contract no. cv/2007/03 - environmental protection department · contract no. cv/2007/03...

82

Upload: others

Post on 01-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China
Page 2: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China
Page 3: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. i January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

TABLE OF CONTENTS

EXECUTIVE SUMMARY .................................................................................................................................. III

1. INTRODUCTION ......................................................................................................................................1

Background .............................................................................................................................................1 Scope of Report ......................................................................................................................................1 Project Organisation ..............................................................................................................................2 Summary of Construction Works .........................................................................................................2

2. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS ......................................................3

Monitoring Parameters ..........................................................................................................................3 Monitoring Methodology and Calibration Details ...............................................................................4 Environmental Quality Performance Limits (Action and Limit Levels) ............................................4 Event Action Plan ...................................................................................................................................4 Termination of the EM&A Programme .................................................................................................4

3. MONITORING RESULTS ........................................................................................................................5

Air Quality ...............................................................................................................................................5 Construction Noise ................................................................................................................................6

4. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES ...............................7

Implementation Status of Environmental Mitigation Measures ........................................................7 Summary mitigation measure in During Construction period of the project ..................................7 Advice on Waste Management Status..................................................................................................8

5. NON-COMPLIANCE (EXCEEDANCES) OF THE ENVIRONMENTAL QUALITY PERFORMANCE LIMITS ......................................................................................................................................................9

Summary of Exceedances .....................................................................................................................9 Summary of Actions Taken ................................................................................................................ 14

6. ENVIRONMENTAL COMPLAINTS, NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTIONS .................................................................................................................................. 15

7. OPERATIONAL PHASE NOISE MONITORING .................................................................................. 28

Introduction .......................................................................................................................................... 28 Monitoring Requirement ..................................................................................................................... 28 Measurement Time .............................................................................................................................. 28 Noise Monitoring Locations (Noise Sensitive Receivers) ............................................................... 28 Noise Monitoring Equipment ............................................................................................................. 29 Noise Measurement Methodology ..................................................................................................... 29 Traffic Survey ....................................................................................................................................... 29 Projected Noise Levels ....................................................................................................................... 30 General Result and Observation ........................................................................................................ 30 Traffic Noise Monitoring Results ....................................................................................................... 30 Road Condition and Traffic Survey ................................................................................................... 31 Predicted Noise Levels under the Traffic Flow Condition in 2011 ................................................. 31 Predicted Noise Levels in Current Situation .................................................................................... 32

8. OVERALL SUMMARY .......................................................................................................................... 33

Review of EM&A Program .................................................................................................................. 33 Comparison of the EM&A Data with the EIA Predictions ................................................................ 33 Review of the Monitoring Methodology and EM&A Programme .................................................... 33 Environmental Acceptability of the Project ...................................................................................... 33

Page 4: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. ii January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

List of Tables Table 1.1 Contact Information of Key Personnel ..........................................................................................2 Table 2.1 Monitoring Parameters and Frequency ........................................................................................3 Table 3.1 Comparison of Impact Monitoring Results of 1-hr TSP Concentration .........................................5 Table 3.2 Comparison of Impact Monitoring Results of 24-hr TSP Concentration .......................................5 Table 3.3 Comparison of Baseline and Impact Monitoring Results of Noise Monitoring ..............................6 Table 4.1 Summary of Waste Disposal in During Construction Period of the Project ..................................8 Table 5.1 Number of Exceedances throughout the Construction Phase ......................................................9 Table 6.1 Summary of Environmental Complain throughout the Construction Phase .............................. 15 Table 6.2 Summary of Summon and Successful prosecutions throughout the Construction Phase ........ 27 Table 7.1 Traffic Noise Monitoring Locations ............................................................................................ 28 Table 7.2 Traffic Noise Monitoring Equipment ........................................................................................... 29 Table 7.3 Road Traffic Count Details ......................................................................................................... 29 Table 7.4 Noise Measurement Results ...................................................................................................... 30 Table 7.5 Traffic Survey Results ................................................................................................................ 31 Table 7.6 Counted Traffic Data and Traffic Data in the Approved EIA Report for assessment year of 2011

32 Table 7.7 Comparison of the Projected Noise Levels and the EIA Predicted Noise Levels ...................... 32

List of Figures Figure 1.1 General Layout Plan Figure 2.1 Monitoring Locations

Appendices Appendix A Project Organization Structure Appendix B Environmental Mitigation Implementation Schedule (EMIS) Appendix C Summary of Action and Limit Levels Appendix D Graphical Presentation of Air Quality Monitoring Results Appendix E Graphical Presentation of Noise Monitoring Results Appendix F Event Action Plan Appendix G Cumulative statistics on complaints, notifications of summons and successful prosecutions

and Complaint Log Appendix H Meteorological Data for the Construction Stage Appendix I Proposed Noise Mitigation Measures for the project

Page 5: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. iii January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

EXECUTIVE SUMMARY Introduction

The Project “Development at Anderson Road – Site Formation and Associated Infrastructure Works” (hereafter called “the Project”) is proposed to form platforms for housing development and associated uses in area of about 20 hectares, and to carry out necessary infrastructural upgrading or improvement works to cater for the proposed development.

China State Construction Engineering (Hong Kong) Limited (CSCE) was commissioned as the Contractor of the Project. AECOM Asia Co. Ltd. (AECOM) was employed by CSCE as the Environmental Team (ET) to undertake the Environmental Monitoring and Audit (EM&A) works for the Project. This is the Final Environmental Monitoring and Audit (EM&A) Review Report prepared by AECOM for the Project. This report summarises the EM&A work performed throughout the construction and operation stage of the Project from May 2008 to December 2018 of the Project.

The impact EM&A for the Project includes air quality and noise monitoring. The EM&A programme for Sau Ming Primary School (ID 4) and Sau Mau Ping Catholic Primary School (ID 5) commenced on 1 May 2008, while for Kwun Tong Government Secondary School (ID 1A), On Yat House (ID 2) and Sau Nga House (ID 3) commenced on 1 June 2008.

The monitoring stations ID 4 & ID 5 will serve both the entire Development of Anderson Road (Schedule 3 Designated Project (DP)) project as well as the Widening of Po Lam Road (Schedule 2 DP) project.

The construction for the Widening of Po Lam Road (Schedule 2 DP) project was commenced on 21 September 2011.

The major works of the Project was substantially completed in December 2018 and the construction phase EM&A programme was terminated on 16 January 2019. The operational phase noise monitoring of the Widening of Po Lam Road (Schedule 2 DP) project was conducted in September 2018.

Environmental Monitoring Works Air Quality 1-hr TSP Monitoring There was no action / limit level exceedance recorded throughout the construction period. 24-hr TSP Monitoring There were a total of 17 action level and 1 limit level exceedances recorded throughout the construction period. Noise Construction Noise There were a total of 32 action level and 1 limit level exceedances recorded throughout the construction period. Complaints During the construction phase of the Project, there were a total of 75 complaints received, in which 38 were air quality related, 30 were noise related, 5 were water quality related and 2 were both air quality and noise related. During the construction phase of the Project, there were a total of 6 notification of summons, in which 2 were successful prosecutions.

Page 6: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 1 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

1. INTRODUCTION

Background 1.1 The Project site is located in the East Kowloon District. It is bounded by Anderson Road to the north,

the realigned Sau Mau Ping Road to the south, Po Lam Road to the east, and Lee On Road and Shun On Road to the west.

1.2 The objective of the Project “Development at Anderson Road Site Formation and Associated Infrastructure Works” under Contract CV/2007/03 (hereafter called “the Project”) is to provide land for constructing public housing and government and public facilities. The development will provide 16,100 public housing units for 48,000 people in phases between 2015 and 2016.

1.3 The scope of works of this Project includes construction of site formation, roads, drains and upgrading of existing infrastructure to provide usable land of about 20 hectares for housing and associated government, institution or community uses at the site between existing Anderson Road Quarry and Sau Mau Ping Road in Kwun Tong District.

1.4 The Project was anticipated to be completed in the fourth quarter of 2016.

1.5 Part of the Project involving widening of existing Po Lam Road is a designated project and is governed by an Environmental Permit (EP) EP-140/2002, while the rest of the Project is non-designated. Baseline monitoring covering the entire Project site was undertaken and baseline monitoring report was prepared prior to commencement of construction of the Project in accordance with Conditions 3.2 and 3.4 of the EP (EP-140/2002) and the Environmental Monitoring and Audit (EM&A) Manual.

1.6 Widening of the existing Po Lam Road, is a designated project and is governed by the Environmental Permit (EP) EP-140/2002 issued on 18 June 2002. The construction for the Widening of Po Lam Road was commenced on 21 September 2011. Subsequently, Director of Environmental Protection issued EP-483/2013 on 23 December 2013 regarding the operation of the widened Po Lam Road.

1.7 According to the EP and the EM&A Manual of the Project, there is a need of an EM&A programme including air quality and noise monitoring.

1.8 The EM&A programme for Sau Ming Primary School (ID 4) and Sau Mau Ping Catholic Primary School (ID 5) commenced on 1 May 2008, while for Kwun Tong Government Secondary School (ID 1A), On Yat House (ID 2) and Sau Nga House (ID 3) commenced on 1 June 2008.

1.9 The monitoring stations ID 4 & ID 5 will serve both the entire Development of Anderson Road (Schedule 3 Designated Project (DP)) project as well as the Widening of Po Lam Road. (Schedule 2 DP) project.

1.10 AECOM Asia Co. Ltd. (AECOM) was employed by the Contractor, China State Construction Engineering (Hong Kong) Limited (CSCE), as the Environmental Team (ET) to undertake the EM&A works for the Project. In accordance with the EM&A Manual of the Project, environmental monitoring of air quality, noise and environmental site inspections would be required for this Project.

Scope of Report

1.11 This is the Final Environmental Monitoring and Audit (EM&A) Review Report under the Contract

CV/2007/03 - Development at Anderson Road – Site Formation and Associated Infrastructure Works. This report presents a summary of the environmental monitoring and inspection works, list of activities, mitigation measures carried out by the Contractor for the Project throughout the construction stage from May 2008 to December 2018 and operational phase noise monitoring of widened Po Lam Road carried out in September 2018.

Page 7: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 2 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Project Organisation

1.12 The project organization structure is shown in Appendix A. The key personnel contact names and numbers are summarized in Table 1.1. Table 1.1 Contact Information of Key Personnel

Party Position Name Telephone Fax

ER (Ove Arup) Resident Engineer Yu Kit CHEUNG 2407 0300 2407 8382

Assistant Resident Engineer Brendon LEE 2407 0300 2407 8382

IEC (Ramboll) Independent Environmental

Checker David Yeung 3465 2888 3465 2899

Contractor (CSCE)

Site Agent Holmes Wong 2704 2095 2702 6553

Safety and Environmental Officer

Raymond Ma 6221 9331 2702 6553

ET (AECOM) ET Leader Yiu Wah Fung 3922 9366 2317 7609

Summary of Construction Works

1.13 The construction works under the Project commenced in May 2008, the major construction activities

of the projects are as follows:

Site Establishment

Site Formation Works

Retaining Walls

Bored Pile Walls

Reinforced Earth Walls

Rockfall / Boulder Fence/ Catch Fence

Blasting Protection Measure

Road Works

Junction Improvement Works

Vehicular Bridges

Footbridges

Drainage Works

Noise Barriers

Land Contamination Remediation

Landscaping Works 1.14 The project commenced in May 2008 and substantially completed in December 2018. The only

outstanding works is the slope works, roadworks, roadside planting works and minor E&M Works which were anticipated that insignificant environmental impacts will be generated. Layout plan of the Project work site is provided in Figure 1.1.

Page 8: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 3 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

2. ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS

Monitoring Parameters

2.1 The EM&A Manual designates several locations representative of the identified sensitive receivers for the ET to monitor environmental impacts in terms of air quality and noise due to the Project.

Table 2.1 Monitoring Parameters and Frequency

Parameters Frequency

Air Quality 1-hr TSP Three times per every six days

24-hr TSP Once every six days

Noise Daytime noise Once every week

2.2 Air quality and noise monitoring has been carried out at 5 monitoring locations. ID 2, ID 3, ID 4 and ID 5, were set up at the proposed locations in accordance with EM&A Manual, while monitoring station, ID 1A, was set up at a location agreed by the ER and IEC.

Table 2.2 Locations of Monitoring Stations

ID Location Monitoring Station

1A Kwun Tong Government Secondary School

Roof top of the premises facing Anderson Road

2 On Yat House Roof top of the premises facing Lee On Road

3 Sau Nga House Roof top of the premises facing Sau Mau Ping Road

4 Sau Ming Primary School Roof top of the premises

5 Sau Mau Ping Catholic Primary School

Roof top of the premises

2.3 The EM&A programme including air quality and noise monitoring commenced in May 2008. 2.4 The Project area, monitoring locations and sensitive receivers during construction phase are

depicted in Figure 2.1.

Page 9: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 4 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Monitoring Methodology and Calibration Details

2.5 All monitoring works were conducted and monitoring equipment was regularly calibrated in accordance with the EM&A Manual.

Environmental Quality Performance Limits (Action and Limit Levels)

2.6 The environmental quality performance limits, i.e. Action and Limit Levels (AL Levels) were derived from the baseline monitoring result. Should the measured environmental quality parameters exceed the AL Levels, the respective action plan will be implemented. The AL Levels for each environmental parameter are given in Appendix C.

Event Action Plan

2.7 Relevant mitigation measures were recommended in the EM&A Manual for the ET, IC(E), ER and Contractor to implement. A list of Event and Action Plan is given in Appendix F.

Termination of the EM&A Programme

2.8 As the major works of the Project has been substantially completed in December 2018 and agreed by the IEC and ER, the EM&A programme was terminated on 16 January 2019.

Page 10: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 5 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

3. MONITORING RESULTS

Air Quality 3.1 Air quality monitoring, including 24-hr TSP and 1-hr TSP monitoring, was conducted at 5 monitoring

stations throughout the construction phase of the Project. The monitoring was carried out between May 2008 and December 2018.

3.2 Table 3.1 and Table 3.2 present the averaged, maximum and minimum impact air quality monitoring results of 1-hr TSP and 24-hr TSP throughout the construction period.

Table 3.1 Comparison of Impact Monitoring Results of 1-hr TSP Concentration

Location May 2008 – December 2018

Average Minimum Maximum Action Level Limit Level

(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3)

ID1A 75.3 50.6 94.6 201.5 500

ID2 76.0 56.1 96.3 197.0 500

ID3 76.3 53.9 99.1 203.7 500

ID4 76.2 53.9 103.0 264.6 500

ID5 76.1 53.5 101.3 267.4 500

Table 3.2 Comparison of Impact Monitoring Results of 24-hr TSP Concentration

Location May 2008 – December 2018

Average Minimum Maximum Action Level Limit Level

(µg/m3) (µg/m3) (µg/m3) (µg/m3) (µg/m3)

ID1A 42.0 1.5 251.0 170.2 260

ID2 46.6 4.4 256.2 200.0 260

ID3 52.6 2.2 282.6 200.0 260

ID4 48.7 2.4 213.6 181.3 260

ID5 41.7 0.5 259.1 180.8 260

3.3 Major dust sources during the dust monitoring included construction dust from the Project site,

construction dust from other construction sites nearby and nearby traffic emission.

3.4 Weather information including wind speed and wind direction is annexed in Appendix H. The information was obtained from Hong Kong Observatory Weather Station and Anemometer Station.

3.5 The graphical presentation of the monitoring data of air quality over the construction period is provided in Appendix D.

3.6 For 1-hour TSP, there was no action / limit level exceedance recorded throughout the construction

phase of the Project. 3.7 For 24-hour TSP, there were a total of 17 action level and 1 limit level exceedances recorded

throughout the construction phase of the Project. 3.8 Investigations were carried out by the Environmental Team for all exceedances recorded during the

construction phase of the Project.

Page 11: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 6 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

3.9 Recommendations were provided to the Contractor on all non-compliances of the air quality recorded for the Project. No further non-compliance of air quality was recorded after the implementation of appropriate mitigation measures by the Contractor.

Construction Noise 3.10 Construction noise monitoring was required to be carried out at 5 locations. The construction noise

monitoring was carried out from May 2008 to December 2018.

3.11 Table 3.3 presents the maximum and minimum impact noise monitoring results for daytime period throughout the construction period.

Table 3.3 Comparison of Baseline and Impact Monitoring Results of Noise Monitoring

Location May 2008 – December 2018

Minimum Maximum Limit Level

(Leq, dB(A)) (Leq, dB(A)) (Leq, dB(A))

ID1A 44.5 68.2 *65 / 70

ID2 45.7 71.2 75

ID3 47.8 74.6 75

ID4 49.4 69.9 *65 / 70

ID5 48.4 69.6 *65 / 70

* Daytime noise Limit Level of 70 dB(A) applies to education institutions, while 65 dB (A) applies during school examination period

3.12 Major noise sources during the noise monitoring included construction noise from the Project site,

construction noise from other construction sites nearby, nearby traffic noise and noise from school activities and community noise.

3.13 The graphical presentation of the monitoring data of noise over the construction period is provided in Appendix E.

3.14 For noise monitoring, there were a total of 32 action level and 1 limit level exceedances recorded

throughout the construction phase of the Project. 3.15 Investigations were carried out by the Environmental Team for all exceedances recorded during the

construction phase of the Project. 3.16 Recommendations were provided to the Contractor on all non-compliances of the noise recorded for

the Project. No further non-compliance of noise was recorded after the implementation of appropriate mitigation measures by the Contractor.

Page 12: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 7 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

4. Implementation Status of Environmental Mitigation Measures

Implementation Status of Environmental Mitigation Measures

4.1 Throughout this project, the Contractor had implemented the necessary environmental mitigation measures as stipulated in the EIA report, Environmental Permit and the EM&A Manual.

