer & tractiontransformer.

No Change in TenderConditionsWe request DMRC to consider the price

variation for other items e.g. EHV cablesand switchgears.

31 Vol-3 GS 15.4.2

The Contractor shall provide and maintain allnecessary offices, sheds, stores, mess, rooms,latrines and other accommodation and removethe same from the Site on the

Please confirm that the land for Siteoffice & Site store will be provided byDMRC free of cost.

Tender Condition are selfexplanatory. No Change inTender Condition.

Employer’s Taking Over of the Works.

32 Vol- -3Chapter 6 SOFTWARE MANAGEMENT AND CONTROL:

SIL Certification and EN50128 is notrelevant for SAS (Substation AutomationSystem).

No Change in TenderConditions

Page 11: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 11

All software to be developed or modified(re-engineered software) shall follow thenormative requirements of EN50128 (RailwayApplications: Software for Railway Controland Protection Systems). The Software shallbe designed, developed and tested accordingto the Software Quality assurance Plan,Software Integrity Level (SIL) and theSoftware Lifecycle.

EN50128 is application for software'sused for railways control and protection),However SAS system is general SCADAused for Power Substations. Hence Samestandard shall only be specified fortraction and Signaling SCADA System.SAS System shall be excluded from thisrequirement. Please clarify.

33 Vol- -3Chapter 6 Source Code

Project specific application programcan only be issued for backup andrestoration of system purposes.

No Change in TenderConditionsSoftware development source code is the

proprietary of the manufacturer andapplies copyright regulation for it’sdistribution. Source code can't begenerated project specific.

34 Vol--3 Clause: 1.12.4

Ambient Temperature - 30 Degree C

We understand that in Class ‘B’environment, the average ambienttemperature shall be 30 Degrees and themaximum temperature for a shortduration can be 45 Deg. C. Therefore, wehave to design equipments suitable for anaverage ambient temperature of 30 DegC.

Tender Condition are selfexplanatory. No Change inTender Condition.

Maximum Temperature - 45 degree C

Page 12: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 12

Please consider that thetemperature inside rooms is generallymaintained much lesser than outsideambient temperature. Considerations ofmaximum temperature (which mayhappen for very short durations) fordesign purpose will lead to over designingof the equipment.

35 Vol—4Chapter-2,

Clause:2, PageNo:5

The BCUs shall be provided on the 132kV baysand housed in the indoor cubicles in the controlroom besides/ along with realy panels. The BCUshall have full fledge graphic display for theposition of the switching elements.

We understand that conventionaltype LCC along with GIS bays shall beprovided and both Main and Standby BCUand IED shall be provided in the CRPlocated at control room. Please confirm.

confirmed

36 Vol—4Chapter-2

, The term RSS includes the various facilitiesinside the RSS premises, bound by a fencing orboundary wall.

Please confirm whether fencing orboundary wall is to be considered. boundary wall.Clause-2,

Page No:6

37 Vol—4Chapter-1

Clause 2.4.8.3 Power Source: UPPTCL substation at Sec-82 andSec-148 Noida

Please confirm the UPPTCL substationat Sec-82 and Sec-148 Noida is GIS or AIStype.

AIS type.

Page-12 For confirmation visit theGSSs.

38 Vol—4Chapter-2

Clause-2 A wall display unit of adequate size shall beprovided for operator to visualize the circuitcondition vis-a vis the status of primary switch-yard equipments, while sitting at the controldesk operator’s chair. This display unit shallconnect to the station servers.

Please confirm the size of the walldisplay unit to be considered for theproject.

Tender Condition are selfexplanatory. No Change inTender Condition.

Page-5

39 Vol—4 , Interfacing requirements with PSA: If DMRC Please confirm the requirement of Standby IED for complete

Page 13: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 13

Chapter-3 Clause-2.2, opts for standby IED for 132kV cables thanstandby IED also to be provided by RSScontractor.

the Standby IED, if any. RSS item considered in costcenter-F underaddition/deletion.S.No:5

Page No:5

40 Vol—4Chapter-3,

Clause-6.15Interface with Depot Contractor

Please confirm if supply requirementof any DMRC Depot to be consideredfrom the NE-02 RSSs.

If 132 kV cable crossesdepot then depotcontractor will provide thetrench.Page-17

41Vol—4

Chapter-8A

Clause-1.4.3

All steel structure lattice type shall begalvanized 1000g/Sqm while pipes with610g/Sqm as per latest relevant RDSOspecifications suitable for Very heavy pollutionas per IEC 60815 & IS 13134-1992.All ferrouspart of equipments shall have galvanization1000g/Sqm. The nut and bolts shall begalvanized as per the relevant IS.

Please note that the where everapplicable and possible Galvanization of1000g/sq m shall be provided, howevergalvanization thickness of the sheets shallbe as per the relevant applicable IS forthe sheet thickness. Please confirm.

Pl follow tendercondition.

Page-10

42 Vol—4 Ch-8A

, Clause-2.1.1.1.7 EOT crane with VVVF drive for continuousoperation for GIS equipment handling duringinstallation, commissioning and maintenanceetc.

Normally smaller rating (5 Ton) EOTcranes are not supplied with VVVF drive.We propose EOT crane without VVVFdrive. Kindly confirm.

Pl follow tendercondition. Min capacity is 5ton with VVVF drive.Page-13

43Vol—4

Chapter-8A,

Clause-2.1.5.1.6OLTC - The on-load tap changer shall be suitablecapacity, design and enclosure type, installed ina separated oil tank, offering 16 steps (+6step,normal and -9 step) each representing 1.667%of the nominal voltage.

We understand that OLTC is with 16positions and 15 steps as mentioned inthe GTP of OLTC. Please confirm.

Confirmed.Page-23

44 Vol—4Chapter-

Clause-2.1.5.1.10 Transformer Losses Please confirm whether losses to be

quoted at 75deg C or at 95 deg C.Pl follow tender

condition.

Page 14: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 14

8A Page-23 Normally as per IEC losses to be quotedat 75 deg C.

45 Vol—4 Ch-8A

, Clause-2.1.5.1.17 Metal work & Paint-work: We propose gray shade “RAL 7032”

as paint shade for transformer andaccessories. Please confirm.

Pl follow tendercondition.

Page-28 The shade of paint shall be gray shade 631 asper IS: 5.

46 Vol—4 Ch-8A,

Clause-2.1.5.1.18

Transport

We propose transformer to betransported with oil up to winding topand then with Dry pressurized air uptothe tank top for safety concerns, asNitrogen is not safe for humans. Pleaseconfirm.

Pl follow tendercondition.

Page-29

47 Vol—4 Ch-8A

, Clause-2.1.5.1.21,

Fiber Optic Winding Hot spot temperatureMonitor:

Please note that Wiedman is alaboratory of a specific country, suppliersfrom different countries comply withdifferent testing laboratories thanWiedman. We shall provide the testcertificates of a laboratory as applicablefor the manufacturer of Fiber OpticWinding Hot spot temperature Monitor.Please confirm.

Pl follow addendum 3.Page-35

Probes shall have certified Weidman testing forelectrical parameters per ASTM D - 3426 andASTM D - 149 that is current (no more than 1year old).

48Vol—4

Chapter-8A

, Clause-2.1.7.7

Efficiency at 1/4 load for 33/0.415kV, 100kVAStation Transformer

As per our past experience Vendorsare not able to match efficiencymentioned at 1/4 load for 33/0.415kV,100kVA Station Transformer. We shallprovide the best possible efficiencyprovided by transformer manufacturer at1/4 load.

Pl follow tendercondition.

Page-48

49Vol—4

Chapter-8A

Clause-2.1.9.4Battery: Each battery shall be of stationarycompact, Nickel-Cadmium type. They shall bemaintenance free.

Battery Type: Ultra LowMaintenance free Ni-Cd as per IEC 623,Please confirm.

Battery may besupplied as per IEC60623..

Page 15: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 15

Page-57

50Vol—4

Chapter-8A

, Clause-2.1.10.2.13 Transformer Losses

Please confirm whether losses to bequoted at 75deg C or at 95 deg C.Normally as per IEC losses to be quotedat 75 deg C.

Pl follow tendercondition.

Page-66

51Vol—4

Chapter-8A

Clause-2.1.10.2.20 Metal work & Paint-work: Paint shade specified is Gray shade

631. We propose RAL 7032 as paint shadefor transformer and accessories. Pleaseconfirm.

Pl follow tendercondition.

Page-71 The shade of paint shall be gray shade 631 asper IS: 5.

52Vol—4

Chapter-8A

Clause-2.1.10.2.21

Transport

We propose transformer to betransported with oil up to winding topand then with Dry pressurized air up tothe tank top for safety concerns, asNitrogen is not safe for humans. Pleaseconfirm.

Pl follow tendercondition.

Page-71

53Vol—4

Chapter-8A

Clause-3.2.1

Incomer Line Protection

As per specifications distancebetween UPPTCL GSS & DMRC RSS underNE-02 is 500m only. Kindly confirm themain line protection to be considered isdifferential protection or distanceprotection.

It is differential,distance feature will beenable when differential outof order.

Page-79

54 Vol—4Chapter- Clause-3.5.1.2 Each of the IED/BCU/BPU provided shall be

provided with its similar backup IED/BCU/BPUAs per the clause we understand

that CRP with main protection shall bePl follow tender

condition.

Page 16: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 16

8A,

Page-100

to ensure redundancy. This means for eachIED/BCU/BPU the second hot standbyIED/BCU/BPU should be provided which shouldautomatically take over the system in the eventof failure of main IED/BCU/BPU. This shall alsoinclude the IED/BCU/BPU of PSA end.Redundancy i.e Back up BCU/BPU/IED are to bequoted separately in financial offer undermiscellaneous items. This should be realized bytaking standby control relay panel completewith the BCU and BPU .

offered and separate price for backupprotection IEDs/BCU shall be provided.Please confirm.

55Vol—4

Chapter-8A,

Clause: 4.2.4.2The electric resistivity of the conductor screenshall not be more than 5000 Ώ cm at 20ºC andnot more than 25000 Ώ cm at the working ratedtemperature.

Please note that values mentionedare not in line with IEC, electric resistivityof the conductor screen shall be as perIEC - 60840, Please confirm.

Pl follow tendercondition.

Page-124

56Vol—4

Chapter-8A,

Clause-4.2.4.3 Nominal thickness of the insulation shall be 19mm.

Please note that this insulationthickness is not possible to design.insulation thickness shall be as per IEC -60840.

Pl follow tendercondition. .

Page-124 Kindly confirm.

57Vol—4

Chapter-8A,

Clause-4.2.4.3 The voltage gradient in the rated workingconditions shall be Please note that as per IEC voltage

gradient at internal semi conductor shallbe 8kV/ mm and at external semiconductor shall be 4kV/ mm. Pleaseconfirm.

Pl follow tendercondition.Page-124 '- Equal to or less than 6 kV/mm at the level of

internal semiconductor'- Equal to or less than 3 kV/mm at the level ofexternal semiconductor

Page 17: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 17

58Vol—4

Chapter-8A,

Clause-4.2.4.6 &4.2.5.6

Metallic Sheath: Metallic sheath shall be eitherof corrugated Aluminum sheath or CorrugatedCopper sheath. The metallic sheath shall be ableto carry a short circuit current of 31 kA for 132kV cables for 3 seconds.

Please note that system fault levelfor 132kV system is given as 22kA. Shortcircuit rating of metallic sheath should besame as that of system fault level ie.22kA.Please confirm.

31.5KA for 3 sec.

Page-125

59Vol--4

Chapter-8A,

Clause-4.2.6 Cable Laying Please provide the typical drawing ofthe cable laying sections.

This is design & builtcontract

Page-129

60Vol—4

Chapter-8A,

Clause-4.2.7.3

Bonding

Under Cross Bonding, it ismentioned that the sheaths have to beelectrically transposed at every "straightthrough joints" and SVL's are needed at 2out of 3 joint locations. Please note thatSVL's shall be provided in line with theSheath voltage calculation as per latestapplicable standard i.e. IEEE-575. Pleaseconfirm.

Pl follow tendercondition.

Page-132

61Vol—4

Chapter-8A

Clause-4.2.8.1.1

Pre moulded type: Straight through joints &Cable Terminations

Under referred clause Straightthrough joints & Cable Terminations arementioned as Pre Moulded type whereasunder clause 4.2.7.1 all three types ofStraight through joints & CableTerminations i.e. Pre moulded, heatshrinkable and cold shrinkable arementioned. Please confirm.

Pre Moulded type .

Page-137

62Vol--4

Chapter-8A,

Clause-4.2.15.1&

Acceptance Test and Frequency of Tests

Please note that Water Penetrationtest on complete cable length is notpossible to conduct, Sampling forAcceptance test shall be as per relevantapplicable IEC. Please confirm.

Pl follow tendercondition.4.2.15.2

Page-140

Page 18: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 18

63Vol—4

Chapter-8A

Clause-4.3

Medium Voltage Cable (33kV)

Please note that cables used in theRSS are laid on brackets in the coveredcable trenches, and are not exposed todirect sun light. We understand that FRLS33kV Shall be used in the RSS. Pleaseconfirm.

Pl follow tendercondition.Page-142

64Vol—4

Chapter-8A

Clause-4.4

25kV Cable

Please note that cables used in theRSS are laid on brackets in the coveredcable trenches, and are not exposed todirect sun light. We understand that FRLS25 kV Shall be used in the RSS. Pleaseconfirm.

Pl follow tendercondition.

Page-154

65Vol—4

Chapter-8A

Clause-4.4.10

Data Sheet - 25kV Cable

Conductor diameter is mentioned as240 or higher, it seems to be atypographic error. Cable with suitable diaas per 240 Sq mm Cross section shall beprovided. Kindly confirm.

confirmedPage-161

66Vol—4

Chapter-8A

Clause-5.1.6.4.7

Traction Return Current Earthing

For Traction Return Current earthing120 Sq mm Cable is mentioned. Howeveras per earlier RSS projects with DMRC wepropose to use Cu Flat for Traction ReturnCurrent earthing instead of 120 sq mmcable. Please confirm.

Pl follow tendercondition.

Page-173

67Vol--4

Chapter-8A

Clause-5.1.6.6 Burried Earth Conductor:Please provide the mentioned

“substation Layout” indicating tentativelocations of the equipments.

It is design and buildcontract so, Bidder has todesign.

Page 19: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 19

Page-173 The tentative location of the Buried rail isshown in the Substation Layout Drawings.

Normally buried rail is buried underground. Please clarify the details andarrangement of the specific provisions tobe kept for regular inspection.

