Contracting with WYDOT

The basics to become Pre-qualified with WYDOT for Highway Projects

Bidding Capacity based on:

◦ Financial Worth

◦ Work Under Contract

◦ Equipment

◦ Contractor Performance Rating

WYDOT Pre-Qualification System

All persons, firms, co-partnerships, or corporations proposing to bid on any Wyoming Department of Transportation (WYDOT) construction project must first submit a statement, under oath, on a Prequalification Questionnaire (Form PQ-2) available through the Wyoming Department of Transportation.

WYDOT Pre-Qualification System

On the application you need to indicate the Applicant's financial ability, the adequacy of its equipment, organization, and past experience, and include any pertinent information necessary to accurately assess the Applicant's status.

Contractors wanting to subcontract do not have to be prequalified.

WYDOT Pre-Qualification System

Prequalification will encompass a 15 month period from the date of the Applicant’s fiscal year end. Out of date financial reports will not be considered as part of the Prequalification statement, thus rendering it incomplete.

WYDOT Pre-Qualification System

The Prequalification Form once approved does not approve a contractor to bid on projects (building) let through the WYDOT Procurement office or the WYDOT Engineering Services office.

That process will be covered later.

WYDOT Pre-Qualification System

Prequalification may be denied or revoked if the applicant:

 A) Is declared in default while qualified in accordance with the applicable provisions of any contract issued by WYDOT.

B) Has been determined to have made false, deceptive, or fraudulent statements during the prequalification process.

C) Has been and is currently under debarment or restricted from bidding by another government agency because of criminal acts or serious breach of contract.

WYDOT Pre-Qualification System

D) Has been disqualified for substantial reasons by another governmental agency.

E) Has attempted to or has influenced WYDOT policy through gratuities or gifts to, or by employing WYDOT personnel.

F) Has, while qualified, demonstrated an inability to meet WYDOT requirements for specifications and contracts.

WYDOT Pre-Qualification System

Upon receipt of the Prequalification Questionnaire, the Prequalification Officer examines and verifies the information submitted.

Incomplete forms will be returned to the Contractor.

Applications may take up to two weeks once all required information has been received.

WYDOT’s Process

A decision regarding the applicant’s prequalification and rating including the type of work classification is made after all information has been received.

The WYDOT Prequalification Officer will notify the Contractor of their application status.

WYDOT’s Process

The Applicant's previous and present job performance will be evaluated by using the WYDOT’s contractor performance evaluation system to determine the current prequalification rating.

Work performed by subcontractors is reflected in the Contractor's performance evaluation.

WYDOT’s Process

If approved by the Prequalification Officer, an additional 90 day extension may be granted if the Applicant plans to revise its fiscal year.

Contact the Pre-Qualification Office to see if

you qualify for an extension.

WYDOT’s Process

WYDOT will issue a joint venture proposal envelope to prequalified applicants upon request.

For more information about forming a joint venture, please contact the prequalification office at 307-777-4056

Joint Ventures

Prequalification for AML work will cover all aspect of the prequalification. The PQ-2 has to be filed with WYDOT.

AML representatives will determine if a contractor’s prequalification amount can be changed to perform the work financially.

Many Cities, Towns and Counties use the WYDOT Pre-qualification list.

AML & Other Entities use the WYDOT Pre-Qualification System

The Applicant requesting a Proposal Envelope will be required to submit a Current Work Affidavit (Form E-103) and indicate the total dollar value of all work under contract or subcontract regardless of the contracting agency.

The current prequalification will be determined by subtracting the current work remaining to be completed from the Applicant's maximum prequalification rating.

WYDOT Bid Envelopes

In order to bid on a WYDOT Highway project, a contractor’s prequalification can not expire before the bid letting.

Example: A pre-qualification expiring on March 31,

2014 the contractor will not be allowed to bid in April.

WYDOT Bid Envelopes

Direct questionnaires, correspondence, and questions regarding highway contractor prequalification to:

  Jim Messer Prequalification Officer Construction Program 5300 Bishop Boulevard Cheyenne, WY 82009-3340 (307)777-4056

Contact Information

http://www.dot.state.wy.us/home/business_with_wydot/pre_qualification.default.html

Will find information and forms to submit a pre-qualification for Highway & Purchasing projects.

List of Pre-Qualified Contractors

Web Links

??

Questions?

You do not have to be Pre-Qualified to be a Sub-Contractor or Supplier.

Subcontracts are submitted by the Prime Contractor using Form E-59.

All Subcontracts need to be approved by the WYDOT State Construction Engineer’s office

Important things to know about WYDOT Highway Contracts

WTDOT requires Prime Contractors to pay their subcontractors to be paid promptly after payment.

The subcontractor is required to fill out a Certification of Subcontract Payments (Form E-139) indicating the subcontractors receipt of payment.

Prompt Payments to Subcontractors

Can be found at:http://ipd.dot.state.wy.us/IPD/

The letter “B” indicates that that company has been issued a bid envelope.

Planholders List

Contact Russ Howe @ 307-777-4053

Web Information:http://www.dot.state.wy.us/home/business_with_wydot/contractors/subcontracts.html

Subcontract Information

???

Subcontract Questions

2010 Standard Specifications for Road and Bridge Construction.

Book contains 8 Divisions◦ Division 100- General Provisions◦ Division 200 – Earthwork◦ Division 300 - Aggregate Materials◦ Division 400 – Pavements◦ Division 500 – Structures◦ Division 600 – Miscellaneous Construction◦ Division 700 – Traffic Control & Roadway Lighting◦ Division 800 - Materials

Specifications for Highway Work

Changes to the book since it was printed are called Supplemental Specifications.

Specifications that are unique to the project are Special Provisions.

Specifications Continued

1. Contract Amendments

2. Addenda

3. Contract (Form E-82A)

4. Department Obtained Agreements

5. Proposal (Form E-91)

6. Special Provisions

What Governs?

7. Supplementary Documents

8. Plans

9. Supplementary Specifications

10. Standard Plans

11. Standard Specifications

12. Electronic CADD Files

What Governs continued?

Against WYDOT - Must be filed through the Prime Contractor.

Against the Prime Contractor – If an issue involving payment by the contractor to a subcontractor becomes the subject of dispute, the party (contractor or subcontractor) raising the dispute is responsible for promptly submitting a written description of the dispute to the engineer. State clearly who the dispute is between, the reason for the dispute, the dollar amount involved, and other pertinent information.

Disputes

Andy Long, State Construction Engineer 307-777-4425

Printed Copies Available through Financial Services. (307)777-4435

Web Information:http://www.dot.state.wy.us/home/engineering_technical_programs/manuals_publications/2010_Standard_Specifications.html

Specification Information

Electronic Copy of the 2010 Standard Specifications.

Copies of all current Supplemental Specifications.

What you will find:

Questions?

Thank You!

The End