Summary mitigation measure in During Construction period of the project

4.2 Mitigation measure implemented during the Construction period were included: - Properly store and label oil drums and chemical containers placed on site; - Proper chemicals, chemical wastes and wastes management; - Maintenance works should be carried out within roofed, paved areas with proper drainage

system to handle run-off from maintenance works; - Collection and segregation of construction waste and general refuse should be carried out

properly and regularly; - Site runoff should be properly collected and treated prior to discharge; - Regular review and maintenance of drainage systems and desilting facilities; - Exposed slopes/soil stockpiles should be properly treated to avoid generation of silty surface

run-off during rainstorm; - Proper mitigation measures should be provided to avoid relocation of treated contaminated soil; - Regular review and maintenance of wheel washing facilities provided at all site entrances/exits; - Suppress dust generated from work processes with use of bagged cements, earth movements,

drilling works, breaking works, excavation activities, exposed areas/slopes/soil stockpiles and haul road traffic;

- Conduct regular inspection of the working machineries within works area to avoid any dark smoke emission and oil leakage;

- Quieter powered mechanical equipment should be used; - Provision of proper and effective noise control measures, such as erection of movable noise

barriers during blasting, breaking and drilling works and at crushing plant works area and provision of acoustic material wrapping to breaking tips of breakers; and

- Proper protection and regular inspection of existing trees, transplanted/retained trees.

4.3 The updated implementation status of environmental mitigation measures (EMIS) is given in Appendix B.

Page 13: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 8 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Advice on Waste Management Status 4.4 The actual quantities of uncontaminated sediment, contaminated sediment, inert C&D materials and

C&D wastes generated by activities of the Project during construction period, from May 2008 to December 2018 are provided in Table 4.1. Trip ticket system was implemented for all offsite waste disposal.

Table 4.1 Summary of Waste Disposal in During Construction Period of the Project

Type of waste Summary

Total C&D materials 14,342,754 m3

Hard Rocks and Large Broken Concrete

2,230,368 m3

Amount Reused in the Project 60,007 m3

Amount Reused in other Projects

29,080 m3

Disposed of to TKO 137 11,778,055 m3

Metals 2,211,212 kg

Paper cardboard packing 1,100 kg

Plastics 725 kg

Chemical waste 16,546 L

General refuse 35,047 tonnes

Page 14: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 9 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

5. Non-compliance (exceedances) of the Environmental Quality Performance Limits

Summary of Exceedances

5.1 Throughout the construction stage, there were 18 of 24-hr TSP and 33 of noise exceedances

recorded. Table 5.1 summarizes the number of exceedance throughout the construction phase.

Table 5.1 Number of Exceedances throughout the Construction Phase

Month Air Quality Noise Total Remark

1-hr TSP 24-hr TSP

May-08 0 0 0 0 N/A

Jun-08 0 3 3 6

3 action level exceedances of

24-hr TSP, 2 action level and

1 limit level exceedance of

noise were recorded.

Jul-08 0 3 1 4

3 action level exceedances of 24-hr TSP and 1 action level

exceedance of noise were recorded.

Aug-08 0 0 0 0 N/A

Sep-08 0 0 1 1

1 action level exceedance of

noise was recorded.

Oct-08 0 0 0 0 N/A

Nov-08 0 1 0 1

1 action level exceedance of 24-hr TSP was

recorded.

Dec-08 0 0 0 0 N/A

Jan-09 0 1 1 2

1 action level exceedances of 24-hr TSP ad 1

action level exceedance of

noise were recorded.

Feb-09 0 0 3 3

3 action level exceedance of

noise were recorded.

Page 15: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 10 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Month Air Quality Noise Total Remark

1-hr TSP 24-hr TSP

Mar-09 0 0 0 0 N/A

Apr-09 0 0 1 1

1 action level exceedance of

noise was recorded.

May-09 0 0 1 1

1 action level exceedance of

noise was recorded.

Jun-09 0 0 2 2

2 action level exceedance of

noise were recorded.

Jul-09 0 0 1 1

1 action level exceedance of

noise was recorded.

Aug-09 0 0

2

2

2 action level exceedance of

noise were recorded.

Sep-09 0 0 0 0 N/A

Oct-09 0 0

1

1

1 action level exceedance of

noise was recorded.

Nov-09 0 0 0 0 N/A

Dec-09 0 0 0 0 N/A

Jan-10 0 0 0 0 N/A

Feb-10 0 0 0 0 N/A

Mar-10 0 0 0 0 N/A

Apr-10 0 0 2 2

2 action level exceedance of

noise were recorded.

May-10 0 0 0 0 N/A

Jun-10 0 0 0 0 N/A

Jul-10 0 0 0 0 N/A

Aug-10 0 0 0 0 N/A

Sep-10 0 0 0 0 N/A

Oct-10 0 0 0 0 N/A

Nov-10 0 0 0 0 N/A

Dec-10 0 2 0 2

2 action level exceedances of 24-hr TSP were

Page 16: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 11 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Month Air Quality Noise Total Remark

1-hr TSP 24-hr TSP

recorded.

Jan-11 0 0 0 0 N/A

Feb-11 0 0 0 0 N/A

Mar-11 0 1 0 1

1 action level exceedance of 24-hr TSP was

recorded.

Apr-11 0 0 1 1

1 action level exceedance of

noise was recorded.

May-11 0 0 1 1

1 action level exceedance of

noise was recorded.

Jun-11 0 0

2

2

2 action level exceedance of

noise were recorded.

Jul-11 0 0 0 0 N/A

Aug-11 0 0 0 0 N/A

Sep-11 0 0 1 1

1 action level exceedance of

noise was recorded.

Oct-11 0 0 0 0 N/A

Nov-11 0 0 0 0 N/A

Dec-11 0 0 0 0 N/A

Jan-12 0 0 0 0 N/A

Feb-12 0 0 0 0 N/A

Mar-12 0 0

2

2

2 action level exceedance of

noise were recorded.

Apr-12 0 0 0 0 N/A

May-12 0 0 0 0 N/A

Jun-12 0 0 0 0 N/A

Jul-12 0 0

2

2

2 action level exceedance of

noise were recorded.

Aug-12 0 0 0 0 N/A

Sep-12 0 0 0 0 N/A

Oct-12 0 0 1 1 1 action level

Page 17: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 12 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Month Air Quality Noise Total Remark

1-hr TSP 24-hr TSP

exceedance of noise was recorded.

Nov-12 0 0 0 0 N/A

Dec-12 0 0 1 1

1 action level exceedance of

noise was recorded.

Jan-13 0 0 0 0 N/A

Feb-13 0 0 0 0 N/A

Mar-13 0 0 0 0 N/A

Apr-13 0 0 0 0 N/A

May-13 0 0 1 1

1 action level exceedance of

noise was recorded.

Jun-13 0 0 0 0 N/A

Jul-13 0 0 0 0 N/A

Aug-13 0 0 1 1

1 action level exceedance of

noise was recorded.

Sep-13 0 0 1 1

1 action level exceedance of

noise was recorded.

Oct-13 0 0 0 0 N/A

Nov-13 0 0 0 0 N/A

Dec-13 0 0 0 0 N/A

Jan-14 0 4 0 4

3 action level exceedances

and 1 limit level of 24-hr TSP

were recorded.

Feb-14 0 0 0 0 N/A

Mar-14 0 0 0 0 N/A

Apr-14 0 0 0 0 N/A

May-14 0 0 0 0 N/A

Jun-14 0 0 0 0 N/A

Jul-14 0 0 0 0 N/A

Aug-14 0 0 0 0 N/A

Sep-14 0 0 0 0 N/A

Oct-14 0 0 0 0 N/A

Page 18: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 13 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Month Air Quality Noise Total Remark

1-hr TSP 24-hr TSP

Nov-14 0 0 0 0 N/A

Dec-14 0 1 0 1

1 action level exceedance of 24-hr TSP was

recorded.

Jan-15 0 0 0 0 N/A

Feb-15 0 0 0 0 N/A

Mar-15 0 0 0 0 N/A

Apr-15 0 0 0 0 N/A

May-15 0 0 0 0 N/A

Jun-15 0 0 0 0 N/A

Jul-15 0 0 0 0 N/A

Aug-15 0 0 0 0 N/A

Sep-15 0 0 0 0 N/A

Oct-15 0 0 0 0 N/A

Nov-15 0 0 0 0 N/A

Dec-15 0 0 0 0 N/A

Jan-16 0 0 0 0 N/A

Feb-16 0 0 0 0 N/A

Mar-16 0 0 0 0 N/A

Apr-16 0 0 0 0 N/A

May-16 0 0 0 0 N/A

Jun-16 0 0 0 0 N/A

Jul-16 0 0 0 0 N/A

Aug-16 0 0 0 0 N/A

Sep-16 0 0 0 0 N/A

Oct-16 0 0 0 0 N/A

Nov-16 0 0 0 0 N/A

Dec-16 0 0 0 0 N/A

Jan-17 0 0 0 0 N/A

Feb-17 0 0 0 0 N/A

Mar-17 0 0 0 0 N/A

Apr-17 0 0 0 0 N/A

May-17 0 0 0 0 N/A

Jun-17 0 0 0 0 N/A

Jul-17 0 0 0 0 N/A

Page 19: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 14 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Month Air Quality Noise Total Remark

1-hr TSP 24-hr TSP

Aug-17 0 0 0 0 N/A

Sep-17 0 0 0 0 N/A

Oct-17 0 0 0 0 N/A

Nov-17 0 0 0 0 N/A

Dec-17 0 0 0 0 N/A

Jan-18 0 0 0 0 N/A

Feb-18 0 0 0 0 N/A

Mar-18 0 1 0 1

1 action level exceedance of 24-hr TSP was

recorded.

Apr-18 0 1 0 1

1 action level exceedance of 24-hr TSP was

recorded.

May-18 0 0 0 0 N/A

Jun-18 0 0 0 0 N/A

Jul-18 0 0 0 0 N/A

Aug-18 0 0 0 0 N/A

Sep-18 0 0 0 0 N/A

Oct-18 0 0 0 0 N/A

Nov-18 0 0 0 0 N/A

Dec-18 0 0 0 0 N/A

Total 0 18 33 51

Summary of Actions Taken

5.2 Interim notifications had been issued for all the exceedances during the construction phase of the Project to inform the EPD, ER, IEC and Contractor about the incidents. For the valid exceedances, recommendations were provided in the notifications and the Contractor generally followed up the exceedances to prevent similar non-compliance from happening again.

Page 20: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 15 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

6. Environmental Complaints, Notification of Summons and Successful Prosecutions

6.1 There were a total of 75 complaints received during the construction phase of the Project, in which

38 were air quality related, 30 were noise related, 5 were water quality related and 2 were both air quality and noise related. Table 6.1 summarizes the number of environmental complaints throughout the construction phase. Table 6.1 Summary of Environmental Complain throughout the Construction Phase

Date Received Detail of complaint Parameter Follow up action

6 June 2008#1 The noise complaints were lodged by a Kwun Tong District Councillor and from EPD relayed by Oriental Daily respectively on 6 June 2008 both referring to the complaints from the residents of Sau Mau Ping Estate. Both complaints were about the rock breaking noise at Portion F site area in the morning.

Noise The Contractor erected bamboo scaffolding with acoustic sheet around 3m in height on top of the hoarding along Po Lam Road and Sau Mau Ping Road surrounding the site area. In addition, the Contractor place 3m tall movable noise barriers right in front of the hydraulic breaker to lower the noise level of the works.

15 July 2008 Ms Leung referred a complaint from a resident who lives at Sau Nga House of Sau Mau Ping Estate about the construction noise at slope DT14 opposite Sau Nga House.

Noise A noise enclosure of acoustic sheets was erected in the afternoon to cover the drilling machine during work.

30 September 2008

CEDD’s officer referred a complaint from a resident who lives at Sau Yin House of Sau Mau Ping Estate about the rock breaking noise at Portion F site area opposite Sau Nga House in the morning.

Noise Noise enclosures of acoustic sheets were erected to cover the excavator-mounted breaker during work.

5 January 2009 A complaint from a resident about the fugitive dust emission at construction sites near Shun Chi Court.

Air Regular water was implemented in construction site areas (Portion J2).

12 January 2009

A complaint from a resident (Mr. So) about the fugitive dust emission from site access at Portion J2.

Air Water sprinkler system at site entrance worked effectively and water sprinkler system was installed at site boundary.

23 January 2009

CEDD’s officer referred a complaint from a resident (Mr. Leung) about the rock breaking noise at Portion F site area.

Noise The amount of noise barriers at the working areas had been increased. Noise enclosures of acoustic sheets were implemented to cover up the tips of the excavator-mounted breaker during work.

6 February 2009

Mr. Li Wah Ming referred a complaint from a resident (Mr. Hon) about the rock breaking noise at Portion F site area.

Noise 6m movable noise barriers had been added at the working areas. Noise enclosures of acoustic sheets were

Page 21: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 16 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

implemented to cover up the tips of the excavator-mounted breaker during work.

Mid-February 2009

EPD’s officer referred a complaint about construction noise at Portion J3 site area.

Noise The Contractor had ensured that the absorptive materials coverage at the hoarding and tips of excavator-mounted breakers were well maintained.

27 February 2009

EPD’s officer referred a complaint about construction noise and fugitive dust emission at Portion J3 site area.

Air & Noise The Contractor had ensured that the absorptive materials and nets coverage at the hoarding, absorptive material coverage at the tips of the excavator-mounted breakers and water spraying facilities at rock breaking areas were well maintained.

20 March 2009 CEDD (ICC) officer referred a complaint about fugitive dust emission from construction works at Portion J2 site area.

Air The Contractor had provided additional tarpaulin sheet coverage at working areas and along hoarding at New Clear Water Bay Road. Hourly water spraying had also provided during installation of soil nails.

14 April 2009 Mr. Mak complains about fugitive dust generation when dump trucks passing the site area opposite to Sau Nga House.

Air The Contractor had provided a list of dust suppressive measures to minimize the dust impacts: addition of black top to main haul roads at Portion S2a, installation of sprinkler systems along haul roads at Portion S2a and C2 and provision of geotextile coverage to or shotcreting the exposed slopes at Portion S2a.

17 April 2009 Ms. Mak requested the Contractor to start the slope work opposite to Sau Yee House (DT14), i.e. Portion S2a, after 8a.m.

Noise The Contractor had rescheduled the work and started the slope work at Portion S2a after 8a.m.

19 May 2009 Ms. Poon complains about construction noise impact at Portion J3 in the early morning.

Noise The Contractor rescheduled the work and start any kind of noisy work at Portion J3 after 9:30a.m.

15 June 2009 Mr. To complained about muddy flooding into United Christian College (Kowloon East) at Portion J3.

Water The Contractor cleared up all deposited silt immediately and keep the drains along the toe of the slope clear. Further preventive measures, such as sealing up the gaps at the base of the hoarding and forming a sump pit with pumping facility was also conducted

Page 22: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 17 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

immediately.

The Contractor kept liaison with the Contractors of the construction sites nearby on the arrangement of temporary drainage systems on site and kept regular inspection on the temporary drainage system on site.

16 June 2009 Mr. Mak complained about construction noise impact from rock breaking activities located at Portion D (site area opposite to Sau Ching House) in the early morning.

Moreover, he complained about mosquito breeding problems occur at Sau Ching House and Sau Yin House.

Noise The Contractor rescheduled the rock breaking work and start any kind of noisy work at Portion D after 9:00a.m.

The Contractor kept on carrying out mosquito breeding preventive measures on site as scheduled.

29 June 2009 CEDD officer referred a complaint about construction noise impact from rock breaking activities located at Portion D (site area opposite to Po Tat Estate) in the early morning.

Noise Proper acoustic wrapping around the tips of the breakers working at Portion D and sufficient noise barriers at rock breaking work area at Portion D was provided.

15 July 2009 CEDD officer referred a complaint about construction noise impact from rock breaking activities located at Portion D (site area opposite to Sau Yin House).

Noise The Contractor had rescheduled the work program and started the rock breaking work at Portion D after 10 a.m. in the morning. Also, the Contractor had used the silenced drill rig and non-explosive expanding agent for rock breaking process to minimize the noise impacts. The rock breaking work was completed.

18 August 2009 RSS received a complaint regarding the construction noise impact from rock breaking activities located at Portion D (site area opposite to Sau Ching House).

Noise The Contractor had rescheduled the work program and started the rock breaking work at Portion D in the afternoon.

24 August 2009 RSS received a complaint regarding the construction noise impact from soil nailing activities at the slopes at Portion S1a (site area opposite to Sau Ching House).

Noise The Contractor had erected scaffolding with proper acoustic materials to cover up the soil nailing area at the slopes at Portion S1a.

14 October 2009

RSS received a complaint regarding the construction noise impact from rock breaking activities at the retaining wall

Noise The Contractor had suspended the rock breaking activities at the retaining wall R25B at Portion S1a.

Page 23: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 18 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

(R25B) at Portion S1a (site area opposite to Sau Ching House).

The Contractor had erected additional scaffolding with proper acoustic materials to cover up the rock breaking area at the retaining wall R25B at Portion S1a.

10 April 2010 RSS received a complaint regarding the construction noise impact from rock breaking activities at Retaining Wall R25A at Portion S1a (site area opposite to Sau Ching House).

Noise The Contractor had erected scaffolding with acoustic material coverage at the rock breaking area at Retaining Wall R25A at Portion S1a. All kinds of construction works at Retaining Wall R25A had been suspended until 2pm. Construction activities at the captioned area are kept to minimal, as far as possible. Silenced type drill rig and chemical expanding agent had been employed for the rock breaking works at captioned area.

16 April 2010 A complaint was referred by EPD regarding the discharge of muddy water from the site exit (opposite to the Gate No. 2 of Ka Wah Quarry) onto Anderson Road.

Water Concrete ramps has been provided at the concerned site exit to confine the surface run-off from the works area and eliminate the potential discharge of surface run-off onto Anderson Road.