In addition, provisions to be made for regularinspection of earthing connectivity oftransformer secondary, buried copper bar,earth mat and outgoing return current cable.

68Vol—4

Chapter-8A

Clause-5.1.6.7

AMS & Control Building Earthing

As per specification 120 sq mmflexible bare cu conductor is to be laidbelow AMS building foundation raft,however for ease of work we propose touse Cu flat of equivalent cross section inplace of 120 sq mm bare cu cable. Pleaseconfirm.

confirmedPage-173

69Vol—4

Chapter-8A

Clause-8.5.6.1 The Cable cellar is to be provided for GISBuilding.

Please confirm whether Cable Cellarto be provided only for GIS building or forboth AMS & GIS building.

It is design and Buildcontract, bidder has todesign layout.Page-182

70Vol—4

Chapter-8A

Clause-8.5.6.6 Compressor:

Please confirm whether the ratingsmentioned for compressors are fixed orsame can be decided as per VRF designand heat load of the equipments.However please note that mentionedratings of compressors are not clear andit is not possible to decide the final ratingof compressor to be supplied.

It is design and Buildcontract, bidder has todesign the capacity of VRVsystem based on heat load.

Page-184

The compressor shall be of highly efficienthermetic Inverter / Digital Vapor Injection Scrollcapable of capacity modulation by timeaveraging method and Vapor injectionTechnology. Each ODU should have minimum1 no. variable compressor upto 16 HP

capacity, 2 nos. variable compressors upto 32HP capacity, 3 nos. Variable compressors upto48 HP capacity & 4 nos. variable e compressors

Page 20: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 20

upto 64 HP capacity.

71Vol—4

Chapter-8A

Clause-8.5.6.8 Building shall be supplied with continuous (24hour) running potable cold water to the pantryand wash rooms.

Please confirm the requirement ofsupplying potable cold water to the washrooms.

Provision for potablewater shall be made.

Page-187

72Vol—4

Chapter-8A

Clause-8.5.6.11.3 Lighting Equipment: LED TypePlease confirm whether for outdoor

areas LED type lighting fixtures to beconsidered.

confirmedPage-189

73Vol—4

Chapter-8B

,1 GTP- Traction Transformer The percentage impedance ismentioned as 13.8% in the GTP whereasin the specification it is mentioned as12.5%. Please confirm the requirement.

Kindly Refer AddendumNo.-3Page-4 Percentage Impedance

74Vol—4

Chapter-8B

,1 GTP - Traction Transformer Please confirm that whether wehave to quote Losses at 95deg C or at 75deg C as per IEC. Generally it is to bequoted as per IEC. Please confirm.

Pl follow tendercondition.Page-4 Transformer No Load & Copper Loss

75Vol—4

Chapter-8B,

2 GTP - Auxiliary Main Transformer

Please note that as per GTPtransformer primary neutral BIL is notsame as that of HV, OLTC is used at theHV neutral side. Pl follow tender

condition.Page-6 OLTC

We understand that BIL of OLTC shall besame as that of transformer primaryneutral.Kindly confirm.

76Vol—4

Chapter-8B,

3

GTP - Auxiliary Transformer

Please note that as per Rating ofAuxiliary transformer is mentioned as200kVA in the heading. It seems astypographical error as Auxiliarytransformer rating is 100kVA. Pleaseconfirm.

Kindly Refer AddendumNo.-3Page-10

Page 21: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 21

77Vol—4

Chapter-8B,

7 GTP-132kV Current Transformer - CTC

There are CTs on both sides ofbuscupler as per SLD, DMRC has givenGTP of one CT only. Please provide GTPof both CTs of Bus coupler as applicationof both CTs are different (one is used forprotection and other for metering)

Both CT are samehaving two protection core.

Page-10

78Vol—4

Chapter-8B,

10

GTP - 132kV Voltage Transformer

Capacitive type VT is mentioned inthe GTP. However, in GIS it is not possibleto supply capacitive type VT. We proposeinductive type VT instead of CapacitiveVT.

Kindly Refer AddendumNo.-3Page-16

79 Vol--4 General GTP for 132kV LAPlease provide the GTP of 132kV LA

to be used in incomer as well as on HVside of transformer.

Pl follow tender condition.As per clause 2.1.2 &relevant IEC.

80 Vol--4 General Test Sheet Test sheets of equipments are notprovided.

Tests are to beconducted as per latest &relevant IEC.

81Vol—4

Chapter-8A

Clause-2.1.6.4-I

GIS supplier should have minimumexperience of 05 years for manufacturing ofsimilar GIS substations. The type of GIS offeredshould have been in satisfactory operation forat least three years. Contractor should submitperformance certificate from the employer

We understand that the type of GISoffered should have been in satisfactoryoperation for at least 3 years in MetroSystem.

Pl follow tendercondition.

Page-38 Please confirm.

82Vol—4

Chapter-8A

Clause-2.1.6.4-II The 33kV equipment shall be built accordingto the SF6 gas insulation

We understand that 33 kV GIS shallbe built according to SF6 gas insulationtechnology. All active parts including thebusbars shall be completely encapsulatedin SF6 gas.

Pl follows tenderconditions. Hybrid systemwill not be acceptable.

Page-38 technology.

The hybrid solutions wherein the busbarsare partly insulated through SF6 gas andpartly through other means, shall not beacceptable.

Page 22: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 22

Please confirm.

83Vol—4

Chapter-8A

Clause-2.1.6.4-IV

In the event of arcing in a compartment,the arc should not extend to the neighboringcompartment/panel. Any failure to theenclosure of the compartment shall not lead todamages in the neighboring compartments.

We understand that arcing in onephase should not get extended to theother phases for the purpose of highreliability and minimizing the damages.

Pl follows tenderconditions.

Page-38 Please confirm.

84Vol—4

Chapter-8A

Clause-2.1.6.7.2 Busbar connection and their supports shall bean approved type, designed to withstand allnormal and abnormal conditions arising in theSystem. They shall be capable of carrying thecurrent equivalent to the breaking capacity ofthe switchgear for 3 seconds.

We understand that earth bus barshall be rated according to the earth faultcurrent of 33 kV system. Please confirm.

Pl follows tenderconditions.

Page-40

85Vol—4

Chapter-8A

Clause-2.1.6.9.5 Where interlocking over a distance is requiredtwo independent criteria shall be used, e.g.absence of voltage and remote feeding circuitbreaker open. Indication of the remotecondition shall be by single purpose circuit, carebeing taken that conductors used areadequately screened and shielded to minimizeboth transverse and longitudinal voltages

We understand that the interlockingrequirements defined under clause2.1.6.21 do not require laying of aseparate screened cable to achieveinterlocking over a distance. Pleaseconfirm that our understanding is correct. Pl follows tender

conditions.Page-41

If not, please clarify that for whichinterlocking requirement this screenedcable has to be provided through out thecorridor.

86 Vol—4Chapter- Clause-2.1.6.11 All earth bars and terminals including those in

the switchboard and inside the ASS shall beIt is not usual to use tinned copper

for these application, we request you toPl follows tender

conditions.

Page 23: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 23

8APage-42

tinned copper. allow to use bare copper.

87Vol—4

Chapter-8A

Clause-2.1.11.10 Technical Specification - 25kV GIS:The systems with 27.5 kV system

voltage do not have a requirement of 52kV rated voltage, we request you to dropthis requirement. System voltage , powerfrequency withstand voltage andlightning impulse withstand voltage areadequate to define the requirements forSwitchgear .

Pl follows tenderconditions.

Page-75 Rated Voltage - 52kV

88Vol—4

Chapter-8B

GTP 30.25kV CTIn GIS CTs are located outside

enclosure and not at HV potential, thesevalues are not applicable.

Kindly Refer AddendumNo.-3

Page-34 Rated Impulse withstand(1.2/50 microsecond):250 kVP

CT shall be designed as per IEC 61869-1 /-2 suitable for 25kV GIS. Kindly confirm.

Rated Power frequency withstand voltage: 95kVrms

Insulation withstand Voltage (Permanent): 29kV

89Vol—4

Chapter-8B

GTP As per GTP:13 ,33kV Cables, Page 19-, cablesare unarmoured.

Please confirm if cables arearmoured or unarmoured. Armoured..

13. 33kV Cables Chapter-8A, Clause-4.3.13, Page-147, Cables arearmoured

Page-19

90Vol—4

Chapter-8B

GTP As per GTP:14 ,25kV Cables, Page 20-, cablesare unarmoured.

Please confirm if cables arearmoured or unarmoured. Armoured..

14. 25kV Cables Chapter-8A, Clause-4.4.5.3.9, Page-158, Cablesare armoured

Page-20

Page 24: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 24

91 Vol--4 General General Please provide specifications of3.3kV cables.

Kindly Refer AddendumNo.-3

92 Vol--4 General PV Formula Please provide if the price variationformula applicable for EHV/ MV Cables.

Pl follows tenderconditions

93 Vol--4 General Test Sheet Please provide test sheets shall forall equipments

Tests are to beconducted as per latest &relevant IEC.

94 Vol--4

Table – A Sr. No. 4 –Please confirm Cubicle if both Main

& Standby to be considered or only mainto be considered.

Only for mainSpare Part List SAS Cubicle for Incomer, Outgoing Trafo & Bus

Coupler BayPg 40/51

95 Vol--4

Table – A Sr. no 9 –Please clarify spare IED for which

bay to consider. For incomer bay.Spare Part List IED

Pg 40/51

96 Vol- -4Chapter-6 Clause:3.5.3.3.1

Communication Interface

Scope of communicationinfrastructure to Shastri Park and MetroBhawan is not clear. As per ourunderstanding same shall be provided byTelecom Contractor at both RSS. Pleaseclarify

Two OCC namely Ist atDepot, greater Noida and2nd at RSS sector-153. Plrefer addendum-3

The Substation Automation System shallhave the capability to support simultaneouscommunications with multiple independentremote master stations,

The Substation Automation System shall havecommunication ports as follows

a) Two ports for simultaneous reporting to twomasters, Operation Control Centre

Page 25: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 25

(OCC) at Shastri Park/Metro Bhawan, Ph-IIOCC/Metro Bhawan, Ph-III OCC.b) One spare port for connecting to a thirdmaster if required in future

97 Vol- -4Clause 3.2.6.3.3

Track FeederProtection

Each track feeder circuit-breaker is actuated by:

Please confirm that all Track(outgoing) Feeders of the TSS to beoffered shall have 87L Protection (7SD85)and NOT 21 as also stated in the spec.(additional/optional).

Since It is elevatedcorridor- Minimumimpedance protection,(fn21) required.

- Minimum impedance protection,(fn 21)

Please confirm that the Minimumimpedance protection and the overcurrent protection can be provided by thesame relay.

Main protection shouldbe separate from back up

- Over current protection (fn 50-51).- F87: Differential Current Protection for TSSfeeder CB’s which are directly connected toswitching posts in underground section. Allother necessary provisions, space, CT cores,wiring etc. to be provided by the RSScontractor. Relay shall be provided by Tractioncontractor.

98 Vol- -4Clause 30Current

Transformers

Secondary Core, CT between Transformer and25kV Busbar (TcTx) Core 1, 1600-800/1,cl PS

d) Core 1 (first): “cl PS” is not a validclass according to IEC. It should be PR orPX or PXR. Please clarify.

PS class.

99 Vol- -4 Clause 32 Resistance of Primary winding Resistance of Primary winding: what

Page 26: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 26

VoltageTransformers Not less than 27 000 ohms at 10°C*

does this requirement mean? Therelevant IEC do not include suchrequirement. Please clarify.

Kindly Refer AddendumNo.-3

100 Vol- -4 Clause 2.1.11.10 3) Rated Voltage Please confirm rated voltage can be27.5kV as per Railway Standard EN 50163

Pl follows tenderconditions

101 Vol- -4 Clause2.1.11.6.11

The gas barrier insulation betweencompartment shall withstand 1.5 timesmaximum

Please advise what vacuum on theother side means. The swgr will never bein a vacuum environment

Pl follows tender conditions

rated pressure on one side and vacuum on theother side.

102 Vol-5 - - Please provide a location map/Layoutfor RSS.

Kindly Refer AddendumNo.-3

103 Vol-7 Statement B31,Cost center C Spares as per Annexure A & B

We are not able to locate Annexure A &B.

It is Table A and B.It is named Table A and B.Kindly Clarify.

104 Vol--7

Table – A Sr. No – 2

Please confirm the rating.10/15MVA.

Kindly Refer Addendum No.-3Spare Part List AMT Rating is mentioned as 30/45MVA.

Pg 40/51

Page 27: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 27

S.No.

Volume,Section

Page No.,Clause No.

Relevant Abstract from Tender Query DMRC Reply

A. COMMERCIAL

105Vol-1 &

Vol-2 NIT& ITT

Cl. No. 1.1.4.1 (II)(b)Cl. No. A 3.4Page No. 8 &Page No. 22

A tenderer shall submit only one bid in the sametendering process......A tenderer who submits orparticipates in, more thanone bid will cause all of the proposals in whichthe tenderer has participated to be disqualified.No tenderer can be a subcontractor whilesubmitting a bid individually or as a partner of aJV in the same bidding process. A tenderer, ifacting in the capacity of subcontractor in anybid, may participate in more than one bid, butonly in that capacity.

We would like to request you to kindlyconfirm that vendors proposed byBidders shall not be treated as "sub-contractor". Though the above statementis written under ITT Cl. No. A3.4, Page 8,however as per Cl. No. 1.5 Prority ofdocuments, Page 11 of 66, GCC, Vol-2,NIT supercedes ITT and hence we requestyou to reconfirm that "vendors proposedby Bidders shall not be treated as sub-contractor".

Tender Condition are selfexplanatory. No Change in

Tender Condition.

106 Vol-1 ITT

Cl. No. A 1.5Page No. 19

Final location...Fees deposited by the contractorto Government Agencies for obtainingpermission for laying of EHV cables shallbe reimbursed by DMRC on submission ofdocumentary evidence of payment. Only roadrestoration charges paid by the contractor tothe civic agencies will be reimbursed by DMRCon submission of documentary evidence ofpayment.

We would like to bring to your kind noticethat there are some typographical errorsin the referred clause. We request you tokindly correct the same as follows,Fees deposited by the contractor toGovernment Agencies for obtainingpermission for laying of EHV cables shallbe reimbursed by DMRC on submission ofdocumentary evidence of payment.Onlyand road restoration charges paid bythe contractor to the civic agencies willalso be reimbursed by DMRC onsubmission of documentary evidence ofpayment.

Tender Condition are selfexplanatory. No Change in

Tender Condition.