29 April 2010 A complaint was referred by EPD regarding the construction noise impact from rock breaking activities in the afternoon at works area in junction between Po Lam Road and Sau Mau Ping Road (site area near Po Tat Estate).

Noise The Contractor has provided proper noise barriers (in form of scaffolding with acoustic material coverage) at the concerned rock breaking area. Acoustic wrapping of breaking tip of the breaker stationed at rock breaking area was provided.

1 April 2011 A complaint was referred by CEDD (ICC) officer regarding the construction noise impact from rock breaking activities at Retaining Wall 6 at Portion S2a (site area opposite to Lee Foo House of Shun Lee Estate).

Noise The Contractor provided additional noise screening measures (in form of noise barriers) at the concerned working areas to minimize the noise impacts.

12 May 2011 A complaint was referred by CEDD (ICC) officer regarding the fugitive dust emission from exposed works areas in Portion J2 (site area at New Clear Water Bay Road).

Air The Contractor had covered up the concerned exposed works area with tarpaulin sheet to avoid fugitive dust emission.

Page 24: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 19 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

20 May 2011 A complaint was received by RSS regarding the construction noise impact from rock breaking activities at Retaining Wall R25 at Portion D.

Noise Additional noise barriers were provided at the concerned breaking works area. The works schedule was revised to minimize the noise impact from concurrent undertaking of noisy activities.

3 June 2011 A complaint was referred by CEDD (ICC) officer regarding the construction noise from rock breaking works at Portion D and E of the Project, rock breaking works at Sau Mau Ping Road and at the temple’s sites at Portion F by other contracts.

Noise Noise mitigation measures have been provided at rock breaking areas to mitigate the noise impacts which included erection of mobile noise barriers and scaffolding with adhesion of noise absorptive materials for the sides facing the noise sensitive receivers. Moreover, acoustic wrappings had been provided to the breaking tips of the breakers worked at the works areas. Less noisy construction methods, such as blasting and expanding agent were adopted to reduce construction noise.

17 June 2011 A complaint was referred by CEDD (ICC) officer regarding the construction noise impact from rock breaking and drilling activities in Portion I (site areas opposite to Ning Po No. 2 College).

Noise Contractor was to provided additional noise mitigation measures by means of increasing the length of noise screening measures at the concerned working areas to further minimize the noise impacts.

21 September 2011

A complaint was received by RSS regarding the construction noise and dust impact from blasting activities carried out within the Project site after 1700.

Air & Noise Tyre mat was provided to enclose the blasting area in order to mitigate the noise impacts to nearby noise sensitive receivers.

The Contractor increased the frequency of watering at the blasting area to minimize the construction dust impacts during blasting.

12,17 and 26 January 2012

CEDD (ICC) referred a complaint about fugitive dust accumulated on the water barrier and traffic cones at Portion J2 (Clear Water Bay Road near Anderson Road crossing). The complainant has made other calls on 17 and 26 January 2012 regarding the same issue.

Air The Contractor increased the frequency of watering at the haul road to minimize the construction dust impacts.

Page 25: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 20 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

17 February 2012

CEDD (ICC) referred a complaint about no wheel washing facility was provided for dump trucks at the construction site entrance of the junction of New Clear Water Bay and Anderson Road.

Air The Contractor increased the frequency of watering at the haul road and cleaning on public road to minimize the construction dust impacts and ensure the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site.

21 February 2012

CEDD (ICC) referred a complaint about gravel on the haul road at Anderson Road and New Clear Water Bay Road.

Air In order to minimize the dust impact, cleaning on the public road was carried out in the early March 2012. The Contractor was provided to remove any dusty materials from their bodies and wheels before leaving construction site.

22 February 2012

CEDD (ICC) referred a complaint about gravel accumulated on the haul road at Clear Water Bay Road.

Air In order to minimize the dust impact, cleaning on the public road was carried out in the early March 2012. The Contractor was provided to remove any dusty materials from their bodies and wheels before leaving construction site.

27 February 2012

CEDD (ICC) referred a complaint querying on the presence of wheel washing facility at the construction site entrance at Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

13 March 2012 CEDD (ICC) referred complaint about gravel on the haul road at Anderson Road and New Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

13 March 2012 CEDD (ICC) referred a complaint about traffic obstruction by accumulation of fugitive dust from the road works at Clear Water Bay Road near Anderson Road crossing.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

14 March 2012 A complaint was referred by CEDD (ICC) regarding the construction noise impact from rock breaking at R15.

Noise The Contractor rescheduled noisy construction activities to be started after 10a.m.; And provision of additional noise screening measures at rock

Page 26: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 21 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

breaking works areas, e.g. erection of adequate mobile noise barrier.

14 March 2012 A complaint was referred by CSCEC regarding the construction noise impact from rock breaking at R15.

Noise The Contractor rescheduled noisy construction activities to be started after 10a.m.; And provision of additional noise screening measures at rock breaking works areas, e.g. erection of adequate mobile noise barrier.

14 March 2012 CEDD (ICC) referred complaint about gravel and mud on the haul road at Anderson Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

14 March 2012 CEDD (ICC) referred complaint about accumulation of mud on the haul road at New Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

15 March 2012 CEDD (ICC) referred complaint about gravel on the haul road at New Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

15 March 2012 CEDD (ICC) referred complaint about gravel on the haul road at Anderson Road and New Clear Water Bay Road crossing.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

16 March 2012 CEDD (ICC) referred complaint about gravel on the haul road at Anderson Road and New Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

Page 27: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 22 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

22 March 2012 CEDD (ICC) referred a complaint about traffic obstruction by accumulation of fugitive dust from the road works at junction of Clear Water Bay and New Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

23 March 2012 CEDD (ICC) referred a complaint about traffic obstruction by accumulation of fugitive dust from the road works at Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was provided to remove any dusty materials from their bodies and wheels before leaving construction site and review the effectiveness of wheel washing facility.

17 July 2012 CEDD (ICC) referred a complaint about construction noise impact from retaining wall construction alongside Po Lam Road.

Noise The Contractor maintained the noise mitigation measures to ensure the effectiveness of noise mitigation measures deployed within works area was reviewed onsite regularly in order to provide sufficient noise screening effect properly for the NSRs.

31 July 2012 CEDD referred a complaint about construction noise impact from retaining wall construction alongside Po Lam Road.

Noise The Contractor stopped rock breaking work before 6pm, maintain the noise mitigation measures and ensure the effectiveness of noise mitigation measures deployed within works area reviewed onsite regularly in order to provide sufficient noise screening effect properly for the noise sensitive receivers.

31 August 2012 CEDD referred a complaint about dust nuisance at New Clear Water Bay Road.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

31 August 2012 A complaint was referred by CEDD (ICC) regarding the fugitive dust impact at the slope of Shun Chi Court on 31 August 2012.

Air The Contractor implemented regular water spray to the works area and closely monitor the status of tarpaulin sheet to minimize fugitive emission generated.

15 October 2012

A complaint was sent to CSCE regarding the construction noise impact in the works area facing Sau Mau Ping Estate on 15 October 2012 via email.

Noise The Contractor was stipulated the noise mitigation measures for construction activities involving the use of Powered Mechanical Equipment (PME) is

Page 28: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 23 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

conducted in the concerned area.

4 December 2012

A complaint was referred by CEDD (ICC) regarding the muddy water impact along the road at New Clear Water Bay Road on 4 December 2012.

Water The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility. Moreover, regular water spraying was also cleaned the carriageway along New Clear Water Bay Road.

6 December 2012

CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 6 December 2012.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

11 December 2012

CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 11 December 2012.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

13 December 2012

CEDD referred a complaint about construction noise impact from retaining wall construction alongside Po Lam Road.

Noise The Contractor started the works after 9 a.m., strictly implement the noise mitigation measures and ensure the effectiveness of noise mitigation measures deployed within works reviewed onsite regularly in order to provide sufficient noise screening effect properly for the noise sensitive receivers.

27 May 2013 CEDD(ICC) referred complaints about noise nuisance along the Shun On Road on 27 May 2013.

Noise The Contractor implemented the noise mitigation measures and ensure the effectiveness of noise mitigation measures deployed within works area should be reviewed onsite regularly in order to provide sufficient noise screening effect properly for the NSRs.

9 July 2013 CEDD(ICC) referred a complaint about air quality nuisance at Hiu Kwong Street works area on 9 July 2013.

Air The Contractor provided regular maintenance to the captioned generator operating at the works area, closely monitor the captioned generator to ensure that emission of dark was avoided.

Page 29: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 24 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

7 August 2013 A complaint was referred by CEDD (ICC) regarding the discharging of silty water in the vicinity of KTTS on 7 August 2013.

Water Apart from the cleaning works which have been undertaken by the Contractor in the vicinity of KTTS, Tsui Ping Nullah and sandtrap at Sau Mau Ping Road, the Contractor provided sufficient effluent treatment facility on site to avoid any non-complied wastewater discharge.

23 August 2013 CEDD(ICC) referred complaints about noise nuisance outside Sau Ming Primary School on 23 August 2013.

Noise The Contractor started the works after 9 a.m., strictly implement the noise mitigation measures and ensure the effectiveness of noise mitigation measures deployed within works area reviewed onsite regularly in order to provide sufficient noise screening effect properly for the NSRs.

17 September 2013

CEDD(ICC) referred complaints about noise nuisance along the Shun On Road on 17 September 2013.

Noise The Contractor implemented the noise mitigation measures and ensure the effectiveness of noise mitigation measures deployed within works area reviewed onsite regularly in order to provide sufficient noise screening effect properly for the NSRs.

11 November 2013

CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 11 November 2013.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

2 December 2013

CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 2 December 2013.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

30 December 2013

CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 2 December 2013.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

6 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 6 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

Page 30: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 25 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

6 March 2014 CEDD(ICC) referred a complaint about dust nuisance along Po Lam Road on 6 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

7 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 7 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

11 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 11 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

12 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 12 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

14 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 6 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

21 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 21 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

25 March 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 25 March 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

29 April 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay Road near Anderson Road crossing on 29 April 2014.

Air The Contractor ensured the wheel washing facility was operated at the construction site entrance and closely monitor the effectiveness of the wheel washing facility.

29 April 2014 CEDD(ICC) referred a complaint about dust nuisance along the road at New Clear Water Bay

Air The Contractor ensured the wheel washing facility was operated at the construction site

Page 31: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 26 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Date Received Detail of complaint Parameter Follow up action

Road near Anderson Road crossing on 29 April 2014.

entrance and closely monitor the effectiveness of the wheel washing facility.

16 June 2014 CEDD(ICC) referred a complaint about effluent arisen from washing water of a concrete lorry at Po Lam Road near Po Tat Estate on 16 June 2014.

Water The Contractor avoided improper vehicle washing activity on public road and prevent any potential effluent from entering the public road and drainage system.

24 April 2018 A complaint was referred by EPD during inspection on 20 April 2018. The complaint was about dust emission by road marking removal activity on Lee On Road.

Air The Contractor implemented sufficient water spraying was provided during road marking removal activity to suppress dust generation.

#1 Two complaints were counted in this noise complaint. The detail of this noise complaint please refer to the monthly report for June 2008.

6.2 Complaint investigation was carried out for each of the complaint received. All the complaint cases

had been closed. 6.3 A summary of environmental complaints is provided in Appendix G.

Page 32: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 27 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

6.4 During the construction phase of the Project, there were a total of 6 notification of summons, in

which 2 were successful prosecutions.

6.5 4 summons were received regarding the suspected violation case of Air Pollution Control Ordinance (Cap. 311) within site working area of the project on 17 July 2012. For the four summons, two charges had been convicted and the written reports on successful prosecution were received by the Contractor on 12 July 2013.

6.6 2 summonses were received regarding the suspected violation case of Water Pollution Control Ordinance (Cap. 358) within site working area of the project on 4 May 2013.

6.7 Table 6.2 summarizes the number of Summon and Successful prosecutions in during construction phase.

Table 6.2 Summary of Summon and Successful prosecutions throughout the Construction Phase

Date Nature of Breaches

Detail of Summon Result Follow-up action

17 July 2012 Air No dust control measure implemented during loading

and unloading dusty material.

Dropped Charge

N/A

17 July 2012 Air The vehicle carried dusty material did not cover entirely by clean imperious sheeting

before leaving the site.

Successful prosecution

Not provided

17 July 2012 Air No dust control measure implemented during blasting

work carrying the construction area.

Successful prosecution

Not provided

17 July 2012 Air No dust control measure implemented during and after

the excavation works.

Dropped Charge

N/A

4 May 2013 #1 Water The exceeded limit suspended solid of wastewater was

discharged from the construction site.

Dropped Charge

N/A

#1 Two summons were received in this suspected violation case. The detail of this suspected violation case please refer to the monthly report for February 2014.

6.8 The cumulative statistics on complaints is updated in Appendix G.

Page 33: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 28 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

7. OPERATIONAL PHASE NOISE MONITORING

Introduction 7.1 The operation phase noise monitoring has been carried out in accordance with the methodology and

requirements set out in the approved Updated EM&A Manual. This section presents the noise monitoring results and the verification of the traffic noise assessment conducted in Environmental Impact Assessment (EIA) Study, by comparing the project noise impact predictions with the actual impacts.

Monitoring Requirement

7.2 According to the Environmental Permit Condition 2.3 and 3.3 of EP-483/2013, traffic noise impact monitoring for the operational phase shall be conducted within 12 months after the commencement of operation of the Project. The measured noise levels shall be compared with the project noise impact predications in the Final EIA report (Register No. AEIAR-007/1999), using the counted traffic data at the time of measurement.

7.3 The purpose of this monitoring is to verify the traffic noise assessment and effectiveness of the

proposed noise mitigation measures, which is the provisioning of a 7m high cantilevered noise barrier wall (6 m vertical barrier with 1.4m cantilever length at 45 degree to the horizontal) (same configuration as those being removed), along the footpath of the widened Po Lam Road is proposed, that the impact at NSRs are within acceptable noise limits. The proposed noise mitigation measures plan are provided in Appendix I.

Measurement Time

7.4 As stipulated in the Updated EM&A manual, noise level shall be measured at the time of peak traffic flow on normal weekdays. According to the latest publication on traffic flow produced by Transport Department, The Annual Traffic Census 2017, peak hours on normal weekdays was 0900-1000 and 1800-1900 for the east bound; and 0800-0900 and 1700-1800 for the west bound.

7.5 Since there is a concurrent project in the vicinity (i.e. Contract: NE/2016/01 – Site Formation and Infrastructure Works for Development of Anderson Road Quarry Site) which involves heavy breaking activities and site formation, noise from construction activities (such as breaking activities) would be dominant during normal working hours (normal weekdays, 0700-1900). Monitoring during normal working hours (normal weekdays, 0700-1900) is not feasible as noise from construction activities would affect the monitoring result and validity. Taking into account that typical construction works shifts end at 1800 and with consideration of peak hours from the Annual Traffic Census, the monitoring time is proposed to be any 1 hour between 1830 and 2000 during normal weekdays. Noise Monitoring Locations (Noise Sensitive Receivers)

7.6 Noise measurements were carried out at two locations according to the Updated EM&A manual as

shown in Table 7.1 below.

Table 7.1 Traffic Noise Monitoring Locations

Location Sensitive

Receiver ID. Use Monitoring Floor

Tat Yan House of Po Tat Estate 2094 Residential 30/F

Tat Chui House of Po Tat Estate 2088 Residential 30/F

Page 34: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 29 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Noise Monitoring Equipment 7.7 Integrating Sound Level Meters (Type 1), which comply with International Electrotechnical

Commission Publications 651:1979 (Type 1) and 804:1985 (Type 1), was used for the noise monitoring. The sound level meter is capable of giving a continuous readout of the noise level readings including equivalent continuous sound pressure level (Leq) and percentile sound pressure level (Lx). Acoustic calibrator was deployed to check the sound level meter at a known sound pressure level. The instrumentation to be used for the noise monitoring is given Table 7.2.

Table 7.2 Traffic Noise Monitoring Equipment

Equipment Model

Integrating Sound Level Meter B&K 2238 & 2270

Hand-held Acoustic Calibrator B&K 4231

7.8 The sound level meter was calibrated using a Bruel and Kjaer Sound Level Calibrator Type 4231 for 94dB at 1kHz, immediate prior to and after each set of measurements. The results of the calibration were recorded on the field data sheet. The difference between the readings made before and after each set of measurements was less than 1 dB(A).

Noise Measurement Methodology

7.9 Noise measurements were made in accordance with Section III of the “Calculation of Road Traffic Noise (CRTN), 1998”.

7.10 The noise measurements were conducted to obtain one sets of A-weighted L10 (1 hour) sound pressure level during the PM peak traffic hour in any one hour monitoring period between 1830 and 2000 at each designated monitoring station. Statistical results such as Leq and L90 were also obtained for reference.

7.11 For Tat Yan House and Tat Chui House, noise measurements were conducted at a point 1m from exterior of the sensitive receiver building façade.

7.12 The wind speed should be checked with a portable wind meter. Observations were recorded when intrusive noise was unavoidable. No noise monitoring should be carried out in case in the presence of fog, rain, wind with a steady speed exceeding 5 m/s, or wind with gusts exceeding 10 m/s.

Traffic Survey

7.13 Road traffic data including average vehicle speeds, number of vehicles per hour and percentage of heavy vehicles for both west-bound and east-bound of Po Lam Road were recorded at the time of noise measurement for the two monitoring stations. The road traffic count details are summarized in Table 7.3. Table 7.3 Road Traffic Count Details

Noise Monitoring Locations Sensitive Receiver ID.

Location of Road Traffic Count

30/F, Tat Yan House of Po Tat Estate 2094 Roof top of Tat Yan House

30/F, Tat Chui House of Po Tat Estate 2088 Roof top of Tat Chui House

Page 35: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 30 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Projected Noise Levels

7.14 The measured noise levels should be compared with the predicted noise levels by the application of appropriate corrections to normalise the traffic conditions of the assessment year as adopted in the EIA Study (i.e.Year 2011).

7.15 The correction factor should be calculated as follows:

Correction Factor =

Vp

VpLog

VV

VVLog

Q

QLog

/51

'/'5110

/50040

'/50040'33

'10

Where Q’ is predicted traffic flow using the CRTN noise model V’ is predicted traffic speed using the CRTN noise model p’ is predicted percentage of heavy vehicle using the CRTN noise model Q is measured traffic flow during the traffic noise monitoring event V is measured traffic speed during the traffic noise monitoring event p is measured percentage of heavy vehicle during the traffic noise monitoring event 7.16 The traffic noise prediction and effectiveness of the proposed noise mitigation measures should be

verified by this monitoring. The discrepancy, if any, should be reported to the EPD.

General Result and Observation

7.17 During the course of noise monitoring, road traffic along Po Lam road was the major noise source. Noise data were continuously recorded by sound level meters at an interval of 1 minute.

Traffic Noise Monitoring Results

7.18 The operational phase noise monitoring was conducted on a weekday during PM peak traffic hour from 18:30 to 20:00 on 04 September 2018. The weather condition during the monitoring days were fine. Random check of wind speed at the monitoring stations showed that it was below 5 m/s. The summary of traffic noise measurement results are summarized in Table 7.4.

Table 7.4 Noise Measurement Results

Monitoring Date Monitoring

Station Period

Measured Noise Level (Mitigated),

L10 (1-hr) dB(A)

04 September 2018 Tat Yan House PM Traffic Peak hour

(18:30 – 19:30)

64.6

04 September 2018 Tat Chui House 65.1

Page 36: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 31 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Road Condition and Traffic Survey

7.19 The traffic conditions along the concerned road sections were normal and there was no traffic congestion during the monitoring period. The summary of the traffic data obtained in the peak hour are summarized in Table 7.5.

Table 7.5 Traffic Survey Results

Monitoring Station No. of Vehicles Percentage of

Heavy Vehicles Average Vehicle

Speed (km/h)

30/F, Tat Yan House

East Bound

636(a) 11 71

West Bound

660 27 66

30/F, Tat Chui House

East Bound

996(a) 25 42(b)

West Bound

654 20 68

Notes: (a) According to the observation during the operational noise monitoring, some vehicles from east-bound traffic

counting position for Tat Chui House were driven into On Sau Road or the internal road of Po Tat Estate before reaching the east-bound traffic counting position for Tat Yan House. Therefore, the counted number of vehicles for Tat Yan House is lower.

(b) According to the observation during the operational noise monitoring, east-bound vehicle speed measured at the road section that proposed for vehicle speed estimation for Tat Chui House is relatively lower due to traffic light control and vehicles moving uphill.

Predicted Noise Levels under the Traffic Flow Condition in 2011

7.20 According to approved EIA Report for the Project, the traffic forecast was produced for the design year of 2001, 2006 and 2011 as part of the Traffic Impact Assessment (TIA) of EIA study.

7.21 The traffic noise levels at the identified NSRs were predicted using the computer model “Road Noise” which implements the calculation method as prescribed in “Calculation of Road Traffic Noise (CRTN)” developed by the UK Department of Transport, Welsh Office in 1988.

7.22 In the EIA study, the traffic data of year 2011, which was agreed by the Transport Department,

shows that the projected population figures of the future development of Shun On, Shun Lee, Shun Tin and Shun Lee THA and Rehabilitation of the existing Anderson Road Quarry planned beyond 2011 are included to predict a worst case traffic projection. The traffic forecast for year 2011 (AM peak hour) was therefore taken in the noise impact assessment to predict worst case noise impacts.

Page 37: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 32 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

Predicted Noise Levels in Current Situation

7.23 According to the Updated EM&A Manual, the measured noise levels should be compared with the noise modelling result obtained with the counted traffic data.

7.24 The traffic flow, vehicular speed and percentage of heavy vehicle obtained during the course of traffic noise measurements and that adopted in the approved EIA report for the assessment year of 2011 are summarized in Table 7.6. Table 7.6 Counted Traffic Data and Traffic Data in the Approved EIA Report for

assessment year of 2011

Road No. of Vehicles

(East Bound + West Bound)

Percentage of Heavy Vehicles

Estimated Speed (km/h)

Traffic data from the approved EIA report for the Project

Po Lam Road (Road Segment No.124-

126) 4040 19 50

Counted traffic data during operational noise monitoring

Po Lam Road (Counted from Tat Yan

House) 1296 19.4(a) 68.6(a)

Po Lam Road (Counted from Tat Chui

House) 1650 23.3(a) 52.5(a)

Note: (a) Averaged value of east bound and west bound counted traffic data.

7.25 Table 7.7 shows the measured noise levels, the projected noise levels and the EIA predicted noise

levels in assessment year of 2011 in comparison with the noise standard.

Table 7.7 Comparison of the Projected Noise Levels and the EIA Predicted Noise Levels

Monitoring Station

Noise Level, L10 (1-hr) dB(A)

Measured Noise Level

[1]

Correction Factor

[2]

Projected Noise Level (a)

[1]+[2]

EIA Predicted Noise Level in Year

2011 (AM Peak Hour)

Noise Standard

30/F, Tat Yan House

64.6 3.6 68.2 68.6 70

30/F, Tat Chui House

65.1 3.2 68.3 68.7 70

Note: (a) The noise level that projected to the traffic condition that adopted in the approved EIA report for the assessment year

of 2011 from the measured noise level.

7.26 As shown in Table 7.7, all of the measured noise levels and the projected noise levels are within the

criterion of 70 dB(A). The projected noise levels and the EIA predicted noise level in Year 2011 are considered comparable within a reasonable deviation range. Hence, the noise mitigation measures implemented are considered effective.

Page 38: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03

Development at Anderson Road –

Site Formation and Associated Infrastructure Works

China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

AECOM Asia Co. Ltd. 33 January 2019

P:\60043155\1.01\Deliverables\Final\final report_rev_3.doc

8. OVERALL SUMMARY

Review of EM&A Program

8.1 The impact air quality and noise monitoring was properly conducted in accordance with the EM&A Manual. The monitoring events were sufficient to justify the respective environmental impacts on the nearby sensitive receivers.

8.2 Site audits were carried out weekly to monitor the Contractor’s performance on the air quality, noise,

water quality and waste management issues. The audit programme confirmed that the mitigation measures were properly implemented by the Contractor.

Comparison of the EM&A Data with the EIA Predictions

8.3 Despite occasional air quality and noise exceedances occurred during the construction phase, the

environmental monitoring data (i.e. air quality and noise) collected in the construction period were generally in line with the prediction of the EIA Report as the monitoring results were within the acceptable levels as stipulated in the EIA Report.

Review of the Monitoring Methodology and EM&A Programme

8.4 ET regularly reviewed the monitoring methodology as recommended in the EM&A Manual. There

was no amendment on the monitoring methodology during the construction phase of the Project. 8.5 The EM&A programme and the effectiveness and efficiency of the mitigation measures were

successful during the construction period.

Environmental Acceptability of the Project 8.6 Most of Environmental monitoring result were below the Action and Limit Levels in the construction

stage, excepted few exceedances of air quality and noise results were recorded. The environmental monitoring results indicated that the construction activities in general complied with the relevant environmental requirements.

8.7 From the monitoring results, it is concluded that the overall environmental performance of the project

is satisfactory.

Page 39: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

FIGURES

Page 40: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

CHECK DRAWN

Rev.

FIG 1.1 -

DATENov-09

ENFL LCHC

DRAWING No.

Development at Anderson Road - Site Formation and

Associated Infrastructure Works

SCALEN.T.S.

GENERAL LAYOUT PLAN

JOB NO.

60043155

Page 41: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

ROAD L3

RO

AD L6

ROAD L4

ROAD L5

PO L

AM

RO

AD

NE

W CLEAR

WATER BAY ROAD

WS

D 1

WSD 2

24711/5501A

SFL=+154.900

Y=821145.2660

X=841526.5140

FP=+152.783

ROADLEVEL=+152.658

Y=821028.9612

X=841509.9683

2.5% F

ALL

FP=+156.820

ROAD=+156.695

Y=821027.8724

X=841650.1670

2.5% FALL

FP=+156.933

Y=821029.5980

X=841654.3231

HD PT A2

FP=+167.566

ROAD=+167.441

Y=821075.8767

X=841705.9777

2.5% FALL

FP=167.679

Y=821072.8726

X=841702.6245

Y=821071.203

X=841700.761

HD PT A8

FFL=160.05(APPROX.)

PED. SUBWAY

Y=821148.5688

X=841527.8161

HD_A101

Y=821147.8380

X=841531.1308

HD_A102

Y=821120.2680

X=841525.0524

HD_A103

FP=+152.896

Y=821030.7826

X=841505.8987

HD_A1

Y=821141.807

X=841524.755

EDGE OF PILE CAP

Y=821140.775

X=841529.574

EDGE OF PILE CAP

Y=821148.9084

X=841526.2759

268

49

25

15

820938.725 N

841729.612 E

820934.489 N

841731.936 E

820940.166 N

841737.878 E

820935.731 N

841738.668 E

820935.884 N

841702.052 E

820940.432 N

841702.390 E

820938.913 N

841710.298 E

820934.417 N

841709.964 E

821023.892 N

841638.931 E

821024.513 N

841633.711 E

821016.797 N

841636.773 E

821016.217 N

841641.646 E

821058.357 N

841603.606 E

821053.716 N

841603.064 E

821050.240 N

841610.008 E

821055.087 N

841610.575 E

821069.451 N

841607.910 E

4.5

R

821075.175 N

841605.340 E

821074.024 N

841590.753 E

6.00R

821077.451 N

841597.061 E

821056.926 N

841552.793 E

821051.602 N

841552.171 E

821052.723 N

841545.153 E

821046.790 N

841544.464 E

821022.145 N

841519.817 E

821021.588 N

841524.495 E

821029.087 N

841523.255 E

821028.509 N

841528.114 E

820881.559 N

841553.413 E

820876.763 N

841553.174 E

820870.044 N

841568.807 E

820874.740 N

841569.276 E

820869.129 N

841570.934 E

820870.388 N

841579.400 E

820865.387 N

841591.033 E

8.10R

8.00

R

820858.413 N

841595.865 E820860.432 N

841602.563 E

820856.763 N

841599.703 E820850.433 N

841614.428 E820854.115 N

841617.257 E

820807.480 N

841771.393 E

820812.041 N

841772.329 E

820810.979 N

841753.736 E

820806.418 N

841752.800 E

RED COLOUR - DAR REVISED ON 2/7/2014

MAI

NTE

NA

NCE

ACCESS

ROAD L2

ROAD L2

ROAD L1

D1

D2 D3D4

D5

D6

D7

D9

D10X

D10a

D15

D16

D21XD22X

D23

D24

D29

D30

D31

"FOOTPATH D"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

"FOOTPATH D"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

"FOOTPATH D"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

"FOOTPATH D"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

E3 E4 E5

E6

E7

E8

E9

E10

"FOOTPATH E"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

"FOOTPATH E"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

D20Y

D19

E12a

E13X

E15X

E14aE14X

E11

E12

"FOOTPATH E"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

E16XE17X

E18

"FOOTPATH E"

REFER TO DRAWING NO.24711/4042

FOR BACK OF FOOTPATH SETTING OUT

B138

B137

B136

B135

B134

B139

B140

B110

B111

B112

B113

B114

B115

B125

B126

B127

B128B129B130

B131B132

B133

B116

B117

B118

B119

B120

B121

B122

B101

B102

B103

B104

B105

B106

B107

B108

B109

"FOOTPATH B"

REFER TO SKETCH NO. CV/2007/03/SK/2490

FOR BACK OF FOOTPATH SETTING OUT

"FOOTPATH B"

CV/2007/03/SK/2490

REFER TO SKETCH NO.

SETTING OUT

FOR BACK OF FOOTPATH

"FOOTPATH B"

CV/2007/03/SK/2490

REFER TO SKETCH NO.

FOR BACK OF FOOTPATH SETTING OUT

E1 E2

E19

D10b

D18bD18b.1

D18a

D17D18

D18.1

D10c

D10d

D10e

D10f

D10g

D10h

WIT

H E

XISIT

NG

U-C

HA

NNEL

BAC

K

OF F

OOTP

AT

H

MATC

H

B123

B124

A1

A27

A28

A26

A2

A3

‹‹

ih

‹2

‹2

‹2

‹2

‹CTR

TR

TRTR

‹V

‹V

‹V

‹f

‹f

‹l‹l

‹l

‹l

ts

ts

ts

�*

��

109.7

120.8

75.0

1.111

126.2

2.011

2.111

108.8

��

001

A2

2

<

<

���

etatsE

eeL nuhS

�����

kraP yellaV nadroJ

��

��

��

��

���

��

��

��

��

��

��

TS NUHS NAS

DAOR NEUST EEL N

UH

S

DA

OR

NO

EE

L

TS

GNI

HC

NU

HS

ENAL N

O EEL

.

.

.

.

‹‹‹

‹‹

‹‹

��

‹%

‹(

ih

ih

ihܤ

‹2

‹8

HG‹V

TR

TR

‹V

‹f

‹f

‹f

‹f

‹l

‹l

‹l

rq

ts

ts

ts

ts

~y

~y

��

201.9

190.78.811

194.2

217.0

197.8

2.111

168.9

192.9

109.5

215.5

125.8

175.2

��

���

���

���

��

���

���

���

ssergorpni skroW

ssergorp ni skroW

���

���

051

051

00

2002

00

2

05

2

052

003

002

052

4

7

3

1

9

1

8

8

^

<

<

<

��

���

����

���

���

����

���

���

����

����

���

���

���

NAHS NAT

truoC

naP iaT

truoC

ihC nuhS

etatsE nO nuhS

nedraG ognimalF

euhS naL uisT

neusT oW gnuL

���

yrrauQ

���

��

��

��

����

��

��

��

��

��

DR YAB RETAW RAELC WEN

DA

OR

NA

HS

OG

N IE

F

TE

ER

TS I

HC

NU

HS

DAOR AH IEF

DAOR YAB RETAW RAELC

DA

OR

NO

SR

E

DNA

DA

OR

NO

EEL

DA

OR

NE

US

T E

EL

NU

HS

DAOR NAW I

EF ���

‹‹

‹‹‹‹

‹‹

‹‹

‹‹

‹‹

‹‹‹

‹‹

‹‹

.

ܤ

e

‹l

‹l

ts

0.27

5.69

75.2

85.689.4

95.1

���

���

00

1

��

��

��

��

DA

OR

NE

US

T E

EL

NU

HS

DR NO

NUHS

��

enil

epi

P

��

.

‹‹

‹‹‹‹

‹‹‹‹‹

‹‹

��

‹%

"j

‹(

ih

ih

ih

ܤ

ܤ

‹2‹2

‹2

‹2‹2

‹8

HG

TRTR

TR

TRTR

TR

‹V‹V

‹V

‹V

‹V

‹V

‹V

‹V

‹V‹V

‹V

‹V

e

‹f

‹f

‹f

‹f

‹f

‹f

‹f

‹f‹f

‹f

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

‹l

rq

rq

rq

ts

ts

ts

ts

ts

ts

ts

ts

�*

�*

�*

�*

�*

~y

~y

��

‹‹

‹‹

‹‹

‹‹

‹‹

Z

.

.

.

.

.

.

...

.

FALL

FALL

+200.5

FALL

FALL

ID2DOn Yat HouseShun On Estate

ID3Sau Nga HouseSau Mau Ping Estate

ID4Sau Ming PrimarySchool

ID5Sau Mau Ping CPrimary School

Jan-19

chanyca
Line
chanyca
Oval
chanyca
Text Box
LEGEND ‧ Monitoring Station
chanyca
Stamp
chanyca
Oval
chanyca
Oval
chanyca
Text Box
ID1A Kwun Tong Government Secondary School
chanyca
Text Box
JAN-19
chanyca
Oval
chanyca
Oval
chanyca
Oval
chanyca
chanyca
Oval
Page 42: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX A

Project Organization Structure

Page 43: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

SCALE DATE

CHECK DRAWN

JOB NO. APPENDIX Rev

LCHC

60043155-A

Contract No. CV/2007/03 N.T.S. 2009

ENFL

Project Organization Structure

Development at Anderson Road – Site Formation and Associated

Infrastructure Works

Page 44: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX B

Implementation Schedule of Environmental Mitigation Measures (EMIS)

Page 45: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 1 February 19

September 2015

Appendix B - Implementation Schedule of Environmental Mitigation Measures

Environmental Mitigation Measures Location Implementation Status

Construction Noise Impact

Site Formation Silenced powered mechanical equipment (PME) for most equipment

(including drill rig, backhoe, dump truck, breaker and crane) and the

decrease of percentage on time usage of drill rig among the Central Area

from 50% to 40% is proposed.

All construction sites V

Temporary movable noise barrier shall be used to shield the noise

emanating from the drilling rig in order to provide adequate shielding for the

affected NSRs.

All construction sites V

Construction Air Quality Impact

General Site

Practice

Mean vehicle speed of haulage trucks at 10km/hr. All construction sites V

Twice daily watering of all open site areas. All construction sites V

Regular watering (once every 1 hour) of all site roads and access roads with

frequent truck movement. All construction sites

V

During road transportation of excavated spoil, vehicles should be covered to

avoid dust impact. Wheel washing facilities should be installed at all site

exits together with regular watering of the site access roads.

All construction sites V

Tarpaulin covering of all dusty vehicle loads transported to, from and

between site locations. All construction sites

V

Establishment and use of vehicle wheel and body washing facilities at the

exit points of the site, combined with cleaning of public roads were

necessary.