Page 28: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 28

107 Vol-1 ITT

Cl. No. A 1.5Page No. 19

Final location...Fees deposited by the contractorto Government Agencies for obtainingpermission for laying of EHV cables shallbereimbursed by DMRC on submission ofdocumentary evidence of payment. Only roadrestoration charges paid by the contractor tothe civic agencies will be reimbursed by DMRCon submission of documentary evidence ofpayment.

We would like to bring to your kind noticethat the time duration taken forreimbursement is not specified. Werequest you to kindly stipulate the timeduration taken for reimbursement ofroad restoration/ right of way charges orkindly confirm that it shall be reimbursedwithin 3 weeks from the date ofsubmission of documentary evidence ofpayment.

No Change in TenderCondition.

108 Vol-1 ITT

Cl. No. A 1.5Page No. 19

Final location...Fees deposited by the contractorto Government Agencies for obtainingpermission for laying of EHV cables shallbe reimbursed by DMRC on submission ofdocumentary evidence of payment. Only roadrestoration charges paid by the contractor tothe civic agencies will be reimbursed by DMRCon submission of documentary evidence ofpayment.

Please confirm that the price quoted bythe bidder will be excluding the followingROW (Right of Way) charges and shall notbe considered for price bid evaluation,

i) The fees deposited by contractor togovernment agencies for obtainingpermission for laying of EHV cables.

ii) Road restoration charges paid by thecontractor to the civic agencies

The same will be paid to the bidder byDMRC extra at actuals againstdocumentary evidence over and abovethe contract price.

Tender Condition are selfexplanatory. No Change in

Tender Condition.

Page 29: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 29

109 Vol-2 GCC& SCC

Page No. 49 of66,Page No. 18 of28 Cl.No. 11.2 (GCC),Cl. No. 24 of SCC

All payments made by the Employer pursuant tothe terms of the Contract shall be in thecurrency or currencies specified in the Contract.Wherever any sum in a foreign currency has tobe converted into Indian Rupees for anypurpose, the exchange rate to be employed forsuch conversion shall be the selling rate ofexchange at the close of business of the StateBank of India 28 days before the latest date ofsubmission of Tenders.

We would like to bring to your kind noticethat there is a contradiction in the paraunder reference. ie., in the first it is saidthat "All payments made by the Employerpursuant to the terms of the Contractshall be in the currency or currenciesspecified in the Contract". However in thesubsequent sentence it is said that "Foreign currency shall be convertedIndian Rupees, at the exchange rate ofselling rate of State Banl of India 28 daysprior to date of submission of Tender".Please note that in case exchange rate forthe purpose of payment of foreigncurrency is considered at the exchangerate prior to bid submission, then it willdefeat the purpose of quoting in foreigncurrency (for imported items).We request you to kindly confirm that forthe purpose of bid evaluation Foreigncurrency portion shall be converted toINR at the selling rate of exchange at theclose of business of the State Bank ofIndia 28 days before the latest date ofsubmission of tender. However for thepurpose of payment of Foreign currencyportion to the Contractor, exchange rateshall be considered at selling rate of StateBank of India as on the date of payment.Kindly confirm.

Tender Condition are selfexplanatory. No Change in

Tender Condition.

Page 30: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 30

110 Vol-2 SCC

Page 17 of 28 Cl.No. 24.C

The contract price shall not be adjusted to takeinto account anychange in taxes, duties, levies or introduction ofany new tax, dutyor levy till the completion date including thedate of extended periodof contract.

We have noted that the statutoryvariation in taxes and duties is not to theaccount of Employer. We would like tobring to your kind notice that changes intaxes & duties are happening almostevery year, also it is likely that GST(Goods Service Tax) may be introducedany time soon. It is very difficult topredict the changes in statutory variationin taxes & duties. We also would like tobring to your notice that in all theprevious projects Phase- 1, 2 & 3 tenders,changes in statutory variation was to theaccount of Employer only.In view of the above explanation, werequest you to kindly accept that "anychanges in taxes & duties during projectduration shall be to the account ofDMRC."

No Change in TenderCondition.

111 Vol-2 GCC

Page No. 41 of66 Cl.

No. 8.5

Time is the essence of the contract.....Theaforesaid liquidated damages do not, however,include the sums payable by the Employer toDesignated Contractors on account of delaycaused by the Contractor to DesignatedContractors which sums shall be recoverablefrom the Contractor in addition to anyliquidated damages payable under this clause,the total ceiling limit of which is 15% of thecontract value including liquidated damageslevied under the provision of Appendix 1 to theForm of Tender.

LD shall be the sole remedy and themaximum ceiling stipulated ie., 15% ofContract Value is too high. We requestyou to kindly modify the same to ceilingmaximum of 10% of undelivered portionof Contract Value.

No Change in TenderCondition.

Page 31: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 31

112Vol-1 FOTAppendix -

1

Page No. 89 Cl.No. (iv)

0.5% of Contract value per week of delay. We request you to kindly modfiy theclause as follows, "liquidated damageshall be levied at 0.5% of the undeliveredportion milestone value per one weekdelay with an upper limit of 10% of theundelivered portion contract value.

No Change in TenderCondition.

113 Vol-1 ITT

Page No. 20 Cl.No. A1.6

The Contractor shall be required to interfaceclosely with Delhi Transco Limited(if required),Municipal Corporations, NOIDA Authorities,UPCCL, Traction Contractor, other Contractors &DDCs of DMRC, DMRC and adjacent civilauthorities

We request you to please clarify theabbreviation of UPCCL.

Uttar Pradesh PowerCorporation limited.

114 Vol-2 SCC

Page 24 of 40Clause No. 25

(GCC Sub Clause11.1.3)

Prices quoted by the tenderer shall be fixedthroughout theTenderers performance of the contract and notsubject to variationof any account except where specificallymentioned in the contract..

Cl. No. G, Vol-7, Page 4 of 47, PV is applicableonly for Traction & Auxiliary Main Transformers.

In view of volatility in raw material pricesand the long project duration of 24months, we request you to kindlyconsider IEEMA/LME Price Variationclause for the following major equipmentwith the base date as on one month priorto date of bid submission.(i) 132KV cable, 33KV cable(ii) 33KV & 25 kV Switchgear &transformer

Kindly accept and confirm.

No Change in TenderCondition.

115 Vol-2Schedule-9

Page No. 1 to 5 Schedule-9 Guarantee for Safe Custody We would like to bring to your kind noticethat in Sch-9, Guarantee for Safe Custodyis referred to Cl. No. 59 of SCC. Howeverin SCC, Cl. No. 59 is nil "Not used". Hencewe presume Guarantee for Safe Custodyas null & avoid. Please confirm that ourunderstanding is correct.

Confirmed

Page 32: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 32

116 Vol-2Schedule-9

Page No. 2 to 5Cl. No. (B)

Pursuant to the terms of the Contract, theContractor, as a condition precedent to hisentitlement to receive any payment for itemsincluding an element of [Note 4] Contract [ ] tothe Contractor’s premises in Delhi, is obliged toprovide a Guarantee in the terms hereof for 95percent of the Payment.

We would like to bring to your kind noticethat as already Performance Security of10% of Contract Value is stipulated in thetender which is a sufficient deterrent forperformance of the Contractor. Over andabove this the requirement of "SafeCustody Bank Guarantee for 95% of theamount due as per relevant BOQ" adds toheavy financial burden on theContractors. This will make all the Biddersto load high amount of BG charges in theprice bid and will make the whole processof tendering uncompetetive. Hence werequest you to kindly waive therequirement of Safe Custody BankGuarantee.

Confirmed

117 Vol-3Chapter-6

Page G8 1 of 2 All Control & Monitoring Software has to beprovided to the Employer in the followingformatsi) Source Code

The softwares being supplied as part ofSubstation Automation System are notopen source based, they are proprietarysoftwares owned & registered by OEMswith all necessary rights reserved underregistration of Intellectual PropertyRights. Hence the source code can not beshared which may lead to breach ofIntellectual Property Rights. We requestyou to kindly delete the requirement ofsource code.

No Change in TenderCondition.

Page 33: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 33

118 Vol-2 SCC

Page No. 15 of28 Cl.

No. 22Sub Clause 9.1

If some part of work is not completed along withrest of the contract and the Employer agreed forsuch splitting of work in writing, the Taking OverCertificate can be issued for that part of workwhich has been completed and accepted by theEmployer. However such splitting of work...

In case of delay in Taking Over of theProject in full or part by DMRC, due to thereasons not attributable to theContractor, beyond 30 days of noticebeing issued to DMRC by contractor, theproject in full or part will be consideredas "Deemed Taken Over" by DMRC at theend of such period and balance paymentsdue will be released.

The Warranty/DLP period will start fromsuch date of Deemed Take-Over. Pleaseconfirm

. No Change in TenderCondition.

119 Volume 1ITT

Page 32 ClauseNo.

C 2.11

If the employer so decides, he may supply someitems of Pricing Document to the contractor as“Employer supply items” and in such an eventthe Contractor shall not be allowed to claimpayment for such items. The Employer shallnotify a list of such items within three months ofthe placement of the Contract.

As the Contract Package‘NE-02’ is a fixedLump Sum Price Contract, this clause shallnot be applicable.Hence kindly delete this clause.

No Change in TenderCondition.

Page 34: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 34

120

Volume 3& Volume7 Chapter-2&Vendorapproval

procedure

Page G8 5 of 12& Page 47 of 47

2nd para &Clause No. 2

Volume - 3: The Contractor should ensure thatthe equipments/systems proposed forelevated/at-grade/ underground sections shallbe, as far as possible, similar to the onesapproved for Phase-I/ Phase-II/Phase-III lines. Incase this is not possible, the proposedequipment /system should have been usedatleast 5 years on any metro.Volume - 7:Proposed Systems/ sub-systems shall have beenin use and have established their satisfactoryperformance and reliability on at least Twomass rapid transit systems (including Railwayor Airports) in revenue service over a period ofthree years or more either outside the countryof origin at an average in two different countriesor in DMRC.

The requirement of Proven Design ofSystems & Sub-systems are contradictoryin both the Volumes as shown. Kindlycheck.The criteria stipulated under Cl. No.2 of Vol-7, Vendor Approval Procedure ishighly restrictive and is against the spiritof tendering process. The tender beingfloated under International CompetetiveBidding (ICB), DMRC should encourage toallow more number of OEMs toparticipate, thereby creating idealsituation for competetive bidding. In viewof the explanation given above werequest you to kindly modify the clauseas follows."The System, including all Sub-systems and Equipment shall be ofproven design practice. Sub-systems andEquipment of similar design philosophyshall have been in use and haveestablished their performance reliabilityon at least one Mass Rapid Transit Systemor Suburban Railway System or anyPower Utilities Project in RevenueService over a period of at least twoyears."

No Change in TenderCondition.

121 Vol-4Chapter-5

Page No. 9 Cl.No. 3

Schedule of Access Dates Kindly furnish the Schedule of AccessDates for each section or confirm whenthe access for each section shall be givento Contractor.

Land is already available

122Vol-7

Statement-C

Page no. 12 of47 KM: 0 & KM:

30

Brief description of key dares for sections Kindly clarify what is the meaning of KM:0 - Noida Sec-71 & KM: 30 - GreaterNoida Depot?

KM:0 stand for Chainage Zeroand KM:30 chainage 30

Page 35: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 35

123 Volume 2GCC

Page 42 of 66Clause No. 9.2

The Engineer may, at the sole discretion of theEmployer issue a Taking Over Certificate for anypart of the Permanent Works by following theprocedure stipulated in Clause 9.1 above if:.(a) the Employer uses that part of the Worksfor revenue service before the Taking OverCertificate is issued for the entire work.(b) the balance part is not completed not due tothe fault of the contractor and contractual dateof completion for the completed part is over.

Kindly confirm that the issue of a TakingOver Certificate for the part of the Worksshall not be withheld if the Employer isnot in a position to use that part of theWorks for revenue service due to thereason which are not attributable to theContractor

No Change in TenderCondition.

124 Volume 2GCC

Page 59 of 66Clause No. 14.8

……. The total liability of the Contractor to theEmployer under the Contract shall not exceedthe Contract Price.

Kindly reduce the Limitation of Liabilityfrom 100% of the Contract Amount to10%.

No Change in TenderCondition.

125

Volume -4PS,

Chpater-8B,

TechnicalSheets

Page 34 Cl. No.30, 32 & 33

Rated lightning-peak withstand voltage - 250 kV We would like to bring to your kind noticethat there data sheets furnished for only25KV CT, VT & Lightning Arrester. Kindlywe request you to furnish the data sheetfor 25KV circuit breaker.

Also please note that only one OEMsatisfies the requirement of 250kVImpulse Withstand Voltage (BIL) levelwhich is the requirement of this tenderalso.

We request you to relax the ImpulseWithstand Voltage (BIL) level to 200kV asthis requirement shall be met by a No. ofSuppliers. This shall help in reducing theoverall bid price and shall help in bringingall the competitors to a level playing

Kindly Refer AddendumNo.-3

Page 36: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 36

ground.

126Volume 7

PricingDocument

Page 3 of 47Clause No. C.3

The price shall not be unbalanced therefore, theprice quoted for S1 & S2 in the Cost Center-C(Installation and Site Testing) and Cost Center-E(System Acceptance Tests, Integrated Testingand Commissioning) shall not be less than 15%and 10% of the price quoted in the Cost Center-B (Manufacture and Delivery).

We would like to bring to your kindattention that the minimum % indicatedby you are too high for Cost Center -C &E.Kindly reduce the minimum %indicated, with which the prices for CostCenters C & E to be quoted to avoid theunbalanced bid, as given below.CostCenter - C (Installation and Site Testing) -10% of the price quoted in the CostCenter - B (Manufacture and Delivery)&Cost Center - E (System AcceptanceTests, Integrated Testing andCommissioning) - 3% of the price quotedin the Cost Center - B (Manufacture andDelivery)

No Change in TenderCondition.

Page 37: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 37

127Vol-1 SCC,Schedule-

10

Page 1 to 3 Comprehensive Maintenance Contract We would like to bring to your kind noticethat Sch-10, CAM referes Cl. No. 61 ofSCC, however there is no such clause inSCC. Hence we presume that Sch-10 asnull & void. Kindly confirm whether ourunderstaning is correct.

Kindly Refer AddendumNo.-3

128 Volume 2SCC

Page 17 of 28Clause 24 D (b)

b) UP VAT return forms of the contractor forthe relevant period/periods along with detailedstatement in applicable form & copy of allChallans of UP VAT in regard to deposit of tax.

We have various project in Uttar PradeshState and projects wise UPVATregistration no is not applicable.Therefore, we have single UP VATregistration no. Accordingly, the UP VATform (as stated in sub-clause b of Clause3.6. Para 2) will contain theturnover/details for all the projects of UPState. Therefore, this sub-clause may bedeleted.