Site exits V

Page 46: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 2 February 19

September 2015

General Site

Practice

Suitable side and tailboards on haulage vehicles. All construction sites V

Watering of temporary stockpiles. All construction sites V

Blasting Use of select aggregate and fines to stem the charge with drill holes and

watering of blast face. All construction sites

V

Use of vacuum extraction drilling methods. All construction sites V

Carefully sequenced blasting. All construction sites V

Crushing Fabric filters installed for the crushing plant. All construction sites V

Water sprays on the crusher. All construction sites V

Loading and

Unloading

Points, and

conveyor Belt

System

Water sprays at all fixed loading and unloading points (at the crusher and

conveyor belts). All construction sites

V

The loading point at the crusher is enclosed with dust collection system

installed. All construction sites

V

When transferring materials from conveyor belt or crusher to the dump

trucks or chutes, dust curtains are used for controlling dust. All construction sites

V

Cover the conveyor belts with steel roof and canvas sides. All construction sites V

Construction Water Quality Impact

Construction

Phase

All active working areas should be bounded to retain storm water with

sufficient retention time to ensure that suspended solids are not discharged

from the site in concentrations above those specified in the TM for the

Victoria Harbour (Phase I) WCZ. All fuel storage areas should be bounded

with drainage directed to an oil interceptor.

Site drainage system V

Page 47: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 3 February 19

September 2015

Separate treatment facilities may be required for effluent from site offices,

toilets (unless chemical toilets are used) and canteens.

Site drainage system V

Discharged wastewater from the construction sites to surface water and/or

public drainage systems should be controlled through licensing. Discharge

should follow fully the terms and conditions in the licenses.

All works area V

Relevant practice for dealing with various type of construction discharges

provided in EPD’s ProPECC Note PN 1/94 should be adopted.

All works area V

Waste Management

Waste Disposal Different types of wastes should be segregated, stored, transported and

disposed of separately in accordance with the relevant legislative

requirements and guidelines as proper practice of waste management.

All construction sites V

Sorting of wastes should be done on-site. Different types of wastes should

be segregated and stored in different stockpiles, containers or skips to

enhance recycling of materials and proper disposal of spoil.

All construction sites V

Excavated spoil should be used as much as possible to minimize off-side fill

material requirements and disposal of spoil.

All construction sites V

Chemical waste should be recycled on-site or removed by licenced

companies. It should be handled according to the Code of Practice on the

Packaging, Labelling and Storage of Chemical wastes. When off-site

disposal is required, it should be collected and delivered by licenced

contractors to Tsing Yi Chemical Waste Treatment Facility and disposed of

in accordance with the Chemical Waste (General) Regulation.

All construction sites V

Page 48: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 4 February 19

September 2015

Necessary mitigation measures should be adopted to prevent the

uncontrolled disposal of chemical and hazardous waste into air, soil, surface

waters and ground waters.

All construction sites V

Waste Storage Chemical material storage areas should be bounded, constructed of

impervious materials and have the capacity to contain 120 percent of the

total volume of the containers. Indoor storage areas must have sufficient

ventilation to prevent the build-up of fumes, and must be capable of

evacuating the space in the event of an accidental release. Outdoor storage

areas must be covered with a canopy or contain provisions for the safe

removal of rainwater. In both cases, storage areas must not be connected to

the foul or stormwater sewer system.

All construction sites V

Dangerous materials as defined under the DGO, including fuel, oil and

lubricants, should be stored and properly labelled on site in accordance with

the requirements in the DGO. If transportation of hazardous materials is

necessary, hazardous materials, chemical wastes and fuel should be

packed or stored in containers or vessels of suitable design and construction

to prevent leakage, spillage or escape.

All construction sites V

Human waste should be discharged into septic tanks provided by the

contractors and removed regularly by a hygiene services company. Refuse

containers such as open skips should be provided at every work site for use

by the workforce. On-site refuse collection points must also be provided.

All construction sites V

Page 49: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 5 February 19

September 2015

Landscape and Visual

Additional

Measures

Planting and vegetation restoration (including transplanted trees) on soil

slopes including restoration of grassland, scrub and woodland on slopes

around the development platforms and access road. Restoration would be

undertaken using predominantly native species.

Whole development V

Additional

Measures

Screen planting along the access roads, to limit impacts of elevated

structures and rock slopes.

Whole development V

Colouring of shotcrete slopes. Whole development V

Limited planting on shotcrete slopes. Whole development V

Landscape buffers and planting in and around the development itself to

screen partially close views of the site.

Whole development V

Screen planting in front of retaining walls / granite cladding to those walls to

reduce glare and visual impacts.

Whole development V

Careful design of road elevated structure and abutments, to limit visual

impacts.

Whole development V

Roadside landscape features / hardworks to limit visual impacts. Whole development V

Conservation of CDG or CDV recovered from the site for re-use in the

landscape restoration.

Whole development V

Preservation (by transplanting if necessary) of any trees identified as being

of particular landscape value.

Whole development V

Page 50: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 6 February 19

September 2015

Ecology

Woodland planting on soft cut slopes available (about 13.4ha) within the

development site. Native species, preferably with documented ecological

utility, should be used.

Soft cut slopes V

Seeds of the native species when possible should be added into the

hydroseeding mix. Seedings should be pit planted with placement of slow

release fertilizer.

Soft cut slopes V

Maintenance and service, including weeding, fertilizing, replacement of

dead plants, etc. should be performed during the first 1 years of planting to

enhance the survival rate of the plants.

Soft cut slopes V

Contaminated Land

In accordance with the approved Contamination Assessment Report (CAR)

and Remediation Action Plan (RAP) in Nov 2006, it is recommended that

cement solidification / stabilization prior to on-site backfill for heavy metal

contaminated soil and excavation followed by disposal at designated landfill

for organic contaminated soil. Upon the completion of the proposed

remediation exercise as outlined in CAR & RAP, a Remediation Report will

be complied for submission to EPD to demonstrate that the proposed soil

remediation has been carried out properly and satisfactorily. Results from

the confirmation tests will also be included in the Remediation Report.

Photos showing the area of excavation, the solidification process, and

remediated soil and site shall also be included in the report for reference.

Locations specified in CAR V

Page 51: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Contract No. CV/2007/03 Development at Anderson Road –

Site Formation and Associated Infrastructure Works China State Construction Engineering (Hong Kong) Ltd. Final EM&A Review Report

Appendix B EMIS 7 February 19

September 2015

Landfill Gas Hazard

Further site investigation should be carried out during the detailed design

stage in order to measure landfill gas around the perimeter of the site, to

re-confirm that there is no preferential pathway for landfill gas migration and

to assess the potential for landfill gas hazards on the future development. If

a landfill gas hazard is identified, mitigation measures should be proposed

and implemented to address the hazard.

The whole development site V

Legend: V = implemented;

x = not implemented;

@ = partially implemented;

N/A = not applicable

Page 52: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX C

Summary of Action and Limit Levels

Page 53: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Appendix C - Summary of Action and Limit Levels

Table 1 – Action and Limit Levels for 1-hour TSP

Location Action Level Limit Level

ID 1A 201.5 500

ID 2 197.0 500

ID 3 203.7 500

ID 4 264.6 500

ID 5 267.4 500

Table 2 – Action and Limit Levels for 24-hour TSP

Location Action Level Limit Level

ID 1A 170.2 260

ID 2 200.0 260

ID 3 200.0 260

ID 4 181.3 260

ID 5 180.8 260

Table 3 – Action and Limit Levels for Construction Noise (0700-1900 hrs of normal weekdays)

Location Action Level Limit Level

ID 1A When one documented

complaint is received

from any one of the sensitive

receivers

*65 / 70 dB(A)

ID 2 75 dB(A)

ID 3 75 dB(A)

ID 4 *65 / 70 dB(A)

ID 5 *65 / 70 dB(A)

*Daytime noise Limit Level of 70 dB(A) applies to education institutions, while 65dB(A) applies during

school examination period

Page 54: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX D

Graphical Presentation of Impact Air Quality MonitoringResults over the Construction Stage

Page 55: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

CHECK DRAWN

Rev.60043155

APPENDIX No.

D -

Development at Anderson Road - Site Formationand Associated Infrastructure Works

SCALE N.T.S. DATE Jan-19FYW DTTW

Graphical Presentations of Impact 1-hour TSPMonitoring Results

JOB NO.

40

140

240

340

440

540

Con

cent

ratio

n, µ

g/m

3

Date

ID 1A

Action Level: 201.5 µg/m3

Limit Level: 500 µg/m3

1st Hour

2nd Hour

3rd Hour

Trend (1st Hour)

Trend (2nd Hour)

Trend (3rd Hour)

40

140

240

340

440

540

Con

cent

ratio

n, µ

g/m

3

Date

ID 2

Action Level: 197.0 µg/m3

Limit Level: 500 µg/m3

1st Hour

2nd Hour

3rd Hour

Trend (1st Hour)

Trend (2nd Hour)

Trend (3rd Hour)

40

140

240

340

440

540

Con

cent

ratio

n, µ

g/m

3

Date

ID 3

Action Level: 203.7 µg/m3

Limit Level: 500 µg/m3

1st Hour

2nd Hour

3rd Hour

Trend (1st Hour)

Trend (2nd Hour)

Trend (3rd Hour)

Page 56: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

CHECK DRAWN

Rev.60043155

APPENDIX No.

D -

Development at Anderson Road - Site Formationand Associated Infrastructure Works

SCALE N.T.S. DATE Jan-19FYW DTTW

Graphical Presentations of Impact 1-hour TSPMonitoring Results

JOB NO.

40

140

240

340

440

540

Con

cent

ratio

n, µ

g/m

3

Date

ID 4

Action Level: 264.6 µg/m3

Limit Level: 500 µg/m3

1st Hour

2nd Hour

3rd Hour

Trend (1st Hour)

Trend (2nd Hour)

Trend (3rd Hour)

40

140

240

340

440

540

Con

cent

ratio

n, µ

g/m

3

Date

ID 5

Action Level: 267.4 µg/m3

Limit Level: 500 µg/m3

1st Hour

2nd Hour

3rd Hour

Trend (1st Hour)

Trend (2nd Hour)

Trend (3rd Hour)

Page 57: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

CHECK DRAWN

Rev.Graphical Presentations of Impact 24-hour TSPMonitoring Results

JOB NO.60043155

APPENDIX No.

D -

DATE Jan-19FYW DTTW

Development at Anderson Road - Site Formationand Associated Infrastructure Works

SCALE N.T.S.

0.0

50.0

100.0

150.0

200.0

250.0

300.0

Con

cent

ratio

n, µ

g/m

3

Date

ID 3

Action Level: 200.0 µg/m3

Limit Level: 260 µg/m3

Concentration

Trend (Concentration)

0.0

50.0

100.0

150.0

200.0

250.0

300.0

Con

cent

ratio

n, µ

g/m

3

Date

ID 1A

Action Level: 170.2 µg/m3

Limit Level: 260 µg/m3

Concentration

Trend (Concentration)

0

50

100

150

200

250

300

Con

cent

ratio

n, µ

g/m

3

Date

ID 2

Action Level: 200.0 µg/m3

Limit Level: 260 µg/m3

Concentration

Trend (Concentration)

Page 58: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

CHECK DRAWN

Rev.60043155

APPENDIX No.

D -

Development at Anderson Road - Site Formationand Associated Infrastructure Works

SCALE N.T.S. DATE Jan-19FYW DTTW

Graphical Presentations of Impact 24-hour TSPMonitoring Results

JOB NO.

0.0

50.0

100.0

150.0

200.0

250.0

300.0

Con

cent

ratio

n, µ

g/m

3

Date

ID 4

Action Level: 181.3 µg/m3

Limit Level: 260 µg/m3

Concentration

Trend (Concentration)

0.0

50.0

100.0

150.0

200.0

250.0

300.0

Con

cent

ratio

n, µ

g/m

3

Date

ID 5

Action Level: 180.8 µg/m3

Limit Level: 260 µg/m3

Concentration

Trend (Concentration)

Page 59: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX E

Graphical Presentation of Noise Monitoring Results

over the Construction Stage

Page 60: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

SCALE DATE

CHECK DRAWN

JOB NO. APPENDIX Rev

Development at Anderson Road - Site Formation and

Associated Infrastructure Works

N.T.S. Jan-09

FYW DTTW

Graphical Presentations of Noise Monitoring Results 60043155E

-

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0L

eq

(30-m

in),

dB

(A)

Date

ID 1A

ID 1A

Limit Level: 70 dB(A)

Limit Level: 65 dB(A) (duringexam)Trend (ID 1A)

40

45

50

55

60

65

70

75

80

Le

q (

30-m

in),

dB

(A)

Date

ID 2

Limit Level: 75dB(A)

ID 2

Trend (ID 2)

40

45

50

55

60

65

70

75

80

Le

q (

30-m

in),

dB

(A)

Date

ID 3

Limit Level: 75dB(A)

ID 3

Trend (ID 3)

Page 61: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

SCALE DATE

CHECK DRAWN

JOB NO. APPENDIX Rev

Development at Anderson Road - Site Formation and

Associated Infrastructure Works

N.T.S. Jan-19

FYW DTTW

Graphical Presentations of Noise Monitoring Results 60043155E

-

40

45

50

55

60

65

70

75

80L

eq

(30

-min

), d

B(A

)

Date

ID 4

Limit Level: 70 dB(A)

Limit Level: 65 dB(A) (duringexam)ID 4

Trend (ID 4)

40

45

50

55

60

65

70

75

80

Le

q (

30-m

in),

dB

(A)

Date

ID 5

Limit Level: 70 dB(A)

Limit Level: 65 dB(A) (duringexam)ID 5

Trend (ID 5)

Page 62: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX F

Event Action Plan

Page 63: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Appendix F – Event Action Plan

Event and Action Plan for Air Quality

Event ACTION

ET IC(E) ER Contractor

ACTION LEVEL

Exceedance for

one sample

1. Identify source 2. Inform IC(E) and ER. 3. Repeat measurement to confirm

finding. 4. Increase monitoring frequency to

daily

1. Check monitoring data submitted by ET.

2. Check Contractor’s working method.

1. Notify Contractor. 1. Rectify any unacceptable practice.

2. Amend working methods if appropriate.

Exceedance for

two or more

consecutive

samples

1. Identify source. 2. Inform IC(E) and ER. 3. Repeat measurements to confirm

findings. 4. Increase monitoring frequency to

daily. 5. Discuss with IC(E) and Contractor

for remedial actions required. 6. If exceedance continues, arrange

meeting with IC(E) and ER. 7. If exceedance stops, cease

additional monitoring.

1. Check monitoring data submitted by ET.

2. Check Contractor’s working method.

3. Discuss with ET and Contractor on possible remedial measures.

4. Advise ER on the effectiveness of proposed remedial measures.

5. Supervise implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify Contractor. 3. Ensure remedial actions

properly implemented.

1. Submit proposal for remedial actions to IC(E) within 3 working days of notification.

2. Implement the agreed proposals. 3. Amend proposal if appropriate.

Page 64: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Event and Action Plan for Air Quality

Event ACTION

ET IC(E) ER Contractor

LIMIT LEVEL

Exceedance for

one sample

1. Identify source. 2. Inform ER and EPD. 3. Repeat measurement to confirm

finding. 4. Increase monitoring frequency to

daily. 5. Assess effectiveness of

Contractor’s remedial actions and keep IC(E), EPD and ER informed of the results.

1. Check monitoring data submitted by ET.

2. Check Contractor’s working method.

3. Discuss with ET and Contractor on possible remedial measures.

4. Advise ER on the effectiveness of proposed remedial measures.

5. Supervise implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify Contractor. 3. Ensure remedial actions

properly implemented.

1. Take immediate action to avoid further exceedance.

2. Submit proposals for remedial actions to IC(E) within 3 working days of notification.

3. Implement the agreed proposals 4. Amend proposal if appropriate.

Exceedance for

two or more

consecutive

samples

1. Identify source. 2. Inform ER and EPD. 3. Repeat measurements to confirm

finding. 4. Increase monitoring frequency to

daily. 5. Carry out analysis of Contractor’s

working procedures to determine possible mitigation to by implemented.

6. Arrange meeting with IC(E) and ER to discuss the remedial actions to be taken.

7. Assess effectiveness of Contractor’s remedial actions and keep IC(E), EPD and ER informed of the results.

8. If exceedance stops, cease additional monitoring.

1. Discuss amongst ER, ET and Contractor on the potential remedial actions.

2. Review Contractor’s remedial actions whenever necessary to assure their effectiveness and advise ER accordingly.

3. Supervise implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify Contractor. 3. In consultation with

IC(E), agree with Contractor on the remedial measures to be implemented.

4. Ensure remedial measures properly implemented.

5. If exceedance continues, consider what portion of the work is responsible and instruct Contractor to stop the portion of work until the exceedance is abated.

1. Take immediate action to avoid further exceedance.

2. Submit proposals for remedial actions to IC(E) within 3 working days of notification.

3. Implement the agreed proposals. 4. Amend proposal if appropriate.

Page 65: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Event and Action Plan for Noise

Event Action

ET IC(E) ER Contractor

1.Exceedance for Action Level

1. Notify IC(E) and Contractor. 2. Carry out investigation. 3. Report the results of investigation to

IC(E) and Contractor. 4. Discuss with Contractor and

formulate remedial measures. 5. Increase monitoring frequency to

check mitigation effectiveness.

1. Review the analysed results submitted by ET.

2. Review the proposed remedial measures by the Contractor and advise ER accordingly.

3. Supervise the implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify Contractor. 3. Require Contractor to

propose remedial measures for the analysed noise problem.

4. Ensure remedial measures are properly implemented.

1. Submit noise mitigation proposals to IC(E).

2. Implement noise mitigation proposals.

1.Exceedance for Limit Level

1. Notify IC(E), ER, EPD and Contractor.

2. Identify sources. 3. Repeat measurements to confirm

finding. 4. Increase monitoring frequency. 5. Carry out analysis of Contractor’s

working procedures to determine possible mitigation to be implemented.