No Change in TenderCondition.

129Vol-7

'StatementD

Page 24 of 47'Note

Corridr S2 - Sector-153 Noida RSS We presume that the Payment for allEHV, HV & LV cables will be made againstthe Quantity supplied on per km basis.Please confirm not on quantity laid.Please note that laid quantities of cableshall not be equal to the quantity laidbecause of wastage during jointing,undulation in the land profile, etc.

No Change in TenderCondition.

130 Volume 2GCC

Page No. 39 of66 Cl.

NO. 8.4.2

Extension of time for completion of works Contractor shall be compensated for anyprice escalation during extension/delayperiod for the reasons not attributable toContractor.

No Change in TenderCondition.

131 Genral-- Please clarify whether the equipment

under this project can be shipped on HighSea Sales basis?

No Change in TenderCondition.

Page 38: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 38

132 Genral

UPVAT/Central Sales Tax on the completefinished trains as well as complete finishedequipments manufactured locally.

Please clarify whether DMRC shall issue'C' form for obtaining Consessional SalesTax for inter-state transaction on sale intransit basis.

No Change in TenderCondition.

C- form will Not be issued byDMRC

133 Vol-4Chapter-6

Page No. 14 Cl.No. 6.2

MOCK-UP FOR TRAININGThe Contractor shall install mock-up equipmentfor system and any such facility(s) considerednecessary for the training of Employer’s staff inthe training school and if equipment is differentfromthe ones already in use on DMRC Phase I &Phase-II lines.

We request you to kindly specify the listof mock-up equipment to be supplied &installed, in order to bring all the biddersat par.

No Change in TenderCondition.

134 Vol-3Chapter-6

Page GS 2 of 15 Equipment issued by the Employer shall not besubject to TypeTests or First Article Inspectionhowever the Contractor shallundertakeInspection as referenced in clause 7.1 above.Shouldthe Employer’s issued equipment besubsequently incorporatedinto anothermanufactured item then the whole item shallbesubject to both Type Tests and First ArticleInspection.

Kindly confirm that repetition of typetests & short circuit tests will not berequired in those cases where theContractor can produce certifiedevidence that the required type tests&short circuit tests have been performedsuccessfully on identical equipment orequipment which is, for practical testpurposes, similar. Type test should havebeen obtained/ certified / witnessed fromany of the following test laboratories,1.CPRI, Bangalore2. KEMA, Holland3. EDF,France4. Hydro Qubec, Canada5. CESI,Italy6. IPH, Germany7. CRIEPI, Japan8.STRI, Sweden or any accreditedlaboratoryKindly confirm.

No Change in TenderCondition.

Page 39: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 39

135Vol-4

Chapter-8A

Page No. 131 Cl.No. 4.2.7.14.2.7.1.1 (3)&4.2.15.7

Offers should be supported with type testcertificates from test laboratories of repute, asper IEC/KEMA specifications, failing which theoffers shall be ignored.

We would like to clarify that anyaccredited test laboratory located in anycountry is accredited by LaboratoryAccreditationAuthority of that country which is amember of International LaboratoryAccreditation Cooperation (ILAC), in thatcase any utility should not have anyreservation of nonacceptance of a testreport issued by any accredited testlaboratory but not listed in thespecification. For example India’s NABL ismember of ILAC which has accreditedCPRI. Similarly ACCREDIA, Italy ismember of ILAC which has accreditedCESI, Italy. JAB, Japan is also ILAC memberwhich has accredited CRIEPI, Japan.In view of the explanation given aboveDMRC is requested to accept if Type Test& short circuit test report has beenobtained/ certified / witnessed from anyof the following test laboratories,1. CPRI, Bangalore2. KEMA, Holland3. EDF, France4. Hydro Qubec, Canada5. CESI, Italy6. IPH, Germany7. CRIEPI, Japan8. STRI, Sweden or any InternationalAccredited Laboratory.Kindly accept.

No Change in TenderCondition.

Page 40: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 40

136 Vol-7 CostCenter-F

Page No. 36 of47 Sl.No. 7 to 10

Addition / Deletion of items rate We presume that the unit m / Nos.corresponds to only single phaserequirement. Which means Bidders arerequired to quote for only 1 run of 132KVcable not for 3 phases. Kindly confirm.

Confirmed

137 Vol-2 SCC

Page No. 20 0f28 Cl.No. 35

The quantities of items shown in the Bill ofQuantities areapproximate, and liable to varyduring the actual execution of thework. TheContractor shall be bound to carry out andcomplete the stipulated work irrespective ofvariation in individual items, at the same rate asspecified in the Bill of Quantities subject tovariation in the value of the Contract beinglimited to 25% of the total original/enhancedvalue of the contract.The variations can beimplemented anywhere in the network ofDMRC.

We presume that during implementationin case of any quantity variation itemrates shall be followed as per CostCenter-F Additoin / deletion of items rate.Kindly confirm.

No Change in TenderCondition.

B.ELECTRICAL

138Volume-4 -

Chapter-8A

Page no 13Clause 2.1.1.1.8

Supply, erection, testing and commissioning ofall items of work required to make the HVbays(66kV) fully functional.

We presume that the mentioned abstractto be removed, as the same is notrelevant to NE-02 contract. Kindlyconfirm

Kindly Refer AddendumNo.-3

139Volume-4Chapter-

8A

Page no 18Clause '2.1.5 &2.1.7

33kV/415 V dry type transformerthis specification defines the main technicalcharacteristics required for the 33000/415-240V, 100kVA dry type transformer to used inauxiliary main subsations (AMS) or required.

We would like to bring to your kind noticethat there is discrepancy in the rating ofRSS auxilairy transformer. Kindly clarifythe rating of auxiliary transformer shallbe 100kVA or 200kVA, as the specificationcalls for two different ratings

100KVA, Pl refer addendum-3

Page 41: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 41

140

Volume-4Chapter-

8ATypical

Single LineDiagramfor RSS

cum AMS& TSS

Page no 80Clause 3.2.1.2

A back up high speed full scheme distanceprotection with at least three zones should bepossible to include in order to get faultclearance in case of communication failure,…..

Line distance protection is not shown inTypical SLD for RSS cum AMS & TSS,however as per the high voltageprotection line distance protection ismentioned. Kindly clarify the requirementof protection for line feeders.

Differentialprotection/distance as mainand Over current and earthfault backup protection.

141

TypicalSingle LineDiagramfor RSS

cum AMS& TSS

_ 87* is mentioned in SLD & notes is notclearly mentioned about the "*"reqirement. Kindly clarify

Differential protection.

142Volume-4Chapter-

8A

Page no 8 &125Clause 1.3.2&4.2.4.6

Short circuit current - 22kA for 1secthe metallicsheath shall be able to carry a short circuitcurrent of 31kA for 132 cables for 3sec.

We would like to bring to your kind noticethat there is discrepancy in the shortcircuit rating of 132KV system. Kindlyclarify whether the short circuit currentrating for 132kV system shall be 22kA for1 sec or 31.5kA for 3sec.?

(i).Kindly refer addendum-3(ii) for cable sheath. Pleasefollow tender condition.

143Volume-4Chapter-

8A

Page no 175Clause 6.1.4

All metering data inclusive of above parametersshall be transmitted/communicated to SAS inRSS and also to SCADA in OCC through OFCmedium for trends and reports.

We presume that the OFC cableconnecting between RSS and OCC is notin our scope of supply. Kindly confirm

Please follow TenderConditions as per Vol-4 clause3.2 table 4.2 Sl No.-14

144Volume-4'Chapter-

8A

Page no 190Clause 8.5.6.11.4

they shall be of sealed wall mounted type, withfour poles plus central ground rated for 16A and500V AC…..

We presume the supply for power supplyshall be 415V AC supply. Kindly confirm

Please follow tender condition

145Volume-4Chapter-

8B

Page no 17Clause 12.1 &12.6

cable size(minimum) 630sqmmnumber and cross sectional area of conductor1Cx800sqmm

We would like to bring to your kind noticethat there is discrepancy in the size of132KV cable. Kindly clarify whether thecable size shall be 630sqmm or800sqmm?

Kindly Refer AddendumNo.-3

Page 42: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 42

146Volume-4'Chapter-

8B

Page no 19Clause 13

- Kindly provide us the datasheet for 33kV,3Cx95sqmm cable. Kindly Refer Addendum

No.-3

147

Volume-4'Chapter-

8AChapter-

8B

'Page no 30 &21 Clause2.1.5.1.1916

i)their insulation level shall be suitable as perprimary voltage of transformer.ii) Rated insulation voltage 108kV

we presume that the insulation levelvoltage for primary neutral isolator shallbe 132kV. Kindly confirm Kindly Refer Addendum

No.-3

148Volume-4Chapter-

8A

Page no 122Clause 4.2.2.1

Multiple runs of cables to be provided as percurrent carrying capacity.

kindly furnish criteria for sizing the EHVcable.

Bidder has to design as percurrent carrying capacityconsidering all deratingfactors.

149Volume-4'Chapter-

8A

Page no 180Clause 8.5.1

the control room building shall be multistoriedwith the provision of one number six passengerlift and…..

Kindly furnish the detailed specificationfor lift. Kindly Refer Addendum

No.-3

150 General

-- Solar system / module on RSS Kindly clarify whether Contractor isrequired to provide Solar System /modules in order to meet Green Buildingstatus for Receiving Substation building. Ifyes, kindly provide the detailedspecification for the same and specify therating (Wp) to be considered, in order tobring all bidders at par.

Solar system to be providedby DMRC.

151 General

-- Gas flooding system at AMS (i) We request you to kindly clarify,whether Gas flooding system shall be of"Firetrace type" i.e., Linear Heat SensingTube (LHST), for ACDB, DCDB, auxiliarytransformer at Auxiliary mainsubstations?(ii) Please provide the specification forthe gas flooding system?

Please follow tender condition

Page 43: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 43

152 General

-- EOT crane capacity Kindly stipulate the minimum capacity ofElectric Overhead Travelling (EOT) craneto be cosnidered for GIS installation,maintenance purposes.

Minimum 5T EOT crane withVVVF drive

C. CIVIL & STRUCTURAL

153

Volume-3 -General

Specifications 'Chapter

15 - Siteestablishme

nt &Attendance

'Page no 3/5Clause '15.6.7

The Contractor will be required to providesuitable accommodation for Employer’srepresentative in Contractor’s site office/worksite.

We propose to provide Pota-Cabin Officefor the area as required.

No Change in TenderCondition.

154

Volume-4 -Particular

Specifications

Page no 129Clause '4.2.6.2.1

CasesThe EHV Cables between the Power SupplyAuthorities Substation and the DMRC RSS shallbe laid in ground depending upon the siteconditions of the selected route, any of thefollowing paying conditions, may be adoptedCase 1 & Case 1A – Not Used.Case 2 – Direct buried, with the cables (3) ofeach circuit laid in trefoil formation and side byside in one trench.Case 3 – Laid in underground duct.Case 4 – Laid in Trench less piping.Case 5 – Laid in abutment crossingCase 6 – Laid in Rail Track crossingCase 7 – Laid in Air, supported on piers/walls, fornallah-crossing

As per the descriptions of the clauses, thecable laying has to be done as per therespective clauses and conforming toattached tender drawings. However,tender drawings pertaining to the variouscases of cable laying were not attachedwith the tender documents. We requestyou to kindly furnish the same in order toestimate the quantities involved in theworks.

Site for RSS and GSS isavailable, bidder has to visitthe site and ascertain thequantity.

Page 44: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 44

155

Volume-4 -Particular

Specifications 'Chapter- 4 - Cabling

Page no 130Clause 4.2.6.2.5

On all abutment crossing or in air, supported onpiers/walls, for nallah crossing and at otherspecific locations, cable laying shall be on thegalvanized steel structures which can withstandwind velocity of 160kmph, supported on piersand have sufficient structural strength. Theminimum average weight of zinc coating shouldbe 1000g/m2 (RDSO). The cables should be wellprotected by providing GI sheet of thickness8mm at-least fastened with nuts and bolts & tagwelded on all sides to be protected from anypilferages. The arrangement shall render cableabsolutely safe from any natural calamity. Thecable shall not be exposed or get affected due tostray fire caused in the vicinity. In case of nallahcrossing or crossing of water body, the erectedstructure shall not obstruct the water flow.Theattention of bidder is specifically invited to thenallah crossing near Sector 82.

Kindly confirm whether the galvanisedsteel structure provided fot cablesuppports needs to be provided with amaintance walkway. If yes, kindly indicatethe width and height of maintanancewalkway to be provided.

Also, we fell that there is a typographicalerror in the specifications regarding thethickness of GI Sheer and that it should beread as 0.8mm instead of 8mm. Pleaseclarify.

Kindly Refer AddendumNo.-3

156

Volume-4 -Particular

Specifications 'Chapter

- 8 -Technical

descriptionSection 8 -Civil Works

Page no 179Clause 8.1

The plot area for construction of RSS shall beapprox 2000Sqm.

Kindly indicate the size of the plot (Lengthx Breadth) along with the plot plan withrespect to the approach road, inorder tocheck feasibility of setting up thesubstation and to estimate the quantitiesinvolved in the same.

Plot size is 80 mtr x 50 mtrbut RSS to be constructed in2000sqm.

Page 45: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 45

157

Volume-4 -Particular

Specifications 'Chapter

- 8 -Technical

descriptionSection 8 -Civil Works

Page no 179Clause 8.1

All necessary steps shall have to be taken by thecontractor and requirements fulfilled so as toobtain the Green building Certification (IGBCcertification with Super platinum rating) for RSSbuilding.

We wish to inform that it may not bepossible to conform to cerain rating pointsdefined by IGBC such as use of recycledmaterials, Site selection criteria, Day-lighting and natural ventillation criterea,etc as the RSS building has to conform tothe various Electrical and Functionalrequirements. Can the certification levelbe at "Certified" category instead of"Super Platinum"" category which will bemore appropriate for industrial buildings.

Please follow tendercondition

158

Volume-4 -Particular

Specifications Chapter -

8 -Technical

descriptionSection 8 -Civil Works

Page no 180Clause 8.5.1

The RSS Contractor will have to submit theGeneral Layout of the Control Room Building toaccommodate all equipments required forcompletion of RSS work in such a way that totalarea of layout is not more than 2000sqm.Thecontrol room building shall be multistoried withthe provision of one number six passenger liftand emergency staircase.

Kindly confirm whether the contractor isfree to decide the layout of the buildingsubject to his optimisation or whethersome minimum requirements have to beadhered to regarding the space andpositions of respective rooms.If yes, kindly indicate the same.

Layout may be optimisedsubject to meet allstatutaory and CEA rulesand regulations.

159

Volume-4 -Particular

Specifications Chapter -

8 -Technical

descriptionSection 8 -Civil Works

Page no 182Clause 8.5.6.1

The cable cellar is to be provided for GIS Building We propose to position the cable cellar inthe ground floor such that the GIS shall belocated on the first storey. Kindly confirm.

This is a design & BuiltContract.

Page 46: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 46

160

Volume-4 -Particular

Specifications

Page no 182Clause 8.5.6.3

Internal doors shall be Three hours fire rated. As per the practice followed by most stateand central utilities, we propose to providedoors with 2 hours fire rating instead of 3hours fire rating. Please confirm.

Kindly Refer AddendumNo.-3

161

Volume-4 -Particular

Specifications Chapter -

8 -Technical

descriptionAnnex 1 -

Civil Works

Page no 4 Clause3.2.1

The cement used shall be of the following types:(a) 43 grade Ordinary Portland Cementconforming to IS:8112- For Plaster/Mortar(b) 53 grade Ordinary Portland Cementconforming to IS:12269- For Concreting work

We propose to use PPC (PortlandPuzzolanic cement) also in order toconform to Indian Green Building Council(IGBC) standards. Please confirm.

No Change in TenderCondition.

Query

No.

VolumeSection

Clause , PageNo. Brief Description of Clause/ para No. Query Raise DMRC Reply

162 Vol – I NIT 1.1.3 Source ofFunds Page 2

Source of Funds: Memorandum ofUnderstanding has been signed between NoidaMetro Rail Corporation (NMRC) and Delhi MetroRail Corporation (DMRC) for execution of theMetro work of Noida- Greater Noida corridor,with execution being done by DMRC. Funds shallbe provided accordingly. This is a NON-JICAfunded contract.

Kindly provide the status of fund alloted.

.

On behalf of NMRC, DMRCshall be handling thecontract and shall bereleasing the payment asper contract.

163Kindly provide the status of LandAcquisition for two RSS at Sector-83 andSector 153

Already available.

Page 47: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 47

164 Vol - I NIT

1.1.4.2MinimumEligibility CriteriaPage 9

If the bidder is a JV/Consortium and has aforeign partner and above work(s) have beendone by the foreign partner of JV and suchwork(s) were done in the country of the foreignpartner then in addition to this, the foreignpartner must have done at least one work ofvalue Rs. 40.00 crores or more of similar nature(i.e. any Electrical engineering work ofinfrastructure related project) outside thecountry of origin of the foreign partner.

If the bidder in JV is a foreign partner thenthe experience of similar works shall besufficient and therefore request you tokindly allow the foreign partner to havesimilar work in their own country itself.

No Change in TenderCondition.

165 Vol - I NIT

1.1.4.2MinimumEligibility CriteriaPage 10

In case the work(s) listed under A(i),(ii) or (iii) donot include Laying testing & commissioning of atleast a kilometer of HT cable (132KV or above)works, then the tenderer or any of itsconstituent member in case of JV/ consortiumshould have executed any other work of laying,Testing and Commissioning of HT cable laying (132 KV or above) works of at least one kilometerlength.

Request to kindly allow sub-contractor forHT Cable Laying as in previous tenders ofDMRC also, Specialized sub-contractorhaving experience in Cable Laying wasallowed.

No Change in TenderCondition.

166 Vol - 2 SCC

Clause 25SubClause11.1.1Page 17 of 28

C) Change in Taxes/Duty :The contract price shall not be adjusted to takeinto account anychange in taxes, duties, levies or introduction ofany new tax, dutyor levy till the completion date including thedate of extended period of contract.

As GST is expected to be implemented incoming future and may impact drasticallyon our overall quoted prices. Request youto kindly allow change in law clause as itmay impact heavily.

No Change in TenderCondition.

Page 48: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 48

167 Vol - 2 SCC

Clause 25SubClause11.1.3 Page17 of 28

Price VariationPrices quoted by the tenderer shall be fixedthroughout theTenderers performance of the contract and notsubject to variationof any account except where specificallymentioned in the contract conditions along withthe price variations formula to be madeapplicable.

Request you to kindly allow price Variationclause since the project duration is 24months and Copper/ Aluminium/Steelprices may vary drastically resulting intohufe impact financially. Also, major itemsbeing of Copper kindly allow PV.

No Change in TenderCondition.

168 Vol - 2 SCC

Clause 26SubClause11.2.1 Page 18of 28

Mobilisation AdvanceMobilisation advance shall be equal to 10% ofthe contract value.The advance shall be paid in two instalments of5% each.

We hope that the Mobilization Advancepayed will be interest free. Kindly confirm.

No Change in TenderCondition.

169 Vol-7 BOQ Notes Page 24of 47

**Note:-. Bidder has to quote the price of EHVcable for 3km (six run of 500m each length). Thepayment for EHV cable shall be made on thebasis of prorate as on actually laid.

Kindly clarify the note. We believe thatpayment against EHV cables will be paid asper supply and not as per laying.

As per actually laid only.

S.No.

Volume,Section

Clause No. PageNo. Short Description as per Tender Document Queries by Firms Reply By DMRC

170 General Please provide Rout plan for EHV cables It is design & build contract

171 General Please provide Plot plan for proposed RSS. Kindly Refer AddendumNo.-3

Page 49: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 49

172 vol-1 NIT 1.1.4.1 (II) (a)

A non-Indian firm is permitted to tender only ina joint venture or consortium arrangement withany other Indian firm having minimumparticipation interest of 26% or their whollyowned Indian subsidiary registered in Indiaunder Companies Act 1956 with minimum 26%participation

We as an indian company is interested inbidding for the project in a JV/Consortiumwith our parent foreign company. It maybe noted that our parent company is acompany incorporated under the laws ofSpain and Indian subsidiary is a dulyincorporated entity in India. Further,Parent company holds 51% of theshareholding in Indian subsidiary. Theminimum participation of each party in theJV/consortium shall be 26%. Kindly clarify,that Parent company can bid for theproject in a JV/consortium arrangementwith indian subsidiary under the terms ofparagraph 1.1.4.1 of the NIT.”

Tender Condition are selfexplanatory. No Change in

Tender Condition

173 Vol. IISCC Clause No. 59 Not Used

As clause no 59 of SCC is indicated as "Notused", we understand that Safe custodyguaranty is not required. Please confirm

Confirmed

174 Vol. 7 Clause G

Prices quoted by the tenderer shall be fixedthroughout the Tenderer’s performance ofthe contract and not subject to variation on anyaccount except Traction and AuxiliaryTransformers.

As per vol. 7 PV is applicable forTransformers only. Since the rate of thecables are varying very rapidly, it isrequsted to allow PV for Cable also.

No Change in TenderCondition

175 Vol. 7 Clause G …….benchmark of 180 days or on as actualdate whichever is less. It is requested to allow PV at actual.

No Change in TenderCondition

176 Vol. 7 Annexure B It is requested to provide latest IEEMA forPV

Please Follow tenderconditions

Page 50: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 50

Sr.No.

Section,Volume

Clause No. /BOQ Sr. No.

,Page No.Description Query Clarification

177 Vol-1 __ Construction of contract.

Kindly confirm that the Contract to beentered into will be treated as a divisibleDesign, Civil, Supply, Erection & AMCContract.

No Change in TenderCondition

178 Vol-1 E4 Page No.

Evaluation of Tenders : Only Technical Tendersand alternative Technical Tenders read out attender opening shall be considered forevaluation. No tender shall be rejected at theopening of Technical Tenders except for latetenders, in accordance with Clause D2.

Kindly confirm that the alternativetechnical bids are also invited.

No Change in TenderCondition

179 Vol-2 8.5 Page No. 41Liquidated Damages for Delay : The liquidateddamages are recovered by the Employer fromthe Contractor for delay and not as penalty.

Kindly provide penalty clause.

Tender Condition are selfexplanatory. No Change in

Tender Condition

Page 51: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 51

180 Vol-2 8.5 Page No. 41

Liquidated Damages for Delay : The aforesaidliquidated damages do not, however, includethe sums payable by the Employer to DesignatedContractors on account of delay caused by theContractor to DesignatedContractors whichsums shall be recoverable from the Contractor inddition to any liquidated damages payableunder this clause, the total ceiling limit of whichis 15% of the contract value including liquidateddamages levied under the provision of Appendix1 to the Form of Tender.

Sums recoverable from the Contractor onaccount of delay; payable by the Employerto Designated Contractors is an openclause / without any ceiling limit.Werequest that the LD ceiling limit to be 5%of contract value only; which shall beinclusive of any sums payable by theEmployer to Designated Contractors onaccount of delay and penalty.

Tender Condition are selfexplanatory. No Change in

Tender Condition

181 Vol-2 1 Page No.105 Contract document : Order of precedence. Kindly provide order of precedence of thecontract documents. Pl refer clause 1.5 GCC

182 Vol-2 C Page No. 91 Change in Taxes/Duty

We request to accept that the contractprice shall be adjusted to take into accountany change in taxes, duties, levies orintroduction of any new tax, duty or levytill the completion date including the dateof extended period of contract.

Bid being lump sum kindly clarify whetherGST shall be adjusted accordingly incontract price.

No Change in TenderCondition

183 Vol-2 25 - 11.1.3 PageNo. 91 Price variation

Requesting to accept price variation as perIEEMA applicable from the date of awardof contract.

No Change in TenderCondition

184 Vol-2 17.9 Page No.67 Arbitration

We request that the arbitration to beconducted by three arbitrators; one eachnominated by the contractor and theemployer and the third to be appointed by

No Change in TenderCondition

.

Page 52: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 52

both the arbitrators. Please confirm.

185 Vol-2 7 Page No.124 Contractor's warranty

We understand that the warranty periodshall be 24 months from the last date oftaking over of section of work for all theequipment / machinery / materials.

Tender Condition are selfexplanatory. No Change in

Tender Condition

186 Vol-2 7 Page No.124 Contractor's warrantyKindly confirm '' section of work ''. Pleaseprovide appendix to for of tender as asection as mentioned in 1.1.6.6 pg. No. 12.

Please follow tendercondition.

187 Vol-4 2 Page No.21 Supply, Installation, Testing and Commissioningof lighting masts and lightening protection masts

As per chapter 8A, clause 5. EARTHING,clause 5.1.6.5, The entire Substation shallbe protected against lightning by providingeither earth screen conductors on towerpeaks, or by means of Lightning Protectionmasts suitably spaced to cover the entirearea. Please confirm whether both need tobe considered or any one.

Only lightning Mast withspikes

188 Vol-4 2.1 Page No.22 Broad item works in RSS

Please confirm whether seperate room isrequire for RSS, AMS and TSS or it willacoomodate in the same RSS room of GISbuilding.

Design and build contract.

189 Vol-4 2.2 Page No.22

In general the RSS Contractor is responsible forall works within the RSS premises and its relatedEHV cabling work from Grid Substation (GSS) toDMRC RSS, except for the items of work, whichare specifically excluded from the RSSContractor’s Scope and which would be carriedout by other Agencies.

We have considered length mentioned inthe Table-1 under clause 4 cabling system.Any changes in length during executionshall be paid accordingly by DMRC.

Please follow tendercondition.

190 Vol-4 2.2.1 PageNo.22 Civil Work Kindly provide soil testing reports. Design and build contract.

Page 53: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 53

191 Vol-4 2.1.1.1.8 PageNo.108

Supply, erection, testing and commissioning ofall items of work required to make the HV bays(66 kV) fully functional.

As per SLD and scope of work, there is no66kV system. Kindly confirm.

confirmed. Kindly ReferAddendum No.-3

192 Vol-4 2.1.1.1.1 PageNo.107 Current Transformer – 1 No. Kindly confirm whether three phase CT is

to be considered or 3 nos single phase CT.

132KV GIS is 3-phase (RYB),CT to be provided

indivisualy for each phase.

193 Vol-4 2.1.5.1.10 PageNo.118 Transformer losses.- Capitalized cost. Requesting to provide maximum losses for

all transformers.Please follow tender

condition.

194 Vol-4 3.2, 3.2.1.1 PageNo.174

Differential Protection OR Line DistanceProtection for 132KV cables as per requiredlength of cable suitable for relay technicalparameter.

Requesting to provide the length.Differential protection withdistance protection featurein same relay

195 Vol-4 2.1.6.1 PageNo.132

1 Auxiliary circuit breaker for RSS locatedin/near depot.

Not mentioned in the SLD provided. Pleaseconfirm / provide.

Kindly Refer AddendumNo.-3

196 Vol-4 2.1.8.2 PageNo.145

Distribution of the low voltage circuits shall beprovided with three specific cabinets, one forthe half sub-station one, the other for the halfsub-station two, each supplied by thecorresponding auxiliary transformer. These bothcabinets are respectively called LVSB1 (AuxiliaryBoard 1) and LVSB2 (Auxiliary Board 2). The thirdone shall be dedicated to the coupling and tothe supply of the rectifier two.

Please provide SLD with Legend for 3 nosLVSB Design and build contract.

197 Vol-4 2.1.9.7 PageNo.155 110V DC distribution board Please provide SLD with Legend for DCDB Design and build contract.

198 Vol-4 2 Page No.22 One set of UPS for the emergency or controlpower supply. Kindly provide Main UPS capacity . Design and build contract.

Page 54: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 54

199 Vol-4 4 Page No.215

Cabling, HV Cables from the TRANSCOSubstations to the RSS Contractor will providethese cables and terminate them at theIndoor/outdoor cable end boxes with bushingsto be provided by the RSS Contractor, at the RSS.

Cable termination only in RSS side shall bein RSS contractor scope. Other side(Transco substauion side) shall be inTRANSCO scope. Please confirm.

Both side in scope of NE02contractor

200 Vol-4 4 Page No.215

This specification defines the objectives,guidelines and requirements for Supply, laying,testing and commissioning of High VoltageCables 132 kV from the Grid Substations (GSS) ofPower Supply Authorities (PSA) to the ReceivingSubstations (RSS) of DMRC, or for use at anyother locations as required.

We have considered length mentioned inthe Table-1 under clause 4 cabling system.Any changes in length during executionshall be in DMRC's account.

Please follow tendercondition.