6. Inform IC(E), ER and EPD the causes and actions taken for the exceedance.

7. Assess effectiveness of Contractor’s remedial actions and keep IC(E), EPD and ER informed of the results.

8. If exceedance stops, cease additional monitoring.

1. Discuss amongst ER, ET and Contractor on the potential remedial actions.

2. Review Contractor’s remedial actions whenever necessary to assure their effectiveness and advise ER accordingly.

3. Supervise the implementation of remedial measures.

1. Confirm receipt of notification of failure in writing.

2. Notify Contractor. 3. Require Contractor to

propose remedial measures for the analysed noise problem.

4. Ensure remedial measures are properly implemented

5. If exceedance continues, consider what portion of the work is responsible and instruct Contractor to stop that portion of work until the exceedance is abated.

1. Take immediate action to avoid further exceedance.

2. Submit proposals for remedial actions to IC(E) within 3 working days of notification.

3. Implement the agreed proposals. 4. Resubmit proposals if problem

still not under control. 5. Stop the relevant portion of works

as determined by ER until the exceedance is abated.

Page 66: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX G

Cumulative Statistics of Exceedances, Complaints, Notification of Summons and Successful Prosecutions

Page 67: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Appendix G - Cumulative Statistics on Exceedances, Complaints,

Notification of Summons and Successful Prosecutions

Cumulative statistics on Exceedances

Total no. recorded since project commencement

1-Hour TSP Action -

Limit -

24-Hour TSP Action 17

Limit 1

Noise Action 32

Limit 1

Page 68: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

Cumulative statistics on Complaints, Notifications of Summons and Successful

Prosecutions

Total no. recorded since project

commencement

Environmental complaints 75

Notification of summons 6

Successful Prosecutions 2

Page 69: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX H

Meteorological Data for the Construction Stage

Page 70: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

5 1008.3 31.4 28.1 25.3 23.3 19.8 22.1 83 75 191.9 124.8 80 20.2

6 1006.2 32.9 28.9 26.7 24.8 22.8 24.4 88 81 1346.1 75.5 200 21.7

7 1005.7 34.6 31 28.4 26.5 22.9 24.9 82 70 471.1 179 240 18

8 1005.9 34.3 31.3 28.4 26.5 23.4 24.3 79 66 317 215.5 240 20

9 1007.8 34.3 32 29 26.8 24.7 23.8 75 66 159.2 213.9 90 18.5

10 1014.1 30.7 29.1 26.5 24.9 22.5 22.1 77 69 144.6 180.6 80 28.5

11 1018 29.4 24.5 21.9 19.8 12.5 14.7 65 48 54.3 216 080# 27.8#

12 1019.8 24.4 21 18.4 16.2 11.5 11.1 63 50 9 188.5 360 24.3

King's Park

MeanAmount

AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1021.9 24.5 18.3 15.3 13 9.4 8.1 64 40 Trace 226.5 360 25.9

2 1015.5 28.3 23.7 20.5 18.6 15.8 17.1 81 64 1.1 140.7 70 21

3 1015.2 28.3 22.1 19.7 17.9 12.8 16.6 83 81 120.7 70.1 070# 24

4 1012.7 30.1 24.8 22 20.2 16.8 17.6 77 79 108.7 119.3 70 29

5 1010.8 32 28.8 25.5 23.5 20.7 21.2 78 70 245.2 169.8 80 21.9

6 1004.8 32.9 30.7 28.1 26.2 24.4 24.6 81 76 341.8 127.1 220 18.4

7 1005.1 34.3 31.9 29.1 27 23.9 25.3 81 69 389.4 197.4 100 21.5

8 1004.9 34.9 32.2 29.4 27.7 24.8 25.5 80 69 334.1 192.1 230 16.1

9 1007.5 34.6 31.9 28.8 26.9 24.2 24.6 78 66 486.3 181.3 080# 28.6

10 1012.4 32.1 28.9 26.2 24.3 23 20.8 73 59 44.4 202.6 090# 21.6#

11 1017.7 30.3 23.2 20.5 18.3 9.7 15.1 72 61 60.4 171.4 360 25.5

12 1019.3 24 19.3 17.3 15.6 9.4 13.3 78 65 50.2 124.5 10 25.8

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1020.5 24.5 19 16.8 15.2 9.8 13.3 80 73 24.6 108.7 40 27.1

2 1016.6 27.1 19.7 17.9 16.3 7.7 15.8 88 88 113.1 31.8 30 22.7

3 1016.9 29.1 23.1 20.2 18.1 8.1 16.4 80 73 17.5 110.1 30 22.2

4 1014.7 29.5 23.6 21 19 13.5 18.6 87 84 78.9 49.2 30 23.1

5 1008.8 30.7 28.1 25.6 23.7 20.8 22.9 86 77 176.6 112.1 80 19

6 1007.8 32.7 29.2 27.1 25.4 20.4 24.4 85 81 474.9 92.5 210 21

7 1008.2 33.9 32.1 29.2 26.9 23.6 25.5 81 69 469.4 247.8 210 20.4

8 1008.1 33.7 31.9 28.8 26.6 24.3 25.2 81 67 350.3 213.4 80 15.5

9 1008.7 34.1 30.5 28 25.9 23.1 24.6 83 70 583.1 179.9 60 18.6

10 1012.5 31.6 27.2 24.8 22.9 15.7 19.2 72 67 22.7 165.5 20 31.5

11 1017.1 26.7 23.9 21.2 19.2 16.8 16.1 74 51 42.2 212.5 70 24

12 1016.3 26.8 20.8 18.1 15.6 5.8 11.1 66 45 18.4 185.8 20 26.3

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1021.5 19.4 16.3 13.7 11.6 7.2 7.5 67 63 5.4 158.6 20 27.1

2 1017.1 26.9 19.1 16.2 14.2 8.6 12 77 65 23.7 127.7 40 22.5

3 1018.7 27.4 21.1 18 15.7 12.5 12.4 71 79 20.5 108.6 30 26.2

4 1014 29.7 26.9 22.9 20.6 16.9 18.2 76 59 36 191.6 70 18.4

5 1009.2 33 29 26 24.1 19.8 22.4 81 73 186.7 150.5 50 16.9

6 1005.3 34.5 31.3 28.6 26.7 24.6 25 82 74 446.1 149.5 200 21.5

7 1004.4 33.9 31.4 28.8 27 24.6 25.1 81 64 226.8 202.3 220 19.3

8 1006.1 35 32.4 29.5 27.4 25.2 24.8 77 56 157.6 242 220 13.4

9 1007.6 32.8 30.6 28 26 23.2 23.9 79 70 123.1 158.5 110 26.4

10 1013.9 30.2 27.3 24.8 23.2 21.3 20.6 78 62 172.4 161.1 80 29.3

11 1015.4 29.7 25.3 23 21.5 17.7 18.7 77 70 86.1 134.2 70 27.3

12 1020.9 24.5 19.4 16.9 14.6 9.6 9.9 65 50 2.8 193.9 20 28.1

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2011

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2010

Monthly Extract of Meteorological Observations: 2009

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2008

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Page 71: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1019.3 22.4 17 15.1 13.5 7.4 11.9 82 79 42.1 86 30 23.3

2 1016.8 22.2 17.8 15.8 14 9.8 13.1 85 84 29.5 38.1 40 25.4

3 1015.6 28.8 21.8 19 16.9 11.4 15.8 83 75 22.1 106.5 50 23.9

4 1011.3 30.2 26.2 23.9 22 18.2 21.2 85 80 294.9 88.1 80 21.4

5 1007.5 32.5 29.4 27 25.5 24.1 24.4 86 78 277.7 136.1 090# 23.4#

6 1002.6 33.3 30.5 28.1 26.4 24.7 25 83 78 261.5 126 210# 26.2#

7 1004.6 33.8 31.6 28.8 26.8 24.4 25.2 81 70 467.8 197.6 230 22.6

8 1003.3 34.5 32.2 29.5 27.4 25.1 24.9 77 71 149.8 183.2 230 17

9 1010.3 33.6 30.9 28 26 23.6 23 75 65 213 187.4 110 20

10 1014.3 30.7 28.3 25.6 23.7 17.7 20.4 74 59 46.4 199.8 100 25.7

11 1015.5 27.8 24.2 22.2 20.6 14.6 18.7 81 76 63.9 101.4 80 26.2

12 1018.3 26.2 19.7 17.8 15.9 7.1 13.8 78 74 56 101 70 31.3

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1020.5 25.6 19.1 16.7 14.8 10.8 11.3 71 58 3.4 184 60 21.2

2 1018.3 26.2 22.1 19.1 17.1 11.9 15.4 80 75 1.5 98.7 70 22.6

3 1015.7 28.3 23.5 20.5 18.5 13.2 16.5 79 65 130.5 127.4 50 19.5

4 1012.3 30.6 23.9 21.5 19.7 15.2 19 86 81 253.8 53.6 70 22.9

5 1008.8 33 28.2 25.7 23.9 16.6 23.2 86 80 509.3 90.7 60 19.7

6 1005.5 34.2 30.7 28.2 26.5 22.4 25.1 84 72 438.6 146.1 230 23.4

7 1007.1 33.5 30.9 28 26.1 24.6 25.1 85 72 436.3 156.9 170 20.3

8 1004.9 34.9 31.1 28.6 26.5 24.4 25.3 83 68 445.4 148.1 200 22.7

9 1008.5 34.7 30.3 27.5 25.7 23.6 23.9 82 67 454.2 186 90 27.4

10 1014.1 32 28.6 25.7 23.7 19.4 18.6 66 45 2.9 247.3 90 23.6

11 1017.3 29.5 23.8 21.7 19.7 12.8 16.2 72 67 83.1 133.4 80 30.5

12 1019.6 24.9 18.6 16.1 14 9.2 8.6 63 40 88.3 197.4 30 24.8

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1021.3 24.4 19.2 16.3 14.1 10.3 9.9 67 32 Trace 238.8 40 22.9

2 1017.7 24.6 17.9 15.5 13.5 7.3 12.3 82 73 39.5 91.9 50 26.6

3 1017.1 27.6 20.9 18.7 17 13.9 15.7 83 77 207.6 86 60 24.1

4 1013.4 29 24.9 22.6 21 17.5 20 86 72 132.4 119.4 80 20.6

5 1009.5 32.8 28.6 26.4 24.6 18.8 23.7 86 82 687.3 107.8 240# 24.3#

6 1003.8 33.7 31.5 29 27 25.2 25 80 77 436.6 147.3 230 18.9

7 1005.3 34.2 32.6 29.8 27.6 25.9 25.9 80 70 260.5 217.5 220 18.2

8 1007 34.6 32 29 26.8 22.9 25.3 81 67 548.2 212 240 17.7

9 1008.4 34.1 32 29 27 25.2 24.5 77 57 140.6 203 80 17.4

10 1014.6 31.4 28.9 26.2 24.3 22.8 20.4 71 54 109.8 222.9 100 24.3

11 1017 28.6 24.6 22.6 21.2 18.1 18.5 78 63 31.1 141.4 90 25

12 1021.7 23.9 18.5 16.3 14.2 10.7 9.9 67 67 44.7 115.3 20 30.5

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1021.2 23.9 18.9 16.4 14.5 10.3 11.2 72 45 41.7 198.8 50 24.3

2 1019.4 23.8 19.5 17.5 15.9 11 13.4 78 74 32 97.5 40 22.2

3 1017.7 28.3 22 19.9 18.5 14.8 17.1 85 83 28.4 69.9 50 22.6

4 1014.1 31.9 26.7 23.6 21.4 15.9 19.2 77 63 64.5 159.2 20 18.2

5 1008.7 32.6 29.9 27.5 25.5 22.6 24.5 85 84 513 93.5 210 20.1

6 1007.3 34.2 32.3 29.7 27.7 25.6 25.7 80 69 302.1 192.8 220 20.3

7 1004.2 34.4 31.8 29.1 27.2 23.9 25 79 75 406.2 164.9 210 20.4

8 1006.1 36.3 32.1 29.3 27.2 24.9 25 78 65 143.3 195.9 220 12.8

9 1010.2 32.9 31.1 28.4 26.6 24.5 24.1 78 61 87.9 204.5 60 20

10 1014.4 31.7 28.5 26 24.2 18.5 21.4 77 64 168.3 172.8 80 23

11 1017.5 30.3 26.1 24 22.4 15.3 20 79 66 22.8 143.9 80 27.7

12 1020.8 25.1 20.3 18.6 17.1 11.3 14 76 77 64.3 75.9 20 26.2

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2015

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2014

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2013

Monthly Extract of Meteorological Observations: 2012

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

Page 72: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1020.4 24.3 17.8 16 14.4 3.1 13 83 79 266.9 67.1 60 29.4

2 1022.2 25.9 18.2 15.5 13.4 9.4 10.4 74 68 24.8 103.3 20 21.3

3 1017.7 25.9 20 17.5 15.7 10 14.5 84 79 148.7 84.8 50 22.8

4 1011.6 29.1 26 23.6 21.9 19.8 21.6 89 84 211.4 55.4 40 17.1

5 1009.7 32.1 29.1 26.7 24.9 20.4 23.6 83 78 233.6 122.2 70 20.2

6 1007.7 35.5 32.4 29.4 27.5 24.1 25.8 82 70 347.4 173.5 220# 18.5#

7 1007 35.6 32.6 29.8 27.4 24.7 25.7 79 63 175.9 218.2 230# 19.3#

8 1002.8 34.4 31 28.4 26.5 24.5 25.2 84 72 532.7 148.5 60 17.1

9 1007.1 34.9 30.4 27.9 26.1 22.8 23.9 79 72 323.1 135.7 80 18.8

10 1010.7 32.4 29.1 26.8 25 22 22.9 80 74 624.4 152.6 70 26.3

11 1017 29.2 24.5 22.3 20.3 12.8 18.3 79 68 131.3 138.3 70 27

12 1019.5 25.9 21.8 19.6 17.7 11.5 13.9 70 62 6.6 168.2 60 26.7

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1019.8 25.5 20.6 18.5 17 13.6 14.7 79 66 7.8 145.1 70 26.4

2 1020.5 25.5 20 17 14.9 10.6 12.2 75 65 19.9 139.9 60 26.8

3 1016.4 27.6 21.7 19.3 17.3 13.8 15.7 81 80 48 85.2 60 26.5

4 1013.2 30.7 26.2 23.3 21.2 15.5 19.8 81 69 58.8 130.3 70 20.1

5 1010.5 31.6 28.6 26 24.2 22.6 22.5 82 77 399.3 126 80 18.6

6 1006.7 34.1 31.3 28.8 27.2 24.3 25.6 83 78 656 138.9 240 23

7 1006.8 34.8 31.4 28.7 26.9 24.4 25.5 83 79 570 162.9 90 22.1

8 1006.3 36.6 32.1 29.3 27.3 24 25.3 80 70 489.1 205.4 230 20.6

9 1009.1 34.1 31.9 29 27.2 25.3 25 80 65 192.4 187.1 080# 17.4

10 1012.7 33.5 29 26.3 24.4 19 20.4 71 57 99.6 228.6 70 32.9

11 1016.6 28.4 24.4 22.2 20.5 15.5 17.6 76 74 31.2 114.3 60 28.8

12 1020.6 23.2 20.1 17.8 16 9.8 11.2 66 54 Trace 209.6 70 29.6

King's ParkMean

Amount AbsoluteDaily Max(deg. C)

Mean DailyMax (deg.

C)

Mean (deg.C)

Mean DailyMin (deg. C)

AbsoluteDaily Min(deg. C)

of Cloud(%)

1 1018.4 25.5 18.5 16.1 14.1 7.8 11.7 77 69 62.2 136.1 60 29.5

2 1019.7 26.2 18.7 16 13.9 6.8 10.4 70 73 4.5 108.7 50 23.7

3 1016.1 27.9 24.4 20.8 18.6 11.1 16.2 76 56 22.7 196.2 60 20.8

4 1014.1 30.6 26.9 23.6 21.7 16.1 19.4 78 71 28.1 143.5 70 16.1

5 1010.5 35.4 31.7 28.3 26.1 22.1 23.7 77 62 57.5 236.9 220 20.2

6 1004.8 35.1 31.3 28.6 26.8 24.4 24.7 80 79 458.8 145.2 230# 24.6#

7 1004 34.3 31.8 29.1 27 25 25.4 81 77 341.1 181.1 90 24.2

8 1001.9 34.2 31 28.6 26.7 24.6 25.5 84 84 615.1 116.2 230 19.9

9 1008.8 35.1 31 28 26 23.6 23.7 78 68 383.3 183.3 090# 19.5#

10 1015.5 31.4 28 25.3 23.4 20.9 18.7 69 59 104.3 181.9 80 24.3

11 1017.2 28 24.8 22.9 21.4 17 18.6 78 79 73.4 123.9 70 29.1

12 1019.9 27.1 21.3 19.2 17.6 10.3 14.8 76 75 11.9 122 360 25.9

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2018

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

Mean WindSpeed(km/h)

Monthly Extract of Meteorological Observations: 2017

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Month

Hong Kong Observatory Waglan Island^

MeanPressure

(hPa)

Air Temperature Mean DewPoint (deg.

C)

MeanRelativeHumidity

(%)

TotalRainfall

(mm)

Total BrightSunshine(hours)

PrevailingWind

Direction(degrees)

Monthly Extract of Meteorological Observations: 2016

Page 73: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

APPENDIX I

Proposed noise mitigation measures for the project

Page 74: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

|ILIL!|_"_____L_?|_._1 LIIIIIIIIIIIII_II1IL LLL LXLL? L/LLHLHLHLLLHLLHLL

LWLLLLLL§L_w1____L\L.LLLLLLLLLLLLLLEWW9LL“LN

N\ LL 3|L _LLL LALLLLL LLULLL QL

J’...miLLLLL LaALLHLL

‘L37L_LLLL

LL3/mamHQ %9LLLLLp

f‘LQwL

L_______HM___3L WL L

LLWWM/L%WLL

LLLLIHLLLLLLLLLILILIL >Q%_L

LLLLLLMLLLLIL”L

/XLLLLAWLLLLLLLLLLLLLLLLLL ___’.