201 Vol-42, 2.2.1, 4 &

4.2.6.2.1 PageNo.

In clause no 2.2.1 CIVIL WORKS, it is mentioned"design and construction of the AMS and controlroom building complete in all respects and cablepaths and cable trenches in the Switchyard, aswell as inside the AMS room and control room."In cl no 4.2.6.2.2, it is mentioend, "The EHV

Cables between the Power Supply AuthoritiesSubstation and the DMRC RSS shall be laid inground depending upon the site conditions ofthe selected route, any of the following payingconditions,"

Please confirm scope of cable trenchbetween Power supply authoritiessubstation and DMRC RSS.

Please follow tendercondition.

202 Vol-5 __ Single Line diagramOnly Typical SLD has been given. Pleaseclarify whether same need to beconsidered for both sector 83 & 153

SLD wise both RSS same.

Page 55: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 55

203 Vol-5 __ Drawing / Layout

Please provide Layout for individualsubstation.Plan or contour diagram of substation.Please provide GIS building drawing.Kindly confirm that the euipment capacityshall be considered as per Chapter 8B.Please confirm whether PLCC is require ornot.Please provide SCADA architecture for RSS.

Design and build contract.

204 Vol-7 3 Page No.4

The price shall not be unbalanced therefore, theprice quoted for S1 & S2 in the Cost Center-C(Installation and Site Testing) and Cost Center-E(System Acceptance Tests, Integrated Testingand Commissioning) shall not be less than 15%and 10% of the price quoted in the Cost Center-B (Manufacture and Delivery).

We request that the price quote in S1 & S2in the Cost Center-C (Installation and SiteTesting) and Cost Center-E (SystemAcceptance Tests, Integrated Testing andCommissioning) to be based on thebidders price analysis and experience andshall not be subject to the percentagesmentioned in the clause with respect toCost Center-B (Manufacture and Delivery).However; the bidder shall ensure that theprice quoted are not unbalanced. Kindlyconfirm.

Please follow tendercondition.

Page 56: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 56

205 Vol-7 4 Page No.4

The payment in S1 & S2 for cost Center-B(Manufacture and Delivery) shall be given 75%on delivery subjected to submission of followingdocuments in support of dispatch of material,15% after completion of cost center C andremaining 10% as after completion of milestonemention under cost center-E (Systemacceptance, test, Integrated testing andCommissioning)i) Certificate of Type test,ii)Provision of Indemnity bonds as per clause no.46of SCC.iii) Certificate of factory acceptancetestiv) Proof of Insurancev) Technical literature,installation manual and Equipment manualsvi)Packing list

Requesting to provide terms of paymentfor all cost centers.As per clause 4payment term for Cost Center-B is 75%against delivery. The clause is silent onremaining 25%.

Please follow tendercondition.

206 Vol-7 4 Page No.4 Retention. Kindlly confirm that there shall be noretention from our RA bills.

Please follow tendercondition.

207 Vol-2 24 A) PageNo.90 Service Tax As per this clause service tax is exempted

for this project, Please Confirm.Please follow tender

condition.208 - - List of approved makes Please provide list of approved makes. At vendor approval stage

209 - - Annual Maintanance ContractPlease confirm that after completion of 3years of AMC the bidder may or may notaccept the AMC for another 5 years.

It is complusory toundertake AMC for 5 years

by the contractor.

210 - - Extension of Bid Submission dateThis being design built job we request for45 days extension from the date odsubmission 07.07.2015.

Please follow tendercondition.

S.No.

Section,Volume

Page No, ClauseNo.

Existing Clause Clarification/ Confirmation required DMRC reply

I. COMMERCIAL AND CONTRACTUAL CLARIFICATION

Page 57: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 57

211 Vol-1

Pg-32 Cl. No.:C2.7

Unless Stated otherwise ……………………………………………………………….by the Tenderer.

We would like to inform you that Tenderspecifications does not clarify the type ofContract(s) to be awarded to successfulbidder i.e. Divisible or Indivisible.

We request you to please clarify thenumber of contractors to be made for thispackage.

In addition to above, in case of divisiblecontract (if applicable), please clarify howmany (with scope limits) contracts shall beawarded.

Above is important for overall Taxstructuring according to type of contract.

Further please note that in case of SingleContract, WCT may be applicable on entirevalue of the Contract instead of only onthe Service portion.

We understand that in case of applicablityof WCT (in case of Single Contract), sameshall be reimbursed by DMRC at actuals.Please confirm/clarify our understanding.

No Change in TenderCondition.

212 ITT Vol-1

Pg-33 Cl. No.:2.13

If the same …………………………………….. May be forefitted.

Considering different site conditions, theunit rates for same equipment/ materialmay vary.

We request DMRC to kindly consider thedifferent unit rates as quoted by biddersfor different sites and modify the existing

No Change in TenderCondition.

Page 58: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 58

clause accordingly.

213 ITT Vol-1

Pg-33 Cl. No.:2.13

If the same …………………………………….. May be forefitted.

We understand that said clause is notapplicable for Civil works, Cable Layingworks and Erection activities as the unitrate of individual/ Lot items may bedifferent due different site conditions.

We request DMRC to amend the same inTender Specifications.

No Change in TenderCondition.

214 GCC Vol-2

Pg- 8 of 66Cl. No.: 1.1.3.1& Cl. No.:1.1.3.4/

Commencement Date

Effective Date

We understand that effective (Zero) dateof Contract shall be date of handing overof encumbrance free land by DMRC withfulfillment of Employer's obligations. Werequest you to please confirm the same.

No Change in TenderCondition.

215 GCC Vol-2

Pg- 13 of 66Cl. No. 2.4

Assignment by the Employer This is sub-Clause to “Clause 2 Employer”,which provides the Employer’s obligationsin general. We assume that the Contractorwill be intimated of any action as per thisSub-Clause. Please confirm ourunderstanding.

No Change in TenderCondition.

216 GCC Vol-2

Pg- 14 of 66Cl. No. 3.4

Engineer’s Instructions Any instructions given by the Engineer,Engineer's Representative of theDelegated Assistant shall be in writingonly.We request you to kindly accept thesame.

No Change in TenderCondition.

Page 59: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 59

217 GCC Vol-2

Pg 17 of 66 Cl.No.4.4(b)

….If any act or omission of the Contractorwhether directly or …………………additionalpayment.

Request you to please amend to the effectthat Liquidated damages, if they becomedue, shall be the only liability of theContractor.

No Change in TenderCondition.

218 GCC Vol-2

Pg 34 of 66Cl. No.: 7.5

The Employer/ Engineer may instruct thecontractor for any additional test, at employer'scost.

Please confirm that necessary timeextension for completion of job shall begranted by DMRC in case any special testto be conducted by Contractor onEmployer's instruction.

No Change in TenderCondition.

219 GCC Vol-2

Pg. 35 of 66 Cl.No. 7.6

Notwithstanding any previous Test orcertification, ……………..………... or otherwise.

We understand that a reasoning shall begiven by Engineer for the instructions tothe Contractor as mentioned.

We request you to please confirm ourunderstanding.

No Change in TenderConditions.

220 GCC Vol-2Pg. 39 of 66Cl. No. 8.4.1.Para 2. (c.)

inclement weather conditions We request you to kindly delete the saidclause and included the same under"Force Majeure" conditions.

No Change in TenderConditions.

221 GCC Vol-2

Pg. 39 of 66 Cl.No.: 8.5

Appendix to the Form of Tender shall include inrespect of the Works and in respect of any Stage,a percentage of the total contract value whichwill be recoverable from the Contractor asliquidated damages for delay in completion ofthe Works or in achievement of a stage by aparticular Key Date.

We would like to inform you that, TheForm of Tender Appendix I does not definethe limit of Liquidated Damages. Requestyou to please specify the same.

Please also specify the Liquidateddamages to be levied in case of failure tomeet Key Dates.

No Change in TenderConditions.

222 GCC Vol-2

Pg. 39 of 66 Cl.No.: 8.5

...the total ceiling limit of which is 15% of thecontract value including liquidated damageslevied under the provision of Appendix 1 to theForm of Tender.

The upper limit of Liquidated damegesshall be 10% of the contract value.Requestto please accept our request in line withearlier DMRC tenders.

No Change in TenderConditions.

Page 60: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 60

223GCC&

SCC Vol-2

Pg. 42 of 66Cl. No.: 9.1 &15 of 28 Cl. No.:22

Taking Over Certificate As per said clause, we understand thatTaking over Certificate shall be issued oncompletion of various sections of the jobs.In present case, we understand thatTaking Over Certificate of each Substationand each Cable section shall be issuedseparately. Please confirm ourunderstanding.

No Change in TenderConditions.

224 GCC Vol-2

Pg. 43 of 66 Cl.No. 10.4

.... If the Contractor fails to remedy the defect ordamage by such date and the necessity for suchwork is due to a cause stated in Sub-Clause10.2(a), (b) or (c), the Employer may (at his solediscretion) …..

We request you to kindly include "exerciseeither" at the end of the sentence.

No Change in TenderConditions.

225 GCC Vol-2

Pg. 45 of 66 Cl.No. 11.1.4

Change in Taxes/Duty We wish to bring to the kind attention ofDMRC that as per the standard practicefollowed by all major utilities in India &worldwide statutory variation inTaxes/Duties/ Levies, imposition of newtaxes and duties during the agreed projectschedule for all in-house and Bought-outitems and services are paid as per actuals.

Also, any statutory variation during thedelayed period is in Customer’s account, incase the delay is for the reasons notattributable to contractor.

Further, there are also chances that duringthe execution of the project new tax isimplemented by Government authorities(like GST) on self-manufactured items /bought out goods (domestic or imported &services) which may lead to imposition of

No Change in TenderConditions.

Page 61: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 61

a different tax structure which cannot beenvisaged/considered in the bid attendering stage.

In view of the above we request DMRC tokindly amendment this clause by allowingpayment of statutory Taxes & Duties asapplicable at the time ofdespatch/services. This would enable thebidder to consider the taxes & dutiesaccordingly.

226 GCC andof SCC Vol-2

Pg. 45 of 66 andPg 17,18 of 28Cl. No. 11.2.1and SubCl.11.2.1 /SubCl.11.2.5

As advance of 10% payable in 2 tranches of 5%each recoverable from monthly IPC payments inaccordance with 11.24 of GCC.

We understand that the penal interest willbe payable only if the Contractor is notentitled to received EOT in respect ofdelays beyond his control. Please confirmour understanding

No Change in TenderConditions.

227 GCC Vol-2Pg. 46 of 66 Cl.No. 11.2.5

Interest in case of delay in repayment ofadvances

We request you to kindly delete the saidclause.

No Change in TenderConditions.

228 GCC Vol-2

Pg. 51 of 66 Cl.No. 11.20

… may be deducted by the Employer frommonies due to the Contractor under theContract (including, without limitation,liquidated damages) and the Employer shallhave the power to recover any balance not sodeducted from monies due to the Contractorunder any other contract between the Employerand the Contractor.

We would like to inform you that,Payments under other contracts shouldnot be held back for defaults under thisContract.

Request Please exclude the line "due tothe Contractor under any other contractbetween the Employer and theContractor."

No Change in TenderConditions.

Page 62: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 62

229 GCC Vol-2

Pg. 55 of 66 Cl.No. 13.2.2

.... the Employer may upon giving 14 days noticeto the Contractor,....

We request you to kindly amend the saidclause as follows :

..... the Employer may upon giving thirty(30) days notice to the Contractor,....

No Change in TenderConditions.

230 GCC Vol-2

Pg. 51 of 66 Cl.No. 15.5

............... In such cases the premium paid by theemployer plus overheads (equal to 50% of thepremium paid) shall be recoverable from thecontractor by the employer, ....The contractorshall not dispute the amount of premium paid bythe employer or the overhead charges thereon.

We request you to please modify thiscluase as under: ............... In such casesthe premium paid by the employer plusoverheads (equal to 50% of the premiumpaid) shall be recoverable from thecontractor by the employer, ....Thecontractor shall not dispute the amount ofpremium paid by the employer or theoverhead charges thereon.

No Change in TenderConditions.

231 GCC& SCC Vol-2

Pg. 21of 28 Cl.No. 36 & Sub-Clause 13.3.4

Payment on termination due to force majeure:For the ease of determination of the cost to bepaid to the Contractor, a lump sum paymentequal to 2% (two percent) of the value of thework remaining incomplete on the date ofTermination notice taking effect shall be paid inplace of payments as per subclause 13.3.4 ( c),(d) & ( e).

We understand that there is atypographical error and below clauses ( c),(d) & ( e) should be (a), (b), (c).Pleaseconfirm.

Kindly Refer AddendumNo.-3

232 SCC Vol-2

Pg. 8 of 28 Cl.No. 10

(Sub-Clause 4.11).......... The Contractor shall indemnify theEmployer in respect of all claims, demands,proceedings, damages, costs, charges andexpenses whatsoever arising out of or in relationto any such matters.

We request you to kindly delete the saidclause.

No Change in TenderConditions.

233 SCC Vol-2

15 of 32 Cl. No.:23

Defect liability period Defect liability period shall start within 30days from the date of readiness ofSubstations for charging in case chargingof Substation is delayed due to reasonsnot attributable to Contractor.

No Change in TenderConditions.

Page 63: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 63

234 SCC Vol-2Pg. 21 of 28 Cl.No. 29

(Sub-Clause 11.2.5)Interest in case of delay in repayment ofadvances

We request you to kindly delete the saidclause.

No Change in TenderConditions.

235 SCC Vol-2

Pg. 24 of 28 Cl.No. 44

Additional Clause Spares (a) Supply of spareparts for ten (10) years

Firm prices for spares shall be provided fora period of 3 years. However, supply ofspares beyond 3 years shall be at newrates to be informed by the Contractor ondemand by DMRC.

No Change in TenderConditions.

236 SCC Vol-2Pg. 26 of 28 Cl.No. 49

Additional Clause Technology Transfer Please confirm that Transfer of Technologyshall be limited to Training, O&M Manualsand As Built Drawings.

No Change in TenderConditions.

237 Vol-7

Pg 4 of 47 Cl.No. G

Price Variation:-Prices quoted by the tenderer shall be fixedthroughout the Tenderer’s performance of thecontract and not subject to variation on anyaccount except Traction and AuxiliaryTransformers.

As you aware that commodity prices inpresent market are highly volatile, hencewe request you to accept variable pricesfor EHV Cable and Civil works along withother Equipment’s/ Material and Serviceswithout any ceiling.

Further we would like to inform you that,in previous tenders floated by DMRC, PriceVariation clause was applicable for EHVCable and Civil Works.

IEEMA formula for Price variation may beused for the applicability of the same.Request you to kindly accept the same.

No Change in TenderConditions.

238 Vol-7

Pg 4 of 47 Cl.No. G

Price Variation:- We understand that base date for Pricevariation formulae shall be the date onemonth prior to opening of technical b id.Please confirm.

No Change in TenderConditions.

Page 64: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 64

239 Vol-7

Bill of Material From the Schedule of prices provided inVolume-7, it is observed that there is nobreakup for the taxes and duties to beconsidered by bidder for this package. Werequest you to kindly furnish the same.

No Change in TenderConditions.

240Form-C We understand that Form-C shall not be

provided by DMRC for this contract.No Change in TenderConditions.

241

AMC We would like to inform you that, in thetender specifications there is nomanpower details given for Operation &Maintenance of the substation.

We would request you to furnish thefollowing Manpower Details:1. Number of Man power required.2. Profile of the manpower to be deputed.3. Minimum Experience for manpower tobe considered.

We would like to inform you that theabove requirements are mandatory to befurnished by client during bidding stage forproper financial evaluation of the bid andbringing all the bidders at par.

Please refer addendum No3(Details of AMC given inannxure- 2 of clause 9 chp8A,PS)

II. TECHNICAL CLARIFICATIONSII.A CLARIFICATIONS SPECIFIC FOR 132 KV GIS

Page 65: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 65

242 Vol-4Chapter-8A

Cl. No.2.1.1.1.1

Voltage Transformer with motor operatedisolation device of rated insulation

We would like to inform you that,proposed VT shall have manual operateddisconnecting link. We presume thepurpose of the isolation is to do powerfrequency test and HV DC test to locatethe cables fault without dismantling VTfrom GIS. Hence for this purpose motoroperated isolation device is not requiredfor VT and we do not have such design inour GIS. Request you to please accept thesame.

No Change in TenderConditions.

243 Vol-4Chapter-8A

Cl. No.2.1.1.1.30

In case of any internal arc fault – regardlesswhether it occurs in a bus bar section, a busbarisolator or the circuit breaker-repair worksshould be possible without shutting down thesubstation; at least one busbar and theundisturbed feeder should remain in operation.

It should be possible to remove and replace afully assembled circuit breaker withoutinterfering the operation of the adjacent feeder.

We like to inform you that as we offerthree phase encapsulated design, activepart of CB can be remove, repair andreplace. In standard practice, there is noneed of removing the fully assembledbreaker.

Request you to please accept the same.

Pl follow tender condition

244 Vol-4Chapter-8A

Cl. No..2.1.1.1.33

The Conventional Local Control Cubicles shall beintegrated with the GIS.

As per chapter-2, scope- pg 5, “The BCUsshall be provided on the 132 kV bays andhoused in the indoor cubicles in thecontrol room besides/ along with relaypanels.”

We understand that BCU is mounted onRelay panel and we are providingconventional; LCC without any BCU andprotection relays. Request you to pleaseconfirm our understanding.

Pl follow tender condition

Page 66: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 66

245 Vol-4Chapter-8B

Cl. No. 4 Rated operating cycle – O-CO-CO We would like to infomr you that, Ratedoperating cycle shall be O-0.3s-CO-3min-CO. Request you to please accept thesame.

Confirmed

Page 67: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 67

246 Vol-4Chapter-8B

Cl. No. 6, 7, 8, 9 Secondary cores (CTIM-X)Core 3 - 1000-500/1A 50 VA, 5P20Core 4 - 1000-500-25-100/1A , CL 0.2, 15 VACore 5 - 1000-500-25-100/1A , CL 0.2, 15 VA

Secondary cores (CTC)Core 1 - 1000-500/1A 50 VA, 5P20Secondary cores (CTATP-X)Core 3 - 400-200/1A 50 VA, 5P20

Secondary cores (CTTTP-X)Core 3 - 400-200/1A 50 VA, 5P20

We would like to inform you that, due tolimited space availability in GIS, it is notfeasible to provide CTs with low currentratio and with high burden. Request you toconfirm the below ratios and amend thesame.

Secondary cores(CTIM-X)Core 3 - 1000-500/1A, 20 VA, 5P20Core 4 - 1000-500/1A , CL 0.2, 15 VACore 5 - 1000-500/1A , CL 0.2, 15 VA

Secondary cores (CTC)Core 1 - 1000-500/1A 20 VA, 5P20

Secondary cores (CTATP-X)Core 3 - 400-200/1A 20 VA, 5P20

Secondary cores (CTTTP-X)Core 3 - 400-200/1A 20 VA, 5P20

Request you to please accept the same.

It is design and buildcontract. Ratio and burdenshall be dealt during GTPapproval.

247 Vol-4Chapter-8B

Cl. No. 10 Type of voltage transformer – capacitive

Rated output at power factor 0,8 lagging – 200VA

We would like to inform you that, theoffered voltage transformer for bus andline bay shall be of inductive type.

Rated output at power factor 0,8 lagging –150 VA/. Request you to please accept thesame.

It is design and buildcontract.Burden shall bedealt during GTP approval.

248 Volume -7

Cl. No. 1 Table-A (Spare PartList)

132 kV Bushing – 1no We would like to inform you that, 132 kVBushing is not applicable as we proposecable termination for all the 132kV GISfeeders. Request you to please confirm.

Pl follow tender condition

Page 68: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 68

249 Volume -7

Cl. No. 15 Table-A (Spare PartList)

Arrester (SVL) – 2 nos We presume that the requirement ofArrester (SVL) – 2 nos in List of Spares isoutdoor type surge arrester. Request youto please confirm our understanding.

Confirmed

250 Volume -5Typical SLD forRSS cum AMScum TSS

Incomer bay module Request you to confirm how many phasesare dummy for future use.

Pl follow tender condition

251 Volume -5Typical SLD forRSS cum AMScum TSS

General We presume that the customer typical SLDis common for both sector-83 & 153 GISpackage.

Confirmed

II.B CLARIFICATION SPECIFIC FOR INDOOR 25 KV & 33 KV GAS INSULATED SWITCHGEAR (GIS)

252 Volume -8A

Pg. 75 Cl. No.2.1.1.1.10 (sec.10)25 KV GIS

Rated Voltage We would like to inform you that, therated operational voltage of the offered25KV GIS shall be upto 27.5 KV which isadequate for specified rated BIL (LightingImpulse withstand voltage) of 200 KVp asper specification Cl. No. 2.1.1.1.10 (7) .Request you to please accept the same.

Pl follow tender condition

253 Volume -8A25 KV GIS Panel rating Request you to Kindly provide the

incomer and outgoing feeder currentrating for 25 KV GIS.

2000A

254 Volume -8ACl. No. 2.2.2.533KV / 25 KV GIS

Panel Gas flooding system We would like to infom you that, Panelgas flooding system shall not be a part of33/25 KV GIS.

Confirmed

255 Volume -8A Cl. No.2.1.6.1433 KV GIS

Cable entry Request you to kindly confirm cable entryis required from bottom or top.

Pl follow tender condition

256 Volume -5

Typical SLD forRSS cum AMScum TSS

Earthing switch We would like to inform you that, In 33KVand 25 kv GIS , the earthing switch is apart of the 3 position switch which isused for earthing as well as disconnecting. The earthing switch is offload type andearthing is done in conjugation with thebreaker . This is a tested and safe proven

Confirmed

Page 69: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 69

method of line earthing since any makeand break occurs in the CB . Request youto please accept the ame.

257 Volume -8A

33 KV GIS Type test reports- 33 KV

We would like to infomr you that, Typereports of 33KV GIS is less than 10 yearsold . However , since there is no change indesign of the switchgear since the typetest all type test reports are still applicablfor the same .

Pl follow tender condition

II.C CLARIFICATION SPECIFIC FOR CRP-SAS

258 Chapter-3,Volume-4

Table 2.2, itemno. 5

Relay required at PSA end will be supplied andinstalled at PSA premises by RSS contractor…..

We understand that only Line differentialrelay will be required at PSA end. Therelay to be mounted in existing panel atPSA GSS. Also, any integration of suppliedrelay with existing SAS at PSA is not inbidder’s scope. Please confirm whetherour understanding is correct.

Confirmed

259 Chapter-3,Volume-4

Table 2.2, itemno. 4

Data exchange between PSA & DMRC - RSS We would like to inform you that, anycommunication medium such as PLCC,FOTE (Fiber optic telecom panel) forinterface with PSA/ OCC etc. is not part ofbidder’s scope. Bidder’s scope is limited toprovision of digital relay andcommunicable FO cable between RSS &PSA. Please confirm whether ourunderstanding is correct.

Pl follow tender condition

Page 70: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 70

260

Chapter-8A,&

Chapter-8B,Volume-4

Cl no. 3.2.3.3 &Sl no. 14, 15, 18

& 19

Restricted Earth fault protection (REF): Highimpedance type

Technical particular of CTATP, PNCT, SNCT, LBCT,CTTTP, transformer Neutral CT

We would like to inform you that, as perspecification, High impedance type REFprotection shall be provided fortransformers whereas the CT ratio andaccuracy class of Phase and neutral CTdoes not match.In such case, we propose to provide lowimpedance type REF protection intransformer feeders. Request you toplease confirm the final requirement.

It is design and buildcontract, shall be dealtduring GTP approval.

261 Chapter-8BVolume-4

Technical particulars of 132kV, 33kV & 25 kV CT& VT

We would like to inform you that, wehave considered the CT/ VT ratio, no. oftaps and accuracy class of all CT/PT as perthe specified Technical Sheets. Pleaseconfirm whether our understanding iscorrect.

It is design and buildcontract, shall be dealtduring GTP approval.

262 Chapter-8B,Volume-4

Sl. No. 7 KeySingle LineDiagram

Ammeter in Bus coupler bayCT of 5P20 & PSclass

We would like to inform you that, as pertypical Single line diagram for 132kVsystem, ammeter shall be provided in Buscoupler bay whereas in technicalparticulars of CCB (Coupling CircuitBreaker), measurement core is notspecified. In case measurement is donethrough protection core, the accuracy willbe less. Please clarify.

It is design and buildcontract, shall be dealtduring GTP approval.

II.C OTHER TECHNICAL CLARIFICATION

Page 71: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 71

263 Chapter-2Volume-4

Pg 3. Cl. No. 1.1 For complete appreciation of the Scope, theSpecifications, and Bill of Quantities along withtheir Explanatory notes, Drawings and otherrelevant paragraphs of the Tender documentsshall be referred to.

We would like to inform you that, the Billof Quantities along with along with theirExplanatory notes, Drawings is not foundattached along with bid documents.

Request you to please furnish the detailedBill of quantity of RSS and EHV cablingalongwith the explainatory notes for eachline item.

It is design and buildcontract,

264 Chapter-2Volume-4

Pg 4 Cl. No.1.1& Cl. No.2.

For Validation of design of complete system, theContractor shall arrange auditing of design ofworks within the scope of work which primarilycovers Receiving cum Auxiliary cumTraction Substation, 33kV Power Supply systemas per IEC and other relevant Standards fromreputed Independent Agency (Auditor), whohave already undertaken similar job in pastfor other Metro system. The Bidder or its any ofthe partner or the designer shall not be partof this independent agency.Any suggestions / improvements / Corrections inthe design works suggested by theIndependent Agency are to be carried out by thecontractor at no extra cost………

We would like to inform you that, thepresent tender scope of 132/33/25kV GISof RSS pertains to typical switchyardscope and based on our long standingexperience in AIS/GIS turnkey substationprojects right from 11kV to 800kV level forvarious industry/utility/infrastructurecustomers. Hence we do not foresee anyvalue addition in having an additionalindependent design validation by thirdparty.

Request to please accept our request inline with earlier similar DMRC tenders.

No Change in TenderConditions.

265 Chapter-2Volume-4

Pg 4 Cl. No.2 Any suggestions / improvements / Corrections inthe design works suggested by the IndependentAgency are to be carried out by the contractor atno extra cost………

In case there is a third part validation, weunderstand that suchsuggestions/improvements shall be withinthe tender specificationrequirement/framework. Anynew/additional requirement notenvisaged in original specification shall bedealt separately. Please confirm ourunderstanding.

No Change in TenderConditions.

Page 72: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 72

266 Chapter-2Volume-4

Pg 4 Cl. No.2 The building shall have all the amenities andfeatures to be at least similar to the RSS buildingbuilt in Phase I & II of DMRC.

Request you to Please furnish the RSSbuilding layout for Noida Sector-83/153 orelse of similar RSS building of DMRC ph-I/II showing the internal distribution ofrooms/offices, etc.

It is design and buildcontract,

267 Chapter-2Volume-4

Pg 10 Cl. No. 2 Two nos. of receiving bays at 132 kV incomingvoltage from the respective utilities (Indoor GIStype)

We understand that 132kV bay formationincluding associated CRP, cabling, cabletermination structure is excluded fromthe scope within the respective Noida Sec-82/148 GSS utility premises of UPPPTCL.Please confirm our understanding.

Pl follow Interfacingchapter-3,vol-4 of tender .

268 Chapter-2Volume-4

Pg 10 Cl. No. 2 Two nos. of receiving bays at 132 kV incomingvoltage from the respective utilities (Indoor GIStype)

Further to above we undersatand that,cable trench within the boundary of theutility is excluded from the scope. Pleaseconfirm our understanding.

No Change in TenderConditions.

269 Chapter-2Volume-4

Pg 4 & 5 Cl. No.2

Two nos. of spare bays for auxiliary maintransformer for future PD requirement

We understand only space provision oftwo nos. transformer bays to beconsidered in 132kV GIS, however, theseshall be un-equipped bays. Please confirmour understanding.

Only space provision to bemade in the layout.

270 Chapter-2Volume-4

Pg 5 Cl. No. 2 33kV AMS & 25kV TSS We understand that no future bayprovision is to be considered for the 25kV& 33kV switchgears. Please confirm ourunderstanding.

Only space provision to bemade in the layout.

271 Chapter-2Volume-4

Pg 5 Cl. No. 2 A wall display unit of adequate size shall beprovided

We understand wall display unit impliesan LVS (one no. per RSS), Request you toplease inform the size of LVS to beconsidered.

Kindly Refer AddendumNo.-3

Page 73: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 73

272 Chapter-2Volume-4

Pg 5 Cl. No. 2&Typical SingleLine Diagram forRSS cum AMS &TSS

25kV TSS (GIS) We would like to inform you that, there isa mismatch in the no. of bays for 25 KVGIS. As per referred specification it isindicated that 25 KV GIS switchgear with(8 nos.) bays, whereas as per Single LineDiagram furnished it is 7 nos.bays for 25KV GIS.

We understand that total bays are 7 nos.i.e. 2 nos. Incomers, 1 Bus-coupler & 4nos. outgoing feeders. Request you toplease confirm the final requirement.