__ IIJIP-".|_|I.I|L*_ll||’‘IFELL_'_ L

U Q

H: LLLHLLLEXwQFm

\/ LLLLLLWLELLLMLLLL__L_L “HmLL LLLLLLL/LLLLLLB0/Efig/MLLgLL/L/LLLLLM

L"\/N\/L‘Q/MQ/Aw _

MM L L4WLLI

_

LwfiM _MLLLm___NW WmL fQ“II,ii

ll|II‘I‘_I‘___-___Iiiiii¥iQ9i99___-______-J9

355553

53

Page 75: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

I. LIL I__LlL

v

L_ L___m

N LLLLWNHLM

'__\__‘\_“L_\\\___“_______________“__‘______L_ LLL

LL“_h__LL“LM

LMLLm

L

__

_L

_L_ __

{___mY

@QM

6\LLL\LLL_

\\\LW

\ E\\L__L LL‘‘\/_L

PL_\E6..LL MLL

LL“\LLNL_

W

LLLL.L LLLLLLLLLL\LLLLL LLL?ZLLLLLEELL$LbQM8 L \““ml

wH%%%hA%V$Lw%xH\\\@\%KXW“MM_LL L LLLL______“_\_‘__‘“_‘_‘_______"n___‘____________d“‘__‘KL_LL“L\L_LLLMML

&fim7L&QMELL@\Xfi.._xL\L Vmm-

LL___/LLWLLLL LWLLHYE ________\LL\LLL_“\L_LHLL_LLLALLMLWWLLLiV_Wm LLQLLLLLLmymM/ A/LHmUH6H7LIL_LLL_L_L LLHLwL@_LLg?JLHHLHR‘__8W\(MLLELLLLLLL_L_LLLQLLFH/LLLL_HLLLLLLLLLL LI LEI\LLLLLLLLLLLLLLL_\L_|_L[L__L|“_®LL§MmLgfi$/VKCBSLIL!LLEELLLL LLLLLLO_\__‘___.‘__.\__\‘-LU

_____H

__g_‘____________\\L ‘LLwU+_UTM___’illRL

_I_hf¥_*0‘;‘L!ii______!gM!_i__‘S______-__L___i‘___-_______if~!H;_iJ’i_'____!BBix’_“!___!__‘!__15_‘!ii_“!_______-IB‘LL!__‘5

LL LIllLII:

Page 76: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

1- 14-‘-

- I1| '\l-

.1*“ *-._

-.-. _ I '-

/iii‘"'-"--.---

""*-'1.-.-u

. “*1-....-/’ '. 4'

-I. .1"I

"'1 .-‘F. I-I

. ,-I'.-

. ‘-531Jr \\ .'

. _- \ ,*'I _,- I .r" ""~.\_¢

/J,’ _.-' ,1-I"-""5 -,\' k ,-*.- ___,» -R‘ \‘ __ '_ X

__,. t .1 -.._-.+,- .‘ ._ __.._‘

I I'M "1-E I" i. \ ‘Hyr \ ‘III.-' 1 _ '1‘./’ 1! .- +. -. -. ..-I ' ~ '. ‘H. ‘I '- ., "1.-' \. In .._ —-*~=.:P 3014 ~. ._ ~- . - __..L .-_ - ,-E \ va 6‘ 30?; R.‘ _ K. --- _____Z=-H

3079"H1 ‘*0 3g75\-:?:*‘-E ' R "F: I/1.*1. gfig fin? €qé¥%m

~~1-1». 3°B3‘»= ' ~~*.:s0e31'__.

*i;>,/1?’I-"'5'Qt‘:-—_"-I2";-—-._ _

h Rik‘ I I ~‘J I‘ 2/ —'—\—\_

K‘ I/" I.-\_ II.

-. 31xxax W ___316.; 3.165 @-.g—

.' I/,1x.=’P‘ ,.»";/7<"'>’7J%7 1

."'.)’;

‘Xx.

'\if/_/J;-Iif/;/"

1"‘'I1/'/'

./.-" .§1'I F"

Ti.vi 1""D

‘K.\_\ '\_-/\

'-1* ‘-

\ . .1 1_I— . . .

if .‘ p___, ._. _ t .-.,Y’--I-“"'

-' -.._ ‘H... ix“-. _II. ., I. _ . .-___ ""- I-, I - \ \___-Q . -._ . - \ _

-4- -- - _ .__.-»" _- - I J-- - - ¢__.-- ..- - -r__.-- . _,.- .1-_-|- . ._,.- 1- - ,

-4--I-" * .- _r' -' '-.-»-__'_- ' I .- ._ ._L ‘In I‘ ‘.-I" '

-\. ." . -1'

/ 4-' 1' - H. \ H‘

' I \ \.| -_.-"’r.‘:',|" _~

.' -_. I; I.‘|r _. _

I ‘Ix . \. ___ ...

1- _-| .' K ~.\__ 5'2 ___-_ \

.-' / I- 1-'; _—»-_ - ‘I.

g ii E.‘ i - ' \_. __.'. .

.__--. -1-___‘ K ~\

I "‘-. _. I "'‘\

-I.

\@ I9 \ n I .

“~. H2 """-H-__“_:7':'--2:-—_I:—_——-_ "":"- '. .l ax‘ ..__M::\‘m.|P..»' {H} wE\¢ ~, _‘ "‘——~j:_:;_\__“___‘-‘I N -

~ _ “"-~7?:§‘30e'is "3oe's3°93'_3 H3 :' 399515;; '=34>%'a9s“~» ,¢;1a13/1-08 \.--_ ~ . /*_:~ "' -..m_-e “ jggjf .._ A! 3692 -_, ,-I 3099' * :' 1...! ' ., ‘_‘-»._

. R K ./ _ I “I _ --.- * /‘we 3103"’ E4 2.1100 3136'? H51”. 3109 ii “I -\~_ _. .- ~. __ --~o_~;;__'__________._,. 3mm Q. ___ ‘I5. 3110.- ___._.--I"-‘H, -.., ‘* If "' Ji"— “--[lg-.__--—_:'_-:_'::_-.-'f__-:_:'-u~ -5’ .1’ I\3Il1 9'\. /xxal I ~- . K ___-

I

\\ij,\.f.i'\rr.,:.-'

‘Iin

.1" I’.I

//i/'/‘__/ \-

'\IJ1,

~. _./"91'}f//£/5".-’ ./'/'

/1',"‘-r/-—--.,

e’;’i‘K\*\~.,\_f‘~3Qzl1§:\’~: -:_,» :1‘. 321 Ii’ ':._/ fi.

32. J‘, m11__2,.- ‘$131385.’ A., M‘ . \ em‘ "es/?;..;1@a "a1w>'”*»m6f-éaigs ’\'\-lie._H._ ’ ._k‘ ‘D \ .|_‘\ I __. ___~__H .._; A ‘x .\ _ ._ _\ _ ,

I . ' » _ K 319%. *319°e~.; \I " __ _ < I ~ ~ :21 ‘ H ~- 31931 ‘3197“- am- »--* - ~ ~~~., / I I I 2021 .1-"""'-F--H -~ - ~ -- 1:» - --_.. ‘-- \ 9 i xq

9 '~ .~ *~- ; "-I,-"3213 ~I-< -K ‘- Ia N 2" ...! I i

N

‘ii,-fl .-I ,-I".-

i-a .; Pi? ‘I1- ' ul _-I"' ‘P

I r

.I 'u_ - "‘—._-\. . ~ --._,__‘__I. ‘I:-I-||.‘_ 1- -IIn_,_.__ u___

\ :' 1 E \"" I -\. "-1- -'-.-LJ xi‘!-\,,\ " ‘Rub "'-..:_:__"."‘ -\—\-q_____:"\—\-._.__-qi -I-___'__\_

| ' ' "'v-._ "'--,, '-\-._ -_.‘.-\—- -‘-u._\_ I 1I--3-‘. aI..__-i -%¢_,___'

""1---.._-!';-"-ii"*-\-HI "- --,.-

-‘__‘-‘- - I.

ft’-Iv _._ _'___ \ -_____ - i,.-"'--

___ -¢_.__-.::'-'..,_H_‘___ --,,- --|-‘___ /

I’/\e___--‘_‘“_"I--:12;-_-_-._-__,___

_.I\___-:;__-I-_ -\-0_

.r')-

I-/-I /_/f I

__/

__rf___rR. mg: /‘3l3-° 312:; =--‘L33-i~1““~‘\-1~~.""'-."“~ 1 '~ 3136-»~ '3131 \ -1' 31153», "~h' fl,-F‘//»=-... ‘ iffi.:.3132 311%./¥_ -..__'\\ \ ‘emf .

’" J.-e -.;-.__,/ /' ; 33111;‘ 3153'" x “~~:;~\ "\‘\3i§5~.a13;,,313';§1.38.»'3115 "- 5 g 31 ‘I /’ "- =31 1317 ~ i“ 4 *~\ \ \ ‘ - ~*~ » ~,_2-1@116§1%§ 1 ‘"~1=|1a> 311%. 3143-v - 3140. /” 'J1fl1%1=;~.

$‘\~?.{ " ii -.. \1?\§169‘~» ' M 3163 '“"""""-§.l75*-N "“"-~\ Q‘ 3172*‘ \ -\<: -""‘“"'\3I>41"‘i§*e“"’ "§1§7:"' 3113-'3: ...-i' ‘Q1 /‘ ..";§-~§j_-.~‘ i"~3_1_6]"I:(n_2:"1l 54 '*3];-E//3133 o:31j_g1_ ‘£1124 I

\. ~ D \_ \ at .,. :31 \\ H v~,_;"U ‘-_‘-.

\‘ \\"\_\ I ‘w-J’ ‘F /~" " -‘-ll".H, 3135 ' J 31_?§~. \\ 3_I5?""\ ..I 3151/ ~ ,

2/ /. I,

/L»/'3‘i83,3H14¥f3§"9~. .2: \ 31s1$”I:E0‘§,s1'4§, *~ -'K ¢"...3§i8°\\.\ \_\§,e”3t§,a149/

~. //I it .

1%/gv/,z/\<;§@%21o 3132 5' 1. I 3‘3§l86 /H13 ” “H15 3187 ’ /.".c"3

-Iii 71 I .1. 203 "--.,__,..w'217_ ..;%>i"/.T_\.\32£07.-I H17 *.:'332_B4

- I h ‘__ xi M, 1 nu |\_~:."~~‘.. 3 H‘; ff‘

m..1r" I113.’ 320:?-Q-J’/$9.;/‘.5. \ ' b13221 ,' ___.»-.;:.»-*

:5\,»—

,_ - ___ ,_.__ __':\ \ '“ . I --" ‘I--Ii"-F ' _.'-'---H-F ---"P ‘lm-"' -,

1- _' - I I "-5 _'-1""-FF - 4"'- ._-r"'- --""-F "_\ .- .- - - -hid _--" _ ,-- '_--F ‘" \ ‘ _ ‘Iv, ___-v-" I TL I-H-" ___‘:-II-___r— - _-

' . _-'-"'-F-F:--F-F-p~¢-"- -4“.-

T5i --~ ~ .- ..*- ~ “ \ ‘-‘¢../ xx ,\_-i, __.“? .-I. - I ..--»_‘ I‘. ___,_+ --___-n'-m--_ ___-' ..-I“II‘:3’

H:n.._, _ ,,_ in _ 4"-~..'~+-_ .._..--.~iI-

' - ‘ -7-P.r- of‘I-.’_.

._|I-vi-i.Z|._¢-|- —-.-II, _..-- i,,.|,_|-o--| ___ ___ _ .L~'_‘----+-

_ . _|‘ _i-—- --\¢_~_. ---L.

W 1- -l- --‘H. I?" "- I‘ -'-I--- H -"1- _.--

Hi II .--'__.

_J

-. _ ‘—-—-. -—--I ..- ___ -"i " 1"’:-.___ _ .1. __.. __u___---'----4-1.--P" I ‘,1-I-I-'

_ I _l,--In.‘

l.'I‘I_# _ J. . _

\If

./(E./-23 /,4 f, '1-._~h

1 $'25'*"/;~\ _-./1' I -f

\. _ ..... . /x ' I.1 ___

-'1- --.

__.-' If Ia _ . |‘H "\ -. '~.__ “'1 P’ ' "In |

-~ --.

..-";-u

1I-.4 .

I

uL‘r"‘_.

/0/0 .»;'

F"

3.-.»Q-x,1Id‘' -

‘fl

-“-

I -‘ _. I» I,

ifl r I

I: __.--'

n. _—

ii"-

. ' I‘._ . .____-

-1. '4P—

H In._ \__-"1. . -Q“.

- I-.

-\.

It I - 5 ... 1" . .. 1- __. _-

' \ - , -‘+,_ I _- .1 I.-.. I-___ "' I --1 -. ‘ I l_,-___ I.-\-I\qI' I.‘

. | ._ ~

1- _ _.

_ ‘——-—-

-\.-.-.- —-—-: ._-....___ _ , Legend._:;|,-LII

9; 50 . Po . so 100 Meters ,I‘»'B@mdaWWfl"-|-*1 -1‘

4 _ _ _ ' — H ' - _

TITLE -

.~,,.ii-H41$1112 |lf_’w=::~(') mrrlfimzufiiaci ' DATE 1993

for Anderson Road Development Sites L we--=

ii 1 i CES(AS1A)I_1MITE.D

Fanny Lap: L

-I-"'-If-‘I I

-. X -I

ProposedNoise Ivfitigation Measures C210 Q‘ L _Figure 1.6

In-

I.1

Page 77: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

--E

LII-|--j‘

-I-.

5

3.1...-\_

L--1-II"

..~._.\_

-1-1-|lI"'

.-.-|-.,

.1-..,--=

.-L-5

I....-P

-|--In

--'\-I‘

-.|-.|-1|,-5H---III‘

F-3

__| 1 --.‘ hi '1'-'| . \\. . ,. .._; ‘.1. Jr - . 5“ la

. "II;-P"! /I. I | '

/'1 ‘X’!¢¢¢¢ // I %aN / ‘X '/I // ’/ \‘\ /I '\ J’ - """'-----. "*"--.::_::=h """"‘--:::>-

1"’ ..-4* K / \/ \\ K. <1“, 'r_r""

. - 1' - _ - . _ ; ,/ HR ,,,,,,/"'//J____.--'”“ I \\ ~ fr - N . ‘ E . X,’ - ‘ _ \k_ '!>' I if _ -.»— .. - . ' _ . .1-._ - .-.-- __/» __,...--"" _,,/“ 3 _ -- ;@ __;_.......--_~:_;__E T_ _ _,1__,_;f _ ‘=- >3’ I I /_ . I .1

/,/ (§\E -' ,» H\\&f,H~#"f?%y~*; 1Q% X _‘T%é?§i! f A f I/{J . .r"H \ ._\ \ . i}* “*4? F 1% ' -¢— .V \ I 1‘-H

“-~..____MhH R‘ I"“'--.

5 Ҥ:_:::_::-*1.

Q) 31 ;;; 1; {Tfl; , -41$ . !I-E //,/" J _J____ f :1 _________,,. A/,..---.._, '"“‘*- -

E I/N "1 "‘ W“ S1 K‘/I I /fr’! / | i

I \-~ \ \: H W H 5“\ % Q “”“ ,Wi~'"- /</O <~ J fa A-M /" __ -—— - '" ‘ " '- - F‘ I -1-’-L“-1"! 3m mu gouugmy wit?A (\\ Q """:; _ ____+_m {LENGTH sum: Q

~.._ E \@—§§’l[;8/’/fx

//kfl ”F‘ <0“ ‘1% ; ~ “Q\\%/“@w@T/%lD@“W“N

~ N’ Li! F 1' W Q.»-' i"';~;<.*="i..1-/'.""' \ \""’"""' * W , H“% \ l E T <\ fL:\<§ “X ? \\ i 4+ f4, /ll ‘x J fl .

6 __) X/I/I _ \ xx _ xx H I j 1"fi77#( - -.;___ ' Iix

’, / _/i /gm .. . . \ 3 L’ O W I »/ /I /3 \ “ \.-. 1 _,,..»--‘ --'"""‘"j . M M _ i I% /~ mm N -~ / %.£\\ \R -/' -/' ,,-/>‘#N//O‘ 1 P15 Y? ‘"~\7 /~ / / =-~\P@\\ EWL \‘~ \ /

_ 1 . ' . , - ./ ‘\§‘:-"iii 1‘ r ' _ ' } /\ \ / / Q -- /"' / M./’, T \,_ x_,,,/\__\\\ . __7 I; /' / . -E I,. -~ E‘\ "3 \/ / * ‘Iv ’/t lg it L. .1 Cjf»-l\1 X E Q7 $1 / //I 0 10 X 20 ‘ 30 ',5 ’>~"‘» _ \\ ' 4'1-’L,/,,f” / » 4' "‘~1’->- 9% N ‘-~W 1 1-“. I D ' N

/’ -" - ~ \ \/. - -'"' /" ‘* \?\‘\ N / // HETRE5’//\\ \ \ \ / /I/ P7\ a\ LX.\*@J_LJ N N / . ' O ' N I’ i1“~Aiv@m‘\X ,4//E3 '/ \

~. - ‘*' '

l ' .// { /) /\ l ' i\\ :8/\ 7'... \<(€// /.4 E/\:‘~> “""" ...»--'"."-.""-'-"".‘l-'\ .» O ’ y . 5 K ._ ncfsrcu :EE5¢R1P1r:H| U _§-L: om: mm:-wcu !Eu_l!flE!I_l|'uuuuun:u_ _ __ *___ ___ an _n=.1:~ 'r:=.n:-.-.rc UNI. EPIEKEFIIF IP!flTINT.|'l*$ "um

in ussociui_ion' with _ E E E O f§; jE -' E E 1 ==1=~=m=<:-'s=~:|:> ~o|se ‘»m<=»wc~~ E E“‘“° iii? * "I _ .... 2 Oum E _ MEASURES FOR e~vER$<>~ E 'CES N ‘ 9°” '?E"'5L°"‘"'s?"T 5'“? SHEET1OF5 F'g""“‘-'3

' a -.