Confirmed

273 Chapter-2Volume-4

Pg 5 Cl. No. 2&Typical SingleLine Diagram forRSS cum AMS &TSS

33kV AMS (GIS) We understand that total 9 nos. bays tobe considered including the 2 nos. sparefeeders.

We understand that the spare feedersshall be of un-cabled type. Please confirmwhether our understanding is correct.

No Change in TenderConditions.

274 Chapter-2Volume-4

Pg 6 Cl. No. 2 Provision of 2 x 100 kVA dry type transformersfor station supply

We understand the 100kV LV stationauxiliary supply transformers are indoortype. Please confirm.

yes

275 Chapter-2Volume-4

Pg 6 Cl. No. 2 Supply, installation & commissioning of 132 kV,25kV, 33kV or 415V cables & control wirings ofsuitable sizes or design for requirements withinthe RSS boundary location if not statedotherwise.

We understand that the Terminal pointfor 33kV outgoing feeder from AMSswitchgear located in RSS building is therespective outgoing breaker terminal atswitchgear end. Further cabling from thisterminal point will be done by AMS bidder(others). However, cable path upto theRSS boundary shall be in bidder’s scope.Please confirm our undertsanding.

Pl follow tender condition

Page 74: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 74

276 Chapter-2Volume-4

Pg 6 Cl. No. 2 Termination kits for 33kV & 25kV outgoingfeeders.

We understand that the 33kV & 25kVcable termination kits for the outgoingfeeders from 33kV & 25kV GIS shall be inother AMS/TSS bidder’s scope for bothpanel end & other end terminations.Please confirm our undertsanding.

Pl follow tender condition

277 Chapter-2

Pg 8 Cl. No. 2 Design, Supply and erection of all 25kV cablesrequired inside the TSS, including those from theTraction transformer to 25kV switchgear

We understand that the Terminal pointfor 25kV outgoing feeder from TSSswitchgear located in RSS building is therespective outgoing breaker terminal atswitchgear end. Further cabling from thisterminal point will be done by TSS bidder(others). Further cabling from thisterminal point will be done by TSS bidder(others). However, cable path upto theRSS boundary shall be in bidder’s scope.Please confirm our undertsanding.

Pl follow tender condition

278 Chapter-2Volume-4

Pg 8 Cl. No.2.2.2.5

Panel gas flooding system Request you to please clarify thisrequirement & furnish the technicalrequirement. Also clarify whether it islimited to 33kV GIS (for AMS).

Pl follow tender condition

279 Chapter-2Volume-4

Pg 11 Cl. 3.2.2 Design Services:- We would like to infomr you that, we arefollowing the rating of 132/33/25kVswitchgear, Traction transformer,Auxiliary main transformer, Stationauxiliary transformer, EHV/MV cable sizes,etc. considered as per the ratingsspecified in DMRC tender document. Anychange in rating at a later stage shall havecost implication and hence not envisagedin scope. Request to please accept.

It is design and buildcontract,

Page 75: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 75

280 Chapter -3Volume-4

Pg 13 Cl. 4 CCTV can also be provided by CCTV contractor inRSS

We understand that CCTV, intercom/EPAXare excluded from bidder’s scope. Pleaseconfirm our understaning.

Pl follow tender condition

281Chapter -3

& Chapter 8A Volume-4

Pg. 15 Cl. 6.1.2,Item no. 3 &Pg. 121 &Cl. 4.2.1.4

Fault Level Reference to the cited clauses weunderstand that 132kV system fault (shortcircuit level) is 31kA for 3 sec. duration.However, the 132kV cable sizing shall bedone for 31kA for 1 sec. duration. Pleaseconfirm our understanding.

31.5KA for 3 sec

282 Chapter -3Volume-4

Pg 16 Cl. 6.1.3 Any ROW & related compensation for132kV EHV cabling from RSS to UPPTCLGSS is excluded from bidder’s scope.

Pl follow tender condition

283 Volume- 5

Typical SingleLine Diagram forRSS cum AMS &TSS

Tender Single Line Diagram We understand that the 132kV, 33kV and25kV end terminals of the transformersshall be directly connected through cableswith cable box arrangement.With this no outdoor AIS type132/33/25kV surge arrestors envisaged inscope.Please confirm whether ourunderstanding is correct.

SLD is indicative.This isdesign & build contract.

284 Chapter 8 AVolume-4

Pg 4 Cl. 1.4.4 CREEPAGE DISTANCE AND CLERANCE Request you to please confirm thefollowing :1. Please confirm whether 25kV/mmcreepage is acceptable in line with earlierDMRC tenders.2. We understand creepage is applicablefor outdoor equipments / bushings only.

Pl follow tender condition

285 Chapter 8 AVolume-4

Pg 13 Cl.2.1.1.1.7

EOT crane with VVVF drive for continuousoperation for GIS equipment handling

We understand EOT crane to be providedfor the 132kV GIS only. No EOT crane isenvisaged for 25kV & 33kV switchgear.Please confirm our understanding.

EOT crane shall be providedfor all GIS equipmentsdepending on the layoutapproved.

Page 76: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 76

286 Chapter 8AVolume-4

Pg 75 Cl.2.1.11.10/, itemno. 7

Rated lightning Impulse withstand voltage of25kV TSS (GIS)

We understand that the rated lightningimpulse withstand voltage for 25kV GIS(for TSS) and its associated componentslike circuit breakers, CT’s, VT’s, etc. shallbe designed for 200kV(p). Please confirmour understanding.

Confirmed

287 Chapter 8 AVolume-4

Pg 75 Cl.2.1.11.10, itemno. 8

Rated short time current of 25kV TSS (GIS) We understand that the rated short timecurrent for 25kV GIS (for TSS) and itsassociated compenents like circuitbreakers, CT’s, etc. shall be designed for16kA. Please confirm.

Confirmed

288 Chapter 8AVolume-4

Pg 93 Cl. 3.4 The panels shall be used for housing thecontrol and protection equipments for 132kVand 25 kV system. The 33kV control andprotection system shall be housed in the localcontrol cubicle of the 33kV Switchgear.

Reference to the cited clause, weunderstand that the control & protectionsystem of 33kV GIS shall be integral to theswitchboard and no separate LCC isenvisaged for 33kV system. Pleaseconfirm whether our understanding iscorrect.

Confirmed

289 Chapter 8AVolume-4

Pg 122/123/127, Cl. 4.2.2.1 /4.2.4.1/4.2.5.6

76/132kV cable data sheet. We understand that the 76/132kV ( E)grade EHV cable (aluminium conductor)shall be sized for 2000Amps currentcapacity in line with 132kV GIS bus rating.Please confirm whether ourunderstanding is correct.

Pl follow tender condition

290 Chapter 8 AVolume-4

Pg 122/123/127, Cl. 4.2.2.1 /4.2.4.1/4.2.5

76/132kV cable data sheet. We would like to inform you that, there isa mismatch in 132kV cable size indicatedin the referred clauses. Request you toplease confirm the size & no. of runs perphase of 132kV cable to be considered bybidder.

It is design & build contract.

Page 77: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 77

291

Chapter 8 B&

Chapter 2Volume-4

Pg 13Cl. 3 &Pg 6 Cl. 2

Technical Sheets (LV Auxiliary Transformers) We understand LV Auxiliary transformerrating is 100kVA, Request you to pleasefurnish datasheet of 100kVA instead of200kVA.

100KVA

292 Chapter 8 BVolume-4

Pg 13 Cl. 13 33kV Cables Technical sheet We understand that the incomer to 33kVAMS switchgear from 132/33kV AuxiliaryMain Transformer shall be fed through19/33kV cable of size 3Cx400sqmm (1 runper feeder) Cu conductor. Please confirmwhether our understanding is correct.

Pl follow tender condition

293 Chapter 8 BVolume-4

Pg 14 Cl. 14 25kV Cables Technical sheet We understand that the incomer to 25kVTSS switchgear from 132/27.5kV TractionTransformer shall be fed through 19/33kVcable of size 1Cx240sqmm (1 run perfeeder) Cu conductor. Please confirmwhether our understanding is correct.Kindly provide the no. of runs along withsize of the cable for 33kV outgoing feederwhich will terminate at 33kV switchgearpanel. So that size of the Indoor cabletrench can be decided.

Pl follow tender condition

294 General

33kV outgoing cables Kindly provide the no. of runs along withsize of the cable for 33kV outgoingfeeders (Supplied by others) which willterminate at 33kV switchgear panel. Sothat size of the Indoor cable trench &provision for same in switchgear can bedecided.

It is design and buildcontract,

295 General

25kV outgoing cables Kindly provide the no. of runs along withsize of the cable for 25kV outgoingfeeders (Supplied by others) which willterminate at 25kV switchgear panel. Sothat size of the Indoor cable trench &

It is design and buildcontract,

Page 78: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 78

provision for same in switchgear can bedecided.

296 General132kV spare cable We understand no spare cable to be

considered for the 132kV cabling betweenRSS and GSS.

It is design and buildcontract,

297 General

132kV cable laying Please furnish the drawing showingtypical cross section of buried cable laying& cable trench crossings to be followedfor EHV cabling within RSS & outside RSS.Also request you to please furnish us thetypical sketch of cable bridge as per DMRCstandards.

It is design and buildcontract,

298 General

33 & 25kV cable laying Please furnish the drawing showingtypical cross section of buried cable layingto be followed for 33kV and 25kV cablingwithin RSS.

It is design and buildcontract,

299 General

Layout drawing of RSS @ Noida Sector 83 &Sector 153

Please furnish the following drawings formaking bid stage estimation of lot items:1. General switchyard layout plan forrespective Noida Sector 83 & Sector 153.2. Elevation & section drawing forrespective Noida Sector 83 & Sector 153RSS.

It is design and buildcontract,

300 General

Plot / site plan of RSS @ Noida Sector 83 &Sector 153

Please furnish the plot/site plan ofrespective Noida Sector 83 & Sector 153of proposed RSS.

Kindly Refer AddendumNo.-3

Page 79: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 79

301 General

EHV cable route plan Request you to please furnish thetentative “Cable Route plan for 132kVcable from existing AIS Substation locatedat Sector-82 to proposed new RSS ofDMRC substation at Sector-83.

It is design and buildcontract,

302 General

EHV cable route plan Request you to Please furnish thetentative “Cable Route plan for 132kVcable from existing GIS Substation locatedat Sector-148 to proposed new RSS ofDMRC substation at Sector-153.

It is design and buildcontract,

303 GeneralControl & Monitoring Block diagram Request you to Please furnish the referred

drawing for the respective RSS.It is design and buildcontract,

304

Foundationfor Cable

TerminationStructure at

PSA End

Item no 1 - Take - off points at PSA substationsfor AIS substations

We envisage that foundation at PSA end(Noida UPPTCL end GSS) for 132kV Cabletermination is not in bidder scope. Pleaseconfirm our understanding.

All requiredstructure,foundations,termination etc to take off 132KVsupply from PSA end isNE02 scope.

305 General

Solar power panel……., solar based lighting We understand that solar power panel,solar based lighting is excluded fromscope as same is not specified in tenderscope. Please confirm our understanding.

Confirmed

306 General25kV & 33kV cable path inside RSS Request you to kindly specify the cable

path or route for 25kV & 33kV ougoingcables in order to estimate Cable trench.

It is design and buildcontract,

307 General

We presume that cutting of trees,dismantling of road, any kind ofdismantling work shall be done by DMRC.Please confirm our understanding.

Pl follow tender condition

308 GeneralWe understand that emergency LV DG setis not required for all the RSS. Please

Pl follow tender condition

Page 80: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 80

confirm our understanding.

309 Vol-1Vol-2

Pg-32Cl. No.:C2.7 & Cl.No.: FPg 44 of 66 Cl.No.: 11

Unless Stated otherwise……………………………………………………………….by theTenderer.Contract Price

In case DMRC awards only one contractfor entire package, WCT may beapplicable on total project value. Weunderstand that WCT shall be reimbursedby DMRC at actuals and also will not beconsidered for bid evaluation. Pleaseconfirm/clarify our understanding.

Pl follow tender condition

310 GCC Vol-2

Pg. 39 of 66 Cl.No.: 8.5

Liquidated Damages for Delay We would like to inform you that as thereare two site included under contract NE-02, we understand that Liquidateddamages shall be separate for both thesites. Please confirm.

Pl follow tender condition

Page 81: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 81

311 Volume -7

Milestone Payment Schedule (MPS) We requesty you to please accept thefollowing Terms of Payment:SUPPLY PART:1. 10 % initial interest free advanceagainst submission of ABG of equivalentamount.2. 80% of Contract value amount alongwith 100% Taxes and duties shall be paidon Pro-rata basis against receipt ofmaterial at site, through confirmedirrevocable sight Letter of Credit (L/C).3. Final 10% payment shall be released onsuccessful commissioning or within 60days from readiness of the work.SERVICE/CIVIL PART :1. 10 % initial interest free advanceagainst submission of ABG of equivalentamount.2.80% of the Contract Price along withService Tax shall be released on proratabasis through Bank Transfer.4. Final 10% payment shall be released onsuccessful commissioning or within 90days of Completion of Erection.

All Payments shall be released withinThirty days(30) days of submission of aninvoice/claim by the bidder.

Pl follow tender condition

Page 82: Contract NE-02: Design, Detail Engineering, Supply, Installation, … · 2015. 7. 3. · Contract NE-02: Design, Detail Engineering, Supply, Installation, Testing and Commissioning,

Page | 82

312 Chapter-2Volume-4

Pg 11 Cl. 3.2.2 Type test requirement of Traction Transformer Request you to please confirm if thebidder has short circuit test report of21.6/30.24MVA, 132/27KV Tractiontransformer, which is as per RDSOapproved design, the same report may beconsidered for 21.6/30 MVA Tractiontransformer which is the requirement forthis package.

Pl follow tender condition

313

Typical SLD forRSS CUM AMS &TSS 33kV surge arrester

Refer to tender SLD surge arresters arenot shown both for incomer & outgoingfeeders in 33kV GIS. Please review &confirm the exact requirement.

Pl follow tender condition

314 Vol-4,chapter-3

Item no.1 ofTable 2.2, Take off points at PSA Substation We understand that both substations at

PSA end are AIS type. Please confirm

AIS

315 Cl C 18.1 page 24 of ITT

Any deviation in bid security with regard toamount, validity and format shall be considered as

material deviation and bid shall be dealtaccordingly. No clarification shall be sought from

the bidders regarding bid security

Please confirm the BG with addition ofbank NWC clause shall also be applicableto DMRC as it was accepted in previousDMRC tenders. You would appreciate

that this is very critical in bid submissionand would need your response at the

earliest

The tender security BG withNWC clause (as given inPerformance security BGclause 11) shall also be

acceptable