__._€v/

K\Ԥ\\\E\\\ ' __\R\<>\\~

\§£M~&\\l gy\ WA:‘““*-~\ 760/~\\14»

HQgs///[Hiu//j?/4§;f,/K/4%

~_..___ "\_\_

A\\%A 2”\ (AX &§{>Ax//F,

<.»~‘-*‘Y/€a\

“L Yi \if //I

4‘ t““-\.___‘_~

a./'. "”“‘*~;-

r--F

/ K~=~ I7-E?11?

1’; 5’?! X/" T

:' ff I L-""'*-- ‘I ""\\H//fir ; 1é—‘ ___.--* gr’ -""-.\ 13Q\Y '‘<5

J7. >3“~I/6%‘I

‘I-QH //'EO

Q/‘gr/;z51¢/E/\‘53‘-~;\OE” W D_B,\\LIL{FLO ~~:>>mi\ ;§/Y1]/\}FIE/N/-O ‘I?[,\h/

”/7_U___C).\.I-1:,-,_

\‘1__,{_J_/_~.““:/kL>%$%E1 ""-/1?r77/\-jQON?Q4;/#2“““:-'"O I\/;*

\i““;;53.“\\“--I6

k_i A‘I\_’7 >§\\\1;3/‘;/

/_ -—-__.--‘.- -—-.._--1-__—-h--.._—-_

—'=-___i

_'Iu___1.V_-IF““=-— _---—

//‘\-ff

'“'\\

\%/Z at

\§g I2/

M/ Z<;x.2;;

\//

~¢%,\E\ 5%?/ _/*\

\€//\\[gs\\~ >\

H ~\FU

/.Y{,\&"~..»\LF

"1a ‘L~"'f'\‘FI'll

\

1-"'

1- * I

| --

Page 78: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

_!\KQ%_\/HXIf%__“_H_Mx1 ___\/H__i

_ ,,,,,,,I! _\X,L___“__“___MWX_ ’//fwS

F Empg_ ?_Vfly/WK/EV%_m%WMM§N@§mM%W%

HIfDI!/I_

llll} % /E\If__f__ _ J!__;_//I(EV\

4%_R%I X\/if,O\_/xi\2/ M% iH

llllllIfk‘WI __ M5___ 9_/_W

_ _If/lEH _h_ I/___ __| H

Z_d_

%%Mo$1/p

ihf__fi1I/ml_\\§>lllllllliiiiiiiiiiiii¢*_Qfifigfi/W/fi AA__ V ;;fI_1\WHUfivhyvwwv/fxxgywii\? gggiii ‘

d \\Qm_WHY 1RB/mg\\\___mV//¢/4/ISmf f;_J_J_I_j,_k if/I _

ff__\///I_ _X “M%

_k__\%_ _ _ F;%*___&f_i\HX\~W/Q\it; %UVfwf\\nWUmS> J%QN\/O

L

Rm__1__{_f_|I___l__’_f_r_J__|_r'____'_I__€_\|__ :'!,r’__H__#‘EMUml

_ ____ _"_m__|

___ ___MHm_ __H_“_U

2

___

_____

x _ _j _m

M

f’f\,,,,{wt\?\ fl$:fl ¥I_“____ _n__“_______F_’|__ ___?

X\Lg V?@__EE

_ if//I_mm____“__T! _ I _ __|“ _|_ __!_| IIiI _m“__AL‘_“_(___:_'_{_____iii“__\___L|___1 \ r

\‘%#fl__L LXS!l1|___ __|_|______l_|V._:|_|-__________|____i_1|.___|___fig‘_ if____\\y\_x______ E4iv

\__fr‘,/’“m__H__mii_|_ _jS_ ___gm

____n_“_b_’/L___'\__ I‘_ _M“__M:_m_m_

X__L_/\‘miH_ _I

\\PMTiI F‘_msL _ imm_‘ _\\//5®1fiI E MW‘?L~ E

iligqlhfi}?_ i>XflA§Vfmh§j_%m;_ WJ_!!:wi'%%:1 ;%

_X_ _____’;;%__M‘NH_ //If/_MA IKAk_?\fXf%1lL__%_%XJA?= %\X\KfiX%f;J %% ¢AA iJyf%w} _i

___“

_ 3mg

’_

Wm

§\/_' 7'HREE

_ %% _$%,LMXj@GMT; %*

iiigYWBW6? __\_r_ J4m|An_w_’$_W0%_ A_Mk‘if____“h_Xixii///_

N__"\MI_LH_}W*//_XK/II _¥____f_lMIff;+% __ \_\%/%‘ %/%\\\ix8///N

_I

MM“____"_“m__

_I\A\R_ Myé___"

xi%XM% ‘N/FMmu4

____

W

__um

___m___

EMFJm

‘___f

Bfm

5F

_O

2_HEHS

%NE_HO_HMES"Mm“NEEMBmwONFW“mamR

MUwfimRWRP_

___

_ inUflu‘U_“__h_

__ %%2O0/_ %M__\h__L1¥;H/Q_%/J,

_>9MLL/SET\_PIf‘kt

M<{EmmytQ/II;M3 ¢\Aw/\%//%\!_w\ w¥'__J_/ \\\\3%K/V_fi\/#\,//IffffIf_ % ? _

iii_ %‘O/‘M_ _%A76 M//V//WV% /\\\\|

?>‘___,’%?Hif?“/_%é_#_/I _/I_ x__ /I___‘

“___/I;____I;I/fl,I_____/_\

___ ‘Eff,’____ _I_______ __ _I

__;_f____f;PA//IfMyI M$\/\H

-_IifI/UL % _\S_/Hf//_% %M/TM;

_ ff!’/X

_¢q__§_4;F99$95S955B559935EEEgg3E555EEE%E3

I/\/mwvyA//W

% If//]\\5N /V \&//3_ _ /Ii///I//‘\\\J_\nVi//M:/‘\//_/xx____ I/xi:/;,f_*i

/flAUMW\\3/MJ//XifI/I//I///I

/_

B

Page 79: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

LU\.U‘\.!I‘kl!‘k!1‘@.I‘k!J*klfik!a*\!J‘\la‘&i§\U\iJ\i)il)lIJ\IJ\!Jll)lU'.UlDlUW'U'UJ

E;

:11-II’

"1':{»'.\"_!-@4--\.‘_!-*".~!.-4“

:-

*4»~\i

. /I

1'

-I

41”“

/\ gfi

T

+

I/'

IF

I

‘“// L1iy//H4

I,r .Ki“>* /

/\

\/#.__ '1 .\-

\ .--"'. ' . 1'- .-P

""""/

Q

III-""-IF

\|.|-II'l"""'-i\-

\

.---"""""fl-I,-1"",

.-1"’

._ —', ' . I - x \.\-.\‘\\;i*_iia0\x1 Fr",

‘P _ \ _ QR‘ ‘H

“\.\_~_,<;[email protected] Mmfflfifl:

.-'-'

/"'

\32~{\\;1‘

KI

1

1‘. 1‘if’

--|Lflj"'..P-qixl'\

11‘:

"»--"""" _

I (In

‘\-x‘

1‘ E ‘

"“"i"‘Ex

If

\<:>2:”1E

N...-5*u-I"""

§\\F

"~.{'ji\Q

6//% i

/ 1 / '4 »

;-"""'1.-k

\‘\_\\

rw

¢ / H8//¢ V V? V H5 V/T-*3///éhfl > - L V V T?

,g%@@[/-5§*’”‘\ f§// E "M5 "fjix/fi O~ ¢\%g@@Hj,,..::_"':,#,/*'"" . ‘ ‘ - 5"“ _ ff?

..-—-"""" I -_ Pu A‘ O \/rap-1" H1/F /F7“

\\ é/i

..-»-'3¥lX.

..‘L:-1.‘\-JK?a

\\\\\f"""1-5.-’-J1-‘Y3;\

E

~L__;'uI“\‘\:'‘E_

qvto\ ‘*5??‘a\i

-H H1%‘1%

‘x"‘~\

RH‘‘iv 4‘~11

--...-1:.

..-'-"""1__,.;

(LI

E

L,°”'I/"'-

“D

E

J

- -,.-I-4"‘-'|r- r '.- ______,. J -" -'%.__ "" ‘‘I ,_......_---- - -:- -_-,_.__"________£ ||“'-.,h.,H 5

_,,,...|--II""""""""“-I ____ I -. l, H

“M.

r”“~1.._"'\ .1;‘___;-__,~\.C3 *3?»

J‘

1C3‘ 0)‘_ 01

‘J.‘I. ' .- :

r..--

"I.

__,,..nI""''JflgJ€F U,,W ____-_-;_— --—'—-—— - =--____:_ _ ""‘---.._“ . “MM Ii ' If

"""'."'H ,_...- ---""'::__,_...---"""""""'-I-W \1 fl_-h“~“"“"-- “H‘“"“*~';-..___ NR‘ E: ' .F I-l""“. _.\~§"u\._.‘.\‘-‘:: "E Jr

..»- -"‘"" H Q \ T\”‘\‘\“\ If {i ____...--—-"" _,,,,_.4,.-.-=1==*"-»-""'"' "1 \ . '5 ' ' ,1’ f/I .

| ‘ \'\ 4'.. L I - ‘ - .-I)3 4--' \ =

I \--

---""'

r"'"'..----'i"" ...--""""zL Mr‘ I ._1i/A I Tw’ .-fiiigqxx \ *1 ‘K385

"V: \ Q i\\.-<=;-‘>~'"' ' 1K‘ _ 1 1 ® \ / Q ‘ ? L 1 H. I .

///,..,.

L _//A,0 1/}"'"

. ‘I \

. x KI‘ -:.r- . - x

N.

//\/""_“"‘“"-

/Lv*

““*-.

"""\-

\\7/"":;"/' ‘\:'f“\

mi

--“\x’

\}I§>\ A/W\“ Q0 \§\

Maunsel|n ossocnutlon withUr |s£2I LOU1

/I/{MW/%'/WLEO /11$ (“J WP...) / 1\I -‘ $1’/»

Wffiigjfl V/*’\~, w~,\‘/\/*

/E/1% g"“"3 H1;

AL 1 wf 4 Q»/ ” -kf

‘L!. 1

\E”1'

-iii

.'.-1-‘

6 T“> \;~»

|-

4/"\.\/5 1:.

/ 1r\L<.§

.l"I .iii;//__f_'

/J

P-E‘!!!-‘ISH II!!!-iP,f1lUIl _ " B1’ DATE

_ l l '5 D ' ___ _ D E A I \_:|:. u — [I IL " — 1+ F — % % % MEASURES FOR mosnsou ?—i V Dllfll -... A F" i.-.__| 1__'-- -__ r_—_--_1,......... —1-_,.-_ ~ x _ __—| --_- .---_-_.- - - 3 3 5 cm REF" r|\i::|';j::||:i4Ii?'.qn\l‘a\ 1-1'5 II

»~\»-/L1 ’.__,...- /\ J’ 'a\\__ / ?

—~ :1-U?\ KY‘/{H14 ‘Q’--'"1.J/‘J £10 ,,.1\ " \¢‘L'( “'"""”“"‘ x . T ‘___,-,.'a' A H ,.‘_-'Q\_ , J /x

/W5 I ,_,,..-J‘Z\:> A53 ~®"b" -»"*1 *1 H19

1. , / ,.-—~*"""'MH _ . -1,.J"‘~ C /,. 1/_ .@\!3r @ Avg V/%%_ff G T . ,3 mi“/Ayt‘:

/~"g?5N7‘ iv¥:§%\*T“?~\ -""'”" X V

"0 T fir§/ WT?‘EWKN. 1*" (‘W =5 ' V‘ i . ' . " ..-? If 1/"

Q’; . it ' /{/ - ‘..-». . _ . Lfi"IA.-1+ fr . /’ X , / 1,! I :

“-~. “#f _/f ///if/,\ ' §“:1 I 0 mg P 20 so

1.41.0-4?r-=§/%\1\\\““

\ /“§K%RMy \‘\

.H_____\H

K.1-\ R-am‘-“wk

~...__‘__‘_‘\hb~“"-~\~.¢\§7l*5“""*:1“Y?“§

. ~ IL

memes \ F/

/' ,/I

\ . . /’ . I-I q I , ;. _ _ X I - .» Ix‘

r"""'=. . 9», -. . .... . Fifi L X ‘fr ' \\ ' + _

H -=1 =*=~ Pmllic Am ENGNIERNG FEASBLIIY sruov ml: m:mn|:m.|-ma mm ». . rm otvsnomur 11, nncresou Rom M ~£m 'PROPOSED NOISE HITGATION W '“° -" "

Page 80: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

__5__~qQQ5QQSQQ5

S5

@__fi9RdB

Q5

QE

E5

Q3%Q

QMEdRdadHg

_l________

__H‘__~P

_+_________I_____h__‘

__1'

I__.._’

________-_"

___‘h{_h__v__

__________

____I___i|_

IIIII__|___I:|_||||__|I___________

wajgm_Eas

QEBEM%gmaQHao_®>®QQ8“fighe%m%%

i/Q 6"§fl___Mfi3

‘ VW é Q

“___E A ’

I

'

_AI.VAE_H€£_~_

I_II

II‘I

QI

__

/__W___avg_HwW#

_®F

AP

1__|I‘_

IfIIfir___:ll‘\||______

|I_____I|‘l||Ir_

__

_II‘I

_lllulhll_I

III_

_____

I__r|__

F

_HI|_I_____

_Jr__‘I'll-ll

III

||‘____llI

Irll’

_‘Fl ‘ll_

IIIIll-II___

_IFll!JF___‘Ill

llrll-Fl_1|!

IJ-F_

‘IF!lift_I‘Ir-II

__

_ H‘

____

I_

_‘_I_‘

W_

\-\

I

_f\\

b“

%

%2

/1__-f

___

MW:DEEgigfigml%_

k‘AV‘

giMi

_£oE®2_w| m

gfisfivé’Ampg”;gumwgzgflozgg

HEOEm“W

Q Q

___? ”U

%E_FA

/__

%JJJWHU_W

V

GQif_/I

Page 81: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

____

___

___I1

m___DH*H_§??1

IifikgmM%

_xiiM

_‘%I

_

gag%_VV£OmH_®®fi_m|%?m

flow_

mg_E28

d__E@__%gmH__§&o_®>®QgoM_8E%_H<H£m_+_

@§§2§U??MFqgzgawfifiozgémHEDEM“

____.\___Ihi?_//_4

_

gmwfi€_g_m__)_(__V_gm:8H? _O%

*V_

V8_/

wgmfi____

__H\hm““i1MW_MiimWV____%

_||_‘ll‘IrI‘.

an%

win

£ ¢

4\

Q0

\§ _dd’§4i

R figxfiE%¢1?_-

_ Efi_

RR X 3 IQg8E__J_Baum%Q_TVA?$1!“MHFMWF

V?VN??N

fluIV_

VPVwk_

____

____*_____;__$1;;_;5___§§@9§3§§@3;U333

Page 82: Contract No. CV/2007/03 - Environmental Protection Department · Contract No. CV/2007/03 Development at Anderson Road – Site Formation and Associated Infrastructure Works China

‘Z-

'liJ'lil»‘lIJVLV:)‘L:JL:JL:>‘¢££¢z»‘<z»*<:»‘.¢z)w'-.2»-we

‘K.

<1)all.-I."I“~_‘L

-I

'IE1V’Li.-

‘ID"I""\|__-‘H J

E5E_=V>V_V-1-—-nu-51:15__.._....L1__.,l_I-"'l\_'?'

l_lV-*1.-1"‘

.| I1-.-— 1'

I-1-..

ll}!"~\_V_,

-___- 1-1.;

V_‘-.»-"

___‘-... H

'-1:‘

ll .

+

iE

Q \®) VVVVVV VVV R6II]E11'kS 71nHighCant11everedN01seBa1rier" means V6mVm1ca1 Ba1nervath141i1Ca1_11j1everI.ength at -

H V .

.1-|-

|-

EEV$5!-

/§ P VD V V V / V I‘ V’ ~

“ V V L f;_I-_;; V #'____,..-"V

E6Eli

wx

:.---3)"V'VVVVV' _‘ /4\V‘ ,M 6)

a€UljCVCF T T V '\:\

§\

\n""-A V

_ . J

J

% zV l

V15

{V\4

1- _ l|I r

V 7

\V glllfi/} q H V *H - % . - V % 45 Degee to the i VV A_ . E .;= V V 1 /1%)

R

/§ WT 1 ‘_ V - I - /E/\/7mHigh,Canti1eve1'edN0ise '

? _l V % V % _ "Q Reprovisi0n0f7mI-fighCanfi1eve;redNoiseBa11ia'byI-figl1wayDepmi

Lewd -Bame1'byHc>11smgI)epmtme:1t

-.

C TlTI_E . V V _ V VV % CE5(A$IV.A)1IMITEDI

11551345-|3V ‘ - nmwmsno;§ Fannylau

E? P1Up0S®dNoiseMifig3fionMeasm*esfmPoI.amR0ad V VVVVVVVVVVVVVVVVVVVVVW C210 VVVVVVV @5611-1993i_ FVig_11rq 1.30

i ... -! -

_L —-